Professional Documents
Culture Documents
TE-419888-001 - 869-U-1004 - ANTIFOAM INJECTION PACKAGE - Rev.B
TE-419888-001 - 869-U-1004 - ANTIFOAM INJECTION PACKAGE - Rev.B
OPRNS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG'G CERT
MWK
HCK
SBK
SBK
JFGP 2
Jafurah Utilities, Sulfur and Interconnecting Systems
(Package 3)
DESCRIPTION
DISCIPLINE
ENGINEER FOR
ANTIFOAM INJECTION PACKAGE
SBK
DATE
18-FEB-22
ENGINEERING
MANAGER
DATE
JHK
18-FEB-22
(869-U-1004/2004/3004)
CERTIFIED
MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 1
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
MWK
HCK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SBK
SBK
CONTENTS
1 Introduction 3
DESCRIPTION
2 Process Duty 4
3 Mechanical Design 5-6
4 Control, Safeguarding and Instrumentation 7
5 8
10-14329-0003 ISSUED FOR REVIEW
Electrical
6 Utilities 8
7 Package Data 9
8 Dosing Pump 10-11
9 Dosing Pump Motor Data Sheet 12-13
JO/EWO
2021-DEC-16
18-FEB-22
DATE
REV
NO.
A
DISCIPLINE
ENGINEER
SBK
DATE
18-FEB-22
ENGINEERING
MANAGER
JHK
DATE
18-FEB-22
CERTIFIED
MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 2
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
1.0 INTRODUCTION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
1.1 General
ENG'G CERT
MWK
HCK
This Data Sheet covers the requirements for Antifoam Injection Package (869-U-1004), for the Jafurah Project.
Antifoam injection facilities are required in JFGP SRU and TGTU, one package per train, three trains in total. 869-
SBK
SBK
- 1 x 100% antifoam storage tank. Tank to be fitted with necessary level and temperature instruments
- 1 off tank mixer including driver fitted with the storage tank
- 2 x 100% (Duty/Standby) antifoam metering pumps
2021-DEC-16 10-14329-0003 ISSUED FOR REVIEW
. . .
to DCS by others).
- Junction box located at skid edge
- Necessary sample and drain connections.
18-FEB-22
DATE
- All other mechanical and electrical equipment, instrumentation and controls necessary for safe and
reliable operation.
REV NO.
- Structural steel base frame with sun shades (VTC for sunshades).
A
TBC To Be Confirmed
EDSD
TBA To Be Advised
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 3
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
This document shall be read in conjunction with the following related project documents:
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENG'G CERT
SBK
18-FEB-22
DISCIPLINE
ENGINEER Rated capacity: 25 lb/hr (TBC by EPC Contractor HOLD)
SBK Turndown capacity: 10 %
DATE
18-FEB-22 Discharge Pressure: 100 psig (TBC by EPC Contractor HOLD)
ENGINEERING
MANAGER
JHK Predicted rated capacity was calculated based on 3 x 25 ppm(wt) antifoam concentration.
DATE 18-FEB-22 Discharge pressure to be confirmed based on highest injection point operating pressure.
CERTIFIED
Required injection rate must be confirmed by the chemicals vendor (depends on the type of antifoam).
MWK Demineralized water Cooled Clean Condensate is supplied for dilution and maintenance via a pressurized header,
DATE 18-FEB-22 available at skid battery limit, as required. Instead of demi. Water cooled clean
condensate will be used for dilution
CONSTRUCTION
AGENCY Package control shall be done through the DCS.
2.2 Discharge Conditions
DATE Dosing rate shall be proportional to main stream flow rate. The dosing pump discharge pressure shall
OPERATIONS be adequate for supplying the chemical into the discharge line which has a normal injection pressure of
100 psig (to be confirmed during detailed engineering HOLD) and a maximum injection pressure of 100 psig (HOLD).
DATE The actual hydraulics shall be developed at a later stage when necessary details are available.
