Cover Comers Common Cam Screen: W-600mm X 260mm

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

S/N Descrlption Qty

1 Sltoca Server Rack 450


Nos
Upgraded Enclosure 19’ H-48U X W-600mm x D-1260mm
Complete with
-
• T op base and mam frame structure Load tested to
1800kg SWL
• Top cover c/w 4 x 200*100mm cable entry with brush at
4 comers
• Rear Bi-fold (double) Honeycomb door c/w swing
handle & common lockset
• lx quick release side panel c/w cam lock & 2 keys, end
of row rack with both side
• 2 pairs panel mount c/w silk screen U indicator -
800mm apart
• 6 x Horizontal cable tray Right for PDU & left for cable
• Front structure with cover and cutout for can locking
• 3 x Earthing cable kit tied to door
• Front 4 side to be metal air seal
• Finish power coated black (FF160/78005/ST4N)
Delivery
6th week deliver 100 racks
8'h week deliver 100 racks
10th week deliver 100 racks
12w weeks deliver 150 racks
2 Hot Aisle Containment Work (for 12 corridors) 1 lot
To supply & install 6pcs of 1 2mm thick electro galvanized filler
panel c/w selected powder coat finishes inline with racks
Size L609 D50 H2300 mm
To supply & install 24 sets of sliding semi auto track system in
aluminium frame, sliding door viewing panel in 8mm thick
tempered clear transparent panel @ above 3mm thick
aluminium sheet @ bottom c/w 1 2mm thick electro galvanized
sheet framework panels in selected white powder coat finish
Overall size 2500 x 2435 mm ht
To supply & Install 228nos of 75Ht x 1200L mohair brush at
2300mm ht c/w aluminium channel in powder coated finish
To supply & install 48nos of flip hinges c/w mohair brush at
2330mm ht
To supply & install 353m2 of 1 2mm thick electro galvanized top
hang solid panel c/w 32mm x 32mm x 2 3mm thick SHS cross
bracing, with necessary metal structure hollow frame in selected
powder coat finish
To supply & install 24 sets of aluminium sliding window profile
transparent access panel c/w 3mm thick aluminium sheet insert
mounted above server racks, supported by metal hollow
structure frame in selected powder coated finish
Delivery Schedule upon PO confirmation
6,d week deliver 3 corridor
8^ week deliver 3 corridor
IO1" week deliver 3 corridor
12th week deliver 3 comdor

3 Sltoca Blanking Panel/blocker 9000


Nos
1U Blanking Panel inclusive of installation
conntcc
1O1U1IOM PO« lOMOIlOW

Q23/19102R6/DT

_S/N Description Qty


4 Sltoca Cabinet Shelf 30 Nos
2U metal shelf600-700mm
5 Sitoca Server Rack PDU 904
Nos
PDU. Lock 24*C13+6'C19, 3 phase. 32Awith 6mm2 cable,
C-Form Plug (2m cable)- 50mm gap
6 Cross connect & ODF patch panel 1 lot
Supply and install the following
3x 96 core sm outdoor cable (exclude from MDF to nser to
Datahall)
Direct terminal with LC pigtail 288 nos
48 port panel c/w 24 LC coupler 2 nos
96 port panel c/w 48 LC coupler 2 nos
Inclusive of testing, labelling & Test report
7 Fiber tray & copper ladder 1 lot
Supply and install Cable basket for Fit out A & B
2 x 530m of 450mm x 150mm c/w bracket
Include accessories and Cable Guider drop down to
vr
every rack
Each rack will have 1 Cable Guider from each cable basket
8 CCTV 1 lot
To supply and install 3 sets of 32 Channels 2U 8HDD WizSense
Network Video Recorder (NVR5832-EI)
• Smart H 265+/H 265/Smart H 264+/H 264/MJPEG
decoding format
• Max decoding capability 32 * 1080p@30 fps or 32 *
2MP@30 fps
• Max 384 Mbps incoming/recordmg/outgoing bandwidth.
• Support AcuPick with Max. 16-Channel.
• Support N+M duster.
• Support RaidO/ 1/5/6/10
• Al by recorder 2-channel face detection and
recognition, 4-channel penmeter protection, and 8-
channel SMD Plus
• Al by camera Face detection and recognition, perimeter
protection, SMD Plus, metadata, ANPR, stereo
analysis, heat map, and people counting
• Security baseline 2.3.
To supply 18nos of 8T HDD for NVR (Include 90 days of 24/7
recording storage)
To supply & install all necessary network switches (each network
switch with dual power supplies) for the CCTV System
To supply and install 78nos of 2MP Lite IR Fixed-focal
Dome Network Camera (IPC- HDBW2230E-S-S2)
• 2MP, 1/2 7" CMOS image sensor, low illuminance, high
image definition

