ACCESS – CHEC JV (PVT) LTD: EAST CONTAINER TERMINAL (PHASE 2) PROJECT

HSE Training Attendance Sheet


表码/ No.:HSE-2022 编号/Serial No.:
培训类别/
Dynamic compaction Operation safety training
Type
培训内容 Training content:
Education & 1. Both operator and rigger having valid certificate is mandatory.
Training
2. Dynamic compaction radius should be barricade always and
Content
must be displayed proper waning sign boards to prevent from
accident

3. Before start dynamic compaction operation HSE department


should be conduct daily safety regulation and tool box for them
and must be get the signature for related training documents.

4. While freefall the hammer all of them (workers) should be


keep safe distance from hammer points (Minimum 5m)

5. Before the lifting operation, the crawler crane operator and


rigger must carry self-machine inspections on the lifting and
hoisting equipment, wire ropes, slings, safety devices, etc., and
fill in the daily check list form of the crawler crane to ensure
safety and reliability of the crane.

6. Before dynamic compaction works all of them should have to


know hammer weight and hammering weight, proceed lifting
permit should be arranged including dynamic compaction
PTW

7. Without having lifting permit cannot works start. Lifting


permit will issuing by ACJV HSE department after the inspect
the machine and work condition.

8. Before commence the dynamic compaction works machine


operator, rigger and supervisor must inspect the underneath
ground condition.

9. If ground condition unstable, cannot work proceed in that area.

10. If machine working in muddy surface using at least 2 metal


plates is mandatory. Metal plates should use in opposite
direction of the crawler crane track line underneath.

11. If wind speed is greater than or equal to six levels of 10.8 m / s


or poor visibility condition should stop all operations.

12. Operator must aware rigger position all the time as well as
ACCESS – CHEC JV (PVT) LTD: EAST CONTAINER TERMINAL (PHASE 2) PROJECT

machine swing area.

13. Operator and rigger must familiar with hand signal for
communication.

14. While dynamic compaction in progress, not allowed to cross


the barricaded area any other person.

15. The crawler crane is strictly prohibited to walk in uneven


places. When there is a height difference, the on-site
engineering department personnel are required to repair the
slope before driving. It is strictly forbidden to drive on the
unsloping slope and the soil is soft, so as to avoid the crawler
crane overturning.

16. When the dynamic compaction operation it must maintain a


distance of at least 30m from any barriers or buildings.

17. Rains creates wet and slippery ground, loose and landslides
situation. When the soil is loose and could cause danger to the
crane stability dynamic compaction works must be stopped.

18. During thunderstorms stop lifting operation immediately is


mandatory. Moreover, in strong wind decrease the weight of
the safe working load to improve safety. If the wind intensifies
dynamic compaction work must be stopped.

19. Operator cannot leave from machine cabin when machine is


switch on.

20. It is highly prohibited to give the machine to operate for the


rigger under any situation.

Inspection points
Dynamic compaction hammer lifting point connected D
shekels & cable eye

Wire rope slings, shackles and cable clips (Bulldog clips)


inspected points

Use only suitable wire ropes slings and never use damage wire
rope slings.
During lifting safe working load cannot exceed.
Regular inspection must be conducted.
If more than one wire rope sling is use in lifting need to pay
attention to the angle between the slings.
The distance between the cable’s clips shall be the same as
well the direction of installation should be correct.
ACCESS – CHEC JV (PVT) LTD: EAST CONTAINER TERMINAL (PHASE 2) PROJECT

Hooks inspecting point


All hooks shall be installed with safety latches.
Do not tie or remove the safety latches.
Maintain the hook in a vertical position always.is mandatory.
Questions:
1. What is the important time of machine (Crane) inspection?

A. Daily
B. Weekly
C. Monthly
D. No important

2. What is the minimum safe distance from dynamic compaction


points
A. 3m
B. 6m
C. 15m
D. 30m

3. What are the main responsibilities of operator and rigger?


A. Should be available competent certificate
B. Should be good health condition and no use drugs.
C. Should be use standard lifting gears and methods only
D. Correct all A, B & C

4. What kind of precautions should be completed before start


dynamic compaction
A. Lifting gears inspection
B. Barricade the dynamic compaction area.
C. Keep away from the workers
D. Correct all A, B & C

5. How to control crawler underneath gravity stability in proper


way?
A. Crawler underneath condition not important to control the
gravity stability
B. Crawler underneath condition very important to control the
gravity stability

培训部门
培训时间/Date 年/Y 月/M 日/D
Taught By
ACCESS – CHEC JV (PVT) LTD: EAST CONTAINER TERMINAL (PHASE 2) PROJECT

参加人员/Attendees

No. 姓名/Name 护照号/ID 单位/Department 签名/Signature

10

11

12

13