TE-419889-001 - 869-U-1009 - BFW CHEMICAL DOSING PACKAGE - Rev.B
TE-419889-001 - 869-U-1009 - BFW CHEMICAL DOSING PACKAGE - Rev.B
TE-419889-001 - 869-U-1009 - BFW CHEMICAL DOSING PACKAGE - Rev.B
OPRNS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG'G CERT
MWK
HCK
SBK
SBK
JFGP 2
Jafurah Utilities, Sulfur and Interconnecting Systems
(Package 3)
DESCRIPTION
18-FEB-22
DATE
DISCIPLINE
ENGINEER FOR
BFW CHEMICAL DOSING PACKAGE
SBK
DATE
18-FEB-22
ENGINEERING
MANAGER
DATE
JHK
18-FEB-22
(869-U-1009/2009/3009)
CERTIFIED
MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 1
869 U TE-419889-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
MWK
HCK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SBK
SBK
CONTENTS
1 Introduction 3
DESCRIPTION
2 Process Duty 4
3 Mechanical Design 5-6
4 Control, Safeguarding and Instrumentation 7
5 8
10-14329-0003 ISSUED FOR REVIEW
16-DEC-21
18-FEB-22
DATE
REV
NO.
A
DISCIPLINE
ENGINEER
SBK
DATE
18-FEB-22
ENGINEERING
MANAGER
JHK
DATE
18-FEB-22
CERTIFIED
MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B_____
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 2
869 U TE-419889-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENG'G CERT
SBK
SAES-P-111 Grounding
SAES-L-310 Design of Plant Piping SAES-A-206 Postive Material Identification
2.0 PROCESS DUTY
2.1 Design Parameters
Boiler feed water dosing chemicals are required in the Boiler Feed Water inlet to the Waste Heat Boiler,
Second Sulfur Condenser, Third Sulfur Condenser and the Thermal Oxidizer Waste Heat Boiler.
JO/EWO
The current design considers the dosing of two separate chemicals, trisodium phosphate (softening
agent) and sodium sulfite (oxygen scavenger). This should be confirmed during EPC (HOLD). Alternative
chemicals e.g. polyphosphates and hydrazine, can be considered for above purposes. Additionally, it
should be considered whether additional pH-control, anti-scaling agents, anti foaming agents or
16-DEC-21
18-FEB-22
DATE
neutralizing amines are required. The chemicals are required to prevent scaling and to protect the Waste
Heat Boiler, First Sulfur Condenser, Second Sulfur Condenser as it is a closed loop.
The chemicals are required to prevent scaling and to protect the equipment from corrosion.
The Package is to provide sufficient dosing for normal operation.
REV
NO.
Maximum BFW consumption per train is 340 USGPM at 700 psig operating pressure and 231°F
DISCIPLINE
ENGINEER operating temperature.
SBK The inlet Boiler Feed Water Specification from the battery limit is:
DATE 18-FEB-22 Total hardness, mg/kg as CaCO3 max. Not Detectable
ENGINEERING
MANAGER pH value at 25 °C 8.5 to 9.5
JHK Oxygen, mg/kg as O2 max. 0.01
DATE 18-FEB-22 Iron, copper and nickel, mg/kg max. 0.03
CERTIFIED
Total solids, mg/kg <1
MWK Total alkali metals mg/kg < 0.005
DATE 18-FEB-22
CONSTRUCTION
AGENCY The current package design considers the addition of phosphate and oxygen scavenger with the following
design parameters. (All values to be confirmed during EPC HOLD):
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 4
869 U TE-419889-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
1.0 INTRODUCTION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
1.1 General
ENG'G CERT
MWK
HCK
This Data Sheet covers the requirements for BFW Chemical Dosing Package (869-U-1009), for the Jafurah Project.
BFW chemical dosing facilities are required in JFGP SRU and TGTU, one package per train, three trains in total.
869-U-2009 and 869-U-3009 are identical to 869-U-1009.
SBK
SBK
- 2 x 100% chemical storage tanks. One each for Phosphate and Oxygen Scavenger chemicals.
Tank to be fitted with necessary level and temperature instruments
- Tank mixer including driver fitted with each storage tank.