Private & Confidential 2


cnnntcc:
lOtunoM job toMOtiow

Q23/19102R6/DT

_ S/N Description Qty


• Outputs 2MP (1920 * 1080) @25/30 fps
• H 265 codec, high compression rate, ultra-tow bit rate
• Built-in IR LED, max IR distance 30 m
• ROI. SMART H 264+/H 265+, flexible coding,
applicable to various bandwidth and storage
environments
• Rotation mode, DWDR. 3D NR, HLC, BLC, digital
watermarking, applicable to vanous monitoring
scenes
• Intelligent detection Intrusion, tripwire
• Abnormality detection Motion detection, video
tampenng, no SD card, SD card full, SO card error,
network disconnected, IP conflict, illegal access, voltage
detection
• Max 256 GB Micro SD card
• 12V DC/PoE power supply
• IP67, IK10 protection
To supply and install cat6 cable for camera (use Gl pipe and
secured trunking)
To supply labour to install and adjust camera
To supply labour to config NVR and adjust camera
To supply and install 2 workstation c/w CPU and LED monitor of
27". cabling and integration works
To supply and install 1 x server rack 19" 48U/600 x 1200 and 2 x
RPDUs to house the CCTV system
To supply and install UPS power for CCTV system (15 minutes
back up time)
9 Office/ Store Room 1 lot
> 2 sets of office desks/ chairs with 4nos of steel filing cabinets
> Wifi to cover data hall, office & store room
> To provide roller blind for office room
10 Portable Crash Cart 2 Nos
(with keyboard and monitor) To deliver to cage
11 Extension Power Cord/ Socket 2 Nos
To deliver to cage
12 Store Shelf 5 Nos
To deliver to store room
13 Store Cabinet with Lock 5 Nos
To deliver to store room
14 Ladder 2 Nos
Fiber glass A frame ladder, 7 steps, 2m
15 Cabinet Label 900
Nos
> Emergency Exit route map and security sign in data hall
> (30 x 80)mm Engraved Black Nameplate with Wording in white

Private & Conhdenlial 3


cnnatczc
lOLUtlONl fO< TOMOMOW

Q23/19102R6/DT

_ S7N Qty
Description
located on top center of rack, front and rear (2 labels per rack)
16 Earthing Cable 900
Nos
To supply and install 2 x 16mmsq earthing cable from IT rack to
building clean earth bar in cable trunking
To supply & install earthing cable from cable basket to building
earthing in cable trunkhng HI
To supply and install green earth to earth bar using 70mmsq
cable and 8 x earth bar
Earth bonding
17 Ino Secured Trunking from data hall to office room + 1no 1 Lot
Secured Trunking from data hall to store room The size of
trunking to be the largest possible dimensions subject to site
survey and should not be less than 150mm x 150mm Including
all relevant building works such as but not limited to wall
Hl
openings, fire stops, etc
18 8 Years Comprehensive Maintenance (CCTV) 1 Lot

Year 1 Inclusive in DLP


Year 2 to Year 8 annual maintenance (Bi-annual a year)
19 Rack Earth Testing 900
Earth Cable Continuity Test HI
20 Handover Report 1 lot

