MASTER SCHEDULE (30th/June to 11th /July)

PROJECT : FACTORY 01,02,03,05 - REPAIR FOOT COLUMN WORK


Jun-23 Jul-23
Position
No. TASK NAME 30 1 2 3 4 5 6 7 8 9 10 11 12 REMARK

Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed

8-10am10-12am
1-3pm3-5 pm8-10am10-12am
1-3pm3-5 pm8-10am10-12am
1-3pm3-5 pm8-10am10-12am
1-3pm 3-5 pm 8-10am10-12am
1-3pm 3-5 pm 8-10am10-12am
1-3pm 3-5 pm 8-10am10-12am
1-3pm 3-5 pm 8-10am10-12am
1-3pm 3-5 pm 8-10am10-12am
1-3pm 3-5 pm 8-10am10-12am
1-3pm 3-5 pm 8-10am10-12am
1-3pm 3-5 pm 8-10am10-12am
1-3pm 3-5 pm 8-10am10-12am
1-3pm 3-5 pm

1 DAMAGED COLUMN REPAIRING

Fac 1( Kawamura) Fac 1( Kawamura)

Fac 3( Mogami) Fac 3( Mogami)


Chipping columns
a

Fac 2 Fac 2

Fac 5 Fac 5

Fac 1( Kawamura) Fac 1( Kawamura)

Fac 5 Fac 5
Inject Sika 752 for cracked columns
b

Fac 2 Fac 2

Fac 3( Mogami) Fac 3( Mogami)

Fac 1( Kawamura) Fac 1( Kawamura)

Fac 5 Fac 5
Install formwork, fill sika grout for damaged area
c

Fac 2 Fac 2

Fac 3( Mogami) Fac 3( Mogami)

Curing Curing
d

Fac 1( Kawamura) Fac 1( Kawamura)

Fac 5 Fac 5
Remove formwork, Apply mortar for columns
e

Fac 2 Fac 2

Fac 3( Mogami) Fac 3( Mogami)

Curing Curing
f

Fac 1( Kawamura) Fac 1( Kawamura)

Fac 5 Fac 5
Apply putty and painting
g

Fac 2 Fac 2

Fac 3( Mogami) Fac 3( Mogami)

Inspection & Handover Inspection & Handover


h

2 Other works