The document is an internal audit checklist for a quality control (QC) project. It contains 24 items to audit including reviewing quality policies, project documentation, logs of requests, materials, inspections, testing reports, calibrations, observations, non-conformance reports, and records of external audits. The checklist includes verifying that documents are displayed, logs are updated with status and comments, samples and reports are submitted, and certificates are valid with expired ones also listed.
The document is an internal audit checklist for a quality control (QC) project. It contains 24 items to audit including reviewing quality policies, project documentation, logs of requests, materials, inspections, testing reports, calibrations, observations, non-conformance reports, and records of external audits. The checklist includes verifying that documents are displayed, logs are updated with status and comments, samples and reports are submitted, and certificates are valid with expired ones also listed.
The document is an internal audit checklist for a quality control (QC) project. It contains 24 items to audit including reviewing quality policies, project documentation, logs of requests, materials, inspections, testing reports, calibrations, observations, non-conformance reports, and records of external audits. The checklist includes verifying that documents are displayed, logs are updated with status and comments, samples and reports are submitted, and certificates are valid with expired ones also listed.
Shall be display multiple location in Project Office, especially in Meeting Room, 1 Company Quality Policy Project Manager Office etc. Quality Assurance ISO Displayed multiple location in Project Office, especially in Meeting Room, 2 9001-2015 Project Manager Office etc. Environmental Displayed multiple location in Project Office, especially in Meeting Room, 3 Management System ISO Project Manager Office etc. 14001-2015 Safety Management Displayed multiple location in Project Office, especially in Meeting Room, 4 System ISO 45001-2018 Project Manager Office etc. 5 Project Scope Hard Copy 6 Project QCP Hard Copy Project Organization Plan Shall be display multiple location in Project Office, especially in Meeting Room, 7 (Updated) Project Manager Office etc. 8 Project Specifications Soft Copies Design Drawing 9 Submission Log(For EPC Updated Log with Comments Project) Shop Drawing Submission 10 Updated Log with Comments Log Log of Approved Personal with Updated Status. 11 Approved Key Personals. Letter Log / Reference for any Person Abscent / Replacement. 12 RFI's Log Log with Updated Status & Response. Log with Updated Status & Comments 13 Material Log Delay in Re-submission will have reason marked. Communication in support of Pending Response (if any). Specially for Code C Sample / Mock Up Up dated Status of Sample 14 Physical Sample / Mock Up available / secure Log with Updated Status & Comments Delay in Re-submission will have reason marked. Communication in support of 15 WIR's Record Pending Response (if any). Specially for Code C File Up Physical with serial number. Log with Updated Status & Comments Delay in Re-submission will have reason marked. Communication in support of 16 MIR's Record Pending Response (if any). Specially for Code C File Up Physical with serial number. 17 Testing Reports Updated Original Reports (Hard / Soft copy) submission in Aconex. Manufacturer & Supplier 18 Updated Log & Status Pre-Qualification Log with Updated Status & Comments 19 MOS Delay in Re-submission will have reason marked. Communication in support of Pending Response (if any). Specially for Code C Calibration Log (all 20 Instrument & tools, Valid Vertificates together with Expired Certificates (if any). Survey machines) 21 Observation Log Updated close out status / justification in case of delayin Close Out. Updated status with Justification of : NCR Log (internal / Corrective Action Taken 22 External) Delay Reason if any Close Out Action (if any) 23 PQI Record Every Month PQI with Score as Submitted to Clinet (Hard / Soft Record). 24 External Audit Record Maunacturer / Supplier Audit Record & Evidience (if any)