This document provides a cost estimate for various construction items and materials. It includes 10 items: 1) earthwork excavation, 2) sand filling, 3) PCC flooring, 4) RCC work, 5) steel reinforcement, 6) brickwork for inspection chambers, 7) cement plastering, 8) punning, 9) MS gate work, and 10) white washing. The total cost is estimated to be Rs. 19.70 lakhs plus 3% contingency. GST is extra as applicable.
This document provides a cost estimate for various construction items and materials. It includes 10 items: 1) earthwork excavation, 2) sand filling, 3) PCC flooring, 4) RCC work, 5) steel reinforcement, 6) brickwork for inspection chambers, 7) cement plastering, 8) punning, 9) MS gate work, and 10) white washing. The total cost is estimated to be Rs. 19.70 lakhs plus 3% contingency. GST is extra as applicable.
This document provides a cost estimate for various construction items and materials. It includes 10 items: 1) earthwork excavation, 2) sand filling, 3) PCC flooring, 4) RCC work, 5) steel reinforcement, 6) brickwork for inspection chambers, 7) cement plastering, 8) punning, 9) MS gate work, and 10) white washing. The total cost is estimated to be Rs. 19.70 lakhs plus 3% contingency. GST is extra as applicable.
This document provides a cost estimate for various construction items and materials. It includes 10 items: 1) earthwork excavation, 2) sand filling, 3) PCC flooring, 4) RCC work, 5) steel reinforcement, 6) brickwork for inspection chambers, 7) cement plastering, 8) punning, 9) MS gate work, and 10) white washing. The total cost is estimated to be Rs. 19.70 lakhs plus 3% contingency. GST is extra as applicable.
1. Earth work in excavation in foundation 46.4 Cum
trenches in ordinary soil & disposal of excavared earth as obtained to a distance upto 30 m,all lifts levelling,ramming the foundation trenches all as per building specification and direction of E/I 2. 75mm(3")Sand filling in foundation 6.84 Cum trench & leveled(50mm) 3. P.C.C M-10 with nominal mix of (1:3:6) 3.87 Cum in flooring with approved quality of stone metal grad -II ,20 mm down size clean coarse sand F.M 2.5 to 3,screening placing in position ,striking,curing all complete as per building specification and direction of E/I
4. R.C.C M-20 with nominal mix (1:1.5:3) in 36.70 Cum
with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand F.M 2.5 to 3, screening,centering,shuttering placing in position,stiking,curing all complete as per building specification and direction of E/I
5. Steel reinforcement for R.C.C. work 2673.93 Kg
including straightening, cutting, bending, placing in position and binding all complete per building specification and direction of E/I 6. 250mm(10") I - class B/w in C.M(1:4) in 68.66 Cum Inpection chamber with approved quality of clean coarse sand F.M 2 to 2.5,10 mm thick mortar joints screening,raking of joints15mm,curing all as per building specification and direction of E/I 68.66 M3(298.52M2) Item Particulars of Item and details of work No. Rate Qty. Unit Amount Rs. P
7. 12 mm thick cement plaster (1:6) with 886.32 Sqm.
clean coarse sand of F.M 1.5 including screening,curing with all leads and lifts of water,scaffolding all complete as per building specification and direction of E/I 886.32M2
8. Punning with neat cement 1.5mm on 5.74 Sqm.
C.M(1:6) with clean coarse sand of F.M 1.5 with rounding of junctions,curing all complete as per building specification and direction of E/I 5.74 M2
9. MS steek gate work welded in built up 432 Kg.
sections/ framed work, including cutting hoisting, fixing in position and applying a priming coat as per building specification and direction of E/I 8.64 M2(432 Kg)
10. White washing including 886.32 Sqm.
cleaning and smoothening surface all complete as per building specification and direction of E/I 886.32M2 Total Rs. Add. Contigency @ 3 % Rs. Grand Total Rs. Say Total Rs. Rupees Ninteen Lakh Seventy Thousand Only