1 1nform Customer the completion of project and provide the


internal acceptance report at least 5 working days earlier than
the formal delivery date
2 Arrange the resources work with Customer local PM to do the
site check according to Customer acceptance checklist within 3
working days
3 After email confirmation and acceptance report sign-off by
Customer, the billing date start
4. CCTV Screenshot Report
5 Rack PDU Test Report
21 Ralt-kit distance adjustment 1
cabinet
Should assist to do the rail-kit adjustment if some cabinets
needed Pnncing per rack on adhoc basis.
22 Preliminaries 1 Lot

Project mgmt, insurance. WSH, As-built drawing, QP


endorsement, BP, FP, RI. FSC, floor protection Engineer
support for heat load test
23 RI Inspection (OPTIONAL) 1 Lot
Review of drawings for FSSD submission
Provide advice to Fire system design
Additional work after drawing submission advice by QP
Additional works and resolutions after RI inspection

Private & Confidential


canatcc
soivTKJNj <ot iomohow

Q23/19102R6/DT

S/N Description Qty


24 Fire Systems and RI Inspection 1 Lot
To design supply and install additional equipment to fulfil RI
Inspections requirements and complete the RI Inspections,
including but not limited to the below
Modifications of equipment floor layout plan to meet fire
inspections requirements
Supply and install of fire exit lights and signs, including the
supply and Install related power sources
Supply and install additional full height panels if fire escape
route changes as requested by QP / RI Inspection
Any modifications or relocations of the installed equipment
by Contractor (for example but not limited to racks, hot aisle
containments, cable trays, etc.)
Engineenng works
Update drawing and zone chart
Testing & commissioning
Fire plan submission works to relevant authonty
Scaffold / Sassors-Lift
Additional work after drawing submission advice by QP are
inclusive
Additional work after RI inspection advice by RI are
inclusive
Additional RI inspection required after is inclusive until RI
inspection is pass
Any other modification works required by RI, except for
pre-action

‘Cost w/// be charged according to additional work done


'Excluding sprinkler and associated works

24 Door Access Control (Dahua) 1 Lot


Fingerprint + Door Access Card System Package
Door Access controller. User Capacity 3.000
> Support card, password, fmgerpnnt unlock and unlock through
their combinations, support unlock by period
> User data can be stored at the access controller
> Ebelco 600lbs Magnetic lock with LED
> Emergency break-glass
> Exit release button
> DC-12V 3Amp power supply with 7AH back-up battery
> Installation of Equipment cabling work and Testing and
Commissioning
> Emid Card Free 10 pcs
> To supply and install u/lz backet for emlock
> To supply and install power point for door access
> To supply and install additional EM lock (two door)
> To supply and install u/lz backet for emlock
Remarks Punch record is limited only to 150,000 and not by
timeline

Piivale & Confidential 5


cnnatEC SoiunoNi foi iochqw

Q23/19102R6/DT

S7N Description I Qty I

Terms and Conditions


1 Validity of quotation 30 days from date of quotation
2 Delivery 16 weeks upon order confirmation
3 Payment term 10% downpayment, 90% after completion, 30 days upon invoice
4. Price quoted in Singapore Dollars and excludes prevailing GST
5 The contract shall consist of supply of equipment and installation Canatec reserve to right to reject the
contract for partial award/work
6 Other requirements and specifications refer to attached RFP related sections
7 Supplier warrants the products are free from detects in parts and factory workmanship for a penod of 12
months from date of delivery to site
8. Canatec Pte Ltd confirms that, for some of the scope of works above, Canatec may need to subcontract
such scope of work to the data center service provider’s nominated subcontractors as required by the data
center service provider and all such costs have been included in this quotation and no extra cost shall be
charged
9 Any alteration and additional works not specified in this offer will be quoted separately and shall only
proceed upon receiving of PO
10. Order cancellation charges 50% of contract award sum
11 The warranty also does not cover the following situations:

