Strip Footing and Raft Interface

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

275 260 261 260

01 02 03 04 05 06 07 08 09 10 11
8118 16167 15810 15810 15810 15810 15810 15810 15810 15810

SFL - 217.850
01 02 03 04 05 06 07 08
RAFT - 1000 09 10 11
UNDERSIDE OF RAFT - 216.850 D-XA
UNDERSIDE OF RAFT +50mm B4-108

FH
A A CL PILE CUTOFF LEVEL - 216.900 A
1-W132
525 COLS @ GRID 2 STAIR B4-1

1-W139
BREAK ROOM
1 D-XA
W-161
1-W140
DP 280 R1 STORAGE
FH
1-W128
STOP THE W-SF1 1-519
TRUCKER TOILET
1700
PRECAST CORE RECESSED DOCKS NORTH 1700 BUMP OUT B4
STRIP FOOTING

S-

P1
INTERNAL TOPPING

P1
14934

S-
REFER TO MEL9-IVS-WH-XX-DR-ST-320 1-W133 REFER TO MEL9-IVS-B4
3290 1100 1207 5000 1625 2850 1095 1210 2850 2420 2850 2420 2850 910 2850 960 1100 960 2850 2120 2850 1210 2850 2420 2850 3295 SHORT
1100 2085 AT
1210 THE
2850 2420 2850 6480 216.900 6480
216.900 2850 2420 2850 1210 1210 2850 2420 2850 2420 2850 1210 1210 2850 4925 345 6480 FH CORRIDOR
D-XA RRA RRB RRB RRB RRB RRB D-XA RRB RRB RRB RRB
FORRAFT
CORE STAIR DETAILS.
D-XA RRB RRB RRB
SLAB
RRB
BUILDUP RRB RRB RRB RRB
1-W135 SERIES FOR DETAILS
1210 1210 RRB D-XA
W-101 W-601 W-602 W-603 W-604 W-605 W-606 W-102 W-607 W-608 W-609 W-610 W-103 W-611 W-612 W-613 STRATEGYW-614 NEEDS TO W-615 W-616 W-617 W-618 W-619 SEE
UTILITY
W-107
D-XN D-XN 1-W141
1-W127 W-174 BE REVIEWED - ISOMETRIC W-177 POD SHAFT
TRUCKERS LOUNGE
APPEARS TO BE

7000

7000
11175 465 4527
D-XN 1-512
W-175 1 ALMOST A 2.0m BUILDUP SPRINKLER VALVE 4
D-XN
W-176 1-W134
? 1-W138
290 1-W130 ? MALE
- WILL NEED TO BE A
216.900
216.900
SCRUBBER ELECTRICAL
FH 1 FH FH FH

S-
P1
FH
SUSPENDED SLAB IF 1-W136

P1
S-
FR WC LOBBY
B B 1-W126 THIS IS THE CASE B
525

COL COL COL COL COL FHR COL COL COL COL COL
SWITCHGEAR - MSB
CL

B-2 DLP DLP


FHR DP PEN. B-2 DB DB FHR DLP W-SF1 DB DLP W-SF1 DLP
W-SF1 B-2 B-2 B-2 B-2 B-2 B-2 B-2 B-2 W-SF1
FHR B-2 B-2 B-2 B-2 B-2 B-2 B-2 B-2 B-2 B-2 B-2W-SF1 B-2 B-2 B-2 B-2 B-2 B-2 B-2 D-G W-SF1
D-T D-XQ W-PF3 W-105

464 1100
COLS @ GRID B W-154
W-PF3 FLP W-PF3 W-PF3 W-PF3 W-PF3 W-PF3 W-PF3 W-PF3
W-156 D-J D-H W-PF3
2160 WE WILL POUR W-104 W-106
CLN D-H 1-W172

1000
FH W-153 TRUCKERS CAGE THE RAFT CONNECT STRIP
DB 5270 5270 5270 4970 5870 4970 5270 5270 10540 THROUGHT 5270 15810 5270 5270 5270 5270 5270 5270 4515 1920 1000 7907
B4 ANCILLARY WC
FOOTING INTO RAFT
STOP THE W-SF1 467

