REPUBLIC OF THE PHILIPPINES

TABLE OF CONTENTS Department of Public Works and Highways


Department of Transportation and
Communications
ARCHITECTURAL Office of the Building Official

TABLE OF CONTENTS, PERSPECTIVE,


AR-01 SITE DEVELOPMENT PLAN &
LOCATION MAP City / Municipality / Province

GROUND FLOOR PLAN & 2ND FLOOR


AR-02 PLAN

LAYOUT OF DOORS AND WINDOWS @


GROUND FLOOR PLAN & LAYOUT OF
AR-03
DOORS AND WINDOWS @ 2ND FLOOR
PLAN

FRONT ELEVATION, REAR


AR-04 ELEVATION, RIGHT SIDE ELEVATION &
LEFT SIDE ELEVATION LAND USE AND ZONING

CROSS SECTIONAL VIEW,


AR-05 LONGITUDINAL SECTION VIEW,
TYPICAL DETAILS OF REST ROOM &
DETAILS OF STAIR

FRONT FENCE & GATE DETAILS,


AR-06
SCHEDULE OF DOORS & SCHEDULE
OF DOOR'S AND WINDOW'S

STRUCTURAL LINE AND GRADE

GENERAL NOTES, FOUNDATION PLAN


ST-01 & DETAILS OF CHB REINFORCEMENT

DETAILS OF WALL FOOTING, DETAILS


OF WALL FOOTING & SCHEDULE OF
ST-02 COLUMN FOOTING

DETAILS OF WALL FOOTING, DETAILS


ARCHITECTURAL
ST-03 OF WALL FOOTING & SCHEDULE OF
COLUMN FOOTING
1 PERSPECTIVE SCALE : N.T.S
FLOOR FRAMING PLAN, DETAILS OF
ST-04 STEEL TRUSS & DETAILS OF STAIR
N SITE TO MAHARLIKA HI-WAY N
2.00 W E W E ELECTRICAL
12.0
0
STRUCTURAL
8.30 S
CIRCUMFERENTIAL
S ground floor lighting layout,
ROAD ground floor lighting layout &
EL-01 legends & symbols
1.70
s 7
3 ° ground floor power layout,
5 6
.

' e EL-02 ground floor power layout &


0 M
26

1 2 .
0 0 legends & symbols
5.50

M.

A D
9 . 0
lot

general notes, CIRCUIT


1.20

R O
BREAKER, riser diagram,
9.00

EL-03
schedule of loads & location ELECTRICAL
d

' E

I N
map
roa

.
0 4

L O
0 M

M A
T
14
108 B L
PLUMBING
9 . 0

. 0 O
6 °

0 S C K
3.50

Q. M 34
N 1

9.00 1.30
' w

general notes, location map &


PL-01 details of septic tank
0 4

6.50

POTABLE WATER LINE PIPING


6 °

N 7 PL-02 LAYOUT @ GROUND FLOOR & MECHANICAL


s 1

3 ° POTABLE WATER LINE PIPING


5 6
' w LAYOUT @ 2ND FLOOR
5.30 1 2 .
0 0
M.
sanitary LINE PIPING LAYOUT @
GROUND FLOOR, sanitary LINE
12.0 6.70 PL-02 PIPING LAYOUT @ 2ND FLOOR,
0 legends & symbols & details of
CITTA GRANDE area drain / catch basin

storm drain piping layout,


PL-04 potable water line isometric &
2 SITE DEVELOPMENT PLAN SCALE : 1 : 75
3 LOCATION MAP SCALE : N.T.S sanitary line isometric PLUMBING / SANITARY
CONTRACTOR CIVIL ENGINEER PRC. NO. 87923 CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. 3416705 CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO PERSPECTIVE, SITE DEVELOPMENT
ENGR. WILLIAM P. LAGSIT DATE/REG JAN. 03, 2023 (2) STOREY RESIDENTIAL BUILDING CHECKED BY AR-01
PLAN & LOCATION MAP
BRGY. GULANG-GULANG, LUCENA CITY BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
PLACE LUCENA CITY IYAM, LUCENA CITY
DATE JUL. 08, 2023
AR-05

AR-05
3

3
A B C D A B C D

9.00 9.00

2.50 3.90 2.60 1.20 1.40 1.00 1.45 2.75 1.20

1 1

1.20

1.20
PROP. PROP. DIRTY
1.70

LAUNDRY KITCHEN
AREA KITCHEN

3.10
TOILET & CABINET BED ROOM 3
2 2 SHOWER

2.10
TOILET &

3.00
SHOWER

CABINET
CABINET

AR-05 AR-05 STAIR


5.00

2 2
BED ROOM 1

CABINET
LIVING ROOM
3.60

3.40
DINING ROOM

3.00
12.00

12.00

12.00

12.00
STAIR

3 3 BED ROOM 2

1.60
LIVING ROOM
BALCONY
3.30

CAR
PORT
5.30

4.80
2.70
MINI BAR

4 4
PORCH
2.00

1.00
5 5

2.10 1.50 1.95 3.15 1.20 3.80 2.80 1.20


2.10 3.15
9.00 9.00

1 GROUND FLOOR PLAN SCALE : 1 : 100


2 2ND FLOOR PLAN SCALE : 1 : 100

CONTRACTOR CIVIL ENGINEER PRC. NO. 87923 CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. 3416705 CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO
GROUND FLOOR PLAN & 2ND FLOOR
ENGR. WILLIAM P. LAGSIT DATE/REG JAN. 03, 2023 (2) STOREY RESIDENTIAL BUILDING CHECKED BY AR-02
PLAN
BRGY. GULANG-GULANG, LUCENA CITY BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
PLACE LUCENA CITY IYAM, LUCENA CITY
DATE JUL. 08, 2023
AR-05

AR-05
3

3
A B C D A B C D

9.00 9.00

2.50 3.90 2.60 1.20 1.40 1.00 1.45 2.75 1.20

1 1

1.20

1.20
PROP. PROP. DIRTY
1.70

LAUNDRY KITCHEN
AREA KITCHEN
W5 D3

3.10
D2 W7
W7 W4 W2
2 2

2.10
D4 TOILET & D3 BED ROOM 3

3.00
W3 SHOWER
D4 W2

D2 D2
AR-05 AR-05
5.00

W3

LIVING ROOM
2 2

3.60

3.40
DINING ROOM BED ROOM 1 W6 BED ROOM 2

3.00
W2
12.00

12.00

12.00

12.00
W5 W3 W5 D1 D2
W5
3 3 W1

1.60
BALCONY
LIVING ROOM
3.30

W3

D1 MINI BAR CAR


5.30

PORT

4.80
2.70
W3 W3

4 4
PORCH
2.00

1.00
5 5

2.10 1.50 1.95 3.15 1.20 3.80 2.80 1.20


2.10 3.15
9.00 9.00

1 LAYOUT OF DOORS AND WINDOWS @ GROUND FLOOR PLAN SCALE : 1 : 100


2 LAYOUT OF DOORS AND WINDOWS @ 2ND FLOOR PLAN SCALE : 1 : 100

CONTRACTOR CIVIL ENGINEER PRC. NO. 87923 CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. 3416705 CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO LAYOUT OF DOORS AND WINDOWS @
ENGR. WILLIAM P. LAGSIT DATE/REG JAN. 03, 2023 (2) STOREY RESIDENTIAL BUILDING CHECKED BY GROUND FLOOR PLAN & LAYOUT OF DOORS AR-03
BRGY. GULANG-GULANG, LUCENA CITY BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
AND WINDOWS @ 2ND FLOOR PLAN
PLACE LUCENA CITY IYAM, LUCENA CITY
DATE JUL. 08, 2023
A B C D D C B A
9.00 9.00
2.50 3.90 2.60 2.60 3.90 2.50

