Project: Korean Medical Center (KMC Hospital project)

METHOD STATMENT SUBMITTAL


Date: Jul -18-2022 Reference: EF-0002-EDTC-TS-MST-KMC-EL-000019-00

Rev.OD Description: METHOD STATEMENT FOR INSTALLATION

OF ELECTRICAL PANELS (DB/SMDB/MCC)

Location Of Works : (i.e. Floor, ro

Specification Section: Section 21 urpose:


2 0 J UL
2022 • Record

Date: July-18-2022

ACTION: As Marked

D A pproved _ dpproved as Noted D Not Approv ed 0 Resubmit

For The Engineer:

App endix 07 Page 1of 1 LCQ-Jan. 2015 (Rev.O)


The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT •elegancia
healthcare
elegancia Project Name OUT WORKS AND FINISHES OF KOREAN
The Engineer:
MEDICAL CENTRE (LGF+G+S+RF) I \ f -\ ,\
elegancia .. !Jtt!l t
,.,_t,
Iii Fr1.F"'e<•--:; Cti'.. .-1'.,·ts

Project No. EF.0002 Document No.:

Consultant LACASA A rchitect and Engineer ing Consultants EF.0002-EDTC-KMC-MST-EL-000 11


Main
Elegancia Fit-out Rev. No. Date
Contractor

METHOD STATEMENT FOR INSTALLATION OF ELECTRICAL


00 07-16-2022
PANELS (DB/SMDB/MCC)

METHOD STATEMENT FOR THE INSTALLATION OF ELECTRICAL PANELS


PROJECT NAME:

KOREAN MEDICAL CENTRE (LGF+G+8+RF)

Document Ref. Number: EF.0002-EDTC -KMC-MST-EL-00011 REV . 00

Prepared by Approved by Approved by (LACASA)


(EEMS) (EEMS Project Manager)
Full Name: RUIN E.MENESES Yousef A l Tanbak j i

Designation : Snr. QA/QC Engineer Project Manager

Date: 16J U L
.. .-- --. ...
Y 2022
II . •11
'
Signature: \
/ .""
Status Code : ----....::.

0 D: Draft D Fl: For Information D FC: For Construction

DP: Preliminary Ill FA: For Approval * Externa l Authorization {Client I


Consultant), where required
Distribution:COPY NO. COMPANY DESIGNATIO N
1 EDTC Sr. Project Manager
2 EDTC Technica l Manager
3 EDTC Constructio n Manager
4 EDTC QA/QC Manager
5 LACASA Client Representative
6 EHC Client/Employer

Page 11
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
healthcaM
elegancia Project Na me OUT WORKS AND FINISHES OF KOREAN
The E ngineer:
MEDICAL CENTRE (LGF+G+S+RF) I \ ( '\ .\
elegancia £,{ t
,.,,..1, ,. \ r: ,,r,.ttn Cf'.n?U'J t,
Project No. EF.0002 Document No.:

Consultant LACASA Architect and Engineering Consultants EF.0002-EDTC-KMC-MST-EL-00011


Main
Elegancia Fit-out Rev. No. Date
Contractor

METHOD STATEMENT FOR INSTALLATION OF ELECTRICAL


00 07-16-2022
PANELS (DB/SMDB/MCC)

Table of Contents

1.0 PURPOSE............................................................................................................................................................ 3

2.0 SCOPE................................................................................................................................................................. 3

3.0 REFERENCES............................................................................................................................................................. 3

4.0 ABBREVAT IONS/DEFEN ITIONS ........................................................................:...................................3

5.0 RESPONSIBILITIES............................................................................................................................................. 3

6.0 MANPOWER........................................................................................................................................4

7.0 PLANT AND EQUIPMENTS.......................................................................................................................4

8.0 SITE LOGISTICS................................................................................................................................................. 4

9.1 WORK PROCEDURE.............................................................................................................................................................5

9.2 PRE-INSTALLATION CHECK....................................................................................................................... 5

9.3 INSTALLATION PROCEDURE OF ELECTRICAL PANELS.........................................................................5

9.3.1 Wa ll Mounted Panels.................................................................................................... 5

9.3.2 Recessed and Semi-Recessed Panels..............................................................................................6

9.3.3 Floor Mounted Panels................................................................................................................6

10.0 QUALITY CONTROL PROCEDURES/ INSPECTIONS:.............................................................................................7

11.0 PLANT AND EQUIPMENT'S CONTROL....................................................................................................7

12.0 HEALTH AND SAFETY ENVIRONMENT............................................................................................................7

13.0 RISK ASSESSMENT (Attached).......................................................................................................................... 7

14.0 INSPECTION TEST PLAN/ INSPECTION CHECKLISTS {Attached)..................................................................7

P a ge
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
hei!fthan
elegancia Proj ect Name OUT WORKS AND FINISHES OF KOREAN The Engineer:
MEDICAL CENTRE (LGF+G+S+RF) I \ (,.A 4) .\
elegancia .\rd'J r 11, f-9r 1"'j C: *"'J•tf
Uctk-l
Project No. EF.0002 Document No.:

Consu ltant LACASA Architect and Engineering Consultants EF.0002-EDTC-KMC-MST-EL-00011


Main
Elegancia Fit-out Rev. No. Date
Contractor

METHOD STATEMENT FOR INSTALLATION OF ELECTRICAL


00 07-16-2022
PANELS (DB/SMDB/MCC)

1.0 PURPOSE

This method statement gives guidelines conta ined herein to ensure tha t the job execution complies with t he
requirement of the proj ect requirements, specification and the A uthorities conce rned and serves the intended
purpose to satisfactory level.

