Professional Documents
Culture Documents
Pre-Concrete Inspection Checklist:: 13 Oktober 2023: CCMSPHR/SPK/3700132652
Pre-Concrete Inspection Checklist:: 13 Oktober 2023: CCMSPHR/SPK/3700132652
CHECKLIST
CONCRETE STRUCTURE/ LOCATION : TRANSFORMER PAD EQUIPMENT STRUCTURAL STEEL DRAWING NO.
:
REFERENCE DRAWING : SKETS DRAWING BY PHR ENGINEER U/G ELECTRICAL DRAWING NO : N/A
CONCRETE REBAR & EMBED. DRAWING NO : U/G MECHANICAL DRAWING NO : N/A
ADEQUATED BRACING
4. EMBEDMENTS
ANCHOR BOLTS (DIAMETER, LENGTH, TYPE) 5. MISC
PIPES JOINTS
JOINT FILLER
7 REMARKS :