10-14329-0003 ISSUED FOR REVIEW
- All interconnecting
. piping and instrumentation
. within the package boundary,
. including all isolation,
control and relief valves; strainers; calibration pots; pulsation dampers; pressure gauges, flowmeter on
pumps discharge etc.
- All instrumentation wired to skid edge junction box for wiring to the DCS (wiring from junction
16-DEC-21
18-FEB-22
DATE
- All other mechanical and electrical equipment, instrumentation and controls necessary for safe
DISCIPLINE and reliable operation.
ENGINEER
SBK
- Structural steel base frame with sun shade (VTC for sun shades).
DATE
18-FEB-22 - Ladders and platforms as necessary
ENGINEERING
MANAGER
- First fill and supply of chemical containers (TBC)
JHK
DATE
18-FEB-22 1.2 Abbreviations
CERTIFIED
The following acronyms and abbreviations are used in this document:
MWK
DATE
18-FEB-22 Bbl US Barrels
CONSTRUCTION
AGENCY BEDD Basic Engineering Design Data
BFW Boiler Feed Water
DATE
OPERATIONS MBCD Thousand Barrels per Calendar Day
MBD Thousand Barrels per Operating Day
DATE
NPS Nominal Pipe Size
CONTROL NUMBER
VERIFICATION
TBC To Be Confirmed
REVISION CERTIFICATE
Dosing will be automated with minimum operator intervention during normal operation.
ENG'G CERT
MWK
HCK
SBK
The chemicals will be will be filled into the storage tank using the unloading pump. Platforms, steps,
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
handrails shall be provided to enable safe manual handling and operation of the package.
The layout of the skid shall be such that all equipment, tanks, instruments and valves are accessible
for maintenance and there is adequate removal clearance for all equipment.
pump discharge pressure shall be adequate for supplying the individual chemical into the discharge
line which has a normal injection pressure of 700 psig (to be confirmed during detailed engineering HOLD)
and a maximum injection pressure of 750 psig.
The actual hydraulics shall be developed at a later stage when necessary details are available.
The current design considers the dosing of two seperate chemicals, phosphate and oxygen
scavenger. Chemicals are to be confirmed during EPC (HOLD).
18-FEB-22
DATE
The design life time for the Boiler Feed Water Injection Package 869-U-1009 shall be 20 years.
DISCIPLINE
ENGINEER Each Package shall include controlled volume pumps, tank, tank mixer, gauges, strainer, filter,
SBK pressure relief valves, sight glasses and flow metering/monitoring devices, check valves, hand
DATE 18-FEB-22 valves, a power source for the pump and instrumentation to control the injection and to monitor its
ENGINEERING
MANAGER effectiveness.
JHK Electrical dosing diaphragm pumps shall be used. Dosing pumps shall be provided with appropriate
DATE
18-FEB-22 alarms and automated controls to provide immediate switchover from running to standby pump, in
CERTIFIED case of pump failure or the neeed for maintenance.
MWK Each pump shall have an adjustable stroke length to achieve turndown ratio from maximum flow.
DATE
18-FEB-22 Alteration of the stroke length shall be possible without shutting the pump down.
CONSTRUCTION
AGENCY Stroke length to be adjustable, both locally and by a control signal from the remote control room.
Mechanical lost motion capacity adjustment is not permitted. Hydraulic lost motion capacity is not
DATE permitted for duties with motor rating > 1 HP.
OPERATIONS
Dosing will be fully automatic with minimum operator intervention during normal operation.
While the design conditions of the equipment within the package shall be determined by the Vendor,
following criteria shall be followed:
EDSD
a) Design temperature shall be set at 50ºF above the maximum operating temperature. The
DATE:
b) The maximum operating temperature is defined as the highest material balance temperature.
Consideration shall also be given to other conditions such as start-up, shut-down etc. Such
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 5
869 U TE-419889-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF
B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
d) Design Pressure for pumped systems: process piping and equipment which form part of a pumped hydraulic
PMT
system, and which may operate liquid full, shall be designed for the maximum pressure that can be developed
by the pump.
