DAR-Sustainable and Resilient ARCs (SuRe ARCs) FMR Projects under the SAGF FY 2022

Office of Undersecretary for Support Services 1


Department of Agrarian Reform
Support Services Office

FARM-TO-MARKET ROADS (FMR)

ELIGIBILITY CRITERIA

1. Site should be within Agrarian Reform Communities (ARCs) or CARP Areas;

2. The identified FMR should support the agricultural and agribusiness

development in the ARCs or CARP Areas for rice and corn production areas;

3. The road is classified as Barangay Road and is targeted to provide the needed

link from production to the market or main thoroughfare;

4. Proposed FMR must not have firm funding commitment from the Department

of Public Works and Highways (DPWH), Department of Agriculture (DA), other

Government Funding Institutions or Non-Government Organizations;

5. One (1) FMR subproject per ARC or CARP Area;

6. Minimum length of the proposed FMR is 1 kilometer and the maximum length

is 5 kilometers;

7. There is no Road-Right-of-Way (RROW) problem for the proposed road

alignment; and

8. LGU is capable to provide the necessary support (i.e. RROW acquisition,

relocation of utilities) and provide annual maintenance funds.


Office of Undersecretary for Support Services 2
Memorandum 60, S’ 2023
Permanent Marker of FMR under
SuRe ARCs

Office of Undersecretary for Support Services 3


Memorandum 60, S’ 2023: Permanent Marker of FMR under SuRe ARCs (MOA with DPWH)

Office of Undersecretary for Support Services 4


Memorandum 60, S’ 2023: Permanent Marker of FMR under SuRe ARCs (MOA with LGU)

Office of Undersecretary for Support Services 5


Memorandum 142, S’2023
Inspection of FMR under
SuRe ARCs

Office of Undersecretary for Support Services 6


Include the road
shoulders in the sub-grade
preparation

7
Pouring should be double
lane and not monolithic

8
If possible, provide headwall, wing
wall and apron at the RC Pipes

9
Ensure to provide
the foundation (toe)
of the stone masonry

10
DAR’s Request to DPWH and LGUs:
 Invite DAR during the bidding as an observer;
 Invite DAR during Material Testing & Quality Control (MTQC); and
 Provide a copy of DED, DUPA, Request for VO, S Curve, Quality Control Program and As
Stake Survey Plans during the inspection.

Reminders to DPWH and LGUs:


 The DPWH/LGU shall ensure that all materials used in the FMR projects have passed the
minimum material testing requirements;
 Prior to the construction, DPWH/LGU shall secure a copy of the test reports from DPWH or
other DPWH-accredited testing centers for ready reference, including the pouring permit
and placing activity.

Office of Undersecretary for Support Services 11


DAR-SuRe ARCs Proposed Sticker:

Office of Undersecretary for Support Services 12


Office of Undersecretary for Support Services 13
Office of Undersecretary for Support Services 14
Office of Undersecretary for Support Services 15
Daghang Salamat Sa Tanan!

Office of Undersecretary for Support Services 16

You might also like