Topic Summary

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Topic Brief about topic

At a time when the world was grappling with unprecedented health and logistical crises during Covid-19,
Flare header and flare tip replacement Mumbai Refinery undertook the task of - the replacement of flare headers and flare tips. What made this
with scan climber endeavor truly remarkable was the incorporation of advanced technologies such as scan climbers, cold
cutting machines, and drone monitoring.
Challenges Overcome - Success Stories 1. In this presentation, we delve into an advanced procedure for removal of tube stubs from boiler drums.,
1. Advanced tube stub removal offering efficiency, precision, and safety that were previously unattainable.
procedure from boiler drums 2.The operation of cutting and removing a towering structure from a running unit presents a multitude of
2. FR-APS Tower cold cutting and challenges. This success story outlines how innovative techniques and technologies were employed to
removal from running unit safely and effectively dismantle the FR-APS Tower.
3. FRE Lift cold cutting and removal 3. Cold cutting and removing a component from a running unit is no small feat. In this story, we explore a
from running unit remarkable achievement where this intricate task was successfully accomplished.
4. Design improvement in DHT CT Hot 4. This presentation details a design improvement that enhanced the reliability of the DHT CT hot basin
basin Nozzle for reliability nozzle. Such innovations are vital in ensuring the smooth and dependable operation of industrial systems.
improvement
Improvement Measures:
1. Integrated Comprehensive Corrosion
Protection Program using HPGRDC
Chemicals at MR
2. Reliability Improvements at NFCCU
MR - Fractionator shell leak

Concerted efforts for MS maximisation

Systematic approach to optimize DIU


Operation

You might also like