Saudi Aramco 2616-ENG (10/2002)

OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK
SBK

JFGP 2
Jafurah Utilities, Sulfur and Interconnecting Systems
(Package 3)
DESCRIPTION

Contract No. 6600050506 (OOK) & 6600050503 (IK)


BI No. 10-14329
SAID Dummy PO No. ABCI-861-49-B016-DA
10-14329-0003 ISSUED FOR REVIEW

Location JAFURAH, SAUDI ARABIA

MATERIAL REQUISITION
JO/EWO

``

FOR
CHEMICAL INJECTION PACKAGE
2-MAR-22
DATE
REV. NO.

DISCIPLINE 9COM: EQUIPMENT DESCRIPTION


ENGINEER

SBK
6000002309 CHEMICAL INJECTION NON-WELL HEAD TIE-INS
DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
REVIEWED BY PROCUREMENT QC SUPERVISOR Y.S. CHOI
CERTIFIED

MWK REVIEWED BY QA MANAGER S.D.KANG


DATE 2-MARN-22

CONSTRUCTION
REVIEWED BY PROJECT PROCUREMENT MANAGER K.H.LEE
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
A 2-Mar-22 ISSUED FOR REVIEW S.B.KIM J.H.KWAK M.W.KIM
DATE _____________
CONTROL NUMBER

BY: ______________

REV. DATE DESCRIPTION BY CHECKED APPROVED


VERIFICATION
EDSD

CONTRACTOR DOC. NO. JUS&ICS-RM-MR-0005


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 1


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENG’G CERT PMT OPRNS
THIS INDICATES THAT REV. NO. _____A_____ VERIFICATION

MWK
A 2-MAR-22 10-14329-0003 ISSUED FOR REVIEW SBK MWK

JHK
OF THIS DRAWING IS COVERED, FOR ALL

SBK
APPROVAL/CERTIFICATION REQUIREMENTS, CONTROL NUMBER

AGENCY

________
DATE 2-MAR-22
MANAGER
ENGINEER

CERTIFIED
DISCIPLINE

DATE 2-MAR-22_
BY DRAWING COMPLETION CERTIFICATE BY: ______________

DATE 2-MARN-22

OPERATIONS
ENGINEERING

CONSTRUCTION

DATE ___________
DATE ___________
________________
(DCC)NO. _______________________________
DATE _____________

``

JAFUARAH
Saudi Aramco 2616-ENG (10/2002)

MATERIAL REQUISITION

CHEMICAL INJECTION PACKAGE


SHEET (COMPANY ONLY)

JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)


DOC
DWG.TYPE

SAUDI ARABIA
861
PLANT .NO

U
INDEX

2
SAUDI ARABIAN OIL COMPANY

JO / EWO: 10-14329-0003
DRAWING NO.

TE-419843

DOC CLASS: 2 DSN:


2

76
OF
SHT. NO.

A
SECTION 1. BIDDER’S LIST AND MR APPROVAL/COORDINATION

REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

SECTION 2. INDEX
SBK

SECTION 1. BIDDER’S LIST AND MR APPROVAL/COORDINATION SHEET


(COMPANY ONLY) 2
SECTION 2. INDEX 3
SECTION 3. REVISION HISTORY 6
DESCRIPTION

SECTION 4. MR CHECK LIST (COMPANY ONLY) 7


SECTION 5. BILL OF QUANTITY – SCOPE OF SUPPLY 8
5.1 SCOPE 8
10-14329-0003 ISSUED FOR REVIEW

5.2 SUPPLY LIST 8


SECTION 6. REGULATED VENDOR LIST (RVL) 12
SECTION 7. DATASHEETS - DRAWINGS 16
7.1 DATA SHEET 16
JO/EWO

``

7.2 P&ID 16
SECTION 8. PROJECT SPECIFICATION 18
2-MAR-22
DATE

8.1 PROJECT SPECIFICATIONS 18


REV. NO.

8.2 INTERNATIONAL DESIGN STANDARD 19


A

DISCIPLINE
ENGINEER SECTION 9. SA STANDARDS, SPECIFICATION & 175 FORM 21
SBK 9.1 SAUDI ARAMCO ENGINEERING STANDARDS 21
DATE 2-MAR-22_
ENGINEERING 9.2 SAUDI ARAMCO ENGINEERING PROCEDURES 23
MANAGER

JHK
9.3 SAUDI ARAMCO MATERIAL SYSTEM SPECIFICATIONS 24
DATE 2-MAR-22
CERTIFIED
9.4 SAUDI ARAMCO STANDARD DRAWINGS & LIBRARY DRAWINGS 26
MWK
9.5 SAUDI ARAMCO INSPECTION AND TESTING REQUIREMENTS 27
DATE 2-MARN-22
9.6 SAUDI ARAMCO NON MATERIAL REQUIREMENTS 28
CONSTRUCTION
AGENCY 9.7 SAUDI ARAMCO STANDARD FORMS 29
________________
SECTION 10. GENERAL REQUIREMENT 32
DATE ___________

OPERATIONS 10.1 DESIGN GENERAL REQUIREMENTS 32


________
10.1.1 GENERAL 32
DATE ___________

10.1.2 ORDER OF PRECEDENCE 33


DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

10.1.3 SITE CONDITION 33


EDSD

10.1.4 AMBIENT TEMPERATURE DESIGN CONDITION 34


10.1.5 HAZARDOUS AREAS 34
10.1.6 EQUIPMENT 35
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

10.1.7 EQUIPMENT ASSEMBLY 35


10.1.8 OFF SKID AND SHIP LOOSE ITEMS 35
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 3


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

10.1.9 ACCESSIBILITY AND MAINTENABILITY 35


ENG’G CERT

MWK

10.1.10 MATERIALS 35
SBK

10.1.11 NAMEPLATES 36
10.1.12 NOISE CONTROL 36
10.1.13 SPECIAL TOOLS 36
10.1.14 CORROSION PROTECTIVE COATING AND PAINTING 37
10.1.15 PRESERVATION AND PROTECTION 37
DESCRIPTION

10.1.16 PACKING AND SHIPPING 37


10.1.17 SASO REQUIREMENT 38
10.1.18 FIELD SERVICES 39
10-14329-0003 ISSUED FOR REVIEW

10.1.19 TRAINING 39
10.1.20 SUB-SUPPLIERS 39
10.1.21 GUARANTEES 40
10.1.22 DOCUMENTATION 40
JO/EWO

``

10.1.23 UNITS OF MEASUREMENTS 41


10.1.24 LANGUAGE 41
2-MAR-22
DATE

10.1.25 PROJECT COORDINATION 41


REV. NO.

10.2 DESIGN SPECIFIC REQUIREMENTS 43


A

DISCIPLINE
ENGINEER 10.2.1 CHEMICAL INJECTION PUMP 43
SBK 10.2.2 STORAGE TANK 43
DATE 2-MAR-22_
ENGINEERING 10.2.3 PULSATION SUPPRESSION DEVICES 44
MANAGER

JHK
10.2.4 LUBRICATIONS 44
DATE 2-MAR-22
CERTIFIED
10.2.5 MATERIALS 44
MWK 10.2.6 ELECTRIC MOTORS 45
DATE 2-MARN-22
10.2.7 COUPLINGS AND COUPLING GUARDS 46
CONSTRUCTION
AGENCY 10.2.8 FOUNDATION AND STRUCTURE BASE FRAME 46
________________

DATE ___________
10.2.9 EARTHING BOSSES AND GROUNDING PADS 47
OPERATIONS 10.2.10 CONTROL AND INSTRUMENTATION 47
________
10.2.11 PRESSURE SAFETY VALVE 50
DATE ___________

10.2.12 ELECTRICAL SYSTEM 50


DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

10.2.13 PIPING 50
EDSD

10.2.14 TEST AND INSPECTION 51


SECTION 11. QA/QC REQUIREMENT 68
SECTION 12. SPARE PARTS 69
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

12.1 START-UP SPARE PARTS (BASE) 69


12.2 OPERATING SPARE PARTS (OPTIONAL) 69
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 4


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

12.3 OPERATING MATERIALS (OPTIONAL) 69


ENG’G CERT

MWK

12.4 SPARE PARTS DATA PACKAGE (SPDP) 69


SBK

12.5 SPECIAL TOOLS 70


SECTION 13. NON MATERIAL REQUIREMENT 71
13.1 NON MATERIAL REQUIREMENT 71
13.2 DRAWING AND DOCUMENTS REQUIREMENT 71
13.3 SUPPLIER DOCUMENT 72
DESCRIPTION

SECTION 14. NOTE TO SUPPLIER 73


SECTION 15. PACKING SPECIFICATION 76
10-14329-0003 ISSUED FOR REVIEW
JO/EWO

``
2-MAR-22
DATE
REV. NO.

DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 5


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENG’G CERT PMT OPRNS
THIS INDICATES THAT REV. NO. _____A_____ VERIFICATION

MWK
A 2-MAR-22 10-14329-0003 ISSUED FOR REVIEW SBK MWK

JHK
OF THIS DRAWING IS COVERED, FOR ALL

SBK
APPROVAL/CERTIFICATION REQUIREMENTS, CONTROL NUMBER

AGENCY

________
DATE 2-MAR-22
MANAGER
ENGINEER

CERTIFIED
DISCIPLINE

DATE 2-MAR-22_
BY DRAWING COMPLETION CERTIFICATE BY: ______________

DATE 2-MARN-22

OPERATIONS
ENGINEERING

CONSTRUCTION

DATE ___________
DATE ___________
________________
(DCC)NO. _______________________________
DATE _____________

``

JAFUARAH
A
NO.
REV.
Saudi Aramco 2616-ENG (10/2002)

MATERIAL REQUISITION

CHEMICAL INJECTION PACKAGE


DATE

2-MAR-22
REVISION
SECTION 3. REVISION HISTORY

JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)


DOC
DWG.TYPE

SAUDI ARABIA
ISSUED FOR REVIEW

861
PLANT .NO
DESCRIPTION

U
INDEX

2
SAUDI ARABIAN OIL COMPANY

JO / EWO: 10-14329-0003
DRAWING NO.

TE-419843

DOC CLASS: 2 DSN:


6

76
OF
SHT. NO.
REMARK

A
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENG’G CERT PMT OPRNS
THIS INDICATES THAT REV. NO. _____A_____ VERIFICATION

MWK
A 2-MAR-22 10-14329-0003 ISSUED FOR REVIEW SBK MWK

JHK
OF THIS DRAWING IS COVERED, FOR ALL

SBK
APPROVAL/CERTIFICATION REQUIREMENTS, CONTROL NUMBER

AGENCY

________
DATE 2-MAR-22
MANAGER
ENGINEER

CERTIFIED
DISCIPLINE

DATE 2-MAR-22_
BY DRAWING COMPLETION CERTIFICATE BY: ______________

DATE 2-MARN-22

OPERATIONS
ENGINEERING

CONSTRUCTION

DATE ___________
DATE ___________
________________
(DCC)NO. _______________________________
DATE _____________

``

JAFUARAH
Saudi Aramco 2616-ENG (10/2002)

MATERIAL REQUISITION

CHEMICAL INJECTION PACKAGE

JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)


DOC
DWG.TYPE

SAUDI ARABIA
861
PLANT .NO

U
INDEX
SECTION 4. MR CHECK LIST (COMPANY ONLY)

2
SAUDI ARABIAN OIL COMPANY

JO / EWO: 10-14329-0003
DRAWING NO.