2.0 SCOPE

This Method Statement covers the nature and type of work for the Installation and insulation of HVAC GI Duct
and accesso ries. This procedure is to be read in conjunctio n w ith the relevant Inspection and Test Plan (ITP)
clear and detail, outl ining the responsibility and the qua lity ve rification to be performed by various parties.

3.1 REFERENCES

• Project Specifications/ Qatar Construction Specification 2014 "Electr ical


Works"
• Proj ect HSE
Plan
• Project Qua lity
Plan
• A pproved Material Submitta
l
• A pproved Shop Drawing/ IFC
Drawing
• Kahrama Regulations

4.0 ABBREVAT IONS/DEFENITIONS

QCS Qatar Construction Spec ifica


tions
HSE Health, Safety and
Environment
QA/ QC Quality Ass urance and Quality
Control
ITP Inspection and Test Plan
ERP Emergency Response Plan
GI Galva nized Iron
VCD Vo lume Cont rol
Damper
FD Fire
Damper
SD Sound Attenua
tor
SIR Site Inspection
Request
MIR Material Inspect ion
Request

5.0 RESPONS IBILITIES.

Page 3 1
5.1 Project Manager ( EEMS) : Ensure that works are carried out in accordance with this method stateme nt and
a ll necessary safety a nd protective equipment are provided a long w ith properly trained a nd qualified
personnel dedicated to wor k on task.
5.2 Construction Manager (EEMS} : In charge shall be responsible for coordination and supe rvision of
construction
works (activit ies) and constr uction groups, ensuring that works s hall be done as per project specification a
5.3 nd approved drawings, and all safety' measures are implemented .
QA QC Engineer (EEMS) : Obta in consent for applicable ITP prior to use. E nsure that all inspections and tests
are carried out as per project requirement and in t urn are recorded. Ensure that all equipment related
are rnl '' 'oc celtvoot to vecifotioo of cewcd'

Page 3 1
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
healthcare
elegancia Project Na me OUT WORKS AND FINISHES OF KOREAN
The Engineer:

elegancia
MEDICAL CENTRE (LGF+G+8+RF) I,\ fA .\
,..,,,....\ f:"ryr..tr• \.f'MV".1 h
Vuiit 1
Project No. EF.0002 Document No.:

Consultant LACASA Architect and Engineering Consultants EF.0002-E DTC-KMC-MST-EL-00011


Main
Elegancia Fit-out Rev.No. Date
Contractor

METHOD STATEMENT FOR INSTALLATION OF ELECTRICAL


00 07-16-2022
PANELS (DB/SMDB/MCC)

5.4 Surveyor (EEMS) : Responsible for all survey works related to levels for formation level of blinding,
coordinates with site engineer to ensure that all required information has been provided to proceed
with the works complying with the project spec ification/standar ds.
5.5 General Foreman (EEMS) : Shall be supervising closely the activities designated to them ensuring that all
instructions and procedures according to this method statement and Risk Assessment are strictly followed .
5.6 Safety Officer {EEMS) : Responsible for day-to-day activities on maintaining safety on site complying with
the requirement s of project HSE Plan Cooperate with the Project team to create and maintain safe
working conditions. Assist Site Engineers and Foremen to organize the work area to perform their duties
with maximum efficiency and minimize risk to them or to equipment. Inspect equipment and tools before
use to ensure correct storage and proper utilization. Exercise emergency authority to prevent or stop
unsafe acts. Investigate accidents that have occurred within incident areas. Ensure preparation and
implementation of Site Safety and Health Plan (SSHP). Maint n re all injuries and damages on site.
Submit HSE reports as require.
6.0
MANPOWER Qk( (_ • ' '
• Project/Site Electrical Engineer
• QA/QC Engineer - Electrical
• Supervisor/Foreman - Electrical
• Charge Hand - Electrician
• Skilled workers - Electrician
• Unski lled workers - Helper, Electrician

7.1 PLANT AND EQUIPMENTS


All equipment or tools brought on to premise s will be of sound construct ion and will meet the
statutory requirements applicable to these tools or equipment.

• Electrical Toolbox
• Safety Ladder I Scaffolding
• Electric Drilling Machine
• Measurement Tape I Spirit Level I Water Levelling Pipe
• Hacksaw Cutter
• Warning Tapes, boards, barriers, lighting as required
• Hammer I Cleaner I Lubricants
• Duct Insulation Toolbox
• Marker
• Torque wrench/open end wrench/Ratchet wrench
• Painting/Brush
• Spanners/Screw drivers
• Sharp knife/cutter

8.1 SITE LOGISTICS

• All the Electrica l Panels insulation shall be loaded and transported by a delivery truck, crane,or fork lift to store
and shifted and loaded to the specific wor kplace location and accompanied by experienced riggers.
• EEMS shall safeguard the accessibility of all the roads around the project to avoid delay or accident.
• Safety officer shall be present during loading and unloading of the materials.

