Annex L: QUALITY CONTROL PLAN

‫ خطة ضبط الجودة‬:L ‫الملحق‬

Tender Ref. #: :‫ رقم مرجع المناقصة‬Project: YEMA ‫ يمــا‬:‫البنامج‬


‫ر‬
ADRA-YEMA II -559-2023

Project Description: Rehabilitation of Kamaran Hospital in Al Hodeiah and Al-Thaluth health center in Hajjh

‫ى‬
.‫مستشف كمران بالحديدة ومركز الثلوث بحجة‬ ‫وصف ر‬
‫ عادة تأهيل‬:‫المشوع‬

Essential Specifications and Testing Requirements


‫المواصفات األساسية ومتطلبات االختبار‬

The Contracor should confirm to adhere to the ‫ى‬


:‫االلبام بالمواصفات المذكورة أدناه‬ ‫يجب عىل المورد تأكيد‬
specification listed below:

All items/ materials specifications shown in the ‫ بنود‬:‫جميع المواد والمعدات المطلوبة ومواصفات العينات‬
BoQs include supplying the materials, with any ‫الت تتطابق مع‬
‫ومعدات المواد المطلوبة والموضحة ي‬
necessary equipment needed, and cost includes
.‫المواصفات الواردة يف ملحق جدول الكميات‬
Attached
1. Bill of quantity Annex A
‫مرفق ملحق‬
A ‫ جداول الكميات ملحق‬-1
2. Drawings Annex A
B ‫ رسومات محلق‬-2

ADRA-YEMA II-0529-2023 Annex L


Page 1 of 4
Contract Testing Requirements ‫متطلبات اختبار العقد‬
1- Bidders should submit all supporting ‫يجب ببا مت المتاب ببدت دب ببالعطب ببا تاب ببدي جميع المسـ ـ ـ ـ ـ ــتن ـ ــدات‬-1
documents concerning the proposed
)‫الداعمة المتعلاة دمواد وأممال البنا الماتحة‬
construction materials and works.
(i.e., catalogues, models, brands, drawings, ،‫مث ببل اللت ببالوجببات والنم ببا ا والعيمببات التج ببار ببة وال ب ب ب ب ببومببات‬
technical documentation, technical
‫الفت‬
‫والوثائق والمواصفات ي‬
specifications, etc.)

2- Accepted construction, Electrical, and


mechanical materials, and equipment: :‫ معدات ومواد البناء والمواد الكهربائية والميكانيكية‬-2
All Constructions, Electrical and mechanical
materials, and equipment supplied must ‫الت‬ ‫جميع مواد البنا والمواد اللهربائية والميكانيكية ي‬
have specifications that match those listed ‫المواصفات‬ ‫يت تور دها يجا ان تتطابق من مع‬
in attached Annex (A). (A ‫الواردة يف جداول الكميات (الملحق‬

3- Contractors should provide samples for all


‫مادم العطا ات تادي مينات من المواد‬
‫ي‬ ‫ يجا مت‬-3
the items. The procurement committee will
‫المحددة و وف تاوت لجنة تحليل العطا ات بتايي‬
evaluate the quality of all the samples from
‫مادم العطا ات خيل‬‫ي‬ ‫جودة كل العينات المادمة من‬
the bidder during the evaluation stage.
. ‫م حلة التايي‬
4- The bidders should provide detailed
‫ يجا مت ماد يم العطا ات تادي معلومات تفصيلية‬-4
information on the specified materials they
‫ وتتضمن هذه المعلومات‬،‫الت يت تور دها‬ ‫من المواد ي‬
will supply including pictures, these
:‫صور و جا ان تحتوي الصور مت المعلومات التالية‬
pictures should show brand, origin, and
‫ دلد المنشأ داإلضافة اىل المواصفات‬،‫العيمة التجار ة‬
detailed specifications.
.‫التفصيلية‬
5- During delivery, all Material will be
‫ يخضع جميع المواد اىل فحوصات‬، ‫ اثنا التسلي‬-5
subjected to 100% checks against a
‫و يت رفض اي مواد‬. ‫ ماادل المواصفات‬%100 ‫بنسبه‬
specification. Any Material identified with
‫ت تحديد انها تحتوي مت مشكيت و يتطلا من‬
issues will be rejected and the Contractor
.‫الغت مابولة‬
‫المورد ا تبدال جميع المواد ر‬
will be required to replace all affected
materials.

