RISK ASSESSMENT

PROJECT: SITE: Ref No: Serial No:


JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:

Basic Job Step Hazard Or Risk Risk Control Measures

Likelihood

Likelihood
Severity

Severity
Or Activity Existing and Measures Action by

Factor

Factor
Risk

Risk
To Be Implemented

HEALTH, SAFETY, AND ENVIRONMENT


 Supervisor to obtain required Permit to Work &
shall be available at the site at all times.
 Violation of Permit  Supervisor/Foreman to conduct toolbox talk
Permit to Work to Work Procedure
3 2 6
and discuss the hazards involved in the job as
2 1 2 HSE+ S.V
per RA.

Plan the job  Review the principal contractors Site Safety


 Inadequate training, Plan
prior to
consultation & 3 1 2  Provide adequate & competent supervision 3 1 3 HSE+ S.V
arriving on planning  Provide equipment to ensure job is completed
site. safely
 Ensure all workers are adequately trained and
 Lack of competence 3 2 6 2 2 4 HSE+ S.V
competent to undertake the work
 Untrained personnel  All workers to have current General Induction
1 2 2 1 2 2 HSE+ S.V
commencing work Card
Entry to Site  First day on site, 3 2 6  Report to site office. All workers to undertake 1 3 3
entry to unsafe site induction HSE+ S.V
areas.
 Accessing site via 4 2 8  Entry to site to be via gate directed by site 2 1 2
other means than management.
the main gate can  Review site access, parking and delivery area HSE+ S.V
lead to exposure to
site hazards

Page 1 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:

Site Inspection  If site management 4 2 8  Review the site emergency evacuation plan 1 2 2 HSE+ S.V
Identify site are unaware of and advise site management of work activity
work being carried for the day.
conditions out then workers
will be unaccounted
for in the event of
evacuation
 Failure to follow 2 3 6  Ensure Traffic management procedures 3 1 3 HSE+ S.V
traffic management developed by site management are followed
plans can lead to
injury, damage to
vehicle or
equipment
 Ignoring safety 3 3 9  Become familiar with the site safety signs and 1 2 2 HSE+ S.V
signs can lead to follow all instructions (e.g. wearing of
exposure to appropriate PPE)
hazards and
noncompliance with
site safety
 Personal Injury 4 2 8  Identify where the first aid kit is located. 3 1 3 HSE+ S.V
 Identify who the first aider is on site.
 Identify the location of the toilets and amenities
on site
 Each worker is required to wear the required
PPE at all times.
 MSDS for any onsite materials are to be
registered on site
 Added danger of 3 3 9  All the PPEs are subjected to periodical 2 1 2 HSE+ S.V
exposure to the risk inspection for their fitness for use.
Proper PPE and injury.
Basic &
Special)

Page 2 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:

using grinder  Lung disease, 5 3 15  Mandatory using proper dust mask. 3 1 3 HSE+ S.V
to smoothing illness suffocation.  Using proper exhaust fan to minimize dust &
the work ventilate the work area
surface
Transporting  Strains from loading 3 3 9  Use of correct manual handling methods 2 2 4 HSE+ S.V
Hazardous hazardous
substances into
Substances vehicle
(paint,  Load moving, 3 2 6  Carry a spill kit in transport vehicle 2 2 4 HSE+ S.V
solvents, shifting and spills  Load secured with rope, straps or Cargo
detergent, Barrier
fuel)  Carry and secure all paint and substances in
rear of vehicle.
 Paint spill, 4 3 12  All paint is to be in original containers in good 1 2 2 HSE+ S.V
unidentified condition, label all containers accurately
substance  MSDSs (Material Safety Data Sheets) and Fire
Extinguisher to be carried in all vehicles while
transporting hazardous substances
 Fire 3 2 6  Extinguisher to be carried in all vehicles while 1 4 4 HSE+ S.V
transporting hazardous substances
 Ensure fire extinguisher has been tested and
MSDS are current
 Environmental 4 4 16  Spill Kit to be carried in all vehicles transporting 1 3 3 HSE+ S.V
impact hazardous substances
Handling  Electrocution, 3 3 9  All the electrical tools are color coded and 1 2 2 HSE+ S.V
electrically shock, burns or monitored for their serviceability.
personal injury.  All faulty tools are dispatched immediately for
operated
repair.
power tools  Only trained & authorized personnel are
permitted to operate the electrical tools.
Using a mobile  Falling from heights 3 3 9  Ensure Mobile Scaffold is properly erected 1 3 3 HSE+ S.V
scaffold to while setting up or
using mobile access
complete the equipment
task

Page 3 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:

(Working At  Personnel injuries & 5 5 25  Trained and competent personnel shall work at 1 4 4 HSE+ S.V
Height) property damage height
 Ensure green tag in place before using
scaffolding
 Ensure proper access/ egress in place
 Safety harness shall be worn before using
scaffold
 Do not use scaffolding if it is displayed with
Red tag
 Conduct the specific TBT & discuss the RA
mentioned points
 Do not remove the safety harness on
scaffolding
 Continues supervisor required while personnel
working at height
 Do not perform monkey jumps from scaffolding
 Provide life line if required
 Barricade the area with warning sign
Prevent Public  Pedestrians, slip, 3 3 9  Place ‘Wet Paint’ signs around area 1 3 3 HSE+ S.V
contact with trip & falls,  Do not leave signs where the public can slip on
painted them
 Tape to floor and wall so that they can be seen
surfaces when coming from all directions, remove where
applicable at the end of each day.
 Remove signs only after paint is dry

Page 4 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:

Mixing the  Body contact while 5 5 25  Take special care while mixing of paints; 3 1 3 HSE+ S.V
handling, Skin  avoid contact with skin;
paints
Disease, irritation,  wear PVC or rubber hand gloves and coverall
Dermatitis, Eye  Use safety goggles to avoid the paint contact with
irritation. eyes.
 Also Paints must be handled properly to avoid any
splash.

 Vapor inhalation.  Ensure local Exhaust Ventilation/General ventilation


 Asphyxiation, prior to start of the painting job.
Intoxication, acute  While painting always wear proper respirators
and chronic chest (referred by manufacturer’s instructions).
pain. Dizziness.  Refer MSDS (Material Safety Data Sheet).
 Display warning signs and make others away from
inhaling the vapors.

 Ensure proper segregation of Empty and full drums


 Slips. of paints
 Fire.  Mixing must be carried out on concrete floor or use
of polythene sheet.
 Clear spillage if any immediately.
 Follow safe clean up and disposal procedures.
Personnel  Fall of men from 4 4 16  All the holes shall be closed by solid planks. 4 1 4 HSE+ S.V
movement at height.  All sheet covers shall be removed to expose
 Personal the real surface of working platform.
Scaffold
injury/death.  Proper housekeeping is maintained at the
working area at height Working on height is to
be viewed seriously.
 A thorough part to part inspection should be
carried out on the scaffold if it holds the
working platform and scaffold tag to be signed.
 All the workers working at height more than 2
meters should be with full body safety harness
properly worn on them and linked to the strong
support.
illumination  Working in dark 5 5 25  Install LEDs in all working area. 3 1 3 HSE+ S.V
area lead to Slips,
Trips, and falls.

Page 5 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:

Environmental  Dehydration  Work rest rotation must be observed as heat HSE+ S.V
Hazards  heat exhaustion prevention program.
 Heat stroke.  Cold drinking water is provided at the place of work
Heat Stress
 Appropriate persona' protective equipment such as
 Internal chronic
4 4 16 dusk mask, safety goggles must be used. 4 1 4
disease and  Shade for rest is provided for break time and for any
infection weak workers.
 In heavy sand storm, considering the wind speed
work can be cease.
Housekeeping  Slips, Trips And 2 5 10  Maintain proper arrangement of hand tools. 3 1 3 HSE+ S.V
falls  Make clear access/egress all time.

 the infection leads 3 3 9  All Employees temp should be checked at the 3 1 3 HSE+ S.V
to serious health Main Gate.
COVID 19 damage or death.  Keep at least 2m distance between the
workers.
 Wearing special PPE (face mask, gloves)
 Using hand sanitizer for employees
 Attend TBT and training for COVID 19.
 Any employee feeling tired should inform
management and leave the site and should
recommend visiting the nearest health facility.
 Any employee who feels tired at home should
not come to work.

Page 6 of 7
RISK ASSESSMENT
PROJECT: SITE: Ref No: Serial No:
JOB UNDER RISK ASSESSMENT: Painting for main building walls DATE OF ASSESSMENT:
NAME & POSITION OF THE
ASSESSOR:

Severity
1 2 3 4 5
Risk level
2 4 6 8 10
Likelihood.

Low
3 6 9 12 15
Medium
4 8 12 16 20
High
5 10 15 20 25

Severity Likelihood

1- No potential for injury, illness or incident 1- Very unlikely


2- Potential for minor injury, illness or incident 2- Unlikely
3- Potential for recordable injury, illness or incident 3- Likely
4- Potential for a major incident, or major injury or illness causing short term disability 4- Very likely
5- Potential for a major incident or major injury or illness causing a fatality or long-term disability 5- Certain

Sub-Contractor Site Manager (Unitech): ZIAD IBRAHIM Sub-Contractor Safety Officer (Unitech): Wissam Anwar

Date & Signature: Date & Signature:

Approved Site Manager (GE): QASSIM NASSIR Approved Safety Officer (GE): ALI ABDULWADOOD

Date & Signature: Date & Signature:

Page 7 of 7