Page
The Contractor The Client :
DESIGN MANAGEMENT AND BUILD OF FIT • elegancia
elegancia
elegancia
Project Name OUT WORKS AND FINISHES OF KOREAN
MEDICAL CENTRE (LGF+G+8+RF)
I \ (
The Engineer:

•- t
' ---
.\ F -,Jl ""''--:1 C:r.r!l . ·r!J
::'.•ce.,.-t
Project No. EF.0002 Document No.:

Consultant LACASA Architect and Engineering Consultants EF.0002-EDTC-KMC-MST-E L-00011


Main
Elegancia Fit-out Rev. No. Dat e
Contractor

METHOD STATE MENT FOR INSTALLATION OF ELECTRICAL


00 07-16-2022
PANELS (DB/SMDB/MCC)

9.1 WORK PROCEDURE

9.2 PRE-INSTALLATION CHECK

• Ensure that all sa fety requirements are in place in accordance with project safety plan & Qatar Author ity
Health & Safety codes of practice.
• Materials (Electrical Panels) will be transported to the site by the supplier and care shall be taken by
the storekeeper to ensure the materials are not damaged during transit .
• Special care shall be taken by the storekeeper to protect the materia l from physical damaged &
distortion .
• On receipt of the material at site, QA/QC Engineer/Site Electrical Engineer shall inspect the material
internally and inspection shall be offered to the Consultant for approval of Material Inspection Request
(MIR) form.
• Ensure that materials used hav e passed receiving inspection in accordance with QA procedures and
are not damaged or defective.
• Ensure that all electricians and helpers are aware of the correct materials handling and installation
procedur e to ensure best quality of workmans hip.
• Ensure that materials shall be free from damaged and cleaned prior for installation.
• Work shall be carried out by the site personnel under strict supervision and guidance of the concerned
Supe rvisors/Foreman (Electrical) & Site Electrical Engineer.
• Installation of Low Voltage Power Cables shall be coordinated with other services for a fit for
purpose installation.
• Supervisor/Foreman (Electrical) shall ensure equipment and correct tools are available for installation
to achieve compliance with the contract requirements.
• Prior start to installation, refer to the approved shop drawings and details related to the installation area .
• Site Inspection Request (SIR) will be prepared, signed/ stamped by the Subcontractor and shall be

wl)r ct
submitted to Main Contractor/ Consulta witness and approval as per approved

9.2 INS AL&r CE E LE C NELS (l)l

9.2.1 W all Mounted Panels k\.a.ili { l hdt(cJQ. \'>Uvtt\ e_re .


• Relevant panels shall be se lected at warehouse and conveyed to the installation area.
• Exact location of the panel(s) to be determined, panel(s) to be held on the wallfo r the top
level of the panel to be at maximum 2200 mm above finished floor level (unless otherwise
indicated
in drawings) and mounting I fixation holes to be marked on the wa ll.
• Marked points to be drilled and anchor-bolted.
• Panels again to be held on its exac t place and to be mounted using screws. Water leveler
to be used for leveling purpose.
• The surface mounting DBs or LCPs and in case the number of outgoing conduits cannot be
accommodated in the DB or LCP top entry, a GI trunk ing arrangement shall be done at site.
A sample installation can be done at site for approva l if required.
• For the DB's main incomer cable, it can be glanded directly to the DB enclosure or c e
-gJa.cded to the a .f'\,Hi\k.[Ag..il'lst'1rtti:dc!nlie bottom of the DB erit:ltl e. The core shall be
taken inside the DB and terminated to the incomer isolator. Proper edge protection
gaskets/b ushes s hall be provided at the entry to avoid any damage to the cables
installed.
• The wires to the DB or LCP shall be uncoiled and cleaned using cotton cloth and the wires
inside the DB or LCP shall be neatly dressed,tied and connected to the respective MCBs,RCBOs,
neutral bus or earth bus termin als
Page S \
The Contracto r The Client:
DESIGN M ANAGEMENT AND BUILD OF FIT • elegancia
=--ticottl\Olre
elegancia Project Name OUT WO RKS AND FINISHES OF KOREAN ICAL TheEngineer:

elegancia
MED CENTRE (LGF+G+8+RF) I \C .\
"'"ti \F-!J "'eil"j\.<'1'•1•·., 13
:,-:0.·1
Project No. EF.0002 Document No.:

Consultant LACA SA Ar chitect and Engineering Consu ltants EF.0002-EDTC-KM C-MST-EL-00011


Main
Elegancia Fit-out Rev. No. Date
Contractor

METHOD STATEMENT FOR INSTALLATION OF ELECTRICAL


00 07-16-2022
PANELS (DB/SMDB/MCC)

• The DB or LCP door shall be checked for proper alignment and locking mechanism (if any) and
the DB or LCP schedule shallbe displayed on the door of the board and labeling shall be done
as per the design specification.
• The wall mounted MCC & SMBDs, the cable s sha ll be glanded to the panel top entry (since
cables come via cable trays from above in most cases). However; in case a ll cables cannot
be acco mmodated on the top entry, bottom entry can also be used. Proper cable tray
installation is important for a neat cabling arrangement for both incoming and outgoing
cables.
• The permanent labeling for the cables of MCC, SMBD, DB, and LCP shal l be done after the
completion of the panel installations.

9.2.2 Rmmd ond Sem;-Rmmd Ponel• .O )w..{( "'f( eJ ..J.


• The adequate openings for the installation of recessed pa rel dc it co nr\O (
should be arranged during the time of civil works such as concrete or block work.
• The relevant panel back-boxes (if applicable) and related conduit works should be installed
during the time of civilworks such as concrete or block wor k.
• The exact loca tion of the panel shall be as per the approved shop drawing. The top level of
the panel to be at maximum 2200 mm above finished floor level unless otherwise indicated
in the drawings.
• Level of the back box when installed should be checked wit h water leveler for alignment and
mounting height of these panels sha ll be as per the approved shop drawing.
• Permanent labeling fo r the cables of MCC, SM BD, DB, and LCP shall be done after
the completion of the panel installations.