Percent of tested sampling that needs to fail for the


Percent of Materials to be tested -
entire order to be considered non-conforming (%)
Sampling size- (%) Frequency
‫والت يجا أن‬
‫الت ت اختبارها ي‬‫النسبة المئو ة للعينة ي‬
‫ حج العينة‬- ‫نسبة المواد الم اد اختباره‬ ‫التك ار‬
‫غت مطابق‬
‫تفشل حت يت امتبار الطلا دأكمله ر‬
(٪)
(٪)

100% Per order (PO) 0%


‫مند كل طلا رشا‬

ADRA-YEMA II-0529-2023 Annex L


Page 2 of 4
Non-Conformance
1. AUTHORIZED SUBSTITUTIONS
▪ The Contractor shall notify ADRA Yemen prior to signing a Contract if the Contractor wishes to
deliver Goods that are other than the exact goods contained in the specifications but are.
equivalent in price and quality. ADRA Yemen may, using its sole discretion, choose to accept
such Goods by providing the Contractor with written notice, signed by ADRA Yemen’ authorized
representative, that it will accept the equivalent substitute Goods. Substitute goods are not
acceptable unless otherwise acknowledged and accepted by ADRA Yemen in writing prior to
delivery.
▪ If the Contractor requests such substitution, the entire Contract signed by ADRA Yemen loses
its validity unless accompanied by an authorization to substitute issued by ADRA Yemen.
▪ Should ADRA Yemen choose to accept the substitute goods, ADRA Yemen will determine the
market value of substituted commodities and for those commodities will pay no more than the
market value established by ADRA Yemen.
▪ In the eventuality that the market value determined by ADRA Yemen is higher than the
Contractor’s bid for the item originally contracted, ADRA Yemen will pay no more than the price
offered by The Contractor in its original bid.
▪ In addition, due to the disruption caused to ADRA Yemen’ supply chain and the additional work
required to establish the market value of the substituted items, ADRA Yemen will charge a
penalty of 2% of the value of the items that The Contractor is attempting to substitute. The
value listed in this Agreement will be used as the basis for the computation of penalties.
▪ In the eventuality that the Contractor wishes the substitution item to become the permanently
contracted item until the end of the present Agreement, The Contractor may request that an
amendment to Annex A: BoQs (Contents, Specifications, and Packaging List), be drafted. ADRA
Yemen, at its sole discretion, may or may not grant The Contractor’s request.
▪ Any Material substitution which is not communicated to ADRA Yemen after the signing of the
relevant Contract, will trigger the cancellation of the entire Contract unless ADRA Yemen, at its
sole discretion, decides otherwise. In the eventuality that ADRA Yemen accepts the
substitution. In addition, with the exception of the penalty rate, this will be increased to 4%
and computed on the same basis, in order to account for the additional delay caused by The
Contractor.

2. UNAUTHORIZED SUBSTITUTIONS
▪ Any Material substitution, which is not communicated to ADRA Yemen by The Contractor prior to
delivery, will trigger the cancellation of the entire Contract unless ADRA Yemen, at its sole
discretion, decides otherwise. In the eventuality that ADRA Yemen accepts the substitution,

Alternatively, ADRA Yemen may decide to:

- Reject the entire shipment.


- Reject the substituted goods.

