Professional Documents
Culture Documents
Strip Footing and Raft Interface
Strip Footing and Raft Interface
Strip Footing and Raft Interface
01 02 03 04 05 06 07 08 09 10 11
8118 16167 15810 15810 15810 15810 15810 15810 15810 15810
SFL - 217.850
01 02 03 04 05 06 07 08
RAFT - 1000 09 10 11
UNDERSIDE OF RAFT - 216.850 D-XA
UNDERSIDE OF RAFT +50mm B4-108
FH
A A CL PILE CUTOFF LEVEL - 216.900 A
1-W132
525 COLS @ GRID 2 STAIR B4-1
1-W139
BREAK ROOM
1 D-XA
W-161
1-W140
DP 280 R1 STORAGE
FH
1-W128
STOP THE W-SF1 1-519
TRUCKER TOILET
1700
PRECAST CORE RECESSED DOCKS NORTH 1700 BUMP OUT B4
STRIP FOOTING
S-
P1
INTERNAL TOPPING
P1
14934
S-
REFER TO MEL9-IVS-WH-XX-DR-ST-320 1-W133 REFER TO MEL9-IVS-B4
3290 1100 1207 5000 1625 2850 1095 1210 2850 2420 2850 2420 2850 910 2850 960 1100 960 2850 2120 2850 1210 2850 2420 2850 3295 SHORT
1100 2085 AT
1210 THE
2850 2420 2850 6480 216.900 6480
216.900 2850 2420 2850 1210 1210 2850 2420 2850 2420 2850 1210 1210 2850 4925 345 6480 FH CORRIDOR
D-XA RRA RRB RRB RRB RRB RRB D-XA RRB RRB RRB RRB
FORRAFT
CORE STAIR DETAILS.
D-XA RRB RRB RRB
SLAB
RRB
BUILDUP RRB RRB RRB RRB
1-W135 SERIES FOR DETAILS
1210 1210 RRB D-XA
W-101 W-601 W-602 W-603 W-604 W-605 W-606 W-102 W-607 W-608 W-609 W-610 W-103 W-611 W-612 W-613 STRATEGYW-614 NEEDS TO W-615 W-616 W-617 W-618 W-619 SEE
UTILITY
W-107
D-XN D-XN 1-W141
1-W127 W-174 BE REVIEWED - ISOMETRIC W-177 POD SHAFT
TRUCKERS LOUNGE
APPEARS TO BE
7000
7000
11175 465 4527
D-XN 1-512
W-175 1 ALMOST A 2.0m BUILDUP SPRINKLER VALVE 4
D-XN
W-176 1-W134
? 1-W138
290 1-W130 ? MALE
- WILL NEED TO BE A
216.900
216.900
SCRUBBER ELECTRICAL
FH 1 FH FH FH
S-
P1
FH
SUSPENDED SLAB IF 1-W136
P1
S-
FR WC LOBBY
B B 1-W126 THIS IS THE CASE B
525
COL COL COL COL COL FHR COL COL COL COL COL
SWITCHGEAR - MSB
CL
464 1100
COLS @ GRID B W-154
W-PF3 FLP W-PF3 W-PF3 W-PF3 W-PF3 W-PF3 W-PF3 W-PF3
W-156 D-J D-H W-PF3
2160 WE WILL POUR W-104 W-106
CLN D-H 1-W172
1000
FH W-153 TRUCKERS CAGE THE RAFT CONNECT STRIP
DB 5270 5270 5270 4970 5870 4970 5270 5270 10540 THROUGHT 5270 15810 5270 5270 5270 5270 5270 5270 4515 1920 1000 7907
B4 ANCILLARY WC
FOOTING INTO RAFT
STOP THE W-SF1 467
4965
1
___________ STRIP FOOTING 1
___________
NOTE: 262 1-W124 SHORT AT THE POUR RAFT THROUGH DOCUMENTED 262
BREAK ROOM
EXTENT OF RAFT
17398
D-G
ALONG WAREHOUSE PERIMETER W-152
2
8352
500 1-W123
MALE
1-W122
WC LOBBY W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1
W-PF3
C C ?
COL COL COL COL COL COL COL COL COL COL
C
1-W121
EXTERNAL WEST B3 FEMALE
3391
B3 ANCILLARY WC &
VERTICAL MHE SHAFT
8430
4589
BUMP OUT B3
W-SF1
REFER TO MEL9-IVS-B3
8430
DLP
B-2
8430
RRB
2850
F F COL
B-2
COL COL COL COL COL COL COL COL COL
F
RRB
2850
W-652
W-SF1
8430
B-2
4580
FOLD
B-4 B-3
8430
RRA
5000
W-651
B-4 B-3
H H COL COL COL COL COL COL COL COL COL COL
H
4123
W-SF1
8430
D-XA
1100
W-149
B-4 B-3
8430
RRA
5000
W-650
669
1
293
4850
4850
C/O
C/O
6430
W-SF1
DB
8430
FH
C:\Users\camilo.pinto\Documents\MEL9-IVS-ZZ-00-M3-SST_camilo.pintoH2UJJ.rvt
D-XA
W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2
1725 900 1100
RRA
8430
5000
L COL COL COL COL COL COL COL COL COL COL
L
100
SCALE: 1 : 200
B5
REFER DRAWING 1. 214 FOR CONTINUATION B3
LEGEND STRUCTURAL NOTES ZONE 1
90
KEYPLAN
CONSTRUCTION
40
FILE LOCATION:
10mm 20
C1 07/07/23 ISSUED FOR CONSTRUCTION CB DESIGNER SC SCALE: DATE: PHASE: SHT SIZE:
AT A1
P5 26/05/23 ISSUED FOR CERTIFICATION CB DESIGN CHECK MB CRAIGIEBURN, VICTORIA As indicated CONSTRUCTION B1
P4 12/05/23 ISSUED FOR 25% DD FOUNDATIONS TENDER DRAWINGS ISSUE CB PROJECT MANAGER SC DRAWING NUMBER: REVISION:
WHSE FOUNDATION PLAN - ZONE 1
PRINT IN COLOUR: P3 28/04/23 ISSUED FOR PILING TENDER CB PROJECT DIRECTOR CB MEL9-IVS-WH-01-DR-ST-201 C3
0
©2021, INNOVIS PTY LTD reserves all rights to these drawings, designs and/or any other data contained herein. No part of the said drawings, designs and/or other data may be reproduced, modified, transmitted or used in any form or by any PRINT DATE: 15/09/2023 4:49:30 PM
means for any purpose without the prior written consent of INNOVIS PTY LTD other than the sole purpose for which such drawings, designs and/or other data are provided to licensed users on such terms as INNOVIS PTY LTD may prescribe.
