SLIDE NO. 01
Week-03
• Lecture-02
• Problems on Base shear and its distribution (Moment Frame in Shorter Direction)
• Lecture-03
• Problems on Base shear and its distribution (Industrial Steel Building with SMRF)
Week-03
• Lecture-01
• Problems on Base shear and its distribution (Industrial Steel Building with SMRF)
• Lecture-02
• Stability Analysis in Building Structures and Sample Problems on Stability Analysis
• Lecture-03
• Fundamental Period and Story Drift with Sample Problems
Week-03
Lecture-01
Practice Problem
• Seismic Base Shear and lateral forces at story level
Q-05: The 03-story industrial steel building (special occupancy building) is located in Lahore situated on Hard Rock
(SA). The structural system of the building is special moment resisting frame in longer and shorter directions.
Determine the base shear and the earthquake force on each story in shorter and longer directions?
Sample Problems
• Seismic Base Shear and lateral forces at story level
The 03-story industrial steel building (special occupancy building) is located in Lahore situated on Hard rock (SA).
The structural system of the building is special moment resisting frame in longer and shorter directions. Determine
the base shear and the earthquake force on each story in shorter and longer directions? Assume the story height
is 13ft for all stories. Seismic weight at roof level = 60psf and at floor level = 150psf
Information Provided:
Required:
1. Base Shear (V)
2. Earthquake forces (Fx)
Note: In the given structure, both the directions have same structural system so the calculated base shear and lateral
forces will be the same as compared to previous example.
Structural Design and Drawing (CE-422), Dr. Aslam Faqeer Mohammad
Copyrights Protected – Department of Civil Engineering, NED University of Engineering & Technology, Karachi
Date: 15th Jun 2020
SLIDE NO. 09
H = 39ft
Ct = 0.035
I = 1.0
R= 8.5
Z= 0.15g
S= SA
Cv= 0.12
Ca= 0.12
level Height
# H(ft)
3 39
2 26
1 13
Base H3 = 39ft
H1 = 13ft
H2 = 26ft
H2 = 13 +13 = 26ft
H3 = 13 +13+13 = 39ft
H1 = 13ft
= W1 x H1 + W2 x H2 + Wr x H3 = 176904 k-ft
V = 201 kips
level Height Weight Wx Hx Fx Ft =0.07 TV = 0 since T < 0.7 sec
# H(ft) Wx (kips) k-ft kips
3 39 1296 50544 57.4286 Wx Hx = Weight of Story x Height of Story from base
2 26 3240 84240 95.7143
SWi x Hi = W1 x H1 +W2 x H2 + W3 x H3 = 176904 k-ft
1 13 3240 42120 47.8571
Base 7776 176904 201.00 Fx = Lateral force to each story
F1 = (V-Ft) x W1xH1/ SWi x Hi
F1 = (201-0) x 3240 x 13/ 176904 = 47.8 kips
F2 = 95.7 kips
F3 = 57.4 kips So Fr = Ft + F3 = 57.4 kips
SFx = F1 + F2 + F3 = 201 kips = V
F3
F2
F1
level Height Weight Wx Hx Fx Story Shear
# H(ft) Wx (kips) k-ft kips kips
3 39 1296 50544 57.4286 57.43
2 26 3240 84240 95.7143 153.14
1 13 3240 42120 47.8571 201.00
Base 7776 176904 201.00
F3 = 57.4
F2+F3 = 153.2
F3
Overturning Moment:
F2
F1
level Height Weight Wx Hx Fx Overturning Moment
# H(ft) Wx (kips) k-ft kips
kip-ft
3 39 1296 50544 57.4286 0
2 26 3240 84240 95.7143 747
1 13 3240 42120 47.8571 2737
M1 = F1 X 13 + F2 X 26 +F3 X 39 = 5350