TE-419843

DOC CLASS: 2 DSN:


7

76
OF
SHT. NO.

A
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

SECTION 5. BILL OF QUANTITY – SCOPE OF SUPPLY


SBK

5.1 SCOPE

SUPPLIER shall be responsible for the design, procurement, engineering, supply of


materials, manufacturing, assembly, shop testing, packing for delivery, timely submittal of
Installation, Operation and Maintenance Manuals (IOM) and timely submittal of Spare
Parts Data Package for both OEM and SUB-SUPPLIERS’ equipment/ materials listed in
DESCRIPTION

the present requisition.

All items not specifically mentioned in this specification, but necessary and required to
form an operational system as describe herein, shall be identified by SUPPLIER to
10-14329-0003 ISSUED FOR REVIEW

BUYER in his bid reply and upon approval shall be provided by SUPPLIER as a part of
the system.

Any errors or omissions in this specification shall not absolve SUPPLIER from the
responsibility of designing and providing complete and fully functional equipment as
described in this requisition.
JO/EWO

``

Errors or omissions noted during their initial bid review which impact on the scope of
supply, scope of work, scope of services, etc, should be urgently addressed to BUYER for
2-MAR-22

review, clarification and approval. These errors or omissions could be included in the
DATE

Exception/Deviation List or similar document to establish a record of such additional


REV. NO.

scope items.
A

DISCIPLINE
ENGINEER If the errors/omissions are noted by SUPPLIER during detail engineering process,
SBK SUPPLIER has obligation to resolve the errors/omissions without cost and delivery impact.
DATE 2-MAR-22_
ENGINEERING
MANAGER
The design/manufacturing of the equipment/materials shall be in accordance with all
specification, drawing, procedures, standards and other documents attached hereto and
JHK
with the best modern practice and shall be such to facilitate inspection, cleaning,
DATE 2-MAR-22
CERTIFIED
maintenance and repair to ensure satisfactory operation of the equipment/ materials under
all service conditions.
MWK

DATE 2-MARN-22

5.2 SUPPLY LIST


CONSTRUCTION
AGENCY

________________ This Material Requisition defines the functional and technical requirements for the material
DATE ___________ documentation design, fabrication, inspection, testing, painting, preparation for shipment
OPERATIONS and delivery of the GOODS and service listed below for installation of the JAFURAH
________ DEVELOPMENT PROGRAM, PACKAGE 2 AT JAFURAH, SAUDI ARABIA.
DATE ___________
For a list of definitions within this Material Requisition, refer to Section 10 - Appendix 1.
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

The basic scope is listed below for Centrifugal Pump-VI (ASME-Vertical). For detailed
EDSD

scope of supply, refer to Section 10 - Appendix 2.


Pos. Equipment No. Description No. off 9 COM InspectionApplicabApplica
No. Level le ble
SAMSS SA175
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

1 Produced Water
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

32-
Chemical Injection 175-
861-U-0403 1 6000002309 3 SAMSS-
Package Skids 324400
038
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 8


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Pos. Equipment No. Description No. off 9 COM InspectionApplicabApplica


ENG’G CERT

MWK

No. Level le ble


SAMSS SA175
SBK

Chemical Storage 32-


175-
Tank 5 6000002479 3 SAMSS-
325100
030

Positive 31-
175-
Displacement Pumps 8 6000002361 0 SAMSS-
311500
009
DESCRIPTION

Electric Motor for 6000000994 17-


175-
Pumps 8 1 SAMSS-
6000000995 170200
503
2 Biocide Dosing 32-
10-14329-0003 ISSUED FOR REVIEW

862-U-2301 175-
Package 1 6000002309 3 SAMSS-
324400
038

Chemical Storage 32-


175-
Tank 1 6000002479 3 SAMSS-
325100
030
JO/EWO

Positive 31-
175-
``

Displacement Pumps 2 6000002361 0 SAMSS-


311500
009
2-MAR-22
DATE

Electric Motor for 6000000994 17-


175-
Pumps 2 1 SAMSS-
6000000995 170200
503
REV. NO.

DISCIPLINE
3 Cooling Water
ENGINEER
System Chemical 32-
862-U-2302 175-
Injection Package 1 6000002309 3 SAMSS-
SBK 324400
DATE 2-MAR-22_ Skids 038
ENGINEERING
MANAGER
Chemical Storage 32-
175-
JHK
Tank 6 6000002479 3 SAMSS-
325100
DATE 2-MAR-22 030
CERTIFIED

Positive 31-
MWK 175-
Displacement Pumps 14 6000002361 0 SAMSS-
DATE 2-MARN-22 311500
009
CONSTRUCTION
AGENCY Electric Motor for 6000000994 17-
175-
________________ Pumps 14 1 SAMSS-
6000000995 170200
DATE ___________ 503
OPERATIONS 4 Hypochlorite Dosing 32-
862-U-2902 175-
________ Package 1 6000002309 3 SAMSS-
324400
DATE ___________ 038
DATE _____________
CONTROL NUMBER

32-
BY: ______________

Chemical Storage 175-


VERIFICATION

Tank 1 6000002479 3 SAMSS-


EDSD

325100
030

Positive 31-
175-
Displacement Pumps 2 6000002361 0 SAMSS-
311500
009
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Electric Motor for 6000000994 17-


175-
Pumps 2 1 SAMSS-
6000000995 170200
503
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 9


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Pos. Equipment No. Description No. off 9 COM InspectionApplicabApplica


ENG’G CERT

MWK

No. Level le ble


SAMSS SA175
SBK

5 Gas Corrosion 32-


Inhibitor Injeciton 175-
863-U-3001 1 6000002309 3 SAMSS-
Package 324400
038

Chemical Storage 32-


175-
Tank 1 6000002479 3 SAMSS-
325100
030
DESCRIPTION

Positive 31-
175-
Displacement Pumps 3 6000002361 0 SAMSS-
311500
009
10-14329-0003 ISSUED FOR REVIEW

Electric Motor for 6000000994 17-


175-
Pumps 3 1 SAMSS-
6000000995 170200
503
6 863-U-3002 Liquid Corrosion 32-
Inhibitor Injeciton 175-
1 6000002309 3 SAMSS-
Package 324400
038
JO/EWO

``

Chemical Storage 32-


175-
Tank 1 6000002479 3 SAMSS-
325100
030
2-MAR-22
DATE

Positive 31-
175-
3 6000002361 0 SAMSS-
REV. NO.

Displacement Pumps 311500


A

009
DISCIPLINE
ENGINEER
Electric Motor for 6000000994 17-
175-
SBK Pumps 3 1 SAMSS-
6000000995 170200
DATE 2-MAR-22_ 503
ENGINEERING
MANAGER 7 869-U- Caustic Injection 32-
175-
1003/2003/3003 Package 3 6000002309 3 SAMSS-
JHK
324400
DATE 2-MAR-22
038
CERTIFIED
Chemical Storage 32-
175-
MWK
Tank 1 6000002479 3 SAMSS-
325100
DATE 2-MARN-22 030
CONSTRUCTION Positive 31-
AGENCY 175-
Displacement Pumps 2 6000002361 0 SAMSS-
________________ 311500
009
DATE ___________

Electric Motor for 6000000994 17-


OPERATIONS 175-
Pumps 2 1 SAMSS-
________
6000000995 170200
503
DATE ___________

8 869-U- Antifoam Injection 32-


DATE _____________
CONTROL NUMBER

BY: ______________

175-
VERIFICATION

1004/2004/3004 Package 3 6000002309 3 SAMSS-


324400
EDSD

038

Chemical Storage 32-


175-
Tank 1 6000002479 3 SAMSS-
325100
030
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

31-
REVISION CERTIFICATE

Positive
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

175-
Displacement Pumps 2 6000002361 0 SAMSS-
311500
009

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 10


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Pos. Equipment No. Description No. off 9 COM InspectionApplicabApplica


ENG’G CERT

MWK

No. Level le ble


SAMSS SA175
SBK

Electric Motor for 6000000994 17-


175-
Pumps 2 1 SAMSS-
6000000995 170200
503
9 869-U- BFW Chemical 32-
1009/2009/3009 Dosing Package 175-
3 6000002309 3 SAMSS-
Skids 324400
038
DESCRIPTION

Chemical Storage 32-


175-
Tank 2 6000002479 3 SAMSS-
325100
030
10-14329-0003 ISSUED FOR REVIEW

Positive 31-
175-
Displacement Pumps 4 6000002361 0 SAMSS-
311500
009

Electric Motor for 6000000994 17-


175-
Pumps 4 1 SAMSS-
6000000995 170200
503
JO/EWO

10 869-U- Ammonium Sulfate 32-


``

175-
1010/2010/3010 Dosing Package 3 6000002309 3 SAMSS-
324400
038
2-MAR-22
DATE

Chemical Storage 32-


175-
Tank 1 6000002479 3 SAMSS-
325100
REV. NO.

030
A

DISCIPLINE
Positive 31-
ENGINEER
175-
Displacement Pumps 2 6000002361 0 SAMSS-
SBK 311500
009
DATE 2-MAR-22_
ENGINEERING
Electric Motor for 6000000994 17-
MANAGER 175-
Pumps 2 1 SAMSS-
6000000995 170200
JHK 503
DATE 2-MAR-22
CERTIFIED

MWK A Start-up Spare Parts


Refer to
DATE 2-MARN-22 (for Construction,
One lot Appendix 2 for
Pre-Commissioning,
CONSTRUCTION Details
AGENCY and Commissioning)
________________
B Operational Spare
DATE ___________ Optional
Parts
OPERATIONS
C Operating Material One lot
________

DATE ___________ D Special Tools for


erection and
DATE _____________
CONTROL NUMBER

BY: ______________

One lot
VERIFICATION

maintenance, if
EDSD

required

NOTE:
1. 9COM No.: “Material Number” on Regulated Vendor List. Source approved
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

manufacturers, without a binding quality limitation, listed in the Regulated Vendor


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Listing under the specified 9COM material number 6000002309.

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 11


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

2. The above information is preliminary for main component only, and the final sub-
ENG’G CERT

MWK

component list including SAMSS/SA-175 shall be updated and submitted during


Technical Bid Evaluation for approval.
SBK

3. The listed Inspection Levels represent minimum requirements only, these inspection
levels can always be elevated to higher levels, based on COMPANY directions.
4. For detailed scope of supply, refer to Section 10 - Appendix 2.

SECTION 6. REGULATED VENDOR LIST (RVL)


DESCRIPTION

Quality
Material
9COM MFR ID MFR Name Country Limitation
Description
(Note 8)
30000001 PROMINENT GMBH Germany
10-14329-0003 ISSUED FOR REVIEW

30001085 SPX FLOW TECHNOLOGY GERMANY GMBH Germany

30001117 MILTON ROY EUROPE France

RECIPROCATIN 30001192 LEWA GMBH Germany


600000
G, 31-SAMSS-
2361 30001420 NIKKISO CO LTD Japan
009
JO/EWO

30001989 MILTON ROY FLOW CONTROL USA


``

30002036 PULSAFEEDER INC./ IDEX USA

30007632 OFFICINE MECCANICHE GALLARATESI SPA Italy


2-MAR-22
DATE

30001456 TECO ELECTRIC & MACHINERY CO LTD Taiwan


REV. NO.