• any damage or detects due to mishandling,


• incorrect power supply,
• tamper or alteration, and
• wear and tear

Pr.vaie 8 Confidential e
CW Project

Sub-contractor Contact Ust

S/No. Company Brief scope Contact Person Contact No Email address

1 Sitoca Racks Rick Ng 8388 2112 rlckng@sltoc>-com,?g


Hot aisle containment

2 HT Engrg Cable basket Hao Ren 81117553 ganhao.renl999@gmail.<;orn


Earthing cables

3 Techcom CCTV Mar* Hong 8388 0000 marx@techcgm.<;Q


Door access control

4 Nedcom Fiber optics cabling Maran 9199 4227 marap@ nedcom.corn si


Cross connect & ODF patch panel

Damn
PROJECT MILESTONE - GERAS LEVEL 3 DH FIT-OUT WORK
WEEK 1 2 3 4 S 6 7 8 9 10 11 12 13 14 15 16
DATE 27-Sep 4 -Oct Il-Oct 18-Oct 25-Oct 1-Nov 8 Nov 15-Nov 22-Nov 29-Nov 6- Dec 13-Dec 20- Dec 27-Dec 3-Jan lOian
Document Submission
Client Approval
Procurement & DeAvery
Hot Aisle Containment
IT Rack & PDU
Cable Basket (Full)
CCTV System (Full)
Earth cable and accessories
Cabinet & shelving
Work Desk & Chair
Roller Blind
Installation
HAC Mock Up
HAC Mock Up approval
Hot Aisle Containment
IT Rack & PDU
Cable Basket
CCTV System (Full)
Earth cable and accessories
LEGEND

I wotcwraamaiuw

— i

3 5

— 10800 . _ 1080u 10800 »0W0

I
I
«« 4
*-3

ca
\M

^Mi-m
*—
... «-

,
1— .-
iai-o

H W•
I
o»-«*
|n
ami
t| om-ra on c« J* -a rm AMria
.
-
I

I
pw W 0» ?>«.»¥ }>"■’» >»1-^ F»i j« |x.-«v »»-‘4 R’Wi-’MP •

*f> Jxiui ^tn-wi


I1 oMi-cf j|>
tni oxi >d b»t c® xj
owj-«a> mi mi rai s-Mi-<e pxr-ia> ; i
rw !•
if1 »M1 A0>

Jxixb
PM m> CM

c^
PXl AN PB>-{<M 0301-1» tMi-lM »Wl -M 0301 AM OXi MJl-NM }
’k ,
'
bxt-A®
»1,4 »
SMi »n-TO
jw
gm-m
|w-rn ,
'
oxi
«4 »k:-to |xi-n omi-to
f oxi MarCM ’ ok
ixitf. " omi-t* ox.-at ’ |xi -m
ox>4 ' •*> v* o» V f
,1 om-w pxi-cir bwi t®' oxicr oxi-M’ oxi-w pxi-xcr oxi-jr* iwi i.rc 3» «•? । ' ‘|
1
on t«

4
u>ii|i ew,

J*:
m »» c«
IXl-C^
|xi rx OM1-4 oio.-hX
|»i TO
nw jxi-'M oxi-^4 !»-•«
|>T.-NW
— — 1

:ii (1
SMI Am-TO ANi-CM To DMl-r« «H
DMl OMI
fl OK. «W rW '.H ;

. *•«. l
•j
I
0301 All
m-«.i
»«-C<9
|»i iu
OM. CU
ox><|
0X1 KI
pm. oil
OXl-Vl
^oi-cu
TNl-TIO
Jmitu
DM1 -CU

ox;-t| sxi—u
PX.-jll

sxi-jo
3K>-rc

|xn-«u
IXl-lG >».-•»
sxv*n
f.{•, 11 .
L Wcl-or |»i Ill OX.-tf f’’1111' C»-j^ CXl-t* l»l-c« :
om-aj pa-»ia oi-cij sxt eij om-co osn-cu oxi -o cw-jo dxi-«w sm-os «ro '['


|>r c|> »n: c. |x.WEA cM1<| -.^ —. '—.
6» A!. lit t3d Ml 0»-» ami aw: 1»--
a» a^ o3o os 03O-cis
Join n, n» |ni-<3 .f> |x<>:s
«>«••.» _
soi. »>:•£,« iki- sxi-«» e»cja