CONTROL NUMBER
VERIFICATION
The preferred type of antifoam is a polyglycol type, but both polyglycol and silicone types of anti-foam
should be on-site at start-up for evaluation purposes. Recommended anti-foams are:
• BASF Pluronic L81
DATE:
BY:
• Nalco EC9079A
• Dow Corning 1430
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 4
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
The design life time for the Antifoam Injection Package 869-U-1004 shall be 20 years. Each Package shall include
ENG'G CERT
MWK
HCK
controlled volume pumps, tank, tank mixer, gauges, strainer, filter, pressure relief valves, sight glasses and flow
metering/monitoring devices, check valves, hand valves, a power source for the pump and instrumentation to
control the injection and to monitor its effectiveness.
SBK
SBK
Each pump shall have an adjustable stroke length to achieve the stated turndown ratio from maximum flow.
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Alteration of the stroke length shall be possible without shutting the pump down.
Stroke length to be adjustable, both locally and by a control signal from the remote control room. Mechanical lost
motion capacity adjustment is not permitted. Hydraulic lost motion capacity is not permitted for duties with motor
rating > 1 HP.
Dosing will be fully automatic with minimum operator intervention during normal operation.
DESCRIPTION
Consideration shall also be given to other conditions such as start-up, shut-down etc. Such
temperatures should be considered on a case by case basis to establish if they should be taken as the
maximum operating temperature.
18-FEB-22
d) Design Pressure for pumped systems: process piping and equipment which form part of a pumped
hydraulic system, and which may operate liquid full, shall be designed for the maximum pressure that
can be developed by the pump.
REV
NO.
e) A pressure relief valve must be installed on the pump discharge to vent fluid back into the chemical
DISCIPLINE tank or suction line if pressure builds up. The actual pump internal relief valve setting shall be between
ENGINEER
110% and 120% of the rated discharge pressure.
SBK
DATE
18-FEB-22
3.2 Materials of Construction
ENGINEERING
MANAGER Materials of construction shall be selected by VENDOR in line with Company and Project standards. Materials shall
JHK
be appropriate for process design, compatible with all intended process fluids, and suitable for intended application.
DATE
Minimum material grade shall be SS 316L. Wetted faces of instrumentation shall be compatible with process fluid
18-FEB-22
without coating or lining. Vendor shall ensure material selections and coatings are suitable for external environment
CERTIFIED
in accordance with BEDD requirements.
MWK
PMI shall be performed on all SS components / Welds as per SAES-A-206.
DATE
18-FEB-22
CONSTRUCTION
AGENCY
3.3 Noise
All threaded joints downstream of the pump discharge shall be seal welded.
DATE
Piping to be adequately supported to avoid vibration. Pipes to be anchored at skid edge. Refer to SAES -L-310
CONTROL NUMBER
Section 17.
VERIFICATION
EDSD
liquid level.
BY:
Check valves shall be external type; not integral to any other inline fitting.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
Nozzle loads permitted at all terminal points shall be agreed with BUYER. ‘Zero Load’ condition shall not be
OF THIS DRAWING IS COVERED, FOR ALL
accepted.
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 5
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF
B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
MWK
HCK
Size to be confirmed during detailed engineering. This tank should be heat traced (subject to the type of
antifoam).
SBK
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Tanks shall be manufactured in accordance with 32-SAMSS-030 by an approved Saudi Aramco fabricator.
Vendor may propose a non-metallic tank as an alternative design for approval by Saudi Aramco. The Package
VENDOR shall complete tank data sheet Form SA-2696 for review by BUYER.
Chemical storage tanks shall, as a minimum, be equipped with fill nozzle, utility nozzle, vent, pressure relief,
overflow, discharge, low point drain, level and temperature instrumentation.
DESCRIPTION
2) One 750 mm (30 in) NPS roof manway for tanks larger than 10,000 gallons capacity.
Anti-swirl baffles (vortex breakers) shall be provided on liquid outlet nozzles upstream of a pump suction side.
Block valves shall be installed directly at the tank nozzles. If more than one line connects to the same nozzle,
valves shall be installed in each line, in addition to the nozzle block valve.
JO/EWO
Calibration pot shall be robust design with calibrated toughened glass enclosed in steel guard.
Main line chemical feed and calibration tube shut-off valves shall be ¼ turn ball valves and shall be positioned
REV
NO.
such that the operator can easily and simultaneously operate both valves during calibration.