ENG'G CERT
MWK
HCK
e) A pressure relief valve must be installed on the pump discharge to vent fluid back into the chemical tank or
suction line if pressure builds up. The actual pump internal relief valve setting shall be between 110% and
SBK
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.2 Materials of Construction
Materials of construction shall be selected by Vendor in line with Company and Project standards. Materials
shall be appropriate for process design, compatible with all intended process fluids, and suitable for intended
application. Minimum material grade shall be SS 316L. Wetted faces of instrumentation shall be compatible
with process fluid without coating or lining. Vendor shall ensure material selections and coatings are suitable
for external environment in accordance with BEDD requirements.
DESCRIPTION
Each pump shall have an external PSV with independent discharge line piped back to the tank above the high
high liquid level.
Check valves shall be external type; not integral to any other inline fitting.
16-DEC-21
18-FEB-22
DATE
Nozzle loads permitted at all terminal points shall be agreed with BUYER. ‘Zero Load’ condition shall not be
accepted.
3.5 Tanks
REV
NO.
Chemical storage tanks to be sized for a minimum holdup of 1 month capacity at maximum dosing rate. Size to
DISCIPLINE be confirmed during detailed engineering.
ENGINEER
Chemical storage tanks may be free standing if sizing prohibits skid mounting.
SBK
DATE
18-FEB-22
Tanks shall be manufactured in accordance with 32-SAMSS-030 by an approved Saudi Aramco fabricator.
ENGINEERING Vendor may propose a non-metallic tank as an alternative design for approval by Saudi Aramco. The
MANAGER
Package VENDOR shall complete tank data sheet Form SA-2696 for review by BUYER.
JHK
DATE
Chemical storage tanks shall, as a minimum, be equipped with fill nozzle, utility nozzle, vent, pressure relief,
18-FEB-22
CERTIFIED
overflow, discharge, low point drain, level and temperature instrumentation.
MWK
Manways for vertical tanks shall be specified as follows:
DATE
18-FEB-22 1) One 750 mm (30 in) NPS shell manway.
CONSTRUCTION
AGENCY 2) One 750 mm (30 in) NPS roof manway for tanks larger than 10,000 gallons capacity.
Anti-swirl baffles (vortex breakers) shall be provided on liquid outlet nozzles upstream of a pump suction side.
DATE
Block valves shall be installed directly at the tank nozzles. If more than one line connects to the same nozzle,
OPERATIONS
valves shall be installed in each line, in addition to the nozzle block valve.
DATE
3.6 Calibration Tube
CONTROL NUMBER
VERIFICATION
A clearly graduated calibration tube, vented back to tank above the high high liquid level, shall be provided.
Calibration tube may be common or per-pump and shall be provided with all necessary valves and fittings so
EDSD
Main line chemical feed and calibration tube shut-off valves shall be ¼ turn ball valves and shall be positioned
such that the operator can easily and simultaneously operate both valves during calibration.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
MWK
HCK
Dosing pumps shall be API 675, controlled volume positive displacement type. Pumps shall be provided from
Saudi Aramco approved manufacturer and meet the requirements of 31-SAMSS-009.
SBK
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Pump shall be double diaphragm type with a diaphragm failure signalling system.
Pump shall have an electronic automatic adjustable stroke length controller, capable of remote and local control
without stopping the pump.
Each pump shall have a minimum operating capacity of 30 to 110% of the recommended dosing rate.
DESCRIPTION
Tank transfer/loading pump shall be capable of filling the chemical storage tank within 20mins.
18-FEB-22
DATE
Pulsation damper, to ensure an even chemical application, shall be provided in each pump head discharge line
and sized to provide sufficient degree of damping. Any fitting required for charging the pulsation dampers shall
be provided. Suppression devices shall be furnished as necessary to meet the following criteria.
REV
NO.
DISCIPLINE
ENGINEER
• Rated suction pressure or 100 kPa gauge (15 psig) whichever is less;
SBK • Rated discharge pressure or 100 kPa gauge (15 psig) whichever is less.
DATE
18-FEB-22
ENGINEERING The following situations shall be avoided:
MANAGER
DATE
Others.
VERIFICATION
Total flowrate signal (by Others) will be used to provide the ratio control to the dosing pump to adjust the dosing
EDSD
rate accordingly. The DCS shall supply a flow demand signal to each package.