01 02 03 04 05 06 07 08 09 10 11
REFER TO DRAWING MEL9-IVS-WH-01-DR-ST-201 FOR CONTINUATION
W-SF1
W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 *
W-SF1
W-PF3 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 *
O
W-SF1
8
-P
W
W-PF2 W-PF2 W-PF2 W-PF2 W-PF2 W-PF2
W-PF3 W-PF2 W-PF2 * W-PF2 *
8
-P
W
W-SF1
8
-P
W
R
8
-P
W
1
-P
W
W-PF3 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 W-PF1 * W-PF1 * W-PF1 *
W-PC2
8
-P
W
WE WILL POUR
S THE RAFT
8
-P
W
THROUGHT
2
-P
W
W-SF1
8
-P
-P
-P
W
8
-P
W
INDICATIVE CUT FILL AS PER JAMES REPORT No: 122261/B001-B080 DATED 01/08/23
STOP THE W-SF1
STRIP FOOTING
SHORT AT THE W-PF3 W-PF3
W-PF3 W-PF3 W-PF3 W-PF3 W-PF3 * W-PF3 * W-PF3 *
3
RAFT
8
-P
W-PC3
-P
-P
W
W
W
W-SF1 W-SF1 W-SF1 W-SF1 W-SF1 W-SF1 W-SF1
T
BUMP OUT B2
REFER TO MEL9-IVS-B2
SERIES FOR DETAILS
C:\Users\camilo.pinto\Documents\MEL9-IVS-ZZ-00-M3-SST_camilo.pintoH2UJJ.rvt
BUMP OUT B1
REFER TO MEL9-IVS-B1
SERIES FOR DETAILS
V
B4
100
THE SPLIT SHOWN BETWEEN THE TWO SYSTEMS IS APPROXIMATE AND SUBJECT TO CHANGE.
FOR PRECAST SETOUT PLAN AND ELEVATIONS 3. FOUNDATIONS FOR THE MEZZANINE FLOOR ARE SUBJECT TO RECEIPT OF CONCEPTUAL ARCHITECTURAL DRAWINGS. ROBERTS CO TO MAKE ZONE 4
60
PAD FOOTING PILE OPTION CLIENT: REV: DATE: DESCRIPTION: APR'D: TITLE: NAME: www.innovis.com.au
30
W-PF1 W-P2 C3 15/09/23 ISSUED FOR CONSTRUCTION (REVISED AS CLOUDED) CB DRAFTER CP MEL9
C2 10/08/23 RE-ISSUED FOR CERTIFICATION (REVISED AS CLOUDED) CB DRAFTING CHECK TN A g i l e O u t c o m e s
745 AND 755 SUMMERHILL RD
FILE LOCATION:
10mm 20
W-PF2 W-P1
C1 07/07/23 ISSUED FOR CONSTRUCTION CB DESIGNER SC SCALE: DATE: PHASE: SHT SIZE:
AT A1
W-PF3 W-P3 P5 26/05/23 ISSUED FOR CERTIFICATION CB DESIGN CHECK MB CRAIGIEBURN, VICTORIA As indicated CONSTRUCTION B1
P4 12/05/23 ISSUED FOR 25% DD FOUNDATIONS TENDER DRAWINGS ISSUE CB PROJECT MANAGER SC DRAWING NUMBER: REVISION:
WHSE FOUNDATION PLAN - ZONE 4
PRINT IN COLOUR: P3 28/04/23 ISSUED FOR PILING TENDER CB PROJECT DIRECTOR CB MEL9-IVS-WH-01-DR-ST-204 C3
0
©2021, INNOVIS PTY LTD reserves all rights to these drawings, designs and/or any other data contained herein. No part of the said drawings, designs and/or other data may be reproduced, modified, transmitted or used in any form or by any PRINT DATE: 15/09/2023 4:48:46 PM
means for any purpose without the prior written consent of INNOVIS PTY LTD other than the sole purpose for which such drawings, designs and/or other data are provided to licensed users on such terms as INNOVIS PTY LTD may prescribe.
NLB PRECAST WALLS
- DETAILS TBC
DOWNTURN/UPSTAND
WALL ONTO STIP/PAD/RAFT
DOWNTURN ONTO
RAFT/STRIP