ji] DIAl-Ot Ml-Cl* 0X1 Ol M.-C1A SMl 'lt »Xi-C» C>O--nA Mil- JIA D»1 <A »»: c.A )»:--• ’ \|l
1., (Ml Al'
^3Si »1» Mo TOI-113 DX1-C.7 ^M4U >;j OMI
OSOl -lT DMl .1' |»vtlT CXl-L^ tKu-m7

i‘‘ ’
A,
Ii if
^1 num
OM-M
1
DO.Cl
|
|m
smi-oc
Ol ox,
AN'-ciA
DMi-ric

I
nei-cm
I
ixi
»». J.»
3»i-n»

I (
»xi-<.m

I
I
I
;[
7|
j

C .
*
-I
4.

c
• Dim am in o»
?
coo mc Dw.-tio
: :mi-tiA
•: ? i
mo t.» »i hm ixu-jaj mo «m wt-ui
: tm -ms
^•i

‘j
j] •*•-*♦ H H, ia °"‘ (l h" ‘w •*’ *+ >*■••*" 4 i*-*** 0>w’4J :i
'
.■

i
r* »Wl «U PM9-M1 M0I-C41 DW-fil IJIl Ut OWl— >X1 -*? (Ml *
J
| •«) ojsi-m Me: te/ b*j »j omi-wi 7wi ru *2) c»i-*ee iwi a? jet »ej j/ '
3' MO.
-4 • |»-D» AMI
<^3 f» -Kt OW-tjt F»3 MO
<^1 -^4 MCI jj. |*l .*3 |» J
1» AA ' MOi HI Alli es- ’ MO TO DMI-Cr IMl-AM »11 Ml ' SMI 1<S ' AMl-lit ' 1
...,i
!
1M1-MS t» W '
AMI AJ)t m HS DM1-CZ3 UMI AM DIO C2A CMl-rn CM1-M3 MAI-HM eWl-jjA IO"?.
DM! tf |w PSA PMi c|a Jxi Ml
OXl-cf |jo-rr« OMI
C^A ^M. ' Ht’ MAI jf |mi U* OMI-cj* |»-WT -|
; C101AM 3S01-KT 03O-C4’ »30 DM PMl <M 0»i r»» OMi-Ut gn,.^ oxi J’P OMi »Xlx»T IMi-aN '
IM) «n C Ml Sa DMl-UC PMl-ASA OKUM IW'tt SXi-zh PIO TO IX1-TO tx. TO PM. -TO JMi-TO J —I
;l ,
»X1
OMI
"f
All
f»-TO
03010»
»0l-c|»
»•> CM
f»-9M
OMI 11'
030
rf
0X1 13
Smi-TO
CM1-TM
IXl-cfs
OMl-Clo
|w. “30
«301-11
030
OX) jJ.
j|o |»1TO
DX; «X
.f
OMI
PM-.N
jwi-X
PM; «3i
|.‘
r—
' .J
i' P30.-AK Dim-in pxi-cii m »K’ oxi cis ?» r »i ox. cv oxi-nis oxrju ixi-aji
fxi-.n »s>-»3s '. li ,
>|l <m: tp 1« »n fx.-iui
^i- DMI-OM oxi-r|j j» CK oxi-cf* |»~t3 0x1^3 |n m ox^cfs '1
’j OMI-AJA PM 031 m-C,l3 Dili C 3« CXI-rJS OKI CT) PXI-TO 0X1- jM 0M1-<W DX1-L33 OX. -«3« "jf-l
-7| osm-Ais eld >3« rwi-cM p'u o» wm-tr omi-tm ox.-cm moi -to ojoi.ts . c.x><m pm. to omi-to '<i i
0X1*1*
0»-A3’
1*1-033
D3B-11A
0X1
if
0X1 TO
|»l
MClll’
IN OXl-cjt
OMi-tl'
^JU-133
:»■'» _ OX.-cfs
OXi-Mt
}xi -M
DXi-hI’
l«|j|»
OMI-jIt
|vn-TO
Mm-TO
D31l..f |») -M .^ "i
!Al-l* DK.-T"
0301-a|o |n AM I OXl-cj’ jxi-PM 03SI c|c }mi ri' !
AMI
-tf |mitoo OKI-jit (»!-<» m-cf Ix.-RM 1. -
•? J
i