DISCIPLINE
ENGINEER
3.7 Pumps
SBK
Antifoam Metering Pumps
DATE
18-FEB-22
ENGINEERING The pump should be capable of injecting antifoam to all antifoam injection points, one at a time. The discharge
MANAGER
pressure shall be confirmed during detailed engineering and is related to the specification of the Lean Amine
JHK Pump, Rich Amine Pump and Regenerator Reflux Pump.
DATE
18-FEB-22
CERTIFIED
Dosing pumps shall be API 675 controlled volume positive displacement type. Pumps shall be provided from
Saudi Aramco approved manufacturer and meet the requirements of 31-SAMSS-009.
MWK
DATE
18-FEB-22 Pump shall be double diaphragm type with a diaphragm failure signalling system.
CONSTRUCTION
AGENCY
Pump shall have an electronic automatic adjustable stroke length controller, capable of remote and local control
without stopping the pump.
DATE
OPERATIONS Each pump shall have a minimum operating capacity of 30 to 110% of the recommended dosing rate.
pump (transfer) antifoam agent from barrel / portable drum into the antifoam storage tank.
VERIFICATION
EDSD
Earthing cable on a reel with clamp for attachment to a suitable local earthing / grounding point.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
Tank transfer/loading pump(s) shall be capable of filling the storage tank within 20mins.
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
MWK
HCK
Pulsation damper, to ensure an even chemical application, shall be provided in each pump discharge line and
sized to provide sufficient degree of damping. Any fitting required for charging the pulsation dampers shall be
SBK
SBK
provided. Suppression devices shall be furnished as necessary to meet the following criteria.
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Unfiltered peak to peak pulsation levels shall not exceed 3% of:
• Rated suction pressure or 100 kPa gauge (15 psig) whichever is less;
• Rated discharge pressure or 100 kPa gauge (15 psig) whichever is less.
others.
Total flowrate signal (by Others) will be used to provide the ratio control to the dosing pump to adjust the dosing
rate accordingly. The DCS shall supply a flow demand signal to each package.
REV
NO.
The dosing package storage tank shall be provided with a local level gauge and transmitter to provide remote
DISCIPLINE level indication, including high and low level alarms.
ENGINEER
A temperature gauge shall be supplied on the tank for indication of fluid temperature.
SBK
DATE
18-FEB-22 The pumps shall be provided with a local panel with start/stop facility, emergency stop, selector switch and
ENGINEERING running indication. Remote running indication, pump selection and pump start/stop/trip shall also be provided.
MANAGER
JHK Each pump shall have an external PSV with independent discharge line piped back to the tank above the high
DATE
18-FEB-22
high liquid level.
CERTIFIED A pressure gauge shall be supplied at the suction and discharge side of each pump metering pump.
MWK
Pressure and flow transmitters shall be supplied on a common service discharge line.
DATE
18-FEB-22
CONSTRUCTION Double diaphragm pumps shall be provided with a diaphragm failure signal system.
AGENCY
The package shall interface with the Client's Project site Distributed Control System (DCS) and be operated
DATE from there. The incorporation of the control in the DCS is by others.
OPERATIONS Instrumentation shall be wired to skid edge junction boxes or the local panel. Wiring to the DCS will be by
others.
DATE
Ref.: 34-SAMSS-831 and TD-821310.
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 7
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
5.0 ELECTRICAL
PMT
MWK
HCK
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
All electrical equipment shall meet ambient conditions as stated in Electrical Design Basis TD -821403.
All equipment installed in hazardous (classified) areas, electrical equipment/component meeting the
requirement of IEC 60079 shall be labelled, listed, or certified by any of the agencies in the Approved IECEx
Certification Bodies (ExCBs) under the IECEx Certified Equipment Scheme. Method of protection must be
marked and must correspond with NEC Article 505 requirements for suitable protection method(s) for the
hazardous area where the equipment is applied.
DESCRIPTION
Power cablings to motors will be provided by CONTRACTOR directly to the motor terminal boxes.
VENDOR shall provide on-skid supporting cable tray for the incoming power cables.
2021-DEC-16 10-14329-0003 ISSUED FOR REVIEW
All on-skid grounding and bonding connection shall be wired to skid-edge earth busbars. CONTRACTOR shall
provide cabling up to these earth busbars. The grounding and bounding shall be as per SAES -P-111.
Electrical control cabling on skid shall be wired to skid-edge junction boxes by VENDOR. CONTRACTOR shall
provide control cabling up to these junction boxes.
JO/EWO
6.0 UTILITIES
Following utilities are envisaged to be required for the package. VENDOR to indicate requirement of any other
utilities.
18-FEB-22
DATE
JHK
DATE
18-FEB-22 VENDOR to indicate requirement of any other utilities.
CERTIFIED
For operating and design conditions of utilities, refer to the ‘Basic Engineering Design Data’ document.
MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B_____
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 8
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
Pump Tag No TBC
PMT
No. of Heads/Pump
MWK
HCK
Service Intermittent
ENG'G
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Flow per Head Usgph 3
Discharge Pressure psig 100
Design Pressure Atmos. + static head Shaft Dia VTA Pump Trip YES
Material SS 316L (NOTE 1) Shaft Length VTA Strainers: per System / Pump / Head
10-14329-0003 ISSUED FOR REVIEW
Corrosion allowance NIL Shaft Seal arrangement VTA Calibration: Level Gauge / Calibration Gauge
Lid YES Material Wetted Parts (Note 1) VTA Relief Valve External to Pump YES
Access HINGED LID Mounting Arrangement VTA Pressure Gauges ON DISCHARGE
Atmospheric Vent / Purge System Motor 460 Volts 3 Ph 60Hz kW VTA Diaphragm failure signal system : YES
Dissolving Basket N/A Chemical Mixed VTA
18-FEB-22
HEIGHT ft SHIPPING
Sunshade VTA TP04 DRAIN VTA VTA
Lifting Lugs YES TP05 NITROGEN VTA VTA
DISCIPLINE
Hazardous Area Classification: Class 1, Zone 2, IIA/IIB, T3
ENGINEER
JHK 2) Equipment Tag Nos shall be confirmed by EPC Contractor during Detailed Design phase. will be finalized later.
DATE
18-FEB-22
3) VTA = Vendor to advise. TBC = To be confirmed.
CERTIFIED
MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REQUIREMENTS,
OPRNS
SAUDI ARABIAN OIL COMPANY
POSITIVE DISPLACEMENT PUMP DATA SHEET
NOTE: INDICATES INFORMATION TO BE COMPLETED BY THE PURCHASER; BY MANUFACTURER
PMT
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. LIQUID CHARACTERISTICS 5. FLOW REPEATABILITY %
.1 MAX. FLOW TEMPERATURE °F TBA 131 8. BHP CONS. AT MAX. CAPACITY (C.1)* BHP
3. SPECIFIC GRAVITY AT FLOW TEMP./ MAX. TEMP. 1 1 9. BHP CONS. AT MAX. CAP. AND 110% OF E.12* BHP
1000 20
4. VISCOS. AT FLOW TEMP./ MAX. TEMP. cP (Note 1,2) (Note 1,2) 10. MAX. DISCH. PRESSURE psig
5. VAPOR PRESSURE AT FLOW TEMP. psi(a) 0.5 (Note 2) 11. MAX. RELIEF VALVE SETTING psig
DESCRIPTION
.1 V.P AT MAX. FLOW TEMP. psi(a) 0.5 (Note 2) 12. ACTUAL RELIEF VALVE SETTING psig
1. CAPACITY RANGE Usgph 0.9 3.3 3 *) E.8 AND E.9 TO INCLUDE GEAR AND COUPLING LOSSES
3. SUCTION PRESS. MIN/RATED psi(g) VTA VTA F. PUMP AND COUPLING MODEL,
4. TOTAL DIFFERENTIAL PRESSURE psi VTA WEIGHTS, LUBRICATION
5. RATED DISCHARGE PRESSURE psi(g) 100 1. MANUFACTURER
6. LOCATION .1 TYPE/SIZE
JO/EWO
7. AREA CLASSIFICATION
VENDOR
CLASS 1 ZONE 2 GROUP IIA/IIB TEMP. T3 2. PUMP EQUIPPED WITH : REQ'D
DATE
SUPPLY
8. SUCTION/DISCHARGE PIPE
.1 DRIVER ( INCL. COUPLING
TOTAL ACTUAL LENGTH ft / AND GUARD IF REQUIRED)
REV
NO.