9.2.3 Floor Mounted Panels

• The relevant panel back-boxes (if applicable) and related conduit works should be insta lled
• MDB, MCC and SMDB which are fabr icated in cubicles by the manufacture and can be delivered
to project in cubicles (if required for easy transportation and insta llation) along w ith the
instruction for interconnection of the cubicles. '
• Once the all cubicles are transported to the required area then the cubicles will be
interconnected to furnish the complete panel.
• MDB panels are shipped fully crated on a timber sub-base a nd will be lifted only under the sub
base,in between the bearers, using soft sling (Nylon webbi ng) with spreader bars on the topside
of the crate.
• When transferring with a forklift or unloading w ith a forklift the mast must be as close as
possible to the face of the crate. Forks must be fully projected under the crate.
• MDB, MCC panels shall be lifted evenly then tilt back towards the forklift before moving.
• When the MDB, MCC Panels have reached its final destination, it will be uncrated, unpacked
and removed from its timber base.
• MDB panels shall be lowered to onto skate (rolling devices) for movement to final location.
• Once in its final location on the plinths, rolling devices w ill be removed from under the panels.
• MDB panels will be free standing, self-supporting assembly and will be bolted to the plinths
with anchor bolts ensuring the assembly is horizontal and vertically in alignment as detailed
on the construction drawings and Kahramaa approved drawings.
• A ll connections will be torqued to the required figure as per data from the manufacturer.

Page 6 1
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT • elegancia
" tthc8<t --
elegancia Project Name OUT WORKS AND FINISHES OF KOREAN
The Engineer :

elegancia
MEDICAL CENTRE {LGF+G+S+RF) I \ ( -\ .\
l\trf ,19c"•\ f, F ,]-•"'jf'.IY"!'< .1-h
£1;, 'l: t
Project No. EF.0002 Document No.:

Consultant LACASA Architect and Engineering Consultants EF.0002-EDTC-KMC-MST-El-00011


Main
Elegancia Fit-out Rev. No. Date
Contractor

METHOD STATEMENT FOR INSTALLATION OF ELECTRICAL


00 07-16-2022
PANELS {DB/SMDB/MCC)

• MDB panels will be provided with termina ls for both power and control cables. The
terminals w ill be positioned in such manner as to facilitate optimum access to suit the
specified type of entry as detailed in the substation detail drawings.
• All components (i.e. fuse switches, circuit breakers,contactors, relays etc) shall be operated by
hand to ensure that there are no damages to the moving parts.
• All power cable connections willbe ensured that they are fully tightened and torqued from the
factory a s it is possible for connect ion to vibrate loose during shipment.
• All connections shall be checked for tightness/torque prior to energizing in accordance with
the manufacturer 's recommendat ions.
• All components/door interlocks shall be adjusted correctly and operate freely .
• All the panel shall be proper ly aligned by using water leveler etc.
• Labeling for the cables of MCC, SMBD,DB,and LCP, shall be done .after the completion of
the panel Installations .

10.1 QUALITY CONTROL PROCEDURES/ INSPECTIONS:

10.2 General
• Before Starting repa ir QA/QC must ensure that the location must be identified, marked, and cleaned .
• QA/QC to ensure that all activities done in proper standards before submitting the site Inspection Request
(SIR} for Consultant' s Approva l.
• QA/QC must ensure before proceeding any activities inspection approva l are obtained from the
Engineer.

10.3 Inspection Test Plan


• Installation activities will follow as per the approved Inspection Test Plan (Refer to Section 14)

11.1 PLANT AND EQUIPMENT'S CONTROL:


• Only competent/trained person sha ll use the tools/eq uipment's.
• Alltools and equipment shall be in good work ing condition .
• Labors and Helpers shall be instructed and trained in the safe use of the equipment.

12.1 HEALTH AND SAFETY ENVIRONMENT:


Implementatio n of Health & Safety mechanisms and checks shall be done as per contract agreeme nt and the
approved projec t safety manual. The safety officer shall carryout the necessary routine inspections.

12.2 Safety Lightings : Safety lights wi ll be used in case of power failure ensuring good illuminatio n for the
personnel.
12.3 Task lightings Adequate lightings will be provided ensuring the good illumination of the working area. Task
lighting will be connected to the nearest site distribution board w hich is RCD protected.
12.4 Emergency Arrangements : Site genera l safety procedure will be followed. In case of emergency the
safety officer w ill stop the works. He will put in to action the emerge ncy arrangements as described in
the safety ma nual.

13.0 RISK ASSESSMENT (Attached)

14.0 INSPECTION TEST PLAN/ INSPECTION CHECKLISTS (Attached)

P 7
;leganeia I e1qatre1 1
grou ELEGANC IA ELECTROMECHANICAL SERVICE
p

-
Pre-Start Task Briefing Date:
Activity
:
Method Statement Ref : Rev: loate:
Briefing Done by: Title:

Attendees

S.No. Employee No. Name Role Signature

1
2
3
4
5
6
7
8
9
10
Items Briefed
Task: Work Environment: New Hazards: PPE: !Timings:
Permit System: Tools & Equipment: Environmenta l: Housekeeping &
Logistics: Others (specify) :

Changes to Method Statement (if applicable)

Change Impact Actions Required Accept Yes/No

1
2
3
4
5
Is Risk Assessment still valid? I Yes/No If No - carry out RA before starting I Complete (Y/N)?
Reason for Changes:

Note: Major changes to a method statement must be carried out through a revision of the method statement
Approval

Briefed by (sign): Changes approved by (Sign):

Position: Position:

Date: Date:

Version 01 Date: 15-Jun-2021 Form Title :