1 • -•

“* * 1 , T - .- -r
LEVEL 3 - DATA HALL ARCHITECTURAL PART PLAN

<M<» hum.
PROPOSED DRAWING
1H.SOAA.WNGIS T^E COPVWGH’ C* i
'TOE ASSOCIATES i»TE iTOWHCse WRITTEN I
L CNS.ENT SHALL « SOUGHT BCECRE W UM .
OHHERWXxXTlONOr THE DRAWWIG OK HAT |
PART THEREO* CAN BE MADE
3 4 5 I
I

KEYPLAN

10800 10300 10800 iodon


-—— —r «J

*-1
_ w i
JO
»» w •a IM C X Mi Utl-4 •Ml U M. »«J •Mi J •Wl-v U' WT

Ml >V >* « 08 »5 >M'C1 r fir-c. JW M «V «»-•<»


'1

i • 0JM-A4 1 *4 MJ 13*1 « ) Ml •01 •W.f j


XI'*
M’-ZC Xi -OJ 3Xl j X)«D rx.-v ) Ml
J‘
M> *••
I
' ..II1
ex -> •Ri-i
1

t
1
’ 1
, )♦
।1
s wa
l»-A
* 5• A


IK'
Ml •W 0M« t-4
i

S

B
X

Ml
cx»
ex.
t:
(i i •
>M| »0»
Mi-rw
0X1 0
CM। ' • >Bi »•» rm X -
B »M
•r AK> k 5 -.
W ^4
) »
IKi > K -t* •Ki-- > V. MB* 1
\r t •Ml* I ixr RM &M1 C
>
X. 0X1- << < * X.’P* M *44 H

i
J ' Ki •cn •Xi-r M> »r PXi t< F
mi rr IMI-& -XI-•«’ OK)

IM. /
«
.
X-<7?
WX-AK
•7?j

#JT-k
'’
l
>>l
IXl •*«■
|-
1
.1 - |W1 M • > in w< 9X1 C< 1 . X) a® 6M d1 «i Hm 1». C
»
• » * • 'to a » * K •Ml x * Ml’I* ' X *CT
*• 4 Ml t Ml W1 axi £■ omj

'll
1
wcj 3;*
»
t J
,1 •Xi • Ml »i» PX4 r mi IJ •w: •( K, ”• ox c n.
Ml -J
•Ml
OKi
- »-«.•
Ml -« II
IXl A
eyr.
Mi
xi»a

l’
1

KI -r •X. c OX* u i
PXJ-A >»f »11 •x< t XI-AI. - - 1
m'f -
I ex- *

Mi r.r bM] r
*
r.i SU oxi r ' OMI G Xi^lZ SWJ t Ki -l?
= }
•• •X«-i. > X T9
1
•MX •
p
'nt CM) C w til ®M;-C Ml C Ml <J OX- X‘
HU* ' --
1
— MCI
*
• x: •jA •Ml < X 1)4 XM' r .ARE* • • OXI •
X<
X
IM-L
CM. L
XI “H
X *19
11
r.5 aw c > WI-H9 x1 CM- - •
J
!
J IO M •Mi C M) •M>€ <0 •CX’t
Ml <1
•• •X" JI I. «*
>7
•aX-

Xi-.
1 X -b
X.-*)
I
'*
A IM) At x;
•’ 0*1 c Ml •c7 •«» tj v I 1
Xl-H^ IX / jr-

Bi <3 IX: । Ml *• I M

L
Mi a XQ KI txvc M< ft OMi C Ml-')* 0X1 C MI--U •Xi • J
< : •1
*

* * Ml III 1 x>-^
•Mi - J XI

TT
-*
IC w * w«um 4
'
f
1 a-
PM) <4 I Ml •'» UM. C. Me OBI C 0 M1fi> OKI Cl X- **■ TxT^ D M) >11 • K; . Ml -MO

4 •Ml * M' IM oxi r 1 ») 0? •Mi ( J Ml ’20 •Xi :■ XVQl ajcj a > <• «30 •M' L 3 >n ’.'IJ
I •Ml M’ MJ M. •M< a Mi •1/ 0») c< ? yti^r •Mi-d xt •Ki *3 t Ml »•■ fw-l i m mz

1 IX) *4 1


J* PiZ OMJ < p ; Ml W) rr« -c Ml 'ir OMI G Ki Hl 3 1X1 J )
*
K.-U? •K’ - ? X -*d)

i
.4 IXl * »
* VI axi c j • W U4 OXi-f M
* m-rt^ CWi-G 1 -a Kl"2‘ •Xi . • w X— 29 •X)- 1 - X4-MM

;i CMi
* s • Nj W* oxi a Xi an 0X1 t
, • 000) i XI
•B. J Xi «34 IX1H. 4 * XI •« 1
vt
•mi a. E Ml Mi •Xi c 5
4
Xj oxi <
*
m-c» OX. G. l^'*M
•Xi> 4 X; <n 3XI-U *
:
X hH
i
’ \J
II
1 •Ml
* Ml rf« Ml Kf’ OX) j :xi L a x-«7
4 4 •XI
A
A P a Mi M' CM) C1 iM) BM
•M.-C
OMI t f 4
>M| rv •Mi
X) G 0X1 A
• * k.-r 6Ma ’ * * *e<
F
’ b ;
i
* . ’.
i 5
1 r«j a
• Ml •21 OMI
OMi
c
C
• IM.
3>« SM
an rxi ta •>
omi r c
Xi
xirn
'* •
oxi-g
G 1 i 5

a ?
•M-M *
ox> - c
*
»i-<m
»n 7XI-V
OXi-l
1


ixi-
X) *M 1
•J.
rl
«
•s
|»-A

* w ) . X) Di OJQ. L JW-rjo txi-c D IX.MJI
•XV/
*
xi-c w •xn t c X. «>l - J
J\ ‘Hd
ox: Ri <>t 1X1 “W4 *)l
1
•101 a Ki •1) CXI < 1X1 IV (' mi -Hl CM) £ Ml KU OX) J f L 1

jj •Ml a;-A
4
Ml •» CXI c ? ’ Xi 9)1 ox -r J ' wi ru • XJ-G • '
-
IXl R» 0X1- j ) ’ «• * W •Bi-t r Xi •))
1
1
fl 4XJ w; •» tin-:
f
*? OM OXi c 4 xrfV •XJG XI MU
’■n
OMI- . I X. »D 0W-t
.
1


Ml
r. j
1J •Ml X) •J* UM) C X) pn oxi r iMf*M •Xi G I >mi 63T > jn cj4 7XK *n * J
4‘ i
r «!1 •। OX; a

9»1-a
>0)

M*
in
•*
•M’-r
•X; <
CM
XI’
OXi
•XI f
< ♦.

7
Mi-r» 7X1 «. 5

•Xi c b G Ml **J»
•Mi
•W-
Mi
J 4

J »
xi *r
KI-**
CX1

•o»; vF
K.-L 4
L >7i "M
X.—1’
;' J
a» a X.
•J’ •Xl’C IMi CM 0»i ( • Ml f|» OX) a )>VHM j 5 xv»v X «W -
1
-
f
<
-
,.-x

LEVEL 3 - DATA HALL HAC PART PLAN


I

J
1
'■
I!1 i

1'

1
- ’
1

j


PROPOSED ORAWINO

»W«»MM IVMMO
cm
"acme

«»■* »
"
*
II I *>■»

.