30001639 NIDEC MOTOR CORPORATION USA


A

DISCIPLINE 30001905 BALDOR ELECTRIC COMPANY USA


ENGINEER
30001929 SIEMENS S.A. DE C.V. Mexico
SBK

DATE 2-MAR-22_ 30001965 TOSHIBA INTERNATIONAL INC USA


ENGINEERING
MANAGER 30003471 ATB SCHORCH GMBH Germany
MOTOR:INDUC
600000
JHK TION, 1-500 HP, 30003695 ABB OY, IEC LV MOTORS Finland
0994
DATE 2-MAR-22 HORIZONTAL
CERTIFIED 30003708 GE INDUSTRIAL MOTORS A WOLONG CO Mexico

MWK 30003729 ATB TAMEL SA Poland

DATE 2-MARN-22
30004091 WEG EQUIPAMENTOS ELETRICOS S.A. Brazil

CONSTRUCTION 30005856 ABB MOTORS AND MECHANICAL INC. USA


AGENCY

________________ 30005858 BALDOR ELECTRIC COMPANY USA


DATE ___________
30006593 TECO MIDDLE EAST ELECTRICAL AND Saudi Arabia
OPERATIONS
30001456 TECO ELECTRIC AND MACHINERY CO LTD Taiwan
________

DATE ___________ 30001639 NIDEC MOTOR CORPORATION USA


DATE _____________
CONTROL NUMBER

BY: ______________

30001905 BALDOR ELECTRIC COMPANY USA


VERIFICATION
EDSD

30001929 SIEMENS S.A. DE C.V. MEXICO


MOTOR:INDUC
600000
TION, 1-500 HP, 30001965 TOSHIBA INTERNATIONAL INC USA
0995
VERTICAL
30003471 ATB SCHORCH GMBH Germany

30003695 ABB OY MOTORS AND GENERATORS Finland


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

30003729 ATB TAMEL SA Poland

30004091 WEG EQUIPAMENTOS ELETRICOS S.A. Brazil

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 12


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Quality
Material
9COM MFR ID MFR Name Country Limitation
ENG’G CERT

MWK

Description
(Note 8)
30005856 ABB MOTORS AND MECHANICAL INC. USA
SBK

30005858 BALDOR ELECTRIC COMPANY USA

30006593 TECO MIDDLE EAST ELECTRICAL AND Saudi Arabia

30001805 LOVEJOY INCORPORATED USA

30003289 EAGLEBURGMANN JAPAN CO LTD Japan

30003709 UTC AEROSPACE SYSTEMS USA


DESCRIPTION

COUPLING: 30004541 COUPLING CORPORATION OF AMERICA USA


600001
SHAFT;
3402 30005216 JOHN CRANE SAUDI ARABIA COMPANY Saudi Arabia
FLEXIBLE

30006305 REGAL BELOIT POWER TRANSMISSION SOL USA


10-14329-0003 ISSUED FOR REVIEW

30006488 KTR KUPPLUNGSTECHNIK GMBH Germany

30009281 TWIFLEX LIMITED United Kingdom

30000293 ARABIAN CBI TANK MANUFACTURING Saudi Arabia

30000335 MARITIME INDUSTRIAL SERVICES Saudi Arabia


JO/EWO

30000497 GEYAD FACTORY FOR PRESSURE VESSELS Saudi Arabia


``

30000619 AL-KHODARI HEAVY INDUSTRIES (KHI) Saudi Arabia

30000653 METSCCO HEAVY STEEL INDUSTRIES CO. Saudi Arabia


2-MAR-22
DATE

30000741 OLAYAN DESCON ENGINEERING COMPANY Saudi Arabia


REV. NO.

30000754 YANBU STEEL COMPANY Saudi Arabia


A

DISCIPLINE 30000845 WATER AND ENVIRONMENT TECHNOLOGIES Saudi Arabia


ENGINEER

SBK
30000931 GULF SPECIALIZED WORKS FACTORY Saudi Arabia

DATE 2-MAR-22_ 30003100 KUWAIT PIPE INDUSTRIES AND OIL SERV Kuwait
ENGINEERING
MANAGER
30003749 ZAMIL PROCESS EQUIPMENT CO. LTD. Saudi Arabia
JHK
30004084 THE PETROLEUM PROJECTS AND TECHNICA Egypt
DATE 2-MAR-22
CERTIFIED 30004371 ROTARY ENGINEERING PTE LTD Singapore
TANK; SHOP
600000
MWK FABRICATED; 30004689 ABJ ENGNEERING AND CONTRACTING Kuwait
2479
DATE 2-MARN-22 32-SAMSS-030;
30005085 BEMCO STEEL INDUSTRIES CO. LTD. Saudi Arabia
CONSTRUCTION
AGENCY 30005436 GULF HEAVY INDUSTRIES COMPANY Saudi Arabia
________________
30005471 HESHAM HELAL AL SEWEDY AND PARTNERS Saudi Arabia
DATE ___________
30005513 AL-ZAMIL METAL WORKS FACTORY Saudi Arabia
OPERATIONS

________ 30006181 ROTARY ENGINEERING SAUDI ARABIA Saudi Arabia

DATE ___________
30006356 AL-ZAMIL COMPANY FOR HEAVY STEEL Saudi Arabia
DATE _____________
CONTROL NUMBER

BY: ______________

30006890 SAUDI ARABIAN FABRICATED METALS IND Saudi Arabia


VERIFICATION
EDSD

30007186 POWER TECH. FOR METAL FABRICATIONS Saudi Arabia

30007588 GEYAD FACTORY FOR PRESSURE VESSELS Saudi Arabia

30007889 CROWN SPECIALIZED FOR STEEL CONTRAC Saudi Arabia


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

30007991 PETRON SAUDI INDUSTRIAL CO Saudi Arabia


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

30008062 PETRONASH ARABIA COMPANY LIMITED Saudi Arabia

30008273 SINSINA INDUSTRIAL WORKS AND METAL Saudi Arabia

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 13


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Quality
Material
9COM MFR ID MFR Name Country Limitation
ENG’G CERT

MWK

Description
(Note 8)
30008496 INMA STEEL FABRICATORS CO. LTD. Saudi Arabia
SBK

30008611 FACTORY OF ARABIAN INTERNATIONAL Saudi Arabia

30000280 AMIANTIT FIBERGLASS INDUSTRIES Saudi Arabia

TANK; FIBER 30005557 CASALS CARDONA INDUSTRIAL SA Spain


600000
GLASS; 32-
2481 30005641 OLLEARIS SA Spain
SAMSS-002

30009008 NOVAFAST INTERNATIONAL PTY LTD Australia


DESCRIPTION

30001119 ASHCROFT INSTRUMENTS GMBH Germany

30001251 RUEGER SA Switzerland

30001296 THERMO ELECTRIC INSTRUMENTATION BV Netherlands


10-14329-0003 ISSUED FOR REVIEW

30001830 MINCO PRODUCTS INC. USA

30003986 WIKA ALEXANDER WIEGAND SE AND CO KG Germany

30004141 WIKA INSTRUMENTS LIMITED Canada


THERMOWELL;
600000
DWG AB- 30004167 ABB AUTOMATION PRODUCTS GMBH Germany
2845
036019;
JO/EWO

30004511 EMERSON PROCESS MANAGEMENT Germany


``

30005539 ASHCROFT AL-RUSHAID INSTRUMENT CO. Saudi Arabia

30006176 SENSORTECH SAUDI MANUFACTURING Saudi Arabia


2-MAR-22
DATE

30006201 YAMARI INDUSTRIES LIMITED Japan


REV. NO.

30006418 YAMARI SINGAPORE PTE LTD Singapore


A

DISCIPLINE 30006564 OKAZAKI MANUFACTURING COMPANY Japan


ENGINEER

SBK

DATE 2-MAR-22_ NOTE


ENGINEERING
MANAGER For other items which will be supplied in Chemical Injection Package, refer to below notes:
JHK
1. SUPPLIER shall use approved COMPANY SUB-SUPPLIERS when applicable and
DATE 2-MAR-22
CERTIFIED
appropriate as per the referenced and attached RVL (Regulated Vendor Listing), see
document “RVL, Feb 15 2022” attached in Section 6.
MWK

DATE 2-MARN-22
SUPPLIER shall comply with the two attachments in Section 8.1, Sub-Vendor Listing &
CONSTRUCTION Manufacturing Method Statement, and submit these two attachments with his bid reply.
AGENCY
The attachments should include:
________________

DATE ___________
a) List the major sub-components (minimum 2nd/3rd level sub-components as
OPERATIONS
applicable) which are not specified in this MR. Indicate if the sub-components are RVL
________ managed, i.d. aligned with Inspectable 9COM material number (will be provided later) or
DATE ___________
not. Provide the applicable 9COM material number that applies, if applicable.
DATE _____________
CONTROL NUMBER

BY: ______________

b) List the sub-components proposed by SUB-SUPPLIERS in detail. Indicate if the SUB-


VERIFICATION

SUPPLIERS are COMPANY approved or not, and provide the reference SUPPLIER ID
EDSD

number as applicable.
c) Complete the Manufacturing Methods Statement indicating the methodology for
manufacturing, inspection and testing, FAT, IFAT and shipment to site as clearly
APPROVAL/CERTIFICATION REQUIREMENTS,

explained in the attachment.


THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SUPPLIER is expected to comply with the submittal of these two attachments with his bid
reply, otherwise his bid shall be rendered incomplete and subject to rejection.
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 14


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

2. Sub-components not specified in 9COM shall be approved by AOC.


ENG’G CERT

MWK

8. Quality Limitation
(1) If “Yes”, SUPPLIER shall confirm quality limitation for each part.
SBK

(2) For induction motor, SUPPLIER shall confirm capacity limitation of each motor SUB-
SUPPLIER.
DESCRIPTION

10-14329-0003 ISSUED FOR REVIEW


JO/EWO

``
2-MAR-22
DATE
REV. NO.

DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 15


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

SECTION 7. DATASHEETS - DRAWINGS


SBK

7.1 DATA SHEET

Document No. Item No. Description Rev

MDS - Produced Water Chemical


TE-419894 861-U-0403 B
Injection Package
DESCRIPTION

TE-419891 862-U-2301 MDS - Biocide Dosing Package B


MDS - Cooling Water System
TE-419892 862-U-2302 B
Chemical Injection Package
10-14329-0003 ISSUED FOR REVIEW

TE-419893 862-U-2902 MDS - Hypochlorite Dosing Package B


MDS - Gas Corrosion Inhibitor
TE-419895 863-U-3001 B
Injeciton Package
MDS - Liquid Corrosion Inhibitor
TE-419896 863-U-3002 B
Injeciton Package
JO/EWO

869-U-
``

TE-419887 MDS - Caustic Injection Package B


1003/2003/3003
869-U-
2-MAR-22
DATE

TE-419888 MDS - Antifoam Injection Package B


1004/2004/3004
REV. NO.

869-U-
TE-419889 MDS - BFW Chemical Dosing Package B
A

1009/2009/3009
DISCIPLINE
ENGINEER
869-U- MDS - Ammonium Sulfate Dosing
TE-419890 B
SBK 1010/2010/3010 Package
DATE 2-MAR-22_
ENGINEERING
MANAGER
7.2 P&ID
JHK

DATE 2-MAR-22
CERTIFIED
Document No. Item No. Description Rev
MWK

DATE 2-MARN-22
TD-251001-001 P&ID - Piping Symbols & Legend E

CONSTRUCTION
AGENCY
TD-251002-001 P&ID - Equipment Symbols & Legend E
________________
P&ID - Instrument Symbols & Legend
DATE ___________ TD-251003-001 D
(1)
OPERATIONS
P&ID - Instrument Symbols & Legend
________ TD-251004-001 E
(2)
DATE ___________

P&ID - Instrument Symbols & Legend


DATE _____________

TD-251005-001 D
CONTROL NUMBER

BY: ______________

(3)
VERIFICATION
EDSD

P&ID - Instrument Symbols & Legend


TD-251006-001 D
(4)
P&ID - Instrument Symbols & Legend
TD-251009-001 A
(5)
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 16


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

Document No. Item No. Description Rev


TD-254364-001 P&ID for 861-U-0403 A
SBK

TD-254462-001 P&ID for 862-U-2902 D

TD-254481-001 P&ID for 862-U-2302 C

TD-259662-001 P&ID for 869-U-1010 D


DESCRIPTION

TD-259666-001 P&ID for 869-U-1004 C

TD-259667-001 P&ID for 869-U-1009 C


10-14329-0003 ISSUED FOR REVIEW

TD-259668-001 P&ID for 869-U-1003 C

TD-862234-001 P&ID for 862-U-2301 A

TD-863391-001 P&ID for 863-U-3001 A

TD-863392-001 P&ID for 863-U-3002 A


JO/EWO

``
2-MAR-22
DATE
REV. NO.

DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 17


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

SECTION 8. PROJECT SPECIFICATION


SBK

The documents listed below shall be formed as a part of this Material Requisition. Any
document and standard not listed below, but is referred in any of the following documents
shall be applicable to SUPPLIER and their scope of supply.
The latest edition of all the Codes and Standards stated in each specification and any
documents referred in this Requisition, including the following, shall be applied.
DESCRIPTION

8.1 PROJECT SPECIFICATIONS

Document No. Description Rev


10-14329-0003 ISSUED FOR REVIEW

TD-821950 BASIC ENGINEERING DESIGN DATA (BEDD) G

TD-821951 General Notes for Requisitions C

TD-104602 MECHANICAL SCOPE OF WORK D


JO/EWO

``

DESIGN BASIS - INSTRUMENT & PLANT AIR


TD-064011 E
SYSTEM
2-MAR-22
DATE

TD-071010 ISOLATION PHILOSOPHY E


REV. NO.

TECHNICAL REQUIREMENTS FOR MANUAL


A

TD-101101 C
DISCIPLINE VALVES
ENGINEER

SBK TD-821105 TECHNICAL REQUIREMENT FOR GASKETS C


DATE 2-MAR-22_
ENGINEERING
MANAGER
TD-821106 TECHNICAL REQUIREMENTS FOR BOLTS C
JHK TD-821107 PIPING MATERIAL SPECIFICATION D
DATE 2-MAR-22
CERTIFIED
TD-821108 NOZZLE ALLOWABLES E
MWK

DATE 2-MARN-22 TD-821601 THERMAL AND ACOUSTIC INSULATION C


CONSTRUCTION CONTROL & INSTRUMENTATION - BASIS OF
AGENCY TD-821310 D
________________
DESIGN
DATE ___________
INSTRUMENT PIPING DETAILS - HOOK-UPS -
OPERATIONS TD-651300-001 C
COVER
________

DATE ___________
TYPICAL INSTRUMENTATION INSTALLATION
TD-671300-001 C
DETAILS
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

TD-821300 C&I CABLE SPECIFICATION C

TD-821302 C&I PIPING SPECIFICATION C

TD-821303 C&I PACKAGE EQUIPMENT SPECIFICATION C


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

TD-821304 C&I INSTALLATION SPECIFICATION C

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 18


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Document No. Description Rev


ENG’G CERT

MWK

TD-821403 ELECTRICAL BASIS OF DESIGN E


SBK

JUS&ICS-PM-PD-1002 Instruction for Vendor Data A1

JUS&ICS-PM-PD-4511 Packing and Shipping Procedure A1

JUS&ICS-PM-PD-6003 Vendor Inspection Procedure A1

- Format – Sub-vendor Listing -


DESCRIPTION

- Format – Manufacturing Method Statement -

- Format – Deviation & Clarification -


10-14329-0003 ISSUED FOR REVIEW

8.2 INTERNATIONAL DESIGN STANDARD


JO/EWO

Document No. Description


``

API 675 Positive Displacement Pumps – Controlled Volume


2-MAR-22
DATE

IEEE 841 Standard for Petroleum and Chemical Industries – Premium


Efficiency Severe Duty Totally Enclosed Fan-Cooled (TEFC)
REV. NO.

Squirrel Cage Induction Motors – Up to and Including 500 HP


A

DISCIPLINE
ENGINEER
NEMA National Electrical Manufacturers Association
SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER
IEC 60034 Rotating Electrical Machines
JHK
IEC 60079 Electrical Apparatus for Explosive Gas Atmospheres
DATE 2-MAR-22
CERTIFIED
ANSI/HI 14.6 Rotodynamic pumps for hydraulic performance acceptance test
MWK

DATE 2-MARN-22
ASME SA-388 Standard Practice for Ultrasonic Examination of Heavy Steel
CONSTRUCTION Forgings
AGENCY
ASME B16.5 Pipe Flanges and Flanged Fittings
________________

DATE ___________ ASME B31.3 Process Piping


OPERATIONS
STF05501 Fixed Ladders and Cages Fabrication Details
________

DATE ___________ STF05520 Details for Pipe Railing for Walking and Working Platforms
DATE _____________

STF05530 Grating Fabrication Details


CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

STF05535 Vessel Circular Platform Details


VESFG001 Fiberglass Tank and Vessel Specification
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

This equipment shall be in accordance with ASME Code and Stamped in accordance with
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Saudi Aramco referenced documents.

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 19


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

In addition to the project specifications and documents listed in this Material Requisition, the
ENG’G CERT

MWK

Codes and Standards stated in each specification together with any documents referred to
therein shall apply.
SBK

If not stated, the latest edition of the above Standards and Codes at time of LOI shall govern.
DESCRIPTION

NOTES:

1. SUPPLIER is expected to comply with the requirements noted in Section 6,


regarding the identification of major sub-components and SUB-SUPPLIERS and to
provide such information with his bid reply.
10-14329-0003 ISSUED FOR REVIEW
JO/EWO

``
2-MAR-22
DATE
REV. NO.

DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 20


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

SECTION 9. SA STANDARDS, SPECIFICATION & 175 FORM


SBK

For 9.1 through 9.7, “SAUDI ARAMCO Standard” If any other documents and
specifications to meet satisfactory design even not listed in this Material Requisition are
necessary, they shall be considered as a part of this Material Requisition. SUPPLIER shall
use “SAUDI ARAMCO Standard” In the Material Requisition only not latest specification.
There are useful index files that contains in each directory.
DESCRIPTION

9.1 SAUDI ARAMCO ENGINEERING STANDARDS


10-14329-0003 ISSUED FOR REVIEW

Document No. Description Rev.

SABP-A-015 Chemical Injection Systems 15 Nov 2018

SAES-A-004 General Requirements for Pressure Testing 24 Oct 2018

SAES-A-007 Hydrostatic Testing Fluids and Lay-up Requirement 01 Jan 2018


JO/EWO

``

SAES-A-105 Noise Control 10 Jun 2018


SAES-A-112 Meteorological and Seismic Design Data 13 Jan 2019
2-MAR-22
DATE

SAES-A-134 External Corrosion Protection Requirements 18 Jan 2018


REV. NO.

DISCIPLINE
SAES-A-135 On Stream Inspection Requirements 20 Jun 2018
ENGINEER
SAES-A-202 Saudi Aramco Engineering Drawing Preparation 25 May 2014
SBK

DATE 2-MAR-22_ SAES-A-206 Positive Materials Identification 05 May 2019


ENGINEERING
MANAGER
SAES-B-053 Equipment and piping protective guarding 15 Aug 2017
JHK

DATE 2-MAR-22
SAES-B-054 Access, Egress, and Materials Handling for Plant 28 Mar 2017
CERTIFIED
Facilities
MWK

DATE 2-MARN-22 SAES-B-067 Safety Identification and Safety Colors 28 Jan 2020
CONSTRUCTION SAES-B-068 Electrical Area Classification 23 Nov 2017
AGENCY

________________
SAES-D-001 Design Criteria for Pressure Vessels 17 Aug 2020
DATE ___________

OPERATIONS
SAES-G-006 Positive Displacement Pumps – Controlled Volume 11 Feb 2011
________
SAES-H-001 Coating Selection and Application Requirements for 23 May 2019
DATE ___________
Industrial Plants and Equipment
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

SAES-H-002 Internal and External Coatings for Steel Pipelines and 22 Feb 2018
EDSD

Piping
SAES-H-002V Approved Saudi Aramco Data Sheets for the 07 Feb 2017
Pipeline and Piping Coatings
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

Approved Saudi Aramco Data Sheets – Paints and


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAES-H-101V 16 Oct 2017


Coatings

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 21


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Document No. Description Rev.


ENG’G CERT

MWK
SBK

SAES-H-102 Safety Requirements for coating applications 29 Oct 2017


SAES-J-003 Instrumentation and Control Buildings – Basic Design 02 May 2019
Criteria
SAES-J-100 Process Measurement 01 Jan 2018

SAES-J-600 Pressure Relief Devices 01 Jan 2018


DESCRIPTION

SAES-J-700 Control Valves 01 Jan 2018


10-14329-0003 ISSUED FOR REVIEW

SAES-J-901 Instrument and Plant Air Supply Systems 01 Jan 2018

SAES-J-902 Electrical Systems for Instrumentation 08 May 2019

SAES-J-903 Intrinsically Safe Systems 04-Mar-2015


JO/EWO

SAES-J-904 Foundation Fieldbus (FF) Systems 22-Jan-2019


``

SAES-K-503 Saudi Aramco Inspectable Commodities Applicability 19 Sep 2019


2-MAR-22
DATE

for Rotating Equipment Packages Sub-components


REV. NO.

SAES-L-100 Applicable Codes and Standards for Pressure Piping 16 Feb 2017
A

DISCIPLINE
Systems
ENGINEER

SBK
SAES-L-105 Piping Line Class 29 Jan 2018
DATE 2-MAR-22_
ENGINEERING
MANAGER
SAES-L-108 Selection of Valves 1 Mar 2016
JHK
SAES-L-109 Selection of Flanges, Stud Bolts and Gaskets 29 Jan 2018
DATE 2-MAR-22
CERTIFIED
SAES-L-110 Limitations on Pipe Joints and Components 29 Feb 2018
MWK SAES-L-125 Safety Instruction Sheet for Piping and Pipelines 16 Feb 2017
DATE 2-MARN-22

CONSTRUCTION SAES-L-132 Materials Selection for Pipelines, Piping and Process 24 Aug 2016
AGENCY
Equipment
________________

DATE ___________ SAES-L-133 Corrosion Protection Requirements for Pipelines, 01 Jan 2018
OPERATIONS Piping, and Process Equipment
________

DATE ___________
SAES-L-136 Pipe, Flange, and Fitting Material Requirements 31 Dec 2016
DATE _____________
CONTROL NUMBER

BY: ______________

SAES-L-150 Pressure Testing of Plant Piping and Pipelines 29 Jan 2018


VERIFICATION
EDSD

SAES-L-310 Design of Plant Piping 30 Jan 2018


SAES-M-001 Structural Design Criteria for Non-Building Structures 11 Mar 2019
SAES-N-001 Basic Criteria, Industrial Insulation 16 Jan 2019
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAES-P-100 Basic Power System Design Criteria 01 Jan 2018


SAES-P-104 Wiring Methods and Materials 20 Feb 2019
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 22


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Document No. Description Rev.


ENG’G CERT

MWK
SBK

SAES-P-111 Grounding 24 Jan 2017


SAES-P-113 Motors and Generators 01 Jan 2018
SAES-Q-007 Foundations and Supporting Structures for Heavy 05 May 2014
Machinery
SAES-W-010 Welding Requirements for Pressure Vessels 01 Jan 2018
DESCRIPTION

SAES-W-011 Welding Requirements for On-plot Piping 20 Feb 2019


SAES-W-016 Welding of Special Corrosion-resistant Materials 20 Feb 2019
10-14329-0003 ISSUED FOR REVIEW

9.2 SAUDI ARAMCO ENGINEERING PROCEDURES

Document No. Description Rev.


JO/EWO

SAEP-31 Corporate Equipment and Spare Parts Data 18 Oct 2018


``

Requirements and Responsibilities


SAEP-103 Metric Units of Weights and Measures 19 Jan 2010
2-MAR-22
DATE

SAEP-110 Saudi Aramco Standard Drawings 15 May 2014


REV. NO.