The dosing package tank shall be provided with a local gauge and transmitter to provide remote level
DATE:
A temperature gauge shall be supplied on the tank for indication of fluid temperature.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
The pumps shall be provided with a local panel with start/stop facility, emergency stop, selector switch and
REVISION CERTIFICATE
running indication. Remote running indication, pump selection and pump start/stop/trip shall also be provided.
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 7
869 U TE-419889-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
A pressure gauge shall be supplied on each pump discharge.
PMT
MWK
HCK
Double diaphragm pumps shall be provided with a diaphragm failure signal system.
The package shall interface with the Client's Project site Distributed Control System (DCS) and be operated
SBK
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Instrumentation shall be wired to skid edge junction boxes or the local panel. Wiring to the DCS will be by
others.
Ref.: 34-SAMSS-831 and TD-821310.
DESCRIPTION
5.0 ELECTRICAL
Unclassified
Electrical installation shall be in accordance with 'Auxiliary Electrical Systems for Skid -Mounted Equipment'
17-SAMSS-515, and all applicable referenced specifications and standards.
All electrical equipment shall meet ambient conditions as stated in Electrical Design Basis TD -821403.
All equipment installed in hazardous (classified) areas, electrical equipment/component meeting the
requirement of IEC 60079 shall be labelled, listed, or certified by any of the agencies in the Approved IECEx
JO/EWO
Certification Bodies (ExCBs) under the IECEx Certified Equipment Scheme. Method of protection must be
marked and must correspond with NEC Article 505 requirements for suitable protection method(s) for the
hazardous area where the equipment is applied.
Power cablings to motors will be provided by CONTRACTOR directly to the motor terminal boxes.
16-DEC-21
18-FEB-22
DATE
VENDOR shall provide on-skid supporting cable tray for the incoming power cables.
All on-skid grounding and bonding connection shall be wired to skid-edge earth busbars. CONTRACTOR shall
provide cabling up to these earth busbars. The grounding and bounding shall be as per SAES -P-111.
REV
NO.
Electrical control cabling on skid shall be wired to skid-edge junction boxes by VENDOR. CONTRACTOR shall
DISCIPLINE
ENGINEER
provide control cabling up to these junction boxes.
SBK
DATE
18-FEB-22
ENGINEERING
6.0 UTILITIES
MANAGER
Following utilities are envisaged to be required for the package. VENDOR to indicate requirement of any other
JHK utilities.
DATE
18-FEB-22
- Electrical Power 460V / 3Phase / 60Hz (at Users)
CERTIFIED
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B______
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 8
869 U TE-419889-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
Pump Tag No TBC TBC
PMT
No. of Heads/Pump
MWK
HCK
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Flow per Head Usgph See 2.1 See 2.1
Discharge Pressure psig See 2.1 See 2.1
Design Pressure Atmos. + static head Shaft Dia VTA Pump Trip YES
Material SS 316L (NOTE 1) Shaft Length VTA Strainers: per System / Pump / Head
10-14329-0003 ISSUED FOR REVIEW
Corrosion allowance NIL Shaft Seal arrangement VTA Calibration: Level Gauge / Calibration Gauge
Lid YES Material Wetted Parts (Note 1) VTA Relief Valve External to Pump YES
Access HINGED LID Mounting Arrangement VTA Pressure Gauges ON DISCHARGE
Atmospheric Vent / Purge System Motor 460 Volts 3 Ph 60Hz VTA kW Diaphragm failure signal system : YES
Dissolving Basket N/A Chemical Mixed VTA
18-FEB-22
Corrosion allowance NIL Shaft Seal arrangement VTA Calibration: Level Gauge / Calibration Gauge
REV
NO.