ADRA-YEMA II-0529-2023 Annex L


Page 3 of 4
‫المعدات الغير مطابقة‪:‬‬
‫‪. 1‬البدائل المصرح بها‪:‬‬
‫• يجب على المقاول إخطار منظمة أدرا اليمن قبل التوقيع على العقد إذا كان المورد يرغب في تسليم مواد بخالف المحددة‬
‫الواردة في المواصفات‪ ،‬ولكنها ليست كذلك‪.‬‬
‫ما يعادل السعر والجودة‪ .‬قد تختار أدرا اليمن‪ ،‬وفقًا لتقديرها الخاص‪ ،‬قبول هذه السلع من خالل تزويد المورد بإشعار خطي موقع من‬
‫الممثل المعتمد لشركة أدرا اليمن‪ ،‬بأنه سيقبل السلع البديلة المكافئة‪ .‬السلع البديلة غير مقبولة ما لم يتم اإلقرار بخالف ذلك والموافقة‬
‫عليها من قبل أدرا اليمن كتابيًا قبل التسليم‪.‬‬
‫• إذا طلب المورد مثل هذا االستبدال‪ ،‬فإن العقد الموقع من ‪ ADRA‬اليمن بالكامل يفقد صالحيته ما لم يكن مصحوبًا بإذن بديل‬
‫صادر عن ‪ ADRA‬اليمن‪.‬‬
‫• إذا اختارت أدرا اليمن قبول المواد البديلة‪ ،‬فإن أدرا اليمن ستحدد القيمة السوقية للمواد البديلة ولن تدفع أكثر من القيمة‬
‫السوقية التي حددتها أدرا اليمن لتلك المواد‪.‬‬
‫• في حال كانت القيمة السوقية التي تحددها أدرا اليمن أعلى من عرض المقاول للعنصر المتعاقد عليه في األصل‪ ،‬فإن أدرا‬
‫اليمن لن تدفع أكثر من السعر الذي عرضه لمقاول في عطائه األصلي‪.‬‬
‫نظرا لالضطراب الذي حدث في سلسلة التوريد الخاصة بـ ‪ ADRA‬في اليمن والعمل اإلضافي المطلوب‬ ‫• باإلضافة إلى ذلك‪ً ،‬‬
‫لتحديد القيمة السوقية للمواد المستبدلة‪ ،‬ستفرض ‪ ADRA‬اليمن غرامة قدرها ‪ ٪ 2‬من قيمة العناصر التي يحاول المورد ليحل‬
‫محل‪ .‬سيتم استخدام القيمة المدرجة في هذه االتفاقية كأساس لحساب العقوبات‪.‬‬
‫• في حالة رغبة المقاول في أن يصبح العنصر البديل هو العنصر المتعاقد عليه بشكل دائم حتى نهاية العقد‪ ،‬يجوز للمورد أن‬
‫يطلب تعديل الملحق ‪ :A‬جداول الكميات و يجوز ألدرا اليمن ‪ ،‬وفقًا لتقديرها الخاص‪ ،‬الموافقة أو عدم الموافقة على طلب‬
‫المقاول‪.‬‬
‫• أي استبدال للمواد لم يتم إبالغ أدرا اليمن بعد التوقيع على العقد ذي الصلة‪ ،‬سيؤدي إلى إلغاء العقد بالكامل ما لم تقرر أدرا‬
‫اليمن‪ ،‬وفقًا لتقديرها الخاص‪ ،‬خالف ذلك‪ .‬في حالة أن ‪ ADRA‬اليمن تقبل االستبدال‪ .‬باإلضافة إلى ذلك‪ ،‬باستثناء معدل‬
‫العقوبة‪ ،‬سيتم زيادتها إلى ‪ ٪4‬ويتم احتسابها على نفس األساس‪ ،‬من أجل حساب التأخير اإلضافي الذي يسببه المقاول‪.‬‬

‫‪. 2‬البدائل غير المصرح بها‪:‬‬


‫أي استبدال للمواد‪ ،‬والذي لم يتم إبالغ أدرا اليمن من قبل المقاول قبل التسليم‪ ،‬سيؤدي إلى إلغاء العقد بالكامل ما لم تقرر‬ ‫•‬
‫أدرا اليمن‪ ،‬وفقًا لتقديرها الخاص‪ ،‬خالف ذلك‪ .‬في حالة قبول أدرا اليمن لالستبدال‪ ،‬بدالً من ذلك‪ ،‬قد تقرر منظمة أدرا اليمن‬
‫ما يلي‪:‬‬
‫‪ o‬رفض المواد كاملة‪.‬‬
‫‪ o‬رفض المواد المستبدلة‪.‬‬

‫‪ADRA-YEMA II-0529-2023‬‬ ‫‪Annex L‬‬


‫‪Page 4 of 4‬‬