DISCIPLINE
ENGINEER
SAEP-122 Project Records 24 Jan 2017
SBK SAEP-302 Instructions of Obtaining a Waiver of a Mandatory 20 Nov 2017
DATE 2-MAR-22_
ENGINEERING
MANAGER
Saudi Aramco Engineering Requirement
SAEP-302A Attachment A of SAEP-302 25 Aug 2016
JHK

DATE 2-MAR-22 SAEP-302B Attachment B of SAEP-302 25 Aug 2016


CERTIFIED

MWK
SAEP-302C Mandatory and Recommended Standards 25 Aug 2016
DATE 2-MARN-22
SAEP-319 Pressure Relief Devices - Testing and Inspection 2 Jul 2017
CONSTRUCTION Requirements
AGENCY

________________
SAEP-325 Inspection Requirements for Pressure Equipment 20 Oct 2014
DATE ___________

OPERATIONS
SAEP-343 Risk-Based Inspection (RBI) for Saudi Aramco 24 Jan 2019
Facilities
________

DATE ___________
SAEP-351 Bolted Flange Joints Assembly 11 Jan 2017
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

SAEP-352 Welding Procedures review and approval 01 Jan 2018


EDSD

SAEP-385 Preservation of Project Materials and Equipment 25 Oct 2017

SAEP-415 Vibration Limits for Existing Rotating Machinery, Piping 07 Aug 2017
and Structures
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAEP-1027 Pressure Relief Valves- Conventional and Balanced 11 Oct 2017


Types
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 23


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Document No. Description Rev.


ENG’G CERT

MWK

SAEP-1135 On-Stream Inspection Administration 29 Dec 2014


SBK

SAEP-1140 Qualification of Saudi Aramco NDT Personnel 29 Aug 2016

SAEP-1142 Qualification of non-Saudi Aramco NDT personnel 04 Dec 2014


SAEP-1143 Radiographic Examination 02 Oct 2014
DESCRIPTION

SAEP-1144 Magnetic Particle Examination 01 Jan 2018


SAEP-1145 Liquid Penetrant Examination 23 Jul 2016
SAEP-1146 Manual Ultrasonic Thickness Testing 09 Jul 2014
10-14329-0003 ISSUED FOR REVIEW

SAEP-1150 Inspection Coverage on Projects 15 Jan 2018


SAEP-1151 Inspection Requirements for Contractor Procured 23 Oct 2017
Materials and Equipment
SAEP-1154 Guidelines for Contractor’s Quality Plan 31 Mar 2014
JO/EWO

``

SAEP-1161 Testing & Inspection (T&I) Reporting Procedure 26 Mar 2015


2-MAR-22

SAEP-3101 Equipment and Spare Parts Data Requirements for 31 Mar 2014
DATE

Contractor Procured Equipment


REV. NO.

SAEP-3101A Appendix A - Glossary of Terms 24 Mar 2014


A

DISCIPLINE
ENGINEER

SBK SAEP-3101B Appendix B - Spare Parts Data Package Status Report 24 Mar 2014
DATE 2-MAR-22_ (SPDPSR) Required Format
ENGINEERING
MANAGER
SAEP-3101C Appendix C - Instructions to Suppliers for Providing 24 Mar 2014
JHK Spare Parts and Operating Materials Data for New
DATE 2-MAR-22
Equipment Purchased
CERTIFIED

MWK
SAEP-3101D Appendix D - Spare Parts Data Package (SPDP) 24 Mar 2014
DATE 2-MARN-22 Checklists
CONSTRUCTION
AGENCY

________________
9.3 SAUDI ARAMCO MATERIAL SYSTEM SPECIFICATIONS
DATE ___________

OPERATIONS Document No. Description Rev.


________

DATE ___________
01-SAMSS-010 Fabricated steel Piping 09 Jul 2018
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

01-SAMSS-043 Carbon Steel Pipes for On-Plot Piping 09 Oct 2018


EDSD

01-SAMSS-046 Stainless steel pipe 28 Oct 2018


01-SAMSS-047 Stainless Steel and Nickel Alloy Tubes 18 Dec 2016
APPROVAL/CERTIFICATION REQUIREMENTS,

02-SAMSS-011 Forged Steel and Alloy Flanges 09 Jan 2018


THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

04-SAMSS-001 Gate Valves 05 Feb 2019

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 24


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Document No. Description Rev.


ENG’G CERT

MWK
SBK

04-SAMSS-002 Steel Globe Valves – Flanged and Butt- 04 Feb 2019


welding Ends
04-SAMSS-005 Check Valves, Swing Type 16 Dec 2018
04-SAMSS-035 General Requirements for Valves 16 Dec 2018
DESCRIPTION

04-SAMSS-048 Valve Inspection and Testing Requirements 10 Oct 2017

04-SAMSS-051 Ball Valves, API SPEC 6D 06 Mar 2019


10-14329-0003 ISSUED FOR REVIEW

09-SAMSS-107 Qualification Requirements and Application 05 Jan 2019


of Composite Fluropolymer/Ceramic Coatings
to Fasteners
12-SAMSS-007 Fabrication of Structural and Miscellaneous steel 01 Jan 2018
JO/EWO

``

17-SAMSS-503 Severe-Duty, Totally Enclosed, Squirrel Cage 29 Oct 2018


Induction Motors to 500 HP
2-MAR-22
DATE

17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted 02 Oct 2018


Equipment
REV. NO.

DISCIPLINE
26-SAMSS-088 Turbine Oils 22 Nov 2017
ENGINEER

SBK
26-SAMSS-091 Grease 30 Nov 2017
DATE 2-MAR-22_
ENGINEERING
31-SAMSS-009 Positive Displacement Pumps – Controlled 14 Mar 2018
MANAGER Volume
JHK

DATE 2-MAR-22
32-SAMSS-002 Manufacture of Fibreglass-Reinforced Plastic 25 Dec 2016
CERTIFIED (FRP) Storage Tanks
MWK 32-SAMSS-030 Manufacture of Small Metallic Atmospheric 09 Oct 2018
DATE 2-MARN-22
Storage Tanks
CONSTRUCTION
AGENCY 32-SAMSS-038 Shop Fabricated Skid-Mounted Units 16 Jan 2019
________________

DATE ___________
34-SAMSS-010 Quality Requirements for Pressure Retaining 01 Jan 2018
Instruments
OPERATIONS

________ 34-SAMSS-611 Safety Relief Devices 23 May 2019


DATE ___________

34-SAMSS-831 Instrumentation for Packaged Units 02 May 2019


DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

34-SAMSS-913 Instrumentation and Thermocouple 02 Aug 2017


EDSD

Cable
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

NOTE 1 : 01-SAMSS-017 is applicable only for inspection


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 25


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

9.4 SAUDI ARAMCO STANDARD DRAWINGS & LIBRARY DRAWINGS


ENG’G CERT

MWK

Document No. Description Rev.


SBK

Anchor bolt details inch and metric


AA-036322-001 08
sizes
AA-036873-001 Pipeline Vents 09

Straight pipe requirements for orifices,


AA-036197-001 07
DESCRIPTION

flow nozzles and venture tubes


AB-036019-001 Thermowell assembly and detail 21
AB-036204-001 Letter Designation for Lines Numbers 00
10-14329-0003 ISSUED FOR REVIEW

AB-036207-001 Pipe Spacings 10


Standard Symbol For Piping Orthographic
AB-036227-001 11
Drawings
AB-036305-001 Standard Equipment Symbols 03
JO/EWO

Hardness Testing for Welding Procedure


AB-036386-001 01
``

Qualifications
Local Instruments Symbols (Pneumatic &
AB-036492-001 07
2-MAR-22
DATE

Electronical) For Instrument Loop Diagrams


Local Instrument Symbols (Miscellaneous)
REV. NO.

AB-036492-002 05
A

For Instrument Loop Diagrams


DISCIPLINE
Instrument Loop Diagrams, Panel Instrument
ENGINEER
AB-036493-001 04
Symbols
SBK
Instrument Loop Diagrams, Panel Instrument
DATE 2-MAR-22_ AB-036493-002 00
ENGINEERING Symbols
MANAGER
Reinforcement of Welded Branch
JHK AB-036719-001 13
DATE 2-MAR-22
Connections
CERTIFIED
AC-036045-001 Details Vent, Drain & Sample Connections 14
MWK
Installation of Jack Screws for Flanged
DATE 2-MARN-22 AC-036630-001 16
Joints
CONSTRUCTION
AGENCY AC-036950-001 Instrument Symbols 10
________________
In-Line Instrument Symbols For Instrument
DATE ___________ AD-036491-001 02
Loop Diagrams
OPERATIONS
Spectacle Plates, Blinds and Spacers for Class
________ AD-036633-001 24
DATE ___________
150 RF Flanges
Detail of heavy welding boss socket weld
AD-036643-001 04
DATE _____________
CONTROL NUMBER

BY: ______________

connections
VERIFICATION
EDSD

Detail of heavy welding boss for threaded


AE-036175-001 16
connections to vessels and lines
AE-036311-001 Detail Of Pipe U-Bolts 05
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

AE-036625-001 Engineering Drawing Forms Layouts 07


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Instrument Piping Details for Liquid Level


DB-950046-001 01
Gauge Glasses
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 26


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Document No. Description Rev.


ENG’G CERT

MWK

Standard Instrument Piping Details for Electric


SBK

DB-950048-001 01
Level Instrument (up to Class 600 ANSI Rating)
Pressure Indicators and Switches Locally
DC-950040-001 01
Mounting Instrument Piping Details
Pressure Indicators and Switches Panel or Wall
DC-950041-001 01
Mounted Instrument Piping Details
Instruments Piping Details Pressure
DC-950042-001 01
DESCRIPTION

Instruments Blind and Indicating Type


Electrical Connections For Field-Mounted
DC-950043-001 01
Instruments
Horizontal and Vertical Motor to Ground
10-14329-0003 ISSUED FOR REVIEW

DD-950022-012 00
Grid
DD-950025-001 Nameplate Details For Instrument Boards 00
DD-950053-001 Field Mounting Details For Instruments 00
JO/EWO

9.5
``

SAUDI ARAMCO INSPECTION AND TESTING REQUIREMENTS


2-MAR-22

Document No. Description Rev.


DATE
REV. NO.

175-000003 Detailed Instructions of Inspection and Testing 20 Sep 2015


A

Requirements
DISCIPLINE
ENGINEER
175-010800 PIPE : Beveled End, Seamless or Welded, Straight 22 Dec 2015
SBK
Seam, Stainless Steel Pipe
DATE 2-MAR-22_
ENGINEERING 175-013100 PIPE: Fabrication of Spools; Carbon, Alloy, High 12 Jul 2017
MANAGER
Strength Special, Low and High Temperature Steels
JHK

DATE 2-MAR-22 175-019800 PIPING AUXILIARY – For Mechanical Equipment 01 Nov 2016
CERTIFIED (NOTE 1)
MWK 175-022500 Spectacle Plates, Spacers, Blanks 03 Nov 2015
DATE 2-MARN-22

CONSTRUCTION
AGENCY
175-022501 Flanges : Weldneck, Blind Flanges; Forged Steel & 12 Jul 2017
________________ Alloy
DATE ___________
175-043000 Valve Material Certification Requirements Dec 2016
OPERATIONS

________

DATE ___________
175-043600 Valves: Metallic; Includes gate, globe, angle, check, 12 Jul 2017
needle, ball, plug, piston, and butterfly
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

175-091300 COATING: Shop Applied, Internal or External 12-JUL-2017


EDSD

175-091900 COATING: SHOP APPLIED; For Tanks, Piping, 16 Jun 2016


3Pipelines (and Associated Appurtenances & Fittings),
Structures, Process Equipment;
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

175-092100 COATING: Shop Applied, Application of Composite 31 Oct. 2016


Fluropolymer/Ceramic Coatings to Fasteners

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 27


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Document No. Description Rev.


