Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CONTENTS I

2.5 Sprinkler 34
2.6 Precautions for Work 36
2.6.1 Compaction operation 36
2.6.2 When going downhill 36
2.6.3 On a slope 36
2.7 Applicable Jobs 37
2.8 After Operation 37
2.9 Loading and Unloading 38
2.9.1 Use of a trailer equipped with a winch 38
2.9.2 Self-propelling 39
2.9.3 Use of a hoist. 40
2.10 After Loading the Machine .41
2.11 Transportation 41
2.12 Operation in Cold Weather .41
2.12.1 Fuel oil and grease .41
2.12.2 Coolant 42
2.12.3 Battery 43
2.13 When the Cold Season is Over .43
2.14 For a Long Storage Period .44
2.15 During the Storage Period .44
2.16 When the Battery Has Discharged .45
2.16.1 Connection and disconnection of booster cables .46

3. PERIODICAL MAINTENANCE
3.1 Precautions 47
3.2 Walk-Around Checking 51
3.3 Periodical Maintenance Points 52
3.4 Maintenance Procedure 54
(1) Every 10 hours or daily 54
(2) Every 100 hours 56
(3) Every 500 hours 57
(4) Every 1000 ~lours 59
(5) As required 69
3.5 Feeding Water and Lubricants , 72
3.6 Electric Wiring Diagram 74

4. SPECIFICATIONS 76

You might also like