EXISTING RIB TYPE


TOP OF ROOF TOP OF ROOF
LONG SPAN ROOF
8.35 8.35
subject to remove &
replace
EXISTING RIB TYPE
LONG SPAN ROOF
subject to remove &
TOP OF ROOF BEAM TOP OF ROOF BEAM replace
6.50 6.50
FRENCH STYLE WINDOW'S
FRENCH STYLE DOOR (SEE DETAILS)
(SEE DETAILS)
FRENCH STYLE WINDOW
(SEE DETAILS)
FRENCH STYLE WINDOW
(SEE DETAILS)

2ND FLR. LINE 2ND FLR. LINE


3.50 3.50

MERALCO SERVICE
ENTRANCE COLUMN

3.50
MERALCO METER BASE

2.95
FRONT MASONRY FENCE 5" CHB/PLASTERED FINISHED
& WATER PROOFED
GRND FLR. LINE GRND FLR. LINE
0.50 0.50
GRND. LEVEL GRND. LEVEL
0.00 0.00
ENTRANCE GATE CAR PORT GATE

1 FRONT ELEVATION 2 REAR ELEVATION SCALE : 1 : 100

1 2 3 4 5 5 4 3 2 1
12.00 12.00
1.70 5.00 3.30 2.00 2.00 3.30 5.00 1.70
TOP OF ROOF TOP OF ROOF
8.35 8.35
EXISTING RIB TYPE
EXISTING RIB TYPE LONG SPAN ROOF
LONG SPAN ROOF subject to remove &
subject to remove & replace
TOP OF ROOF BEAM replace TOP OF ROOF BEAM
6.50 6.50

FRENCH STYLE WINDOW


(SEE DETAILS) FRENCH STYLE WINDOW'S
(SEE DETAILS)

2ND FLR. LINE 2ND FLR. LINE


3.50 3.50

5"
5" CHB/PLASTERED
CHB/PLASTERED FINISHED
FINISHED 5" CHB/PLASTERED FINISHED
& WATER PROOFED
& WATER PROOFED & WATER PROOFED
GRND FLR. LINE GRND FLR. LINE
0.50 0.50
GRND. LEVEL GRND. LEVEL
0.00 0.00

3 RIGHT SIDE ELEVATION SCALE : 1 : 100


4 LEFT SIDE ELEVATION SCALE : 1 : 100

CONTRACTOR CIVIL ENGINEER PRC. NO. 87923 CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. 3416705 CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO FRONT ELEVATION, REAR ELEVATION,
ENGR. WILLIAM P. LAGSIT DATE/REG JAN. 03, 2023 (2) STOREY RESIDENTIAL BUILDING CHECKED BY RIGHT SIDE ELEVATION & LEFT SIDE AR-04
BRGY. GULANG-GULANG, LUCENA CITY
PLACE LUCENA CITY BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
DATE JUL. 08, 2023 ELEVATION
IYAM, LUCENA CITY
A B C D 5 4 3 2 1
9.00 12.00

2.50 3.90 2.60 2.00 3.30 5.00 1.70


TOP OF ROOF TOP OF ROOF
8.35 EXISTING RIB TYPE LONG 8.35
SPAN ROOF subject to 1.10 0.90 1.58 1.73
remove & replace EXISTING RIB TYPE LONG
EXISTING ROOF FRAMING SPAN ROOF subject to
WITH 2" X 2" X 41 " ANGLE remove & replace
TOP OF ROOF BEAM BAR TRUSSES TOP OF ROOF BEAM
6.50 ROOF BEAM ROOF BEAM ROOF BEAM ROOF BEAM 6.50

0.60mm THK. RIB TYPE EXISTING ROOF FRAMING


LONG SPAN ROOF WITH 2" X 2" X 41 " ANGLE
BAR TRUSSES
FRENCH STYLE DOOR 2" X 2" X 41 " ANGLE BAR
0.60mm THK. RIB TYPE TRUSSES
(SEE DETAILS) FRENCH STYLE WINDOW'S
LONG SPAN ROOF HALL WAY
(SEE DETAILS)
1 21" X 1 21" X 41 " ANGLE
HALL WAY BED ROOM BAR TRUSSES
2ND FLR. LINE BALCONY 2ND FLR. LINE
3.50 FLOOR BEAM FLOOR BEAM FLOOR BEAM FLOOR BEAM 3.50

ISLAND COUNTER
KITCHEN

3.50
2.95
STAIR BED ROOM PORCH LIVING ROOM DINING ROOM
GRND FLR. LINE GRND FLR. LINE
0.50 0.50
GRND. LEVEL GRND. LEVEL
0.00 0.00

1.20 2.63 1.98 3.20 2.00 3.30 1.00 3.28 1.70

0.13
0.60

1 CROSS SECTIONAL VIEW SCALE : 1 : 100 2 LONGITUDINAL SECTION VIEW SCALE : 1 : 50

B
0.13
0.13 1.93 1.00
0.13

0.42 0.58

0.42
LAV SH 40mm ∅ S.S
1.15

400mm X 400mm hand rail


14 15 16
WC NON-SKID TILES

1.00
A
2ND FLR. LINE 16

0.58
(VERIFY DESIGN)
3.50 15
13 14
0.13

13
12
PLAN 12
40mm ∅ S.S

3.20
11

1.20
11
10 BALUSTER
10
9

3.00
9 8
2ND FLR. LINE 2ND FLR. LINE 7

0.58
8 6
3.30 3.30

1.00
CEILING LINE CEILING LINE 5
3.30 3.00 4
7 6 5 4 3 2 1 3
600mm X 600mm 2
1
GLASS PANEL
DECORATIVE TILES

0.42
GRND FLR. LINE
(VERIFY DESIGN) SHOWER HEAD 0.50

LAVATORY SET
0.42 0.58
INCLUDING FAUCET &
P-TRAP 1.00 1.50
SHOWER & FAUCET 1.00 1.50
water closet CONTROL VALVE 2.50
GRND FLR. LINE GRND FLR. LINE
0.30 0.30

PLAN SECTION
SECTION THRU "A" SECTION THRU "C"
3 TYPICAL DETAILS OF REST ROOM SCALE : 1 : 75
4 DETAILS OF STAIR SCALE : N.T.S

CONTRACTOR CIVIL ENGINEER PRC. NO. 87923 CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. 3416705 CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO CROSS SECTIONAL VIEW, LONGITUDINAL
ENGR. WILLIAM P. LAGSIT DATE/REG JAN. 03, 2023 (2) STOREY RESIDENTIAL BUILDING CHECKED BY SECTION VIEW, TYPICAL DETAILS OF AR-05
BRGY. GULANG-GULANG, LUCENA CITY
PLACE LUCENA CITY BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
DATE JUL. 08, 2023
REST ROOM & DETAILS OF STAIR
IYAM, LUCENA CITY
combination of
metal and wood
garage gate
MERALCO SERVICE
ENTRANCE 1.40 0.80 0.70
concrete molding

0.55
2.40

concrete molding
4.40

WALL LAMP

2.10

2.10
2.10
3.50
2.95
2.00

masonry wall masonry wall


(painted finished) (painted finished)

D1 D2 D3

LOCATION: MAIN DOOR LOCATION: BACK DOOR & LOCATION: DIRTY KITCHEN & WALK IN
BEDROOM'S CLOSET
DECORATIVE STONE FINISH TYPE & SELECTED WOODEN TYPE & SELECTED WOODEN TYPE & SELECTED WOODEN
MATERIAL PANEL DOOR MATERIAL PANEL DOOR MATERIAL PANEL DOOR
0.30 1.54 1.40 1.47 3.09 0.30 (1.0M X 2.10M) (0.80M X 2.10M) (0.70M X 2.10M)