Lid YES Material Wetted Parts (Note 1) VTA Relief Valve External to Pump YES
DISCIPLINE
Access HINGED LID Mounting Arrangement VTA Pressure Gauges ON DISCHARGE
ENGINEER
SBK Atmospheric Vent / Purge System Motor 460 Volts 3 Ph 60Hz VTA kW Diaphragm failure signal system : YES
DATE
18-FEB-22
Dissolving Basket N/A Chemical Mixed VTA
ENGINEERING
Relief Valve N/A Mixing Time VTA
MANAGER
CERTIFIED LENGTH VTA ft DRY VTA lbs TP01 CHEMICAL INLET VTA VTA
MWK WIDTH VTA ft OPERATING VTA lbs TP02 DRAIN VTA VTA
DATE
18-FEB-22
HEIGHT VTA ft SHIPPING VTA lbs TP03 VENT VTA VTA
CONSTRUCTION
Sunshade VTA TP04A DISCHARGE (D-1009) VTA VTA
AGENCY
Lifting Lugs YES TP04B DISCHARGE (U-1002) VTA VTA
DATE Weather Rating SEE BEDD DOCUMENT TP05 TANK UTILITY WATER VTA VTA
TP06 INSTRUMENT AIR VTA VTA
CONTROL NUMBER
VERIFICATION
NOTES
EDSD
APPROVAL/CERTIFICATION
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REQUIREMENTS,
OPRNS
SAUDI ARABIAN OIL COMPANY
POSITIVE DISPLACEMENT PUMP DATA SHEET
NOTE: INDICATES INFORMATION TO BE COMPLETED BY THE PURCHASER; BY MANUFACTURER
PMT
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. LIQUID CHARACTERISTICS 5. FLOW REPEATABILITY %
.1 MAX. FLOW TEMPERATURE °F TBA 131 8. BHP CONS. AT MAX. CAPACITY (C.1)* BHP
3. SPECIFIC GRAVITY AT FLOW TEMP./ MAX. TEMP. Note 3,5 Note 3,5 9. BHP CONS. AT MAX. CAP. AND 110% OF E.12* BHP
4. VISCOS. AT FLOW TEMP./ MAX. TEMP. cP Note 4,5 Note 4,5 10. MAX. DISCH. PRESSURE psig
TBA
5. VAPOR PRESSURE AT FLOW TEMP. psi(a) 11. MAX. RELIEF VALVE SETTING psig
Negligible
TBA
DESCRIPTION
.1 V.P AT MAX. FLOW TEMP. psi(a) 12. ACTUAL RELIEF VALVE SETTING psig
Negligible
1. CAPACITY RANGE (NOTE 2) Usgph *) E.8 AND E.9 TO INCLUDE GEAR AND COUPLING LOSSES
3. SUCTION PRESS. MIN/RATED psi(g) VTA VTA F. PUMP AND COUPLING MODEL,
4. TOTAL DIFFERENTIAL PRESSURE psi VTA WEIGHTS, LUBRICATION
5. RATED DISCHARGE PRESSURE psi(g) 700 1. MANUFACTURER
6. LOCATION .1 TYPE/SIZE
JO/EWO
SUPPLY
8. SUCTION/DISCHARGE PIPE
.1 DRIVER ( INCL. COUPLING
TOTAL ACTUAL LENGTH ft / AND GUARD IF REQUIRED)
REV
NO.
DISCIPLINE
.3 SUCTION STRAINER ( Y-TYPE )
ENGINEER
CONSTRUCTION
( LOOKING FROM DRIVING END ) 1. PUMP lbs
AGENCY
2. ELECTRIC MOTOR DRIVER CONST. SPEED 2. DRIVER ( INCL. COUPLING) TOTAL WEIGHT lbs
MODEL G. UTILITIES
APPROVAL/CERTIFICATION REQUIREMENTS,
AC PHASE
RATIO : AGMA FACTOR DC VOLTS HERTZ
REVISION CERTIFICATE
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 10
869 U TE-419889-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 8010-ENG(11/2010)
H. MATERIALS OF CONSTRUCTION
MWK
HCK
SBK
2. PLUNGER VTA 3.
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. HYDRAULIC DIAPHRAGM VTA NOTES
5. PLUNGER DIAPHRAGM VTA 1) VENDOR SHALL COMPLETE THIS PUMP DATA SHEET TEMPLATE FOR EACH
7. FRAME VTA 2) PHOSPHATE INJECTION PUMPS (Usgph) : 1 (MIN.) / 3.6 (MAX.) / 3.3 (NOR.)
8. SUCTION PULSATION BOTTLE VTA OXYGEN SCAVENGER INJECTION PUMPS (Usgph) : 0.7 (MIN.) / 2.6 (MAX.) / 2.4 (NOR.)
9. DISCHARGE PULSATION BOTTLE VTA 3) Specific Gravity for Phosphate : 1.09 / 1.12 (Max)
10. CHECK VALVE/BALLS VTA Specific Gravity for Oxygen Scavenger : 1.09 / 1.15 (Max)
DESCRIPTION
11. RELIEF VALVE, SEAT AND TRIM VTA 4) Viscosity for Phosphate : 12 cP
13. PIPEWORK VTA 5) Chemical Characteristics are preliminary. To be finalized after receiving
J. PUMP CONSTRUCTION
1. PUMP NOZZLE
FLANGED IN.
