VESTAS PROPRIETARY NOTICE: This document contains valuable confidential information of Vestas Wind Systems A/S. It is protected by copyright law as an unpublished work. Vestas reserves all patent, copyright, trade secret, and
other proprietary rights to it. The information in this document may not be used, reproduced, or disclosed except if and to the extent rights are expressly granted by Vestas in writing and subject to applicable conditions. Vestas
disclaims all warranties except as expressly granted by written agreement and is not responsible for unauthorized uses, for which it may pursue legal remedies against responsible parties.
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 2 of 29
Change description
Description of changes
Updated section 3 Abbreviations and technical terms, page 4, section 5 Purpose, page 5,
section 7.1 Kit set in lifting units, page 6, section 7.2 List of tools in all toolkits, page 7, section
7.6 Specific tools for the kit set VT20024896, page 12, section 7.7 Tower lifting unit
VT20024896, page 12, and section 13.1.1 To lubricate the lifting units, page 25.
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 3 of 29
Table of Contents
1 Safety ........................................................................................................................... 4
2 Educational requirements of service technician .................................................... 4
3 Abbreviations and technical terms .......................................................................... 4
4 Referenced documentation....................................................................................... 5
4.1 Safety documents......................................................................................................... 5
4.2 Reference documents .................................................................................................. 5
5 Purpose ....................................................................................................................... 5
6 Note.............................................................................................................................. 6
7 Tools ............................................................................................................................ 6
7.1 Kit set in lifting units ...................................................................................................... 6
7.2 List of tools in all toolkits ............................................................................................... 7
7.3 Lifting capacity of VT200880 ........................................................................................ 7
7.4 Specific tools for the kit set VT20003722 ....................................................................11
7.5 Specific tools for the kit set VT20008420 ....................................................................11
7.6 Specific tools for the kit set VT20024896 ................................................................... 12
7.7 Tower lifting unit VT20024896 .................................................................................... 12
8 Spare parts ................................................................................................................ 13
9 Consumables ............................................................................................................ 13
10 Weights...................................................................................................................... 13
11 Estimated time use................................................................................................... 13
12 Procedure.................................................................................................................. 14
12.1 To prepare the lifting units before use ........................................................................ 14
12.1.1 To clean the lifting unit ................................................................................................ 14
12.1.2 To replace the bolt bushings and the axles ............................................................... 15
12.1.2.1 To replace the bolt bushings....................................................................................... 16
12.1.2.2 To replace the axle...................................................................................................... 18
12.1.3 Lifting configuration .................................................................................................... 19
12.1.3.1 To lift with a single hook.............................................................................................. 19
12.1.3.2 To prepare the crane with double hook (T-hook)........................................................ 20
12.1.4 To install the lifting unit on the tower flange................................................................ 20
12.1.5 To release the lifting units from the tower flange ........................................................ 23
13 Service and maintenance ........................................................................................ 25
13.1 Daily maintenance ...................................................................................................... 25
13.1.1 To lubricate the lifting units ......................................................................................... 25
13.2 Replacement of tower bolts ........................................................................................ 28
13.3 Annual service inspection........................................................................................... 28
13.4 Repair ......................................................................................................................... 29
14 Certification............................................................................................................... 29
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 4 of 29
1 Safety 0011465016
All work relating to a Vestas wind turbine, including work methods and practices, employee
training and protective measures, and use of tools and equipment, shall be in accordance with
the requirements of the applicable governmental and private occupational safety and health
codes and standards. Employers engaged in such work are also required to be familiar with and
comply with the wind turbine-specific ‘Safety regulations for operators and technicians’ manual
for the relevant wind turbine type. Vestas shall not be responsible for any liabilities arising from
failure to comply with such requirements. Vestas reserves the right to inspect such work to
ascertain such compliance.
The service technician must read and understand the PPE sheets for each of the chemicals used
or work done in this instruction. The PPE sheets describe the correct personal protective
equipment to wear for the specific work. If in doubt about the PPE requirements for the work,
contact the site responsible or the line manager and confirm the correct procedure before starting
the work.
For chemicals that are not specified with accurate name and item no., contact the local site-
responsible person for information about PPE and other safety instructions related to the use of
the chemical.
At least 2 of the service technicians who do work in a wind turbine must be able to prove that they
have a valid GWO basic safety training certificate.
At least 1 service technician must hold the wind turbine-specific training course certificate for the
wind turbine in question.
Some tasks require one or more advanced training modules or job-specific training, as described
in the Vestas ‘Technical training programme’. The person who plans a specific task must make
sure that the service technicians involved have the proper know-how for the completion of that
task.
Abbreviation Explanation
BCD Bolt circle diameter
CCW Counterclockwise
CW Clockwise
ECC Energy control coordinator
ERP Enterprise resource planning
GWO The Global Wind Organisation
PPE Personal protective equipment
RA Risk assessment
SBU Sales business unit
SDS Safety data sheet
SPRA Standardised procedure risk assessment
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 5 of 29
Abbreviation Explanation
UHMPE Ultra high molecular density poly ethylene
WLL Working load limit
Term Explanation
None
4 Referenced documentation
Unless it is specified differently, see 920098 ‘Torque wrench settings’ for information
about bolt types and bolt lubrication, and see 960501 ‘Bolt connections’ for
information about torque values.
5 Purpose 0011403223
The purpose of this document is to give the procedure for how to assemble, configure, and use
the lifting units for tower installation and tower disassembly.
Below listed items with different WLLs are available for this procedure:
• VT200880
• VT20003722
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 6 of 29
• VT20008420
• VT20024896
6 Note 0011362898
7 Tools 0021400905
Some tools in this tools list can vary in shape and technical specification from region
to region due to local requirements.
If in doubt, contact your local tools warehouse for tools applicable to your region.
This note may not be applicable for any special tools used in this procedure.
All kit sets in table Kit set, page 6 contain the items in table List of the tools in all
toolkits, page 7.
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 7 of 29
VT200880: The tower lifting units must be used in sets of 2 to lift a tower section.
The tower lifting units have replaceable bolt bushings for M30, M36, M42, M48, M56,
or M64 bolts. The bolt bushings are installed in the double eccentric housings to
adapt to the variable distance between bolt holes.
An axle in the centre of the tool transfers the load to the tool when you lift the towers
from a horizontal position.
See section 7.3 Lifting capacity of VT200880, page 7 for charts with lifting
configurations for the different bolt/pin sizes.
Figure 7.1: Capacity per lifting unit set with the M30 bolts
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 9 of 29
Figure 7.2: Capacity per lifting unit set with the M36 bolts
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 10 of 29
Figure 7.3: Capacity per lifting unit set with the M42-M64 bolts
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 11 of 29
1 L line
VT20004841 must not be used for tower flange BCD larger than 5200 mm.
VT20006903 must not be used for tower flange BCD larger than 5960 mm.
VT20003722 / VT20008420: These units must be used in sets of two for lifting a tower
section. The M30 bolts are only allowed to lift 30000 kg for each unit and 60000 kg for
a set. The WLL for the remaining bolts, M36, 42, 48, 56, and 64 is 60000 kg each and
120000 kg for a set.
The units are equipped with replaceable bolt bushings for M30, 36, 42, 48, 56, or 64
bolts. The bolt bushings are installed in the double eccentric housings to be able to
adapt to variable distance between bolt holes.
An axle in the centre of the tool transfers the load to the tool when you lift the towers
from a horizontal position.
VT20024896 must not be used for tower flange BCD larger than 6250 mm.
The lifting units are equipped with replaceable bolt bushings for M30, M36, M42, M48, M56, or
M64 bolts.
The bolt bushings are installed on the double-eccentric housings to adapt to the variable distance
between bolt holes.
9 Consumables 0011403216
10 Weights 0011403215
The weight of the full tool kit for the lifting unit is about 250 kg.
12 Procedure
Do not store the lifting units directly on the ground surface as mud and dirt can damage the
bearings in the lifting units.
• Put the lifting units on the pallet or on some equipment which can protect the lifting units and
the lifting slings from the dirt.
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 15 of 29
1 Axle
3 Attach the 2 lifting units onto the 2 remaining holes of the triangle plate with WLL 42500 kg
shackles (item no. VT206182).
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 20 of 29
2 Attach a round sling (item no. VT730060) to extend the wire sling of one of the lifting units.
5 Guide the crane operator until the extended lifting unit is at the tower flange and aligned with
the centre of the tower section.
7 Install the lifting unit in the inner flange holes on the top flanges of T-flanges.
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 22 of 29
9 Turn the eccentrics to align the bolt bushings with the bolt holes of the flange.
The chamfer on the washers must face the bolt head and the nut.
12 Guide the crane operator until the other lifting unit is at the tower flange and horizontally
aligned with the one that is already installed.
13 Install the second lifting unit in the same procedure as the first one.
14 Guide the crane operator to lower the hook above the centre of the tower flange.
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 23 of 29
Let the extension lifting unit (1) stay on the wire sling (3). It must be used again
for the removal of the lifting units.
12.1.5 To release the lifting units from the tower flange 0011403235
2 Extend the released lifting unit with the applicable round sling.
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 24 of 29
4 Guide the crane operator to put the crane hook in position straight above the lifting unit
which is not extended.
6 Guide the crane operator to move the crane up until the bolts are clear of the flange.
• The lifting units and lifting slings must be stored in a dry location when they are not in use.
• The lifting units must be lubricated through the grease nipples at every 10 lifts.
1 Lubricate the bushing on all the lifting units (2) through the bushing grease nipples (1) until
the new grease flows from the lifting unit.
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 26 of 29
1 Lifting unit (item no. VT20024896) 2 Grease nipple for eccentric lubrication
1 Lifting unit (item nos. VT200880, 2 Grease nipple for eccentric lubrication
VT20003722, and VT20008420)
3 Grease nipple for bushing lubrication
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 28 of 29
1 Lifting unit (item no. VT20024896) 2 Grease nipple for eccentric lubrication
3 Grease nipple for bushing lubrication
The tower bolts. with the washers and the nuts, must be replaced once a year at the annual
service inspection.
The tower bolts must also be replaced in case of damage seen during visual inspection or if
required by local rules or regulations.
The lifting units must be sent to Vestas Wind Systems A/S for service inspection at the interval of
12 months. Certification of the lifting slings must be done along with the annual service
inspection. See section 14 Certification, page 29.
Use of lifting unit for upending and vertical lift of single tower section
Document no.: 0001-2437 V13 · Class: RESTRICTED · Type: T09 Page 29 of 29
If any damage is found on the lifting units, the complete lifting unit must be identified as defective
and sent back to Vestas Wind Systems A/S for repair. Do not try to repair the lifting unit on-site.
14 Certification 0011403271
The lifting units must be certified at an interval of 12 months by an approved certification authority
or more frequently, if it is necessary.