0.30 0.30 0.30 NO. OF SETS: ONE (1) SET NO. OF SETS: FOUR (4) SETS NO. OF SETS: TWO (2) SETS
9.00
combination of
metal and wood
garage gate

1 FRONT FENCE & GATE DETAILS SCALE : 1 : 50


2 SCHEDULE OF DOORS SCALE : 1 : 50

2.00
0.60
1.40 1.20 0.80 0.60 1.80 0.60

0.40
0.60
1.80

1.20

1.20

1.20

1.20
2.10

1.70
1.50
0.90

0.90

0.90

0.90

0.90
D4 W1 W2 W3 W4 W5 W6 W7

LOCATION: REST ROOMS LOCATION: bedroom 2 LOCATION: bedroom 2 & 3 LOCATION: LIVING ROOM, DINING LOCATION: 2nd floor HALL WAY LOCATION: LIVING ROOM, KITCHEN, LOCATION: 2nd floor STAIR LOCATION: GROUND & 2ND FLOOR
ROOM & bedroom 1 bedroom 1 & BALCONY REST ROOM

TYPE & PVC FLUSH DOOR TYPE & CASEMENT WINDOW IN TYPE & casement WINDOW IN TYPE & casement WINDOW IN TYPE & casement WINDOW IN TYPE & sliding WINDOW IN p.c TYPE & fixed WINDOW IN p.c TYPE & awning WINDOW IN p.c
MATERIAL (0.60M X 2.10M) MATERIAL P.C ALUM. FRAME MATERIAL p.c ALUM. FRAME MATERIAL p.c ALUM. FRAME MATERIAL p.c ALUM. FRAME MATERIAL ALUM. FRAME MATERIAL ALUM. FRAME MATERIAL ALUM. FRAME
(2.00 X 1.80M) (1.40 X 1.20M) (1.20 X 1.20M) (0.80 X 1.20M) (0.60 X 1.20M) (1.80 X 0.60M) (0.60 X 0.40M)

NO. OF SETS: TWO (2) SETS NO. OF SETS: ONE (1) SET NO. OF SETS: THREE (3) SETS NO. OF SETS: SIX (6) SETS NO. OF SETS: ONE (1) SET NO. OF SETS: FOUR (4) SETS NO. OF SETS: ONE (1) SET NO. OF SETS: TWO (2) SETS

3 SCHEDULE OF DOOR'S AND WINDOW'S SCALE : 1 : 50

CONTRACTOR CIVIL ENGINEER PRC. NO. 87923 CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. 3416705 CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO FRONT FENCE & GATE DETAILS,
ENGR. WILLIAM P. LAGSIT DATE/REG JAN. 03, 2023 (2) STOREY RESIDENTIAL BUILDING CHECKED BY SCHEDULE OF DOORS & SCHEDULE OF AR-06
BRGY. GULANG-GULANG, LUCENA CITY
PLACE LUCENA CITY BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
DATE JUL. 08, 2023 DOOR'S AND WINDOW'S
IYAM, LUCENA CITY
1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED.
MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. A B C D
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL FOR ENGINEER'S APPROVAL
BEFORE FABRICATION.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN, CHECK WITH MECHANICAL AND 9.00
ELECTRICAL CONTRACTORS FOR CONDUITS, PIPE SLEEVES, ETC. TO BE EMBEDDED IN CONCRETE.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING AND BRACING OF THE 2.50 3.90 2.60
STRUCTURE FOR ALL LOADS THAT MAY BE IMPOSED DURING CONSTRUCTION.
5. IN CASE OF QUESTION ARISING FROM THE INTERPRETATION OF OR CONFLICT WITH OTHER DOCUMENTS. THE
1.20 1.30
ATTENTION OF THE OWNER/ENGINEER SHALL BE CALLED IN WRITING.

CONCRETE & REINFORCEMENT 1


1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BUILDING CODE OF AMERICAN CONCRETE
INSTITUTE (ACIi-318).
WF-1 CF-3 WF-1 CF-3 WF-1

1.70

1.75
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT (28) DAYS WITH
CORRESPONDING MAXIMUM SIZE AGGREGATE AND SLUMPS AS FOLLOWS: CF-3 CF-3
LOCATION STRENGTH MAX. SIZE OF MAX. SLUMP WF-2

3.10
AGGREGATES
2 WF-2
A. SLAB ON GRADE, 3000 Psi (20.685 Mpa) 1 in. (25mm) 4 in> (100mm) WF-1
CURBS, PAVEMENTS,

1.35
CF-3

1.68
FOOTING,
WALL FOOTING
B. BEAMS, COLUMNS 3000 Psi (20.685 Mpa) 3/4 in. (20mm) 4 in> (100mm)
SUSPENDED SLAB
WF-2
C. LEAN CONCRETE 2500 Psi (20.685 Mpa) 1 in. (25mm) 4 in> (100mm)
3. ALL REINFORCING BARS SHALL CONFORM TO PNS49 GRADE 275 FOR 12mmØ AND SMALLER BARS AND GRADE 415 FOR CF-3 EXISTING

5.00
16mmØ AND LARGER BARS.
4. IN GENERAL, THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE DETAILING REINFORCED CONCRETE STRUCTURE

3.60
STRUCTURES SHALL BE ADHERED TO UNLESS OTHERWISE SHOWN OR NOTED. WF-1

3.33
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS: WF-1
CONCRETE DEPOSITED DIRECTLY AGAINST GROUND 75mm

12.00

12.00
SUSPENDED SLABS 20mm
SLAB ON GRADE 40mm
WALLS ABOVE GRADE 25mm
BEAMS AND COLUMNS 40mm
3
6. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTENDED IN ACCORDANCE WITH TABLE 1 (TABLE CF-1
OF LAP SPLICE AND ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED CF-1 CF-3 LEGENDS:
WHENEVER POSSIBLE.
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED AND SECURED IN PLACE PRIOR

2.60
CF-1 - COLUMN FOOTING # 1
TO PLACING OF CONCRETE. WF-1 WF-1

3.30
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, EQUIPMENTS, AND MECHANICAL CF-2 - COLUMN FOOTING # 2
SLAB ON FILL 0.10mm THK WF-1
BASES THAT ARE REQUIRES BY THE ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS. 10mm∅ RSB BOTH @ 0.40m O.C CF-3 - COLUMN FOOTING # 3
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN (7) CONSECUTIVE DAYS IMMEDIATELY AFTER

5.30
POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER APPROVED METHODS. CF-3 CF-4 - COLUMN FOOTING # 4
10. STRIPPING OF FORMS AND SHORES:
CF-1 CF-5 - COLUMN FOOTING # 5
CONCRETE CURING
FOUNDATION 24 HRS. 4 CF-1 WF-1 - WALL FOOTING # 1
SUSPENDED SLAB EXCEPT WHEN 8 DAYS CF-2 CF-2 WF-1

2.70
WF-2 - WALL FOOTING # 2
ADDITIONAL LOADS ARE IMPOSED WF-1

2.00
PEDESTAL, COLUMNS, WALLS 2 DAYS
- EXISTING CONCRETE COLUMN
BEAMS 21 DAYS
WF-1 WF-1 WF-1
11. DEVELOPMENT LENGTH FOR ALL BARS SHALL BE A MINIMUM OF 60 BAR DIAMETER, UNLESS OTHERWISE NOTED. - EXISTING MASONRY WALL

STRUCTURAL STEEL AND PLATES 5 - NEW CONCRETE COLUMN


1. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM (A-36) SPECIFICATION WITH MINIMUM YIELD STRENGTH,
CF-4 CF-4 CF-4 CF-4 CF-4
- NEW MASONRY WALL
fy=250MPa.
2. ANCHORS AND FASTENER BOLTS, ALL BOLTS SHALL CONFORM TO ASTM (A-307) SPECIFICATIONS.
3. WELDING RODS, ALL WELDING RODS SHALL BE MILD STEEL ELECTRODE, LOW HYDROGEN E7018 WITH MINIMUM 2.10 1.50 1.95 3.15
YIELD STRENGTH = 420MPa.

FOUNDATION 9.00
1. FOUNDATION IS DESIGNED BASED ON NATIONAL BUILDING CODE OF THE PHILIPPINES FOR AN ALLOWABLE SOIL
BEARING CAPACITY OF 240 KPa.
2. FOUNDATION SHALL REST ON NATURAL SOIL, UNLESS OTHERWISE NOTED BY THE ENGINEER, NO PART OF THE
FOUNDATION SHALL REST ON FILL.
2 FOUNDATION PLAN SCALE : 1 : 100

3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER UPON COMPLETION OF FOUNDATION EXCAVATION FOR ACTUAL
SOIL CONDITIONS WHICH DO NOT CONFORM TO THE SOIL BEARING CAPACITY FOR PROPER REVISION.
CHB REINFORCEMENT
MASONRY WALLS
1. ALL MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE W/ THE APPLICABLE STANDARD & BLOCK REINFORCEMENT
SPECIFICATIONS OF THE STRUCTURAL CODE OF THE PHILIPPINES & UNIFORM BUILDING CODE.
CHB THICKNESS NOTES
0.25 4 - 12mm∅ (mm) HORIZONTAL VERTICAL
2. MORTAR & GROUT FOR ALL CONCRETE MASONRY SHALL CONFORM TO ASTM 270-TYPE N & SHALL HAVE A
0.25

MINIMUM OF 28 DAYS STANDARD CYLINDER COMPRESSIVE STRENGTH OF 17.5 MPa (2500 PSi)
10mm∅ BARS @ EVERY
10mm∅ BARS @
3. ALL CHB SHALL BE LAID OUT WITH THE CELLS IN UNOBSTRUCTED VERTICAL CONTINUITY. ALL CELLS 100 3RD LAYER OF CHB 600mm O.C A. MIN. LAP SPLICE = 300mm LONG
ESPECIALLY THOSE WITH REINFORCEMENT SHALL BE FILLED WITH MORTAR.
4. REINFORCEMENT, AS TABULATED BELOW SHALL BE PROVIDED UNLESS OTHERWISE SPECIFIED IN THE PLAN.
5. ALL MASONRY WALLS SHALL BE PROVIDED W/ STIFFENER BEAM BLOCK & STIFFENER AS REQUIRED. 10mm∅ TIES @ 125
10mm∅ BARS @ EVERY
10mm∅ BARS @ B. PROVIDE RIGHT ANGLE
3RD LAYER OF CHB 600mm O.C REINFORCEMENT @ CORNERS
5.1. FOR HIGH WALLS AND EVERY 3000mm AND cOLUMN (BOLT) AT 3000mm ON CENTER. 200mm O.C
5.2. FOR DOORS & WINDOWS OPENING PROVIDE LINTEL BEAM SAME AS STIFFENER BEAM BLOCK.
STIFFENER BEAM BLOCK STIFFENER COLUMN DETAIL

1 GENERAL NOTES SCALE : N.T.S


3 DETAILS OF CHB REINFORCEMENT SCALE : 1 : 100

CONTRACTOR CIVIL ENGINEER PRC. NO. 87923 CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. 3416705 CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO GENERAL NOTES, FOUNDATION PLAN
ENGR. WILLIAM P. LAGSIT DATE/REG JAN. 03, 2023 (2) STOREY RESIDENTIAL BUILDING CHECKED BY ST-01
& DETAILS OF CHB REINFORCEMENT
BRGY. GULANG-GULANG, LUCENA CITY BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
PLACE LUCENA CITY IYAM, LUCENA CITY
DATE JUL. 08, 2023
0.30 0.25
0.20 0.20

N.G.L
N.G.L N.G.L N.G.L

6-16mm∅ RSB W/ 10mm∅ 4-16mm∅ & 2-12mm∅RSB 4-12mm∅ RSB W/ 4-12mm∅ RSB W/
VARIES

VARIES

VARIES

VARIES
LATERAL TIES SPACED @ W/ 10mm∅ LATERAL TIES 10mm∅ LATERAL 10mm∅ LATERAL
0.20m O.C SPACED @ 0.20m O.C TIES SPACED @ TIES SPACED @
0.20m O.C 0.20m O.C
0.30

0.25

0.25

0.25
6-16mm∅ MAIN BAR, BOTHWAYS 5-16mm∅ MAIN BAR, BOTHWAYS 5-12mm∅ MAIN BAR 5-12mm∅ MAIN BAR

1.00 1.00 0.80 0.80

SECTION SECTION SECTION SECTION

1.00

0.40 0.20 0.40


0.80 0.80 0.80
0.25 0.30 0.25 0.60 0.20 0.28 0.25 0.28
6-16mm∅ MAIN BAR
0.33

5-16mm∅ M. BAR

5-16mm∅ M. BAR

0.25
5-12mm∅ M. BAR
5-12mm∅ M. BAR

5-12mm∅ M. BAR
0.60
1.00
0.35

0.55
0.80

0.80

0.80
0.30
0.33

6-16mm∅ MAIN BAR


0.20

0.25

0.25
5-12mm∅ M. BAR

C1 / CF-1 PLAN C2 / CF-2 PLAN C3 / CF-3 PLAN C4 / CF-4 PLAN

1 DETAILS OF WALL FOOTING SCALE : 1 :25

MAIN
5" thk 4" thk DIMENSION (M) REINFORCEMENT D
N.G.L CHB N.G.L CHB MARK REMARKS
B L T ALONG B ALONG L M
10mm∅ VERT. & HOR. 10mm∅ VERT. & HOR.
0.40

0.40

BAR BOTH @ 0.60M BAR BOTH @ 0.60M


O.C O.C 1.20 1.20 0.30 7-16mm∅ 7-16mm∅ 1.50 SQUARE FOOTING
CF-1
10mm∅ @ 0.30M O.C 10mm∅ @ 0.30M O.C

3 - 10mm∅ RSB 3 - 10mm∅ RSB


CF-2 0.80 0.80 0.25 5-12mm∅ 5-12mm∅ 1.00 SQUARE FOOTING
0.15

0.15

0.40 0.40

5" CHB / WF-1 4" CHB / WF-2

2 DETAILS OF WALL FOOTING SCALE : 1 :25


3 SCHEDULE OF COLUMN FOOTING SCALE : N.T.S

CONTRACTOR CIVIL ENGINEER PRC. NO. 87923 CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. 3416705 CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO
DETAILS OF WALL FOOTING, DETAILS
ENGR. WILLIAM P. LAGSIT DATE/REG JAN. 03, 2023 (2) STOREY RESIDENTIAL BUILDING CHECKED BY OF WALL FOOTING & SCHEDULE OF ST-02
BRGY. GULANG-GULANG, LUCENA CITY BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG COLUMN FOOTING
PLACE LUCENA CITY IYAM, LUCENA CITY
DATE JUL. 08, 2023
MARK COLUMN 1 (C-1) COLUMN 2 (C-2) COLUMN 3 (C-3) COLUMN 4 (C-4)
0.20 0.20 0.25
0.30
COLUMN

0.25
0.20

0.30
0.35
SIZE

VERTICAL BARS 6 - 16mm∅ 4-16mm∅ + 2-12mm∅ 4 - 12mm∅ 4 - 12mm∅


COL. TIES 3 - 10mm∅ @ 0.05M O.C SPACING 3 - 10mm∅ @ 0.05M O.C SPACING 3 - 10mm∅ @ 0.05M O.C SPACING 3 - 10mm∅ @ 0.05M O.C SPACING
JOINT HOOPS 5 - 10mm∅ @ 0.10M O.C SPACING 5 - 10mm∅ @ 0.10M O.C SPACING 5 - 10mm∅ @ 0.10M O.C SPACING 5 - 10mm∅ @ 0.10M O.C SPACING
CONF. HOOPS 10mm∅ @ 0.20M O.C SPACING 10mm∅ @ 0.20M O.C SPACING 10mm∅ @ 0.20M O.C SPACING 10mm∅ @ 0.20M O.C SPACING

1 SCHEDULE OF COLUMN SCALE : N.T.S

A B C D
L/4 L/4
9.00

1.20 1.30 2.60 2.70 1.20 WEB BARS TOP BARS

1
C-3 B-2 C-3 B-2 C-3 B-2 C-3
1.20

T
2 B-2
B-2
BOTTOM BARS
2.10

0.70
C-3 L/5 L/5
C-3

4.60
EXISTING STRUCTURE
B-2
3.40

B-2
BEAM MID SPAN SUPPORT WEB
DIMENSION (M)

8.80
BAR Ø BARS STIRRUPS
12.00

10mmØ
MARK B H TOP BOTTOM TOP BOTTOM 12mm∅
C-1 1 @ 0.05, 4 @ 0.10, 5 @
3 C-3 B-1 0.20 0.35 12mm∅ 2-16mm∅ 4-16mm∅ 4-16mm∅ 2-16mm∅ 2 0.15 REST @ 0.20
B-1 C-1
1.60

1 @ 0.05, 4 @ 0.10, 5 @
0.70

B-1 OPEN B-1 S-1 B-2 0.15 0.30 12mm∅ 2-12mm∅ 2-12mm∅ 2-12mm∅ 2-12mm∅ 2 0.15 REST @ 0.20

B-2
2.80

B-1
1.70

B-1 OPEN B-1


C-3
B-1
4
C-1 C-2 C-2 C-1
2 SCHEDULE OF BEAMS SCALE : N.T.S

B-2
2.00

B-2

C-4 C-4 B-2 C-4 SLAB DIM. (M) SHORT DIRECTION LONG DIRECTION
5 BAR Ø
MARK T CONT. EDGES M. SPAN DISCONT. EDGESCONT. EDGES M. SPAN DISCONT. EDGES
2.24 1.20
S-1 0.10 10mm∅ @ 0.20m O.C @ 0.20m O.C @ 0.20m O.C @ 0.20m O.C @ 0.20m O.C @ 0.20m O.C
5.56 3.44
9.00

3 FLOOR FRAMING PLAN SCALE : 1 : 100


4 SCHEDULE OF SLAB SCALE : N.T.S

CONTRACTOR CIVIL ENGINEER PRC. NO. 87923 CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. 3416705 CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO
DETAILS OF WALL FOOTING, DETAILS
ENGR. WILLIAM P. LAGSIT DATE/REG JAN. 03, 2023 (2) STOREY RESIDENTIAL BUILDING CHECKED BY OF WALL FOOTING & SCHEDULE OF ST-03
BRGY. GULANG-GULANG, LUCENA CITY BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG COLUMN FOOTING
PLACE LUCENA CITY IYAM, LUCENA CITY
DATE JUL. 08, 2023
1.00
A B C D 0.42 0.58

9.00

0.42
2" X 3" G.I C-PURLINS
1.20 1.30 2.60 2.70 1.20 14 15 16

1.00

0.58
C-3 B-2 C-3 B-2 C-3 B-2 C-3

0.30
1
13
1.20

0.30
1 21" X 1 21" X 41 " ANGLE
BAR TRUSSES 12 R.C TREAD IN

0.30
TILE FINISH
11

3.20
B-2

0.30
2 B-2 10
2.10

0.70
9 12mm∅ RSB
C-3

0.58
8
C-3 10mm∅ RSB

1.00
2" X 3" G.I C-PURLINS

4.60
EXTG.STRUCTURE

0.42
7
W/ EXTG. ROOFING B-2
3.40

B-2

8.80
6 5 4 3 2 1
12.00

0.42 0.58
1.00 1.50
C-1
3 C-3
1.60

0.70
BALCONY
B-1 PLAN

2.80
B-1
1.70

B-1 B-1
C-3
B-1
4 16 2ND.FLOOR FIN. LINE
C-1 C-1 15
1
2" X 2" X 4" ANGLE BAR
14
2.00

TRUSSES
13
2" X 3" G.I C-PURLINS 12
C-4 C-4 C-4 11
5 10
9
2.10 3.15 1.20
8
3.44 7
9.00 6
5 10mm∅ RSB
4
1 FLOOR FRAMING PLAN SCALE : 1 : 100
3
12mm∅ RSB 2
10MM THK. INSULATION 0.60MM THK. RIB TYPE
0.60MM THK. RIB TYPE 1
LONG SPAN ROOF 10mm∅ RSB
LONG SPAN ROOF 2" X 2" X 41 " ANGLE BAR GRND.FLOOR FIN. LINE
TRUSSES BRACING
10MM THK. INSULATION 2" X 3" G.I C-PURLINS
2" X 3" G.I C-PURLINS 2" X 2" X 41 " ANGLE BAR
TOP & BOT. CORD
3
8" X 8" HARDIE SANEPA
12mm∅ RSB
0.60 S.S GUTTER 2" X 2" X 41 " ANGLE
BAR TOP & BOT.
CORD
CONC. BEAM

3"∅ PVC SANITARY


PIPE DOWNSPOUT 1.00
SECTION

2 DETAILS OF STEEL TRUSS SCALE : 1 : 100


3 DETAILS OF STAIR SCALE : N.T.S

CONTRACTOR CIVIL ENGINEER PRC. NO. 87923 CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. 3416705 CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO
FLOOR FRAMING PLAN, DETAILS OF
ENGR. WILLIAM P. LAGSIT DATE/REG JAN. 03, 2023 (2) STOREY RESIDENTIAL BUILDING CHECKED BY STEEL TRUSS & DETAILS OF STAIR ST-04
BRGY. GULANG-GULANG, LUCENA CITY BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
PLACE LUCENA CITY IYAM, LUCENA CITY
DATE JUL. 08, 2023
A B C D A B C D

9.00 9.00

2.50 3.90 2.60 1.20 1.40 1.00 1.45 2.75 1.20

1 1

1.20

1.20
1.70

3.10
2 S1 2
S2 p S2

2.10

3.00
S1
S1

S3W S3 S2 S2
d d
5.00

p S1

3.60

3.40
p

3.00
12.00

12.00

12.00

12.00
S2
d d
S3W S1 S1
3 3
d d d

1.60
2
LPP
3.30

5.30
d d d

4.80
2.70
S3 S3
4 4
wp wp
2.00

1.00
LPP

5 5
wp wp wp wp

2.10 1.50 1.95 3.15 1.20 3.80 2.80 1.20


2.10 3.15
9.00 9.00

1 ground floor lighting layout SCALE : 1 : 100


2 ground floor lighting layout SCALE : 1 : 100

d
- PANEL BOARD S4 - FOUR GANG 3-WAY SWITCH TV - CABLE TV/LAN OUTLET - DOWN LIGHT - INDOOR WALL LAMP

S1 - SINGLE POLE SWITCH S6 - SIX GANG 3-WAY SWITCH


HT - WATER HEATER OUTLET p - PENDANT LIGHT M - KW HR METER (MERALCO)

S2 - TWO-GANG SWITCH - TWO GANG OUTLET - POWER CIRCUIT RUN - CHANDELIER


#
S3 - THREE-GANG SWITCH - ONE GANG OUTLET PB
- CIRCUIT HOMERUN TO LIGHTING & POWER PANEL - RECEPTACLE

S3W - THREE WAY SWITCH ACU - AIR CONDITION UNIT


- LIGHTING CIRCUIT RUN wp - OUTDOOR WEATHER PROOF WALL LAMP

3 legends & symbols SCALE : N.T.S

CONTRACTOR ELECTRICAL ENGINEER PRC. NO. CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO
ground floor lighting layout,
DATE/REG (2) STOREY RESIDENTIAL BUILDING CHECKED BY ground floor lighting layout & EL-01
PLACE BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
DATE JUL. 08, 2023
legends & symbols
IYAM, LUCENA CITY
A B C D A B C D

9.00 9.00

2.50 3.90 2.60 1.20 1.40 1.00 1.45 2.75 1.20

1 1

1.20

1.20
1.70

3.10
ACU
2 2
8

2.10
LPP

3.00
5.00

3
LPP

3.60
TV

3.40
TV
4

3.00
LPP
12.00

12.00

12.00

12.00
7
LPP
3 3
ACU ACU
TV

1.60
5
LPP
6
LPP
3.30

5.30

4.80
2.70
4 4
2.00

1.00
5 5

2.10 1.50 1.95 3.15 1.20 3.80 2.80 1.20


2.10 3.15
9.00 9.00

1 ground floor power layout SCALE : 1 : 100


2 ground floor power layout SCALE : 1 : 100

d
- PANEL BOARD S4 - FOUR GANG 3-WAY SWITCH TV - CABLE TV/LAN OUTLET - DOWN LIGHT - INDOOR WALL LAMP

S1 - SINGLE POLE SWITCH S6 - SIX GANG 3-WAY SWITCH


HT - WATER HEATER OUTLET p - PENDANT LIGHT M - KW HR METER (MERALCO)

S2 - TWO-GANG SWITCH - TWO GANG OUTLET - POWER CIRCUIT RUN - CHANDELIER


#
S3 - THREE-GANG SWITCH - ONE GANG OUTLET PB
- CIRCUIT HOMERUN TO LIGHTING & POWER PANEL - RECEPTACLE

S3W - THREE WAY SWITCH ACU - AIR CONDITION UNIT


- LIGHTING CIRCUIT RUN wp - OUTDOOR WEATHER PROOF WALL LAMP

3 legends & symbols SCALE : N.T.S

CONTRACTOR ELECTRICAL ENGINEER PRC. NO. CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO
ground floor power layout,
DATE/REG (2) STOREY RESIDENTIAL BUILDING CHECKED BY ground floor power layout & EL-02
PLACE BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
DATE JUL. 08, 2023
legends & symbols
IYAM, LUCENA CITY
GENERAL NOTES
LINE-TO-LINE
1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN ACCORDANCE SERVICE ENTRANCE
WITH THESE PLANS AND SPECIFICATIONS, THE APPLICABLE PROVISIONS 2 WIRES W/ 1-GROUND
OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). 230V, 60HZ
THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITY MAIN BREAKER
AND REQUIREMENTS OF THE REQUIREMENTS OF THE LOCAL POWER LIGHTING & POWER PANEL
60AT, 2P, 230V,
AND TELEPHONE COMPANIES. THE ELECTRICAL WORK SHALL BE UNDER
THE IMMEDIATE SUPERVISION DULY REGISTERED ELECTRICAL ENGINEERS.
60Hz
KW HR METER
(MERALCO) M 2-14.0mm THHN, #6 AWG +
1-8.0mm TW, #8 AWG G.W IN
2. THE SERVICE ENTRANCE SHALL BE 230 VOLTS, SINGLE PHASE,2-WIRES 100A 15A 1 25mm PVC PIPE

&1-GROUND WIRE, 60Hz INTERMEDIATE METAL CONDUIT (INC)


SIZE OF WIRE:
3. ALL WIRES SHALL BE COPPER, "THHN" OR "THW" TYPE. THE MINIMUM
#6AWG, 2-14.0mm THHN IN 2 15A 20A 3 LPP
SIZE OF WIRE SHALL BE 2.0mm².
25mm PVC PIPE 60 AT 2P MCB
4. ALL CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE W/ INTERRUPTING 60 AT, 2P
CAPACITY AS INDICATED IN THE PLANS. IT SHALL BE SIEMENS BRAND 4 20A 20A 5
OR APPROVED EQUIVALENT.
5. CONVENIENCE OUTLET AND LIGHTING SWITCHES SHALL BE RATED AT 6 20A 20A 7 1-8.0mm TW AWG#8 G.W
15A, 240V. IN 15mm PVC PIPE
6. ALL MOUNTING HEIGHTS OF WIRING DEVICES SHALL BEAS FOLLOWS.
a. CONVENIENCE OUTLET - 0.30 ABOVE FLOOR FINISH. 8 20A #
SPARE N.G.L
b. TEL. OUTLET - 0.30M ABOVE FLOOR FINISH OR AS REQUIRED.
c. LIGHTING SWITCHES - 1.20m ABOVE FLOOR FINISH OR AS REQUIRED
7. ALL EQUIPMENT, SWITCHES, PANEL BOARDS, LIGHTING FIXTURES AND 1-8.0mm AWG#8 IN
ALL NON-CURRENT CARRYING METAL PARTS SHALL BE PROPERLY 15mm PVC PIPE
GROUNDED IN ACCORDANCE WITH THE LATEST EDITION OF THE GROUND GROUND
PHILIPPINES ELECTRICAL CODE.
8. ALL MATERIALS TO BE USED AND THE EQUIPMENT TO BE USED SHALL
BE BRAND NEW AND MUST BE APPROVED TYPE FOR THE 2-14.0mm THHN, #6 AWG +
PARTICULAR LOCATION AND PURPOSE INTENDED. SUBMIT SAMPLES 1-8.0mm TW, #8 AWG G.W IN
FOR ARCHITECT/ENGINEER APPROVAL. 25mm PVC PIPE

1 general notes SCALE : N.T.S


2 CIRCUIT BREAKER SCALE : N.T.S
3 riser diagram SCALE : N.T.S

LIGHT AND POWER PANEL NO. 1 (LPP#1) N


CKT NO. OF WATTS LOAD CIRCUIT BREAKER NO. & SIZE OF WIRES
LOAD DESCRIPTION VOLTS SIZE OF CONDUITS
NO. OUTLET (VA) AMPHERE PH. POLE AT W E
1 LIGHTING OUTLET (100W) 23 2300 230 10.0 1 2 20 2-2.0mm THHN stranded wire 15mm Ø PVC PIPE TO MAHARLIKA HI-WAY
SITE
2 LIGHTING OUTLET (100W) 15 1500 230 6.52 1 2 20 2-2.0mm THHN stranded wire 15mm Ø PVC PIPE S
3 CONVENIENCE OUTLET (180W) 5 900 230 3.90 1 2 20 2-3.5mm THHN stranded wire 20mm Ø PVC PIPE

4 CONVENIENCE OUTLET (180W) 10 1800 230 7.82 1 2 20


30 2-3.5mm THHN stranded wire 20mm Ø PVC PIPE CIRCUMFERENTIAL
ROAD
5 CONVENIENCE OUTLET (180W) 8 1440 230 6.26 1 2 20 2-3.5mm THHN stranded wire 20mm Ø PVC PIPE
6 A.C.U @ bed ROOM 1 (746W) 1 746 230 3.24 1 2 20 2-5.5mm THHN stranded wire 20mm Ø PVC PIPE
7 A.C.U @ bed ROOM 2 (746W) 1 746 230 3.24 1 2 20 2-5.5mm THHN stranded wire 20mm Ø PVC PIPE
8 1 746 230 3.24 1 2 20 20mm Ø PVC PIPE

A D
A.C.U @ bed ROOM 3 (746W) 2-5.5mm THHN stranded wire

R O
SPARE
TOTAL 10,178

I N
M A
COMPUTATION:

IT = 10,178W x 80% MAIN BREAKER SIZE: 60AT


= 35.40Amp
230V CONDIT SIZE: 25mm∅ PVC
WIRE SIZE: 2-14.0mm² THW, NO. 6 AWG
CIRCUIT BREAKER SIZE: 60AT
CONDIT SIZE: 25mm∅ PVC
WIRE SIZE: 2-14.0mm² THW, NO. 6 AWG
CITTA GRANDE

4 schedule of loads SCALE : N.T.S


5 location map SCALE : N.T.S

CONTRACTOR ELECTRICAL ENGINEER PRC. NO. CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO
general notes, CIRCUIT BREAKER,
DATE/REG (2) STOREY RESIDENTIAL BUILDING CHECKED BY riser diagram, schedule of EL-03
BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG loads & location map
PLACE IYAM, LUCENA CITY
DATE JUL. 08, 2023
GENERAL NOTES 3.50
0.13 0.13
1. ALL PLUMBING WORKS SHALL BE EXECUTED IN ACCORDANCE WITH THE LATEST PROVISION OF 0.13 0.88 0.75 1.50 0.13
THE PHILIPPINE PLUMBING CODE, THE UNIFORM PLUMBING CODE, THE NATIONAL BUILDING CODE, 12mm∅ STD.
ANT THE RULES AND REGULATION OF THE LOCAL GOVERNMENT UNIT OF LUCENA CITY. GRADE REBARS
2. ALL SLOPES FOR SANITARY AND STORM DRAIN LINES SHALL MAINTAIN A ONE PERCENT (0.01) SPACED @ 0.30
0.13 M.O.C.B.W
AND ONE-HALF (0.005) MIN. RESPECTIVELY UNLESS OTHERWISE SPECIFIED.
3. PROPOSED SANITARY UTILITIES SHALL CONFORM TO ACTUAL LOCATION, DEPTH AND INVERT
ELEVATION OF ALL EXISTING PIPES AND STRUCTURE. 100mm∅ 100mm∅
4. ALL WATER SUPPLY PIPES AND DRAIN SIZES OF FIXTURES SHALL BE IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATION.
5. TESTING OF SANITARY AND WATER LINES SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE MH MH MH

0.50
1.00
1.25
PHILIPPINE PLUMBING CODE AND UNIFORM PLUMBING CODE. A
6. ALL PIPES SIZES AND DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED.
7. WATER LINE SHALL BE PPR TYPE OR FUSION WELD TYPE. 100mm∅ PVC
8. DRAIN, WASTE AND VENT SHALL BE PVC SANIMOLD EXTRA OR APPROVAL EQUAL. BREATHER AND INLET
100mm∅ PIPE EMBEDDED TO
9. WATER METER SHALL BE ANY BRAND APPROVE QMWD. 0.50
10. ROOF DRAIN SHALL BE ASA 10-12, PIPE SIZE 2"Ø BY ASA METAL. CHB WALL
11. WATER CLOSET SHALL BE VITREOUS CHINA, FREE STANDING TOILET COMBINATION, ROUND FRONT
BOTTOM OUTLET SIPHON VOTEX OR WASH-DOWN BOWL WITH EXTENDED REAR SELF AND 0.13
CLOSED COUPLED TANK WITH COVER COMPLETE.
12. LAVATORY SHALL BE VITREOUS CHINA, WALL HUNG WITH REAR OVERFLOW AND CAST IN DISHES, PLAN
POCKET HANGER WITH INTEGRAL CHINA BRACKET, COMPLETE WITH TWIN FAUCETS, SUPPLY
PIPES, P-TRAP AND MOUNTING ACCESSORIES.
13. FLOOR DRAIN SHALL BE MADE OS STAINLESS STEEL BEEHIVE TYPE, MEASURING 10cm x 10cm 3.50
AND PROVIDED WITH DETACHABLE STAINLESS STRAINER, EXPANDED METAL LATH TYPE. 0.13 0.13
14. SOAP HOLDER SHALL BE VITREOUS CHINA WALL MOUNTED. COLOR SHALL RECONCILE WITH THE 0.13 0.88 0.75 1.50 0.13
ADJACENT TILE WORKS.
12mm∅ STD.
15. TOILET PAPER HOLDER SHALL BE VITREOUS CHINA WALL MOUNTED.COLOR SHALL RECONCILE CO MH CO MH CO MH 0.10 GRADE GRAB
WITH THE ADJACENT FIXTURE AND FACING TILES.
16. HOSE BIBB SHALL BE MADE OF STAINLESS STEEL FOR INTERIOR USE. BAR MOUNTED ON

PLAN CONC. COVER

0.30
AIR SPACE AIR SPACE
WATER SEAL 12mm∅ STD.
WATER SEAL
WATER SEAL INLET GRADE REBARS
OUTLET
1 general notes SCALE : N.T.S SPACED @ 0.30
M.O.C.B.W

N 100mm∅ PVC

1.75
BREATHER AND INLET
SITE TO MAHARLIKA HI-WAY LEECHING LEECHING DIGESTIVE CHAMBER

1.20
PIPE EMBEDDED TO
W E CHAMBER CHAMBER CHB WALL

CIRCUMFERENTIAL
S 5" THK CHB SEPTIC
ROAD TANK WALL WITH
12mm∅ REBARS @
1.00m FRO VER.
0.15 REBARS & @
EVERY 3 LAYER
12mm∅ STD.
A D

GRADE REBARS
R O

SPACED @ 0.30
SECTION M.O.C.B.W
I N
M A

COMPUTATION FOR THE SIZE OF SEPTIC


TANK
TYPE OF ESTABLISHMENT : SINGLE FAMILY DWELLING FOR THE DIMENSION OF SEPTIC TANK LET SAY DEPTH IS 1.20m AND THE
NUMBER OF PERSON : 8 WIDTH IS 1.0m. FIND THE LENGTH OF THE DIGESTIVE CHAMBER.
GALLONS PER PERSON PER DAY : 75GAL.
GALLONS PER DAY : 8 X 75 = 600GAL. L = VOLUME
W x D
USING FORMULA : V=1.125+0.75Q
L = 1.71cu.m
V = 1.125+0.75(600) (1.0m x 1.20m)
V = 451.125gal.
L = 1.425m Say; 1.50m
CITTA GRANDE V = 451.125gal. x 1cu.mm
264gal
V = 1.71cu.m

2 location map SCALE : N.T.S


3 details of septic tank SCALE : 1 : 30

CONTRACTOR sanitary ENGINEER PRC. NO. CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO general notes, location map &
DATE/REG (2) STOREY RESIDENTIAL BUILDING CHECKED BY
details of septic tank pL-01
BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
PLACE IYAM, LUCENA CITY
DATE JUL. 08, 2023
A B C D A B C D

9.00 9.00

2.50 3.90 2.60 1.20 1.40 1.00 1.45 2.75 1.20


20mm∅ PPR 20mm∅ PPR
PIPE RISER PIPE RISER
20mm∅ PPR
PIPE
1 1

1.20

1.20
H.B
1.70

k.s k.s

3.10
2 2
W.C sh

2.10
LAV.

3.00
sh W.C
LAV.
5.00

3.60

3.40

3.00
12.00

12.00

12.00

12.00
3 3

1.60
20mm∅ PPR PIPE
3.30

5.30

4.80
2.70
4 4
2.00

H.B

1.00
5 5
CV GV WM

1.20 3.80 2.80 1.20


GV

2.10 3.15
9.00

FROM EXISTING
WATER SOURCE Ø - DIAMETER LAV - LAVATORY

mm - MILLIMETER GV - GATE VALVE

HB - HOSE BIBB CV - CHECK VALVE

WC - WATER CLOSET KS - KITCHEN SINK

BT - BATH TUB

1 POTABLE WATER LINE PIPING LAYOUT @ GROUND FLOOR SCALE : 1 : 30


2 POTABLE WATER LINE PIPING LAYOUT @ 2ND FLOOR SCALE : 1 : 30

CONTRACTOR sanitary ENGINEER PRC. NO. CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO POTABLE WATER LINE PIPING LAYOUT
DATE/REG (2) STOREY RESIDENTIAL BUILDING CHECKED BY @ GROUND FLOOR & POTABLE WATER pL-02
PLACE BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
DATE JUL. 08, 2023
LINE PIPING LAYOUT @ 2ND FLOOR
IYAM, LUCENA CITY
A B C D A B C D

9.00 9.00

50mm∅ Pvc
2.50 3.90 2.60 1.20 1.40 1.00 1.45 2.75 1.20
PIPE RISER 75mm∅ Pvc
PIPE RISER
50mm∅ Pvc
PIPE RISER
1 1
fd

1.20

1.20
1.70 c.o
k.s k.s
75mm∅ Pvc

3.10
c.o 75mm∅ Pvc PIPE PIPE RISER fd
2 2 c.o
W.C

2.10
LAV.

3.00
fd W.C
LAV.
c.o
75mm∅ Pvc
PIPE RISER

100mm∅ Pvc PIPE


5.00

3.60

3.40

3.00
12.00

12.00

12.00

12.00
3 3

1.60
3.30

septic vault

5.30

4.80
2.70
4 4
2.00

1.00
5 5

RUN AND TAPPED TO


NEAREST EXISTING
PUBLIC SEWER LINE

2 sanitary LINE PIPING LAYOUT @ 2ND FLOOR SCALE : 1 : 100

0.60

0.05
10mm∅ RSB
0.10 0.40 0.10

0.05
0.10
BOTH @ 0.15M
1 sanitary LINE PIPING LAYOUT @ GROUND FLOOR SCALE : 1 : 100
O.C

WC - WATER CLOSET 75mm∅


AD/CB - AREA DRAIN / CATCH BASIN

(COVER)
PVC PIPE

0.05
Ø - DIAMETER LAV - LAVATORY
0.50
0.60
INLET OUTLET

0.45
0.65
CO - CLEAN OUT DS - DOWNSPOUT
75mm∅
MH - MANHOLE WP - WASTE PIPE MH
PVC PIPE
mm - MILLIMETER SD - STORM DRAIN
100mm∅
FD - FLOOR DRAIN KS - KITCHEN SINK PVC PIPE
0.05

VSTR - VENT STACK THRU ROOF 100mm∅

0.10
0.50 PVC PIPE
PLAN SECTION
3 legends & symbols SCALE : n.t.s
4 details of area drain / catch basin SCALE : 1 : 30

CONTRACTOR sanitary ENGINEER PRC. NO. CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. CAD BY D.N. ZOLETA sanitary LINE PIPING LAYOUT @ GROUND
ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO FLOOR, sanitary LINE PIPING LAYOUT @ 2ND
DATE/REG (2) STOREY RESIDENTIAL BUILDING CHECKED BY
FLOOR, legends & symbols & details of pL-03
PLACE BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
DATE JUL. 08, 2023 area drain / catch basin
IYAM, LUCENA CITY
KS
F/SH
A B C D
F/SH
LAV
WC
9.00
KS WC

2.50 3.90 2.60 LAV

50mm∅ Pvc PIPE 50mm∅ Pvc PIPE hb


downspout downspout
PE
1 PI
PR P
m∅ hb
75mm∅ Pvc PIPE m
1.70

20
downspout

3.10
2 CV
GVGV
WM
100mm∅ Pvc PIPE

75mm∅ Pvc PIPE


downspout FROM EXISTING

100mm∅ Pvc PIPE


WATER SOURCE
5.00

75mm∅ Pvc PIPE

3.60
downspout
12.00

12.00
3 2 potable water line isometric SCALE : 1 : 100
100mm∅ Pvc PIPE

75mm∅ Pvc PIPE


75mm∅ Pvc 75mm∅ Pvc
downspout
PIPE stack PIPE
50mm∅ Pvc
50mm∅ Pvc
3.30

vstr PIPE
vstr PIPE ks
100mm∅ Pvc PIPE
FD

5.30
LAV c.o
75mm∅ Pvc c.o WC
c.o 100mm∅ Pvc
stack PIPE FD
4 ks lav WC stack PIPE
50mm∅ Pvc PE
PI
d.s PIPE
k.
s PE vc 100mm∅ Pvc
2.00

PI
P
c m∅
storm drain
75mm∅ Pvc Pv 0m
∅ 10 PIPE
d.s PIPE mm
FD 75
5 75mm∅ Pvc
vc
c.o
d.s PIPE
m∅P
m
75 IPE
P se
RUN AND TAPPED TO RUN AND TAPPED TO PE pt
PI ic
NEAREST EXISTING NEAREST EXISTING c
Pv va
PUBLIC SEWER LINE PUBLIC SEWER LINE ∅ ul
mm t
0
10
RUN AND TAPPED TO
75mm∅ Pvc PE
NEAREST EXISTING
d.s PIPE PI PUBLIC SEWER LINE
c
Pv

AD/CB - AREA DRAIN / CATCH BASIN WC - WATER CLOSET mm 0
LAVATORYRUNNEAREST
AND TAPPED TO 10
Ø - DIAMETER LAV - EXISTING
CO - CLEAN OUT DS - DOWNSPOUT PUBLIC SEWER LINE
MH - MANHOLE WP - WASTE PIPE
mm - MILLIMETER SD - STORM DRAIN RUN AND TAPPED TO
NEAREST EXISTING
FD - FLOOR DRAIN KS - KITCHEN SINK PUBLIC SEWER LINE
VSTR - VENT STACK THRU ROOF

1 storm drain piping layout SCALE : n.t.s


3 sanitary line isometric SCALE : 1 : 100

CONTRACTOR sanitary ENGINEER PRC. NO. CLIENT/OWNER PROJECT TITLE DRAWN BY D.N. ZOLETA SHEET CONTENTS SHEET NO.

PTR. NO. CAD BY D.N. ZOLETA


ARZIE C. GRIMALDO RENOVATION & EXPANSION OF TWO storm drain piping layout, potable
DATE/REG (2) STOREY RESIDENTIAL BUILDING CHECKED BY water line isometric & sanitary line pL-04
BRGY. IBABANG IYAM, LUCENA CITY LOT 14, BLK. 34 CITTA GRANDE SUBD., IBABANG
isometric
PLACE IYAM, LUCENA CITY
DATE JUL. 08, 2023