Or Activity Existing and Measures Action by
Factor
Factor
Risk
Risk
To Be Implemented
Page 1 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:
Site Inspection If site management 4 2 8 Review the site emergency evacuation plan 1 2 2 HSE+ S.V
Identify site are unaware of and advise site management of work activity
work being carried for the day.
conditions out then workers
will be unaccounted
for in the event of
evacuation
Failure to follow 2 3 6 Ensure Traffic management procedures 3 1 3 HSE+ S.V
traffic management developed by site management are followed
plans can lead to
injury, damage to
vehicle or
equipment
Ignoring safety 3 3 9 Become familiar with the site safety signs and 1 2 2 HSE+ S.V
signs can lead to follow all instructions (e.g. wearing of
exposure to appropriate PPE)
hazards and
noncompliance with
site safety
Personal Injury 4 2 8 Identify where the first aid kit is located. 3 1 3 HSE+ S.V
Identify who the first aider is on site.
Identify the location of the toilets and amenities
on site
Each worker is required to wear the required
PPE at all times.
MSDS for any onsite materials are to be
registered on site
Added danger of 3 3 9 All the PPEs are subjected to periodical 2 1 2 HSE+ S.V
exposure to the risk inspection for their fitness for use.
Proper PPE and injury.
Basic &
Special)
Page 2 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:
using grinder Lung disease, 5 3 15 Mandatory using proper dust mask. 3 1 3 HSE+ S.V
to smoothing illness suffocation. Using proper exhaust fan to minimize dust &
the work ventilate the work area
surface
Transporting Strains from loading 3 3 9 Use of correct manual handling methods 2 2 4 HSE+ S.V
Hazardous hazardous
substances into
Substances vehicle
(paint, Load moving, 3 2 6 Carry a spill kit in transport vehicle 2 2 4 HSE+ S.V
solvents, shifting and spills Load secured with rope, straps or Cargo
detergent, Barrier
fuel) Carry and secure all paint and substances in
rear of vehicle.
Paint spill, 4 3 12 All paint is to be in original containers in good 1 2 2 HSE+ S.V
unidentified condition, label all containers accurately
substance MSDSs (Material Safety Data Sheets) and Fire
Extinguisher to be carried in all vehicles while
transporting hazardous substances
Fire 3 2 6 Extinguisher to be carried in all vehicles while 1 4 4 HSE+ S.V
transporting hazardous substances
Ensure fire extinguisher has been tested and
MSDS are current
Environmental 4 4 16 Spill Kit to be carried in all vehicles transporting 1 3 3 HSE+ S.V
impact hazardous substances
Handling Electrocution, 3 3 9 All the electrical tools are color coded and 1 2 2 HSE+ S.V
electrically shock, burns or monitored for their serviceability.
personal injury. All faulty tools are dispatched immediately for
operated
repair.
power tools Only trained & authorized personnel are
permitted to operate the electrical tools.
Using a mobile Falling from heights 3 3 9 Ensure Mobile Scaffold is properly erected 1 3 3 HSE+ S.V
scaffold to while setting up or
using mobile access
complete the equipment
task
Page 3 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:
(Working At Personnel injuries & 5 5 25 Trained and competent personnel shall work at 1 4 4 HSE+ S.V
Height) property damage height
Ensure green tag in place before using
scaffolding
Ensure proper access/ egress in place
Safety harness shall be worn before using
scaffold
Do not use scaffolding if it is displayed with
Red tag
Conduct the specific TBT & discuss the RA
mentioned points
Do not remove the safety harness on
scaffolding
Continues supervisor required while personnel
working at height
Do not perform monkey jumps from scaffolding
Provide life line if required
Barricade the area with warning sign
Prevent Public Pedestrians, slip, 3 3 9 Place ‘Wet Paint’ signs around area 1 3 3 HSE+ S.V
contact with trip & falls, Do not leave signs where the public can slip on
painted them
Tape to floor and wall so that they can be seen
surfaces when coming from all directions, remove where
applicable at the end of each day.
Remove signs only after paint is dry
Page 4 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:
Mixing the Body contact while 5 5 25 Take special care while mixing of paints; 3 1 3 HSE+ S.V
handling, Skin avoid contact with skin;
paints
Disease, irritation, wear PVC or rubber hand gloves and coverall
Dermatitis, Eye Use safety goggles to avoid the paint contact with
irritation. eyes.
Also Paints must be handled properly to avoid any
splash.
Page 5 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:
Environmental Dehydration Work rest rotation must be observed as heat HSE+ S.V
Hazards heat exhaustion prevention program.
Heat stroke. Cold drinking water is provided at the place of work
Heat Stress
Appropriate persona' protective equipment such as
Internal chronic
4 4 16 dusk mask, safety goggles must be used. 4 1 4
disease and Shade for rest is provided for break time and for any
infection weak workers.
In heavy sand storm, considering the wind speed
work can be cease.
Housekeeping Slips, Trips And 2 5 10 Maintain proper arrangement of hand tools. 3 1 3 HSE+ S.V
falls Make clear access/egress all time.
the infection leads 3 3 9 All Employees temp should be checked at the 3 1 3 HSE+ S.V
to serious health Main Gate.
COVID 19 damage or death. Keep at least 2m distance between the
workers.
Wearing special PPE (face mask, gloves)
Using hand sanitizer for employees
Attend TBT and training for COVID 19.
Any employee feeling tired should inform
management and leave the site and should
recommend visiting the nearest health facility.
Any employee who feels tired at home should
not come to work.
Page 6 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:
Severity
1 2 3 4 5
Risk level
2 4 6 8 10
Likelihood.
Low
3 6 9 12 15
Medium
4 8 12 16 20
High
5 10 15 20 25
Severity Likelihood
Sub-Contractor Site Manager (Unitech): ZIAD IBRAHIM Sub-Contractor Safety Officer (Unitech): Wissam Anwar
Approved Site Manager (GE): QASSIM NASSIR Approved Safety Officer (GE): ALI ABDULWADOOD
Page 7 of 7