FLANGED IN.
JO/EWO
2 CAPACITY ADJUSTMENT
.1 MECHANICAL, TYPE
18-FEB-22
DATE
CERTIFIED 4. VALVES
OPERATIONS 5. LUBRICATION
.2 DRIVER
CONTROL NUMBER
SPLASH SUBMERGED
6. TYPE OF DOUBLE DIAPHRAGM PUMPS OF THE SAME TYPE & SIZE IN OPERATION
7. TYPE OF DOUBLE DIAPHR. RUPTURE SIGNALING PUMPS MARK NO. INQ./ORDER NO. DATA SHEET NO.
DATE:
-G-
BY:
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 11
869 U TE-419889-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 17-SAMSS-503 (04/00)
OPRNS
SAUDI ARABIAN OIL COMPANY
17-SAMSS-503, SEVERE DUTY TOTALLY ENCLOSED SQUIRREL CAGE INDUCTION MOTORS
APPLICABLE TO: Inquiry Proposal Purchase As Built
PMT
MWK
HCK
SBK
BASIC DATA
Volts: 460 Phase: 3 Hertz: 60 Nameplate: kW hp
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Full Load RPM: Speed Range for Variable Speed Drive:
Rotation When Facing Motor Opposite Drive End:
Clockwise Counter-Clockwise Bi-Directional
Motor Thrust Loads: None Other
Type Load: Direct Coupled Belt Driven Other
NEMA Torque Design: “B” (normal) Other (specify)
DESCRIPTION
SITE DATA
STARTING
10-14329-0003 ISSUED FOR REVIEW
MOUNTING
Horizontal Vertical Shaft Up Vertical Shaft Down
JO/EWO
ENCLOSURE
16-DEC-21
18-FEB-22
DATE
DISCIPLINE
ENGINEER Space Heaters
SBK Space Heater Required for motors rated less than 75kW (100HP); Operating Voltage: 120 V, 1 ph
DATE 18-FEB-22 Other Voltage Max. Surface Temp. at Operating Volts ºC
ENGINEERING
MANAGER Heater Leads: Main Terminal Box Separate Heater Terminal Box
JHK
DATE 18-FEB-22
CERTIFIED
MWK
DATE
18-FEB-22
CONSTRUCTION
AGENCY
DATE
OPERATIONS
DATE
EDSD VERIFICATION
CONTROL NUMBER
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B_____
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 12
869 U TE-419889-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN:
Saudi Aramco 17-SAMSS-503 (04/00)
Vendor Data:
ENG'G CERT
GENERAL INFORMATION
SBK
SBK
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MOTOR DATA
Rating Data at 1.0 Service Factor:
Nameplate Power VTA kW (hp) Voltage 460 Phase 3 Hertz 60
Full Load Speed RPM Enclosure Type Frame Size
Rotation When Facing Motor Opposite Drive End:
Clockwise Counter-Clockwise Bi-Directional
DESCRIPTION
Torque:
Speed-Torque Curve No. Speed-Current Curve No.
Power Factor
Nominal Efficiency
Guaranteed Efficiency
Insulation System
Class Temperature Class ºC above ºC ambient at 1.0 SF
16-DEC-21
18-FEB-22
DATE
Bearing Information
DATE
OPERATIONS
DATE
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV NO ____B_____
OF THIS DRAWING IS COVERED, FOR ALL
MECHANICAL DATA SHEET FOR BFW CHEMICAL DOSING PACKAGE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
JFGP SULFUR RECOVERY & TAIL GAS DAT 13
869 U TE-419889-001
JFGP 2 Jafurah Utilities, Sulfur and Interconnecting Systems (Package 3) OF B
JAFURAH SAUDI ARABIA JO / EWO 10-14329-0003 13
DOC CLASS: 2 DSN: