‫اﻧﺷﺎء ﻣﺑﻧﻰ ﺳﻛﻧﻰ ﻟﺿﺑﺎط اﻟﺷرطﺔ ﺑﻣدﯾﻧﺔ اﻟﺧﻣﺎﺋل‬ Analysis

Deterministic Point Inside both limits Outside both limits Simulation: Latin Hypercube

Iterations: 1000
61%

$2,940,000 29% 21%


Correlation

Pearson's 13.9%
$2,920,000
Spearman's 13.0%

$2,900,000 Highlighters

x-axis 61% (03/12/2018)

$2,880,000 y-axis 50% ($2,813,508)

Inside both limits 32%

Outside both limits 21%


$2,860,000
Entire Plan: Cost

$2,840,000

$2,820,000
50%

$2,800,000

$2,780,000

$2,760,000

$2,740,000

32% 18%

29/11/2018 01/12/2018 03/12/2018 05/12/2018 07/12/2018 09/12/2018 11/12/2018


Entire Plan: Finish