Doc ument Ref .: EEMS-IMS-PM-33 Pre-Start Briefing Page 1of 1
01E
elegancia INTEGRATED MANAGEMENT SYSTEM elegancia l
group
PROJECT MANAGEMENT

DESIGN MANAGEMENT AND BUILD OF FIT OUT WORK S AND FINISHES OF


PROJECT: SCOPE OF WORKS: INSTALLATION OF ELECTRICAL PANELS ITPNO.: EF.0002-EDTC-KMC-ITP-El-00011
KOREAN MEDICAL CENTRE (LGF+G+8+RF)

MANAGED BY: QA/QC Engineer ITP REVISION 16 JULY 2022


No.:
00
I ITP REV. DATE:

PROCESS ACTIVITY HOLD (H) AND WITNESS (W)


REFERENCE TO SPECIFIED REQUIREMENTS
POINTS
CONTRO
L IPARTY
E GANC I i 3•• I FREQUENCY I FOR INSPECTION TEST APPROVAL
I ACCEPTANCE/REJECTION
I VERIFYING DOCUMENTS
TYPE No DESCRIPTION
SUB
I LE IA LACASA
EEMS , FIT-OUT !
I I CRITERIA & REFERENCE
CON. ! /LAB INSPECTION /TEST PROCEDURE REF.

v
A I DOCUMENTATION
I 1 I Verify App roval of Drawing, Related H H
I H H
I • App roved Shop Drawing Approved Shop Drawing
As per Project 1

i
Documents, Calculation & Method

I

App roved Method Statement Specification and • Approved Method
Statement
I ! I Drawing Statement

v I 2 I Verify Approval of Accessor ies H l H


I H R
I
- I As per Project Material Approval Submittal
I
I I
• Material Approval Submittal

I I Specification (MAR)
v 3 I Verify Approva l Material H l H I H I R I - I • Material App rovalSubmittal As per Project
Specification, QCS
Material Approval Submittal
(MAR)
2014 & KAHRAMA
Regulations
I
B HSE

v I 1 Verify that Risk assessment is in place I H ! H I H I H I I c I HSE PLAN I QCS 2014 I RISK ASSESME NT
and operators are wearing proper PPE.

c MATERIAL INSPECTION

I/A 1 Material Delivered on Site-Check


ver ification,
H H H H c • As per manufacturer's guidelines QCS 2014 SEC.21 Material Inspection Request
(MIR), Delivery Note, Material
• Approved MaterialSubmittal

l.WALL MOUNTED PANELS I Test Certificate (as


applicable), Country of Origin
2. RECESSED OR (as applicable)

SEMI RECESSED PANELS


3. FLOOR MOUNTED PANELS I I
D PRE-INSTA LLATION CHECKS
'
s I 1 Preparation of tools/ Equipment and s s s s c • Project Specification & QCS 2014 As per approved MAR, Site Inspection Request
(SIR) materials at site • App roved Method Statement MST, and Shop
CHECKLIST
Drawing
elegancia elegancia [
group

PROJECT:
KOREAN MEDICAL CENTRE (LGF+G+S+RF)
SCOPE OF WORKS : INSTALLATION OF ELECTRICAL PANELS ITP NO.: I EF.0002-EDTC-KMC-ITP-EL-00011

MANAGED BY: QA/QC Engineer ITP REVISION No.: 00 ITP REV. DATE: I 16 JULY 2022

PROCESS ACTIVITY HOLD {H) AND WITNESS (W) POINTS


CONTROL
TYPE No DESCRIPTION
SUB
II ELEGANCIA I LACASA 3"PARTY
FREQUEN CY REFERENCE TO SPECIFIED REQUIREMENTS
FOR INSPECTION TEST APPROVAL
SPECIFIED REQUIREMENTS
& TOLERANCE
DOCUMENTS

CON. EEMS FIT-OUT i /LAB

E FINAL INSTALLATION

I I
I/A 1 Installation of Electrical Panels H H H H - c • Project Specificat ion & QCS 2014 As per approved MAR, Site Inspection Request (SIR)
1. WALL MOUNTED PANELS • Approved Material Submittal MST, and Shop
Drawing Inspection Check Sheet No.
EEMS-KMC-EL-0011
2.
RECESSED OR SEM IRECESSED PANELS • Approved Method Statement

3.
FLOOR MOUNTED PANELS

HOLD (H) AND WITNESS (W) POINT PREPARED REVIEWED APPROVED APPROVED
CONTROL TYPES I NOTES FREQUENCY EEMS EL.FITOUT (CONSULTANT)
PARTIES
/
SIR - Site Inspection Request Consultant-LACASA I= Initially
"-
A= Approval
T=
Form LACASA

Elegancia Fit -
Elegacia Fit -out

QA/QC Mngr.I
R = Randomly

C =
- - ')

Testing R- YOUSEF AL MARY JOY MUHAMMED


Review
Continually
I= Inspection out Engineer RUIN, ·.MENESES
W - Witness Point F = Final at End TANBAKJI PARTUSA ARSHAD
S = Supervision Elegancia MEP Elegancia Electro- S =As Per
(EEMS) mechanicalServices
Specification V =Verification H - Hold Point
SUR Surveyor SNR. QA/QC PROJECT
S - Surveilla nce Point RESP. PERSON: SNR.QA/QC LACASA
SC Sub-Contractor ENGINEER MANAGER

• ..••
I
T- LAB/ 3'd Party Laboratory I 3'd
Testing
DATE:
. \ -JUL '2!:'.
,,
Party
I
The Employer : The Engineer : The Contractor :

elegancia
healthcare L A. CA. S A. elegancia
Arc hitects & Engineering Consultants

Project Name: Korean Medical Centre (LGF+G+8+RF)

SITE INSPECTION REQUEST


Request Date: Request Reference no. Rev. No.

