Design of Pile Foundation

Estimation of Vertical Compressive Load Bearing Capacity of "Concrete Pile"


[As per IS : 2911(Part 1) and IRC : 78]

National Highway No. 45A (New NH 332)


from Existing km 0.000 to km 25.624 in Location
Name of Project Type of Structure INTERCHANGE Structure No 0+000 Based on Bore Hole BH-4
the State of Tamil Nadu and Union (Chainage in km)
territory of Puducherry

Inclination of Pile with Factor of Safety for Shaft River or Stream Bed Level
Type of Pile Foundation Bored Cast-in-situ Concrete Pile 0 2.5 0.000 Ground Water Level (m) 0.000 Pile Cut - off Level (m) -2.300
Vertical Axis (deg) Friction / Ground Level (m)

Earth Pressure Coefficient, Factor of Safety for Base


Pile Diameter (mm) 1200 1.2 2.5 Scour Level (m) Not Applicable Pile Cap Top Level (m) Pile Tip Level (m)
Ks Resistance

Ultimate Base Resistance, Ppu = Ap * (c.Nc + q.Nq + Total Safe


Bearing Capacity Factors Ultimate Shaft Friction, Psu =( Σ(Ks.Pdi.Tanδ).Asi + α.c.As) Total Ultimate

Recommended
Angle of Angle of Effective Over- 0.5.γ.B.Nγ) Capacity (At Pile

Capacity (T)
Total / Capacity,
RL of Thickness Cohesion, Shearing Wall burden Pressure Tip), Pile Length
Layer Type of SubSoil RL of Submerged Pu
Layer of Layer c Resistance, Friction, at Pile Tip Effective Over- Ps below COL
No Layer Layer Top Unit Weight of Adhesion [ Pu = ( Ppu +
Bottom (m) (t/m2) φ δ 'qtip' Ap Ppu burden Pressure Asi Ps = [ ( Ppu / FOS (m)
Soil (t/m3) Nc Nq Nγ c.Nc q.Nq 0.5.γ.B.Nγ (Ks.Pdi.Tanδ) Factior, α.c fs Psu Psu ) ]
(deg) (deg) (t/m2) (m2) (tonnes) at c.g of the layer (m2) + Psu / FOS ) ]
α (Tonnes)
'Pdi' (t/m2) (Tonnes)

1 Sandy CLAY (CL) -2.300 -2.500 0.20 9.00 0.0 0.0 1.00 0.20 9.00 1.00 0.00 1.13 81.00 0.20 0.00 0.10 0.75 0.00 0.45 4.05 4.05 3.05 0.20

2 Silty SAND (SM) -2.500 -4.500 2.00 0.00 29.0 29.0 1.00 2.20 9.00 18.08 19.34 1.13 0.00 39.78 11.60 1.20 7.54 0.80 0.00 0.00 0.80 9.07 2.20

3 Silty SAND (SM) -4.500 -6.000 1.50 0.00 30.0 30.0 1.00 3.70 9.00 20.95 22.40 1.13 0.00 77.52 13.44 102.87 2.95 5.65 2.04 0.00 0.00 2.04 20.63 3.70

4 Silty SAND (SM) -6.000 -15.000 9.00 0.00 31.0 31.0 1.00 12.70 9.00 23.93 25.99 1.13 0.00 303.91 15.59 361.35 8.20 33.93 5.91 0.00 0.00 5.91 221.23 12.70

CWR (RESIDUAL
5 -15.000 -19.500 4.50 0.00 32.0 32.0 1.05 17.43 9.00 28.88 32.60 1.13 0.00 503.23 20.54 592.37 15.06 16.96 11.29 0.00 0.00 11.00 407.85 17.20
SOIL)

6 HWR -19.500 -20.300 0.80 0.00 32.0 32.0 1.10 18.31 9.00 28.88 32.60 1.13 0.00 528.65 21.52 622.22 17.87 3.02 13.40 0.00 0.00 11.00 441.02 1063.2 425 18.00 404

7 HWR -20.300 -21.300 1.00 0.00 32.0 32.0 1.10 19.41 9.00 28.88 32.60 1.13 0.00 560.42 21.52 658.15 18.86 3.77 14.14 0.00 0.00 11.00 482.49 1140.6 456 19.00 433

8 HWR -21.300 -22.300 1.00 0.00 32.0 32.0 1.10 20.51 9.00 28.88 32.60 1.13 0.00 592.18 21.52 694.08 19.96 3.77 14.96 0.00 0.00 11.00 523.96 1218.0 487 20.00 463