4965
1
___________ STRIP FOOTING 1
___________

NOTE: 262 1-W124 SHORT AT THE POUR RAFT THROUGH DOCUMENTED 262
BREAK ROOM
EXTENT OF RAFT
17398

COLUMN CONCENTRICITY OVER PAD 214 RAFT


FOOTINGS SHALL BE MAINTAINED
W-SF1

D-G
ALONG WAREHOUSE PERIMETER W-152

2
8352

500 1-W123
MALE
1-W122
WC LOBBY W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1
W-PF3

C C ?
COL COL COL COL COL COL COL COL COL COL
C
1-W121
EXTERNAL WEST B3 FEMALE
3391

B3 ANCILLARY WC &
VERTICAL MHE SHAFT
8430

4589

W-PF2 W-PF2 W-PF2


W-PF3

REFER TO DRAWING MEL9-IVS-WH-01-DR-ST-202 FOR CONTINUATION


W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2
D D COL COL COL COL COL COL COL COL COL COL
D
900
4081

BUMP OUT B3
W-SF1

REFER TO MEL9-IVS-B3
8430

SERIES FOR DETAILS

1-W118 1-W119 W-PF2


FH STAIR B3-1 VRC SHAFT 2 W-PF2 W-PF2
W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2
E COL
E
1000 469

COL COL COL COL COL COL COL COL COL


E D-XA 1-W117
FHR

FH B3-105 EXIT CORRIDOR D-H


W-151
2246

DLP
B-2
8430

RRB
2850

REFER DRAWING 1. 212 FOR CONTINUATION


1-518 W-653
RECCESSED DOCKS WEST W-PF3 W-PF2 W-PF2 W-PF2
B-2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2
1000 1865

F F COL
B-2
COL COL COL COL COL COL COL COL COL
F

RRB
2850

W-652
W-SF1
8430

B-2
4580
FOLD

W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2


DB W-PF2 W-PF2 W-PF2 W-PF2
FHR FHR
G G COL COL COL COL COL COL COL COL COL COL
G
2519

B-4 B-3
8430

RRA
5000

W-651

W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2


W-PF2 W-PF2 MDP W-PF2 W-PF2
911

B-4 B-3
H H COL COL COL COL COL COL COL COL COL COL
H
4123
W-SF1
8430

D-XA
1100

W-149

W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2


3207

W-PF2 W-PF2 W-PF2 W-PF2


I I COL COL COL COL COL COL COL COL COL COL
I
1827

B-4 B-3
8430

RRA
5000

W-650

W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2


B-4 B-3
W-PF2 W-PF2 1-W181
W-PF2 W-PF2 1-W182
1603

STAIR WH-1 STAIR WH-2


J J COL COL COL COL COL COL COL COL COL COL
J
670

669
1
293
4850

4850
C/O

C/O
6430
W-SF1

DB
8430

FH

C:\Users\camilo.pinto\Documents\MEL9-IVS-ZZ-00-M3-SST_camilo.pintoH2UJJ.rvt
D-XA
W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2
1725 900 1100

W-PF2 D-J D-J


W-150
W-196 W-197
K K COL COL COL COL COL COL ?COL COL COL COL
K
B-4 B-3
3290 2850
C/O 3385 2850
C/O

RRA
8430

5000

2. W-649 REFER TO DRAWING MEL9-IVS-WH-01-DR-ST-203 FOR CONTINUATION 2.


___________ ___________
261 COLS @ GRID 2 261
B-4 B-3
WAREHOUSE - FOUNDATION PLAN - ZONE 1 B4
1705

L COL COL COL COL COL COL COL COL COL COL
L
100

SCALE: 1 : 200
B5
REFER DRAWING 1. 214 FOR CONTINUATION B3
LEGEND STRUCTURAL NOTES ZONE 1
90

1. REFER TO DRAWING MEL9-IVS-WH-01-DR-ST-195 FOR ALL STRUCTURAL SIZES


DENOTES PRECAST PANEL OVER 1
___________ 1.
___________ 2
___________
2. THE EXTENT OF PAD FOOTINGS AND PILED FOUNDATIONS IS SUBJECT TO COORDINATION WITH THE PROPOSED CUT/FILL DESIGN.
80

REFER TO DRAWING MEL9-IVS-SW-00-DR-ST-180 AND 185 260 261 260


THE SPLIT SHOWN BETWEEN THE TWO SYSTEMS IS APPROXIMATE AND SUBJECT TO CHANGE.
FOR PRECAST SETOUT PLAN AND ELEVATIONS 3. FOUNDATIONS FOR THE MEZZANINE FLOOR ARE SUBJECT TO RECEIPT OF CONCEPTUAL ARCHITECTURAL DRAWINGS. ROBERTS CO TO MAKE WAREHOUSE
70

ADDITIONAL ALLOWANCE FOR PAD AND PILED FOUNDATIONS.


4. UNLESS NOTED OTHERWISE, ALL PAD FOOTINGS AND PILES ARE CONCENTRIC TO THE COLUMN/WALL OVER.
B2 B6
60

REFER TO THE ARCHITECT FOR COLUMN SET OUT LOCATIONS


01 02 03 04 05 06 07 08 09 10 11
B1
FOR INFORMATIO
50

KEYPLAN
CONSTRUCTION
40

CLIENT: REV: DATE: DESCRIPTION: APR'D: TITLE: NAME: www.innovis.com.au


30

C3 15/09/23 ISSUED FOR CONSTRUCTION (REVISED AS CLOUDED) CB DRAFTER CP MEL9


C2 10/08/23 RE-ISSUED FOR CERTIFICATON (REVISED AS CLOUDED) CB DRAFTING CHECK TN A g i l e O u t c o m e s
745 AND 755 SUMMERHILL RD

FILE LOCATION:
10mm 20

C1 07/07/23 ISSUED FOR CONSTRUCTION CB DESIGNER SC SCALE: DATE: PHASE: SHT SIZE:
AT A1

P5 26/05/23 ISSUED FOR CERTIFICATION CB DESIGN CHECK MB CRAIGIEBURN, VICTORIA As indicated CONSTRUCTION B1
P4 12/05/23 ISSUED FOR 25% DD FOUNDATIONS TENDER DRAWINGS ISSUE CB PROJECT MANAGER SC DRAWING NUMBER: REVISION:
WHSE FOUNDATION PLAN - ZONE 1
PRINT IN COLOUR: P3 28/04/23 ISSUED FOR PILING TENDER CB PROJECT DIRECTOR CB MEL9-IVS-WH-01-DR-ST-201 C3
0

©2021, INNOVIS PTY LTD reserves all rights to these drawings, designs and/or any other data contained herein. No part of the said drawings, designs and/or other data may be reproduced, modified, transmitted or used in any form or by any PRINT DATE: 15/09/2023 4:49:30 PM
means for any purpose without the prior written consent of INNOVIS PTY LTD other than the sole purpose for which such drawings, designs and/or other data are provided to licensed users on such terms as INNOVIS PTY LTD may prescribe.
01 02 03 04 05 06 07 08 09 10 11
REFER TO DRAWING MEL9-IVS-WH-01-DR-ST-201 FOR CONTINUATION

W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2


W-PF2

W-SF1
W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 *

W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 *


W-PF3 W-PF2
W-PF2
M

W-SF1

W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 *

REFER TO DRAWING MEL9-IVS-WH-01-DR-ST-204 FOR CONTINUATION


NOTE:
COLUMN CONCENTRICITY OVER PAD
FOOTINGS SHALL BE MAINTAINED
ALONG WAREHOUSE PERIMETER
W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 * W-PF2 *
W-PF3

O
W-SF1

W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2


W-PF3 W-PF2 W-PF2 * W-PF2 *

8
-P
W
W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2
W-PF3 W-PF2 W-PF2 * W-PF2 *

8
-P
W
W-SF1

W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 * W-PF2 *


W-PF3 W-PF2
W-PC1

8
-P
W
R

8
-P
W
1
-P
W
W-PF3 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 * W-PF1 * W-PF1 *
W-PC2

8
-P
W
WE WILL POUR
S THE RAFT

8
-P
W
THROUGHT

2
-P
W
W-SF1

8
-P

-P

-P
W

8
-P
W
INDICATIVE CUT FILL AS PER JAMES REPORT No: 122261/B001-B080 DATED 01/08/23
STOP THE W-SF1
STRIP FOOTING
SHORT AT THE W-PF3 W-PF3
W-PF3 W-PF3 W-PF3 W-PF3 W-PF3 * W-PF3 * W-PF3 *

3
RAFT

8
-P
W-PC3

-P

-P
W
W

W
W-SF1 W-SF1 W-SF1 W-SF1 W-SF1 W-SF1 W-SF1
T

BUMP OUT B2
REFER TO MEL9-IVS-B2
SERIES FOR DETAILS

C:\Users\camilo.pinto\Documents\MEL9-IVS-ZZ-00-M3-SST_camilo.pintoH2UJJ.rvt
BUMP OUT B1
REFER TO MEL9-IVS-B1
SERIES FOR DETAILS

V
B4
100

WAREHOUSE - FOUNDATION PLAN - ZONE 4 B3 B5


90

STRUCTURAL NOTES SCALE: 1 : 200 WAREHOUSE


LEGEND
80

1. REFER TO DRAWING MEL9-IVS-WH-01-DR-ST-195 FOR ALL STRUCTURAL SIZES


DENOTES PRECAST PANEL OVER 2. THE EXTENT OF PAD FOOTINGS AND PILED FOUNDATIONS IS SUBJECT TO COORDINATION WITH THE PROPOSED CUT/FILL DESIGN.
REFER TO DRAWING MEL9-IVS-SW-00-DR-ST-180 AND 185
70

THE SPLIT SHOWN BETWEEN THE TWO SYSTEMS IS APPROXIMATE AND SUBJECT TO CHANGE.
FOR PRECAST SETOUT PLAN AND ELEVATIONS 3. FOUNDATIONS FOR THE MEZZANINE FLOOR ARE SUBJECT TO RECEIPT OF CONCEPTUAL ARCHITECTURAL DRAWINGS. ROBERTS CO TO MAKE ZONE 4
60

ADDITIONAL ALLOWANCE FOR PAD AND PILED FOUNDATIONS.


DENOTES PILE OPTION. IF AN EXCAVATION DEPTH 4. UNLESS NOTED OTHERWISE, ALL PAD FOOTINGS AND PILES ARE CONCENTRIC TO THE COLUMN/WALL OVER. B2 B6
* OF >1.5m IS REQUIRED TO REACH THE REQUIRED REFER TO THE ARCHITECT FOR COLUMN SET OUT LOCATIONS
50

FOUNDING LEVEL FOR THE PAD FOOTING, ADOPT THE B1


FOLLOWING PILE ALTERNATIVE:
CONSTRUCTION KEYPLAN
40

PAD FOOTING PILE OPTION CLIENT: REV: DATE: DESCRIPTION: APR'D: TITLE: NAME: www.innovis.com.au
30

W-PF1 W-P2 C3 15/09/23 ISSUED FOR CONSTRUCTION (REVISED AS CLOUDED) CB DRAFTER CP MEL9
C2 10/08/23 RE-ISSUED FOR CERTIFICATION (REVISED AS CLOUDED) CB DRAFTING CHECK TN A g i l e O u t c o m e s
745 AND 755 SUMMERHILL RD

FILE LOCATION:
10mm 20

W-PF2 W-P1
C1 07/07/23 ISSUED FOR CONSTRUCTION CB DESIGNER SC SCALE: DATE: PHASE: SHT SIZE:
AT A1

W-PF3 W-P3 P5 26/05/23 ISSUED FOR CERTIFICATION CB DESIGN CHECK MB CRAIGIEBURN, VICTORIA As indicated CONSTRUCTION B1
P4 12/05/23 ISSUED FOR 25% DD FOUNDATIONS TENDER DRAWINGS ISSUE CB PROJECT MANAGER SC DRAWING NUMBER: REVISION:
WHSE FOUNDATION PLAN - ZONE 4
PRINT IN COLOUR: P3 28/04/23 ISSUED FOR PILING TENDER CB PROJECT DIRECTOR CB MEL9-IVS-WH-01-DR-ST-204 C3
0

©2021, INNOVIS PTY LTD reserves all rights to these drawings, designs and/or any other data contained herein. No part of the said drawings, designs and/or other data may be reproduced, modified, transmitted or used in any form or by any PRINT DATE: 15/09/2023 4:48:46 PM
means for any purpose without the prior written consent of INNOVIS PTY LTD other than the sole purpose for which such drawings, designs and/or other data are provided to licensed users on such terms as INNOVIS PTY LTD may prescribe.
NLB PRECAST WALLS
- DETAILS TBC

DOWNTURN/UPSTAND
WALL ONTO STIP/PAD/RAFT

STOP STRIP FOOTING AT THE


PAD

NLB PRECAST WALLS


DETAILS TBC

CONNECT FOOTING INTO


SIDE OF THE RAFT

DOWNTURN ONTO
RAFT/STRIP

STOP STRIP FOOTING AT THE


FACE OF THE RAFT

You might also like