Item to be Inspected: DLocation Sketch Attached


DCheck List Attached
Oshop drawing Attached
Date I Time Requested: This Inspection Requires The Following Disciplines:
DMechanical Engineer OCivil Engineer
Spec. Ref.:
bJ-/ectrical Engineer o....... . ............ .. .. ...
' . ' ' .
The Contrac tor QNQC Engineer Approval The Contractor Safety Engineer Approva l

---- --
The Contractor MEP Coordinator Approval

- - - -- - - -
Contractors Authorized Signature Date:

Inspection Comments :
- Checking and Approval by the Engineer/ Employer shall not relieve the Contractor of his Obligations to Perform the Works in accordance with the
Contract Documents, Requirement sof Safety, and Local Authorities rules & Regulations .

- The inspected works are assumed to be coordinated with all trades (e.g. structural, architectural, MEP, aluminum, glazing ,interior design, elevators

I"
Status: D Approved 0Approved As Noted DNot Approved 0Resubmit

I'"''""°" By Tho EogiM&

I
Appendix D4 Page 1 of 1 LCQ-Jan.2015 (Rev.O)
DESIGN MANAGEMENT AND BUILD OF FIT
I1\ CASA
elegancia OUT WORKS AND FINISHES OF KOREAN i\rchltects & Engmeeflng Consultants
healthcare MEDICAL CENTRE {LGF+G+8+RF)
INSPECTION CHECKSHEET • elegancia elegancia
··
SIR No.
CHECK SHEET FOR INSTALLATION OF DISTRIBUTION Rev No.
BOARD {DB)
Date

Description of Work:

Level/ Location :

Checked by Checked
by
SR# ITEM Remarks

Elegancia
EEMS LACASA
Fit-
out

Ensure that the materials are approved by consultant.


1
MIR is available and to be attached to SIR.

2 Ensure the work is done as per approved shop drawings.

3 Check the DB is in good condition,clea n of d irt and dust.

Check the insta lled Distribution Board is without any physical


4
damage.

Check Distribution Board mounting done properly as per the


5
approved installation deta ils.

6 Check mounting height and dimension as per approved drawing.

7 Check for the DB Label as per the Approved Shop drawings.

8 Check for the panelearthing I bonding is done.

Check the wires are pulled as per the approved layout and load
9
schedule.

Check the rating of short circuit rating,quantity of all the


10 breakers MCB's, RCBO's, RCD's etc. Inside the panel as per the
approved load schedule I material submittal I shop drawing.

Check for the Identification labels {Ferrules) & Circuit Reference


11
is provided inside the DB for all wires.

I Notes I

For Elegancia F it-out For LACASA


For EEMS QA/QC :
Date: QA/QC: Date Representative : Date:

Name: Sign: Na me: Sign Name Sign:

INSTA LLATION OF ELECTR ICA L KMC-E F.0002-EEMS-EL-


elegancia
DESIGN MANAGEMENT AND BUILD OF FIT
OUT WORKS AND FINISHES OF KOREAN
I,\ f,A SA
llrcMecls & Eng1neenng Consu an1s
healthcare MEDICAL CENTRE (LGF+G+S+RF}
elegancla elegancia
INSPECTION CHECKSHEET tic."t"'ll

SIR No .

CHECK SHEET FOR INSTALLATION OF MCC PANEL Rev No.

Date

Description of Work:

Level I Location:

Checked by Checked by
SR# ITEM Remarks
Elegancia
EEMS LACASA
Fit-out

Ensure that the materials are approved by consultant.


1
MIR is available and to be attached to SIR.

2 Ensure manufacturer draw ings are available inside the panel.

Ensure MCC assembly and installation according


3
to manufacturer's instructions.

Check Elevation and location of MCC is correct as per approved


4
shop drawing.

5 Check for MCC panel anchorage, clea rance and alignm ent.

Ensure MCC installed has clear accessibility for maintenance and


6
operation.

Ensure Type and rating of circuit breaker, relays, starters, VFDs


7
and other components are correct as per approved SLD.

Ensure cable installation I termination is as per approved


8
schematic diagram.

Ensure cables are proper ly and tightly terminated to respective


9
crimp and terminal blocks

Ensure Internal components such as breakers, relays, VFDs ,


10
Starters among others are completely and correctly installed.

Ensure the Correct labelling and tagging is provided for 1/0


11
cables and panel as per the approved drawings.

12 Ensure earthing is provided for the panel

I Notes I

For Eleganc ia Fit-out For LACASA


For EEMS QA/QC:
Date: QA/QC : Date Representative: Date:

Name: Sign: Name : Sign Name Sign:

INSTA LLATION OF ELECTR ICA L KMC-E F.0002-EEMS-EL-


DESIGN MANAGEMENT AND BUILD OF FIT
I1'\ ( A A
elegancia
healthcare
OUT WORKS AND FINISHES OF KOREAN
MEDICAL CENTRE {LGF+G+S+RF)
f\fcMects & Engineenng Consultants
elegancla elegancla
INSPECTION CHECKSHEET
tc...'f

SIR No.
CHECK SHEET FOR INSTALLATION OF SUB MAIN Rev No.
DISTRIBUTION BOARD {SMDB)
Date

DescriptionofWork:

Level I Location:

Checked by Checked by
SR# ITEM Remarks
Elegancia
EEMS LACASA
Fit-out

Ensure that the materia ls are approved by consultant .


1
MIR is available and to be attached to SIR.

Check inside the panel if any dirt,debris or metallic parts left out
2
during the insta llation. (Remove and clean if any)

3 Check the DB is in good condition, clean of dirt and dust.

Check for the Main Incomer MCCB and Outgoing breakers rating
4 as per approved s ingle line drawing and approved material
submittal

Check for the breaker rating and capacity as per the approved
5
shop drawings.

Check the installation of Containment I SMDB as per approved


6
shop drawing.

Check the Cables are pulled as per the approved layout and
7
load schedule .

8 Check for the panel earthing I bonding is done.

Check for the Identification label is available for containment,


9
cable & panel.

10 Check if any physical damages during the installation of SMDB.

Check for the Identification labels (Ferrules) & Circuit Reference


11
is provided inside the SMDB for all w ires.

For Elegancia Fit-out For LACASA


For EEMS QA/QC:
Date: QA/QC: Date Representativ e: Date:

Name: Sign : Name: Sign Name Sign:

INSTA LLATION OF ELECTR ICA L KMC-E F.0002-EEMS-EL-


The Employer : The Engineer The Contractor :

- . .. -... e leganc
1
i-... . A.. -i!llll .&....._..::: , eleganci a
-. ...... 1 ---
a- ' 1
-..-. &.,,.,_ 1
-1
Project: KOREAN MEDICAL CENTER

MATERIAL INSPECTION REQUEST


Date Request Prepared: Material Request Reference Number: Revision No.

-
Materia l Trade Name: Manufacturer:

Relat ed Material Approva l Subm ittal: B.O.Q Section:

Location Of Use:

Date Of Deliverv: Deiiverv Note Number: Attachme nts/Enclosures:

DDelivery Note DCertificate of Origion


0MaterialTest Report Oothers

QA/QC Manager Inspection And Approval :

The Contractor Author ized Signature: Date:

The Engineer Comments :

Checking and Approval by the Consultant I Sub-Consultant I Employer shall not relieve the Contractor of his Obligation in
Accordance with the Contract Documents, Requirement of Safety, and Local Authorities Regulations .

Status:

D Approved 0Approved as Noted 0Not Approved 0Resubmit

Inspection By: Date: For The Engineer Date:

Appe ndix Page 1 of LCQ-Jan. 2015 (Rev .O)


05 1
>elegancia I elegancia
grou

ELEGANCIA ELECTROMECHANICAL SERVICE

The Employer The Engineer The Contractor

elegancia L A CASA
Architects & Engineering
elegancia
healthcare Consultants
DESIGN MANAGEMENT AND BUILD OF FIT OUT WORKS AND
Project:
FINISHES OF KOREAN MEDICAL CENTRE (LGF+G+S+RF)

Discipline 0 0 Architectural 0MEP 0 Others


: Structural
MRI No. Rev. No. Date:

Material Description:

Manufacturer:

Supplier:

Material Submitta l Number:

Local Purchase Order (LPO) Number :

Delivery Date:
Documents/specificat ion/Drawings BOQ etc.,
for reference:
Identification of Suppliers: Lot No.:

Quantity Ordered: Quantity Received: Validity Date:

State of Packing:

Document s received with the


delivery:
Oves
Samples to be taken :

MAIN CONTRACTOR:

EEMS Elegancia Fit-out LACASA

Signatur e:

Name:

Date:

Consult ant's Comments :

Act ion to be
taken :
A - Approv ed B - Approved with Comments 0 C - Resubmit 0
0 D- Rej

ected 0
CONSULTANT :

Version 01 Date: 15-Jun-202 1 Document Ref.: EEMS-IMS-PM- 3303C


Form Title:
Material Receiving Inspection - MRI Page 1of 1
Document Reference
INTEGRATED MANAGEMENT SYSTEM
elegancia HAZARD IDENTIFICATION & RISK ASSESSMENT Rev. No. Rev.Date
16/Jul/2022

PROCEDURE
HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) Page Number
1 of 1

HIRANo: RISK ASSESSMENT


HIRA-0011 METHOD STATEMENT FOR THE INSTALLAT ION OF ELECTRICAL AREA I PROJECT:KOREAN MEDICAL CENTRE
: PANELS
CLIENT : ELEGANCIA HEALTH CARE
TASK/ Electrical Tool Box
Electric Drilling Machine
OPERATION' INSTALLAT ION OF ELECTRICAL EQ ';N Measurement Tape/ Spirit Level/ Water Levelling Pipe
PANELS
ACTIVITY IN USE: Torque Wrench
DESCRIPTION:

..
WITHOUT CONTROLS A B
Who I What could be
TASKS HAZARDS ASSOCIATED WITH
affected?
CURRENT CONTROLS Method Statement I Site
(.)
ADDmONAL & or SITE z
Q
I CONTROLS
(.)

w
ci (Direct involvementIintervention
z w
Operating Procedure Required
related to the acbvrty) z
HARM/CONSEQUENCE
• (What one does in logical EACH
hurtTASK
w
0
::> 8::;
I
ll steps) (What can one I others?) (What can happen I go wrong) "' (What SAFEGUARDS
do we do to prevent
incdents?) (What additional
to reducedothe could
risk?) we UJ
::>
0
R •Tld< No.
w
"z' w "wz'
O •CINRtlck Pon. 0
(.)
"
::; 0
(.)

11-JC.\....VDIC;'. P'EY'
f)
Ensure all personnelto attend safety
1nduct1on

I
VJO{L\ S Collision between
Procedure not followed/unders tood
site
Unsale working practice,inccorect use of vehicles/plants/equipmenVpedestrians at
Employee.vistors,
0 and proper training
Strict compliance of PTW and wi lbe
Use prpoer use or PPE as per the work
requirement
visiblein
the work area

i'

consultants and
tools/equipments leading to major njury. fatality and property Discuss method statement and risk assessment
clients Carry out toolbox talk pr or to start of
damages the
I work/activity

Chances of falling from the work space and Task briefing to workers and safe use of hand tools
Employee,vistors,

Ii
Falling. dripping and physical injury dripping of tools can make physicalinjuries of
2 Transportation of ElectricalPanels consultants and
0 All hand tools must be in good condition
Management need to provide
that are ingood condition

appropriate

I
clients tools/equipments
Eye & hand injuries the workers Provision of adequate supervision during the task.
Severe damag Provision and use of suitable PPEs to be in place

Installation of Electr cal


Collapse/failure of Structure resulting Employee,vistors All hand tools must be In good condition
Task briefing to workers and safe use of hand tools that
Handling excess amount or weight Management need to provide
appropriate are in good condit ion
Panels Provision of adequate supervision during the task .
tools/equipment s
Provision and use of suitable PPEs to be in place
in ,
sprains/strains/fractures/multiple consultants and
of t rauma/fatalit y. clients
Power Cables
Fall from height during installation of
wor k.
Eye & hand injur ies
Avoid manual handling wherever possible. If the lift is too heavy for one person, a vays ask somebody
Muscular pain Use mechanical means if possible. to assist.
Manual handling of Employee, vistors.
Distribution
Injuries result ing form
manualhandling Slips and trips
Limb
Disorders
consultants and 0 MOOERATE
Assess the situation before you attempt to lift any All workers will be trained in manual handling techniques.
object. Workers shall be given intermitent break time
boards.tools and equipments Sprain clients Workers to be trained on manualhandling Safety monitor ng during the work
Fatigue Provision of safe/ergonomic work platform. Safety inductionItool box talks in regular intervals

Guard rails and toe boards wdlbe fitted. Ont :ined operatives will erect. alter or dismantle
Fall of personnelfrom height
No
f person or materials will be left on the platform a ko · latf . b
wheniti.s being mo ed. . wo%:;bca ;i ;C:t. e u y
b ded nd ·t ble f
oar a su1 a °'the
Fall of materialfrom
Falling from hazard
height
Working at height (Use Employee.vistors. 11 11
of
5 aluminium Scaffold)
Entanglement Falling objects .materials.tools/equipment Collapse of overloadin consultants and
Scaffold scaffold clients
Overturning of saffol tower due to adverse
Collapse tower due to
loading or unstable ground.
MODERATE Only trat1lned Wiii
offperldat1ves d1sman e sea o . scaffolders .
erect, alter or will not J.S times its minimum A:i ss ladders must be provided to reach elevated work
To ensure the ability of the tower.the base ration
shall
rail have guard
system and exceed base d'1mens·1ons outs'1de the b Id' P arms.
erected tower to
ui ing. Toolbox talk to operatives on working at height.

Electrocution
Only competent person will use the power Keep all tools clean and dry
Use of hand and power tools Eye Injury Sever shock and burn Employee,
tools. All hand tools and power tools must bein Routine inspection must be carried out
I Entanglemen Damage to eyes and disability vistors, 12 MEDIUM
6 good conditionat all times Safety induction I toolbox talk in regular basis to remind
equipment t Injury to hand and other body parts consultants and
Managemenl will provide appropriate tools. worker the proper way of using the tools.
Cuts and bruises clients 1ti-->6'
tt-i C..L..UP \('.) C..C\..CI(!... "(
Musculoskeletal
injury Slip, trip and fall Ensure work area is clean and
Hit I struck byIstruck against objects unwanted material
or Employee.vistors, MODERAT
Housekeeping Poor housekeep ing Ensure walkway and emergency exits are free
materials consultants and E at
Improper disposal clients
Environmental contamination all times
No waste
segregation

Employee,vistors
8 General Extreme Temperature I Awarenes training on Heat Stress
Heat Stroke . Heat stress. Heat . consultants and MODERAT Schedule the heavy work during cooler part of the shift
Humidity Ava1lab1hty of facility on site and cold
exhaustion. clients E
water
ci-'.>C'-..v\)E'" {l.. 9 \\
Std PPE. Overalls. Hard /Jat , Safety shoes, Reflective Vest, Safety Glasses & Gloves Average rouNMcl 3 4 12 LOW Average rouNMcl up: 2 3 6
up:

e
RATING f'Rl:QUE : : . ::::=::;€.NCE t c• x UICIEU_H_o_o-o'-,L-) r----11-------rume--=----
It ,,,.• I
5 Catastroohc falair.-; Masso-we Maxia° loss liU.Sl( fR).

-----....,..=r-.--.+------I
k HaJO< l1saton I Lost Dav
lc5s or fai:..' tv 2: I00
!Mr Fi"'"°"' Loss s ---..; Navinkumaroghl
EEMS Tech.fu:al Manager
3
k 5 Loss orkm.......,
5C Fnano.i lnµy < 100 k 4 Vishnu M.Krishnan

10 <I.ms I 50k 3 EEMS HSE Officer


.:.I
Mnor F'w'Sl .Aod mont Min.,,.i !om 2 Approved By:PM
Ik 5 Loss or r,,,_.., < 10 \ Yousef AlTanbakji
CiWlt No on l1n'TIAI fin. 1los