DISCIPLINE
.3 SUCTION STRAINER ( Y-TYPE )
ENGINEER
CONSTRUCTION
( LOOKING FROM DRIVING END ) 1. PUMP lbs
AGENCY
2. ELECTRIC MOTOR DRIVER CONST. SPEED 2. DRIVER ( INCL. COUPLING) TOTAL WEIGHT lbs
MODEL G. UTILITIES
APPROVAL/CERTIFICATION REQUIREMENTS,
AC PHASE
RATIO : AGMA FACTOR DC VOLTS HERTZ
REVISION CERTIFICATE
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 10
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 8010-ENG(11/2010)
H. MATERIALS OF CONSTRUCTION
MWK
HCK
SBK
2. PLUNGER VTA 3.
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. HYDRAULIC DIAPHRAGM VTA NOTES
6. PLUNGER PACKING VTA 2. Chemical Characteristics are preliminary. To be finalized after receiving
J. PUMP CONSTRUCTION
1. PUMP NOZZLE
FLANGED IN.
FLANGED IN.
JO/EWO
2 CAPACITY ADJUSTMENT
.1 MECHANICAL, TYPE
2021-DEC-16
ENGINEERING
.1 SUCT.-VOL./CHARG. PRESS. cu.ft./psi(g)
MANAGER
.2 DISCH.-VOL./CHARG. PRESS. cu.ft./psi(g)
JHK
DATE 18-FEB-22
.3 CHARGING MEDIUM:
CERTIFIED 4. VALVES
OPERATIONS 5. LUBRICATION
.2 DRIVER
CONTROL NUMBER
SPLASH SUBMERGED
6. TYPE OF DOUBLE DIAPHRAGM PUMPS OF THE SAME TYPE & SIZE IN OPERATION
7. TYPE OF DOUBLE DIAPHR. RUPTURE SIGNALING PUMPS MARK NO. INQ./ORDER NO. DATA SHEET NO.
DATE:
-G-
BY:
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 11
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 17-SAMSS-503 (04/00)
OPRNS
SAUDI ARABIAN OIL COMPANY
17-SAMSS-503, SEVERE DUTY TOTALLY ENCLOSED SQUIRREL CAGE INDUCTION MOTORS
APPLICABLE TO: Inquiry Proposal Purchase As Built
PMT
MWK
HCK
SBK
BASIC DATA
Volts: 460 Phase: 3 Hertz: 60 Nameplate: kW hp
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Full Load RPM: Speed Range for Variable Speed Drive:
Rotation When Facing Motor Opposite Drive End:
Clockwise Counter-Clockwise Bi-Directional
Motor Thrust Loads: None Other
Type Load: Direct Coupled Belt Driven Other
NEMA Torque Design: “B” (normal) Other (specify)
DESCRIPTION
SITE DATA
STARTING
2021-DEC-16 10-14329-0003 ISSUED FOR REVIEW
MOUNTING
Horizontal Vertical Shaft Up Vertical Shaft Down
JO/EWO
ENCLOSURE
18-FEB-22
DATE
DISCIPLINE
ENGINEER Space Heaters
SBK Space Heater Required for motors rated less than 75kW (100HP); Operating Voltage: 120 V, 1 ph
DATE 18-FEB-22 Other Voltage Max. Surface Temp. at Operating Volts ºC
ENGINEERING
MANAGER Heater Leads: Main Terminal Box Separate Heater Terminal Box
JHK
DATE 18-FEB-22
CERTIFIED
MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
EDSD VERIFICATION
CONTROL NUMBER
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 12
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 17-SAMSS-503 (04/00)
Vendor Data:
ENG'G CERT
GENERAL INFORMATION
SBK
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MOTOR DATA
Rating Data at 1.0 Service Factor:
Nameplate Power kW (hp) Voltage 460 Phase 3 Hertz 60
Full Load Speed RPM Enclosure Type Frame Size
Rotation When Facing Motor Opposite Drive End:
Clockwise Counter-Clockwise Bi-Directional
DESCRIPTION
Torque:
Speed-Torque Curve No. Speed-Current Curve No.
Power Factor
Nominal Efficiency
Guaranteed Efficiency
Insulation System
Class Temperature Class ºC above ºC ambient at 1.0 SF
18-FEB-22
DATE
Bearing Information
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR ANTIFOAM INJECTION PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 13
869 U TE-419888-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN: