Saifullah PT Bill 222
Saifullah PT Bill 222
Submitted By:
Saiful Maluk PT Checked Approved By:
Contractor. ZKB Representative.
Bill # 4(b):- Item 107a Structural Excavation in common Material
S.No Chainage Length Total Width
Depth (M) Quantity (CM)
(M) (M)
From To
Submitted By:
Saiful Maluk PT Checked Approved By:
Contractor. ZKB Representative.
Bill # 4(b):- Item SIW 25 Plum Concrete (Class 'B' with 40% Boulders)
as per drawing & Engineer's Instructions
Description
Length Avg Width Avg Hight
S.No Quantity (CM)
(M) (M) (M)
From To
Submitted By:
Saiful Maluk PT Checked Approved By:
Contractor. ZKB Representative.
107e.Structure Backfill (Common Backfill available at site)
S.No Chainage Length Total Depth
Quantity (CM)
(M) Width (M) (M)
From To
Qty M3 3,769.80
Submitted By:
Saiful Maluk PT Checked Approved By:
Contractor. ZKB Representative.