ENG’G CERT

MWK

175-120100 STEEL STRUCTURES: (Excludes Offshore Structures 31 Oct 2016


SBK

and Pre-engineering Metal Buildings)


175-170200 MOTORS, ELECTRIC: Severe Duty Totally Enclosed 31 Oct 2016
Squirrel Cage Induction Motors to 500 HP, 4000 V or
Below, and Explosion Proof
175-173700 Auxiliary Electrical Systems 31 Oct 2016
DESCRIPTION

175-311500 PUMPS: Positive Displacement, Controlled Volume, 24 Apr 2016


Diaphragm & Packed Plunger Types
175-320300 Positive Material Identification 31 Oct 2016
10-14329-0003 ISSUED FOR REVIEW

175-321900 Pressure Vessel 31-Dec-2018

175-321950 SMALL PRESSURE VESSEL; 32-SAMSS-036 06 Jul 2017


JO/EWO

``

175-324400 Manufacture of Skid-Mounted Process Packaged 06 Jul 2017


Equipment Units
2-MAR-22
DATE

175-325100 TANKS: Steel; Aboveground or Underground to API- 12 Jul 2017


12F, API-650 Appendix-J, UL-58, and UL-142
REV. NO.

175-325300 TANK: FRP Storage Tanks, ASME RTP-1 26 Jul 2017


DISCIPLINE
ENGINEER

SBK 175-340100 VALVES: Control, Steel, General Service, Pneumatic 16 Nov 2015
DATE 2-MAR-22_ Operated, Up to and Including Class 2500 Ratings
ENGINEERING
MANAGER
175-340200 Instrumentation for Packaged Units 19 Jan 2017
JHK

DATE 2-MAR-22
CERTIFIED 175-341700 Pressure Retaining Instruments 12 Mar 2017
MWK

DATE 2-MARN-22 175-341900 VALVE: Safety Relief Conventional and Balanced 26 Jun 2016
CONSTRUCTION
Type
AGENCY

________________

DATE ___________

OPERATIONS NOTE 1 : 175-019800 refers to 01-SAMSS-017, only for inspection


________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

9.6 SAUDI ARAMCO NON MATERIAL REQUIREMENTS


EDSD

Document No. Description Rev.

SA-7902 Non-material Requirements for Pump 01 Aug 2006


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SA-7907 Nonmaterial Requirements for Instrumentation 01 Aug 2006


(General)
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 28


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

SA-7912 Nonmaterial Requirements for Electric Rotating


ENG’G CERT

MWK

01 Aug 2006
Machinery
SBK

SA-7918 Nonmaterial Requirements for Safety Relief 01 Aug 2006


Valves Conventional and Balanced Types
SA-7918-1 Nonmaterial Requirements for Shop and Field 01 Aug 2006
Erected Tanks
SA-7919-1 Nonmaterial Requirements for Pressure Vessel 01 Aug 2006
DESCRIPTION

SA-7925 Nonmaterial Requirement for Valves 01 Aug 2006

SA-7926 Nonmaterial Requirement for Insulated Cable 01 Aug 2006


10-14329-0003 ISSUED FOR REVIEW

SA-7927 Nonmaterial Requirements for Fabricated 01 Aug 2006


Structural Steel
SA-7928 Nonmaterial Requirements for Pneumatic 01 Aug 2006
Actuators
JO/EWO

``

9.7 SAUDI ARAMCO STANDARD FORMS


2-MAR-22
DATE

Document No. Description Rev.


REV. NO.

DISCIPLINE - Electric Motor Data Sheet (Last sheets of -


ENGINEER

SBK 17-SAMSS-502
DATE 2-MAR-22_
ENGINEERING
SA-2693 Safety Instruction Sheet - Tanks 01 Nov 2010
MANAGER

SA-2742 Data and Operating Limits – Pumps 01 Nov 2010


JHK

DATE 2-MAR-22
SA-2773 Instrument Specification Sheet - Pressure 01 Nov 2010
CERTIFIED

Instruments
MWK

DATE 2-MARN-22
SA-2787 Instrument Specification Sheet - Pressure 01 Nov 2010
CONSTRUCTION
Regulators
AGENCY

________________ SA-2788 Instrument Specification Sheet - Differential 01 Nov 2010


DATE ___________ Type Level Instruments
OPERATIONS
SA-2799 Instrument Installation Sheet - Relief Valves 01 Nov 2010
________

DATE ___________

SA-3099A Relief Valve Authorization 30 Apr 2003


DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

SA-3176A Orifice Plate Detail - Restriction 01 Nov 2010

SA-6078 Instrument Specification Sheet - General 01 Nov 2010


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SA-6239 Flow Instruments 01 Nov 2010

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 29


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Document No. Description Rev.


ENG’G CERT

MWK
SBK

SA-6081 Instrument Specification Sheet - Thermocouple 01 Nov 2010


/ RTD Switches
SA-7305 Equipment Noise Data Sheet 01 Nov 2010

SA-8010 Data Sheet - Positive Displacement Pump 01 Nov 2010


DESCRIPTION

SA-8020-113 Instrument Specification Sheet - Flow 01 Jun 2012


Transmitters-Smart (Differential Pressure)
SA-8020-124 Restriction Orifice Calculation and 01 Nov 2010
10-14329-0003 ISSUED FOR REVIEW

Specification
SA-8020-200 Pressure Transmitter - Smart 01 Nov 2010

SA-8020-212 Pressure and Differential Pressure Gauges 01 Nov 2010


JO/EWO

SA-8020-312 Level Gauge Glass 01 Nov 2010


``

SA-8020-314 Level Instruments 01 Nov 2010


2-MAR-22
DATE
REV. NO.

SA-8020-400 Temperature Transmitter - Smart 01 Nov 2010


A

DISCIPLINE
ENGINEER
SA-8020-415 Thermocouple assembly instrument 01 Nov 2010
SBK specification sheet
DATE 2-MAR-22_
ENGINEERING SA-8020-416 Resistance Temperature Detectors 01 Nov 2010
MANAGER

JHK

DATE 2-MAR-22
SA-8020-418 Thermowells 01 Nov 2010
CERTIFIED

MWK SA-8020-611 Pressure Relief Valves Conventional and 01 Oct 2012


DATE 2-MARN-22 Balanced Types
CONSTRUCTION
AGENCY SA-8020-612 Pressure Relief Valves Pilot type datasheet 01 Oct 2012
________________ format
DATE ___________
SA-8020-711 Glove / Angle Control Valves 01 Nov 2010
OPERATIONS

________

DATE ___________ SA-8020-712 Ball Control Valves 01 Nov 2010


DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

SA-8020-716 Instrument Specification Sheet - Pneumatic 01 Nov 2010


EDSD

Actuators (On-Off Service)


SA-8020-828 Transducers (Signal Conversion) 01 Nov 2010
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

SA-8020-831 Instrumentation for Packaged Units 01 Nov 2010


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 30


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Document No. Description Rev.


ENG’G CERT

MWK
SBK

SA-8020-913 Instrument Specification Sheet - 01 Nov 2010


Instrumentation and Thermocouple Cable
SA-9872 On-Stream Inspection (OSI) 12 Nov 2015

-
SDS-EE-17502 Motor datasheet format
DESCRIPTION

10-14329-0003 ISSUED FOR REVIEW


JO/EWO

``
2-MAR-22
DATE
REV. NO.

DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 31


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

SECTION 10. GENERAL REQUIREMENT


SBK

10.1 DESIGN GENERAL REQUIREMENTS

Followings in this Material Requisition shall be applied to Chemical Injection


Package design as minimum requirements.
DESCRIPTION

10.1.1 GENERAL

SUPPLIER shall design, supply the required materials, fabricate, inspect,


10-14329-0003 ISSUED FOR REVIEW

assemble, shop test, provide internal/external coating (painting), prepare for


shipment, deliver, certify and guarantee the above listed equipment, with
accessories included in the relevant scope of supply.

SUPPLIER shall provide all services, documentations, equipment and materials


including spare parts required to comply with this Material Requisition, its
JO/EWO

Appendices and all referenced Standards, Specifications, Drawings, Forms and


Codes listed in Section 7, 8 and Section 9.
``

The proposal shall be considered to be in full compliance with this Material


2-MAR-22
DATE

Requisition by BUYER, unless specific deviations are clearly identified by


SUPPLIER. BUYER will insist on strict adherence to the Standards and
REV. NO.

Specifications with exception to the agreed variations.


A

DISCIPLINE
ENGINEER
BUYER/COMPANY are under no obligation to consider, accept or find any
SBK
deviations from the specified requirements. No deviation is accepted except for
DATE 2-MAR-22_
ENGINEERING
those listed on the DEVIATION / CLARIFICATION LIST in Appendix 3 subjected to
MANAGER BUYER / COMPANY’s prior approval.
JHK

DATE 2-MAR-22 Alternatives may be offered for materials and fabrication, if technically or
CERTIFIED
economically justified and provided they meet the requirements of the applicable
MWK codes and standards and have obtained prior written approval from BUYER.
DATE 2-MARN-22 However, SUPPLIER shall provide his bid proposal on the MR scope of supply and
then submit any alternate proposal accordingly.
CONSTRUCTION
AGENCY

________________ Deviations, clarifications and/or exceptions submitted by SUPPLIER after order


DATE ___________ placement, if any, shall not be considered by BUYER/COMPANY.
OPERATIONS

________
If any inconsistency or conflict exists between this Material Requisition and other
DATE ___________ BUYER/COMPANY’s documents, Industry Standards, Codes or Drawings, it shall
be the responsibility of SUPPLIER to bring it to the attention of BUYER in writing,
DATE _____________
CONTROL NUMBER

BY: ______________

SUPPLIER shall not contact COMPANY direct.


VERIFICATION
EDSD

BUYER along with COMPANY shall resolve the inconsistency or the conflict.
Conflicts with Reference Standards, Specifications, Drawings, Forms and Codes
listed in Section 8 and 9 shall not be permitted unless accompanied by
BUYER/COMPANY pre-agreed written waiver and/or confirmation.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 32


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

This Material Requisition in no way releases SUPPLIER from the final guarantees
ENG’G CERT

MWK

as to materials, equipment, workmanship and performance of the equipment to be


supplied.
SBK

10.1.2 ORDER OF PRECEDENCE

In case of conflict among any referenced codes and standards or between any
referenced codes and standards and technical specifications, BUYER will
DESCRIPTION

determine which shall govern in accordance with the Hierarchy of Documents


specified below:
 Local Rules and Regulations
 Data Sheets
10-14329-0003 ISSUED FOR REVIEW

 Project Specification specified in this document


 COMPANY standards specified in this document
 Industry Codes and Standards
Any ambiguity or conflict between any of the referenced standards listed within
JO/EWO

the order documents must be referred by SUPPLIER to BUYER in writing for


``

making decision and BUYER will reply to SUPPLIER in writing.


2-MAR-22

The most stringent requirements shall apply, unless highlighted by SUPPLIER in


DATE

his proposal and accepted by BUYER.


REV. NO.

DISCIPLINE
ENGINEER 10.1.3 SITE CONDITION
SBK

DATE 2-MAR-22_ Refer to Basic Engineering Design Data “861-A-TD-821950 (BEDD) & SAES-A-
ENGINEERING
MANAGER
112”.
JHK SUPPLIER shall ensure that all equipment/materials within his scope of supply are
DATE 2-MAR-22 suitable for installation and operation under the site ambient conditions.
CERTIFIED
Equipment components shall have dimensional tolerances such that it can be
MWK
replaced by spare parts without modifying them.
DATE 2-MARN-22

CONSTRUCTION
AGENCY
Wind Data
________________

DATE ___________ - Wind Code : ASCE 7-05


OPERATIONS
- Basic Wind Speed (3 second gust, 50 yr) : 96 mph (155 km/h)
________

DATE ___________ - Exposure : C


DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

Earthquake Data :
- Earthquake Code : ASCE 7-05
- Short Period Acceleration (Ss) in %g : 16.0%
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

- 1-Sec Period Acceleration (S1) in %g : 4.6%


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

- Peak ground acceleration (bedrock) : 3.0%

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 33


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

- Site Class : D
ENG’G CERT

MWK

- Importance Factor = 1.5


SBK

10.1.4 AMBIENT TEMPERATURE DESIGN CONDITION

As per Basic Engineering Design Data “861-A-TD-821950 (BEDD), where there


are no specified design temperatures, the following shall be used for ambient
temperature design condition.
DESCRIPTION

For design purposes, the following shall be used:

Maximum Design Temperature 185ºF (85°C)


10-14329-0003 ISSUED FOR REVIEW

Minimum Design Temperature Note 1


Minimum Average daily soil temperature (1.6ft below grade)
55ºF (13°C)
Winter
Maximum Summer Soil Temperature 88ºF (31°C)
JO/EWO

``

Note 1 : The Minimum Design Metal Temperature is the minimum of:

The Lowest One-Day Mean Temperature 41 °F (5 °C)


2-MAR-22
DATE

The Lowest Process Design Temperature


REV. NO.

Note 2 : For air cooled heat exchangers, the design air inlet temperature shall
DISCIPLINE
ENGINEER be 47°C (1% dry bulb temperature from SAES-A-112), with design margins
SBK
applied.
DATE 2-MAR-22_
ENGINEERING
MANAGER
Minimum Design Temperature due to Solar Heating shall be 185°F.
JHK

DATE 2-MAR-22
CERTIFIED 10.1.5 HAZARDOUS AREAS
MWK

DATE 2-MARN-22 Chemical Injection Package and associated systems shall be suitable to following
area classification.
CONSTRUCTION
AGENCY

________________
- 861-U-0403 (Produced Water Chemical Injection Package) : Safe Area
DATE ___________

OPERATIONS - 862-U-2301 (Biocide Dosing Package) : Safe Area

- 862-U-2302 (Cooling Water System Chemical Injection Package) : Safe Area


________

DATE ___________

- 862-U-2902 (Hypochlorite Dosing Package) : Safe Area


DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

- 863-U-3001 (Gas Corrosion Inhibitor Injeciton Package) : Zone 2, Group IIA/IIB,


Temp. Class T3

- 863-U-3002 (Liquid Corrosion Inhibitor Injeciton Package) : Zone 2, Group IIA/IIB,


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

Temp. Class T3
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

- 869-U-1003/2003/3003 (Caustic Injection Package) : Zone 2, Group IIA/IIB, Temp.


Class T3
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 34


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

- 869-U-1004/2004/3004 (Antifoam Injection Package) : Zone 2, Group IIA/IIB, Temp.


ENG’G CERT

MWK

Class T3

- 869-U-1009/2009/3009 (BFW Chemical Dosing Package) : Safe Area


SBK

- 869-U-1010/2010/3010 (Ammonium Sulfate Dosing Package) : Zone 2, Group IIA/IIB,


Temp. Class T3

10.1.6 EQUIPMENT
DESCRIPTION

SUPPLIER shall be responsible for providing and/or coordinating the detail design of
all equipment and components within the scope of supply. SUPPLIER shall provide
expediting services, progress reports, organize SUPPLIER and SUB-SUPPLIER co-
10-14329-0003 ISSUED FOR REVIEW

ordination / kick-off / design review meetings, resolve engineering questions related to


equipment within the scope of supply and package interface.
Appendix 2 of this Material Requisition defines the required SUPPLIER’s scope of
supply and SUPPLIER’s scope of responsibilities for the equipment and materials.
The equipment in the scope of SUPPLIER shall perform all duties specified on the
JO/EWO

Equipment Data Sheets referenced in Section 7.


``

The equipment in the scope of SUPPLIER shall comply fully with all the referenced
Specifications, Standards, Forms, Drawings and Codes listed in Section 8 and
2-MAR-22
DATE

Section 9 as well as cross-referenced specifications.


REV. NO.

DISCIPLINE
ENGINEER 10.1.7 EQUIPMENT ASSEMBLY
SBK

DATE 2-MAR-22_
SUPPLIER shall provide the equipment/materials under this Material Requisition,
ENGINEERING fully wired and assembled practically to minimize BUYER’s site construction work.
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED
10.1.8 OFF SKID AND SHIP LOOSE ITEMS
MWK
SUPPLIER shall provide a list of off skids and ship loose items, together with
DATE 2-MARN-22
estimated size and weight information, in his bid. SUPPLIER shall also provide a
CONSTRUCTION
description of site installation work to be executed by BUYER for each off skid and
AGENCY
ship loose item to enable estimating construction work volume involved.
________________

DATE ___________

OPERATIONS
10.1.9 ACCESSIBILITY AND MAINTENABILITY
________

DATE ___________
All components requiring operational checks and maintenance shall be easily
accessible. SUPPLIER shall be responsible for providing all access walkways,
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

ladders, stairs, platforms and associated support structures required for the
EDSD

operation and maintenance of the equipment / materials supplied.


Access way such as platform and ladder including handrail to access
maintenance point shall be provided in accordance with SAES-B-054.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

10.1.10 MATERIALS

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 35


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Material shall comply with and be selected as per data sheet, project specification
ENG’G CERT

MWK

and standard unless otherwise Concession Request shall be approved by


COMPANY.
SBK

All materials for pressure part shall be designed as per relevant ASME Codes for
all parts. The materials directly welded on pressure retaining components shall
be of the same material as that used for the pressure retaining components.

10.1.11 NAMEPLATES
DESCRIPTION

Nameplates shall be provided by SUPPLIER. Each of equipment shall be identified


with nameplate showing such as tag no, capacity, speed, size and type and etc.
An arrow indicating the direction of rotation shall be permanently and distinctly
10-14329-0003 ISSUED FOR REVIEW

marked on all machines


For pressure vessels, nameplates shall be 3mm minimum thickness and
manufactured from type 304 stainless steel or Monel and continuously welded to the
mounting bracket according to PIP VEFV1100. For internally coated equipment, the
nameplate shall show the Saudi Aramco Painting System Numbers, type of coating,
JO/EWO

brand name, and date of application. ASME nameplate shall be attached next to
``

SUPPLIER’s nameplate.
SUPPLIER shall also verify, confirm and comply with the specific and unique
2-MAR-22
DATE

requirements for Nameplate data specified by the applicable SAMSS.


Instrument nameplates shall show the following information as a minimum:
REV. NO.

a) Tag number
A

DISCIPLINE
ENGINEER b) Manufacturer
SBK
c) Full model number
DATE 2-MAR-22_ d) Serial number
ENGINEERING
MANAGER e) Ingress protection rating
JHK
f) Area classification
DATE 2-MAR-22 g) Flange size and rating (where applicable)
CERTIFIED

MWK

DATE 2-MARN-22 10.1.12 NOISE CONTROL


CONSTRUCTION
AGENCY
Noise level of the package shall be limited to the permissible noise level specified
________________ in the datasheets and SAES-A-105.
DATE ___________

OPERATIONS
Each unit shall be designed to ensure that during all modes of operation, the total
________
overall package sound pressure level emitted by the Package and its associated
DATE ___________
auxiliaries does not exceed 85 dB(A) measured at a distance of 3 feet (1 m) from
the surface of machine.
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

If the noise level is greater than 90 dB(A) at a distance of 1 m from the skid edge,
EDSD

special design and/or acoustic treatment shall be proposed by SUPPLIER together


with a waiver request using COMPANY Form SA-7305-ENG.

10.1.13 SPECIAL TOOLS


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SUPPLIER shall confirm requirements of special tools to install, adjust, operate and
maintain the equipment and provide it, if required.
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 36


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

10.1.14 CORROSION PROTECTIVE COATING AND PAINTING


SBK

All equipment and materials shall be supplied suitably protected from corrosion
during transportation, storage, after installation and during operation according to
the referenced documents in Section 8 and Section 9.
Painting shall be applied to where it needs as per coating map. Manufacturer
standard for external coating is acceptable provided that manufacturer standard is
suitable for highly corrosive (C5-I) environment with high durability. (equivalent to
DESCRIPTION

C5 in ISO 12944)
All painting shall be performed after hydrostatic test.
SUPPLIER shall follow the requirement of BUYER’s equipment color code and get
BUYERs approval of SUPPLIER’s painting procedure. Inspection shall be
10-14329-0003 ISSUED FOR REVIEW

performed in accordance with Form 175-091900.

SUPPLIER shall also provide 5% touch-up paint materials for field repair work.
SUPPLIER shall also comply and be responsible to meet the requirements that are
additional and specified by the applicable SAMSS.
JO/EWO

``
2-MAR-22

10.1.15 PRESERVATION AND PROTECTION


DATE

Materials / GOODS shall be packed, suitable for overland / sea shipment


REV. NO.

transportation, and storage on site before installation as per COMPANY’s Standard


DISCIPLINE
ENGINEER and Packing and Shipping Procedure (JUS&ICS-PM-PD-4511) in Section. 15.
SBK SUPPLIER shall advise any requirement for preservation of material that requires
DATE 2-MAR-22_
long term storage after delivery on site. SUPPLIER shall provide all preservation
ENGINEERING
MANAGER and protection required for shipment and storage on site prior to installation as per
JHK
SAEP-385. (Heat exchanger, compressor and motor shall be preserved by using
DATE 2-MAR-22 N2 Charging or VCI, if required.)
CERTIFIED
SUPPLIER shall comply with the specific additional requirements for preservation,
MWK
handling and protection of materials/equipment as specified in the applicable SAMSS
DATE 2-MARN-22
in order to preserve and guarantee the safeguard of the Warranty throughout its
CONSTRUCTION intended and agreed period.
AGENCY

________________

DATE ___________
10.1.16 PACKING AND SHIPPING
OPERATIONS

________ SUPPLIER shall ensure that all equipment and materials are designed and packed
DATE ___________
for transit to site without damage and in accordance with the requirements of the
DATE _____________

documents listed in Section 8 and Section 9.


CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

Tested and inspected equipment shall be emptied, dried, painted and where
necessary, preserved for shipment and long term outside storage.

All platforms and ladders shall be assembled and tested for fit-up and then
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

disassembled and shipped separately for field installation.


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 37


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

SUPPLIER shall protect his equipment during transportation, handling and storage
ENG’G CERT

MWK

against outdoor conditions. Internal bracing and shipping cradles as necessary


shall be provided to prevent deformation during shipment and erection. Products
SBK

for corrosion protection shall be used.

All equipment shall be packed and weather protected for export. Loose parts shall
be boxed and shipped along with an itemized packing list with the main assembly.

SUPPLIER shall clearly indicate on the shipping cases or other packages the
required storage conditions.
DESCRIPTION

SUPPLIER shall provide procedure for unloading, handling and installing


equipment at job site. Equipment shall not be released for shipment without
approval of the BUYER’s authorized representative.
10-14329-0003 ISSUED FOR REVIEW

Loose parts shall be individually numbered and boxed and shipped along with the
packing list contains parts and item numbers.

