AL-Mansour Engineering Co.

/ Al-Mansour City Project

PORED PILES DAILY REPORT

Report No.:
Date:
Employe Al-Mansour Co.
Piling Contractor: Al-Yamama Engineering Co.

Building No.
Pile Diameter (m): 1.2
Cut-off Level: -1
Steel Reinforcement Level: -0.2

Boring Reinforcement Concrete Casting M


Concrete Note
Casting Casting Boring quantity m3
Pile No. Start Finish Start Finish start finish Depth

Level STEEL Reinforcement


Pile No. B.M B.S F.S Difference Level Boring Depth (m) Note
Survey Engineer Site Engineer Project Manager