r* -2
•*K-*
- a* W MAOT
‘M

acm
n
i

'
I
6 5 4 3 REVISION HISTORY
E.\2n2O\Drawtngs\4O2 - SHoca CatalogXHAC tor catalog purpose \402- 2 -RACK WITH HA(&Aug-23 12 2705 pm

11639
11399
D 599

iiiiiiiiiiiiiiiiiiiniiiiiiiriniiiiii
IIIIIIIIIIIIIIIIIMIIIIIIIIIIIIIIII
TOP VIEW
Window Frame
c
co
co

,59^
4mm Plate
IB
U 1200
03
CD '(1) 48U Rock ISO VIEW
o
o u
o o
or
B

FRONT VIEW RIGHT VIEW


Sliding Window (600W)
TITLE: Hot Aisle Containment DWG NO : MATERIAL Refer Sub Assy

DRAWN SURIYA CHECKED PART NO : 402-2-Rack with HAC COLOUR


R1CK
A
Material used:
CUSTOMER

PROJECT
APPROVED

Mil AU OUADOOM AXE H MM UMIESS


OIHUVRSI NOTED IUAX All CO*Mm
UMOVt *u SHARP IDG« WHIN M DOW PLS Alt
^rrocr
THIS D1AW1NG CONTAIN SHOCA nt UD nOAMTAXV
REVC.ON

1 ) Polycarbonate 3 mm •oaiMAnoH ano must not M imooucn owciosip c*


UTUUD H WWO1E Ol M TAIT wnNOVI OU* WO* WWTn“
2)Aluminium Profile 40x40 AUTHCMttAnOM

6 5 4
50 mm x 25 mm
HAC- Cable Trunking for MEB
50 mm x 25 mm BOCT 3350
Cable Trunking for MEB 50 mm x 50 mm
BOCT: 3350 Cable Trunking for DCIM
50 mm x 25 mm BOCT 3600
Cable Trunking for TEB 50 mm x 25 mm
BOCT: 3350 Cable Trunking for TEB
150 mm x 150 mm BOCT 3350
Cable Trunking for CEEFORM A1 150 mm x 150 mm
BOCT: 3000 Cable Trunking for CEEFORM A1
150 mm x 150 mm BOCT 3000
Cable Trunking for CEEFORM B1 150 mm x 150 mm

• BOCT: 2650
400 mm x 100 mm
Cable Trunking for CEEFORM B1
BOCT 2650
400 mm x 100 mm
)le Basket for STRUCTURE CABLE Cable Basket for STRUCTURE CAB
BOCT: 2800 BOCT 2800
400 mm x 100 mm 400 mm x 100 mm
)le Basket for STRUCTURE CABLE Cable Basket for STRUCTURE CAB
BOCT: 2500 BOCT: 2500

Hot Aisle

3rd Storey
+ FL 19.05 m
r
f

i*
V- 1

i
t
»
i

KEYPLAN I

i t-
i

LEVEL 3 - DATA HALL CABLE BASKET PART PLAN

tHiJ 0HAW1NG n THE COPVRXWr OF


d
1
X Mf ASlnXiATES FTE LTO WHOSE WWTTTN
.A » HI SHAu. »6 SOUGHT BEFORE AW UM
LEVEL 3 - DATA HALL CABLE BASKET TYPICAL ELEVATION part
THE DRAWING 0«*W
thereof can semak
[
j
1
iniE: MODEL PROJECT [ CMI (G«aa)

CANATEC Cable Bracket Section View TYPE Lc^nc"’’ 1 L3 Data Hall


__ — at****1”
at****^^^!
♦/. *****

3RD STOREY PLAN

Tm£:
MODEL PROJECT CMI (Gm)
CANATEC Earthing Layout Plan TYPE LOCATION L3D«t«H»n
3RD STOREY PLAN

»GJuei im

TITLE: MODEL PROJECT CMI (Goraa)

CANATEC CCTV Layout Plan TYPE LOCAT1OC L3 Data Hall


TTTLE: MODEL PROJECT CMI (G«m)

CANATEC Office Layout TYPE LOCATION L3 Office


TITLE:

C A NA T E C Store Room Layout

You might also like