INCIDENT REPORT
REPORT DAY: May - 17 - 2023
REPORTED BY: Vo Thanh Tung
A. PROJECT: DAIWA HOUSE REAL ESTATE
ITEM COLUMN CRACK

OCCURRENCE DAY: 13/ May /2023 TREATED DAY: -


PRESENT CONDITION : On going

B. SUMMARY OF MAINTENANCE WORK


-Crack and hollow on corner column

C. REASON AND EXPLANATION


The mortar surface on column are cracked and hollow because the quality of mortar is not good
The column mortar do not have gap joint with floor concrete

D. METHOD OF TREATMENT
1. Remove all hollow mortar on column
2. Make column more rough for more connection
3. Apply proper mixture mortar with sika latex
4. Make a joint gap between column mortar and floor
5. Putty and Painting