If the SUPPLIER fails to deliver any part of the Goods at the agreed time due to
the Supplier’s default, the supplier shall supply the Goods involved in the late
JO/EWO

deliver in terms of the FCA, and actual Costs including fright fare, custom duty and
all relevant Costs to the Site shall be borne by the SUPPLIER. BUYER holds the
``

options to request shipment mode to be by AIR in order to recover delays and


impact of such delays.
2-MAR-22
DATE

SUPPLIER shall comply with the specific shipping preparation requirements listed
in SAMSS, BUYER’s Packing and Shipping Instructions, as well as the
REV. NO.

requirements listed in this section. SUPPLIER is responsible to ensure that proper


DISCIPLINE
ENGINEER packing and preservation, shipping, handling and delivery methods are followed in
SBK full compliance with the manufacturer’s recommendation so as to confirm and
DATE 2-MAR-22_ avert any compromise with the applicable warranty period.
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22 10.1.17 SASO REQUIREMENT


CERTIFIED

MWK
SUPPLIER’s supplied material shall comply with Saudi Standards, Metrology, and
DATE 2-MARN-22 Quality Organization (SASO) requirements. If a SASO certificate is required for
SUPPLIER’s supplied materials, SUPPLIER shall promptly forward a copy of the
CONSTRUCTION
AGENCY SASO approved certificate to COMPANY Representative and to BUYER.
________________

DATE ___________ SUPPLIER shall ensure to comply with the SASO Certificate and Hazardous
OPERATIONS material import/special approval requirements and to coordinate with BUYER to
________
confirm the compliance prior to physical shipment of materials.
DATE ___________
SUPPLIER shall be responsible to ensure that if the commodity requires a special
DATE _____________
CONTROL NUMBER

BY: ______________

permit issued by the applicable Saudi Ministry, SUPPLIER obtain such permit prior
VERIFICATION

to material shipment and to provide such permit to BUYER.


EDSD

For the purpose of Customs Clearance in KSA through online SABER system
which is mandatory requirement for the imported equipment and materials to KSA
from Feb. 2020 instead of SASO Certificate.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SUPPLIER shall provide BUYER with the following documents for SABER system
registration by 90 days before contracted delivery terms.
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 38


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

a) Drawings
ENG’G CERT

MWK

b) Breakdown list of goods, equipment, facility, etc., such BOM, etc.


SBK

c) Technical Passport Manual, Brochure

d) Technical Specification Data

e) Test Report/Protocol as per the international standards

f) Manufacture’s QMS(Quality Management System) certificates, such as ISO


DESCRIPTION

9001, ASME1 etc.

g) Other documents requested by SASO/SABER (If any)

SUPPLIER shall bear any costs for the preparation of the said documents and
10-14329-0003 ISSUED FOR REVIEW

Certificate for local regulation, registration fee of SABER system. if required.

10.1.18 FIELD SERVICES


JO/EWO

SUPPLIER shall quote for the provision of suitably qualified and experienced
``

personnel for the supervision of filed services. The following field services might be
2-MAR-22

required:
DATE

a) Installation
REV. NO.

b) Commissioning
DISCIPLINE
ENGINEER
c) Site Performance Testing
SBK

DATE 2-MAR-22_
ENGINEERING
These Field Services will be the subject of a separate contract when required.
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED 10.1.19 TRAINING
MWK

DATE 2-MARN-22
SUPPLIER shall quote the provision of suitably experienced and qualified
personnel to train COMPANY’s personnel in:
CONSTRUCTION
AGENCY a) Pricing for training sessions to be held in the Kingdom of Saudi Arabia.
________________

DATE ___________
b) Pricing for trainers to work In Kingdom.
OPERATIONS c) Pricing for specific training courses outside the Kingdom of Saudi Arabia.
________
Training shall be carried out on site or SUPPLIER’s training facility and shall
DATE ___________
include the provision of support documentation.
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

The training and support documents shall be in English.


EDSD

Training, if required, will be the subject of a separate contract.

10.1.20 SUB-SUPPLIERS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SUPPLIER shall control, co-ordinate, expedite and resolve all problems with any
SUB-SUPPLIERS in order to meet the requirements of this Material Requisition.
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 39


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

SUPPLIER shall guarantee and be responsible for the design and performance of
ENG’G CERT

MWK

all sub-supplied items. SUPPLIER shall ensure that all the relevant information,
reference documents and documentation requirements are passed on to any SUB-
SBK

SUPPLIERS

SUPPLIER shall be responsible for the design, engineering, materials of


construction, manufacture, co-ordination, assembly, inspection, testing and
performance guarantee for the equipment in his supply.

SUPPLIER shall be responsible for reviewing SUB-SUPPLIERS drawings and


DESCRIPTION

documents to ensure compliance with applicable specifications.

SUPPLIER shall ensure that all his SUB-SUPPLIERS manufacturing site have and
maintain documented quality management system in accordance with the ISO-
10-14329-0003 ISSUED FOR REVIEW

9001:2015 (Quality Management Systems- Requirements).

Major equipment components and materials shall be supplied from the SAUDI
ARAMCO RVL List when applicable. SUPPLIER shall fill up “Sub-Vendor Listing &
Manufacturing Method Statement” attached in Sec. 8.1 of this Material Requisition
to submit such SUB-SUPPLIER’s information, whether SUB-SUPPLIERS are listed
in the RVL or not, for COMPANY’s prior approval.
JO/EWO

``

If required, SUB-SUPPLIERS, not mentioned SAUDI ARAMCO Regulated Vendor


Lists, shall be approved in accordance with SAUDI ARAMCO’s Standards.
2-MAR-22
DATE

SUPPLIER shall, as part of the detail design documentation, provide a copy of all
REV. NO.

SUB-SUPPLIERS’ un-priced PURCHASE ORDER for information upon BUYER’s


A

DISCIPLINE
request. SUPPLIER is to ensure that all relevant SAUDI ARAMCO technical and
ENGINEER quality requirements are passed onto the SUB-SUPPLIERS for compliance.
SBK

DATE 2-MAR-22_ SUPPLIER shall provide original manufacturer source information for all material
ENGINEERING
MANAGER
and spare parts supplied on each PURCHASE ORDER including, but not limited to,
manufacturer’s name, address, sales order number, sales contact name,
JHK
telephone number, fax number and e-mail address.
DATE 2-MAR-22
CERTIFIED
SUPPLIER shall visit, perform SUB-SUPPLIERS’ shop expediting and report to
MWK
BUYER whenever BUYER requests without additional cost impact.
DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________ 10.1.21 GUARANTEES


DATE ___________

OPERATIONS SUPPLIER shall guarantee that the complete scope of supply shall safely and reliably
________ meet all of the requirements of this Material Requisition and its reference documents.
DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

10.1.22 DOCUMENTATION
EDSD

SUPPLIER shall provide documentation as stated in Para 13.3 and required by


COMPANY’s NMR (Non Material Requirements) Forms referred in para 9.6.
SUPPLIER shall provide all required drawings and documentation in accordance with
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

“Instruction for Vendor Data (JUS&ICS-PM-PD-1002)” and all necessary


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

documentation to enable BUYER / COMPANY to perform required operational and


maintenance activities.
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 40


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

All SUPPLIER drawings and as-built drawings shall be produced by Bentley Micro
ENG’G CERT

MWK

station CADD in accordance with the CADD specifications in SAES-A-202 and SAEP-
110. AutoCAD shall not be allowed.
SBK

All drawings shall reflect all dimension, design detail and written works in SI
(modified) units and shall be in the English language. However, operating parameters
such as design pressure, design temperature, flowrate and etc. shall be US
Customary Units.
SUPPLIER shall submit Monthly Progress Report at designated date of every month
until complete delivery.
DESCRIPTION

As per SAEP-3101, SUPPLIER shall submit the SPDP package to the BUYER by
the specified delivery date which shall be either the same delivery date as NMR-
602 or delivery prior to shipment release of the equipment.
10-14329-0003 ISSUED FOR REVIEW

Non-Material Requirements (NMR item 601, 602, and 603 on SAUDI ARAMCO
7900 Series Forms) are an integral part of this requirement as are the complete
spare parts packages as such, notwithstanding the terms of payment provisions in
the applicable conditions of purchase, purchase order payment up to the full
purchase order price may be withheld until all Non-Material Requirements and
spare parts data packages are delivered and accepted by COMPANY.
JO/EWO

Material delivery shall not be considered complete until two (2) complete original
``

sets and one (1) electronic copy of Vendor Equipment Operating Instructions and
Equipment Maintenance Manuals have been transmitted to COMPANY and
2-MAR-22
DATE

receipt of Instructions and Manuals has been acknowledged by COMPANY.


REV. NO.

DISCIPLINE
10.1.23 UNITS OF MEASUREMENTS
ENGINEER

SBK Unless specified otherwise, English units shall be used for name plates, operating
DATE 2-MAR-22_ parameters, data sheets, gauges/instruments as specified in Attachment 1 of BEDD
ENGINEERING
MANAGER
(TD-821950).
JHK

DATE 2-MAR-22
CERTIFIED 10.1.24 LANGUAGE
MWK

DATE 2-MARN-22
All the correspondence as well as drawings, instructions, data sheets, design
calculations and any other written information shall be issued in the English
CONSTRUCTION
AGENCY
language. Certificates issued in the country of origin language shall be submitted
________________
“as final” complete with the English translation.
DATE ___________

OPERATIONS
10.1.25 PROJECT COORDINATION
________

DATE ___________
After PURCHASE ORDER placement, SUPPLIER shall assign a project
DATE _____________
CONTROL NUMBER

BY: ______________

coordinator responsible for the following activities:


VERIFICATION
EDSD

 Submit Monthly Progress Report at designated date of every month until


complete delivery.
 Act as a single point contact for all communication between BUYER and
SUPPLIER.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Monitor and expedite all of SUPPLIER’s and SUB-SUPPLIER’s


activities to ensure compliance with the agreed schedule and the requirements
stated in this Material Requisition and its reference documents.
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 41


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

 Attend an ordered kick-off meeting at BUYER’s office.


ENG’G CERT

MWK

 Monitor and expedite responses to BUYER’s communication with SUPPLIER.


 Preparing SPDP (Spares Parts Data Package) in full compliance with SAEP-
SBK

3101, Appendix C and D. Most importantly ensuring timely delivery of the


SPDP package to BUYER by the agreed delivery date. See section 12.5 for
specific SUPPLIER’s compliance and obligations.
DESCRIPTION

10-14329-0003 ISSUED FOR REVIEW


JO/EWO

``
2-MAR-22
DATE
REV. NO.

DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 42


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

10.2 DESIGN SPECIFIC REQUIREMENTS


ENG’G CERT

MWK

Chemical Injection Package shall be designed, manufactured, tested and


SBK

inspected in accordance with data sheets, project specifications and SAUDI


ARAMCO Standard.

10.2.1 CHEMICAL INJECTION PUMP

All chemical injection pumps shall be Positive Displacement Pumps – Controlled


Volume, double diaphragm type in compliance with SAES-G-006, 31-SAMSS-009,
DESCRIPTION

and API 675 3rd Edition, data sheets and mentioned project specifications. Pumps
shall be provided from COMPANY approved manufacturer.

All pumps shall be in compliance with SAES-G-006, 31-SAMSS-009, and API 675
10-14329-0003 ISSUED FOR REVIEW

3rd Edition; datasheets and mentioned project specifications. All proposed


alternate materials should be highlighted by the SUPPLIER and submitted through
BUYER for review and approval.

The Net Positive Inlet Pressure Available (NPIPA) shall exceed the Net Positive
Inlet Pressure Required (NPIPR) by a minimum of 1m head of liquid pumped
converted to pressure in kPa (psi).
JO/EWO

``

Diaphragm material shall be compatible with the pumping liquid condition as


specified in the data sheet. Double diaphragm pumps are either Sandwich type or
2-MAR-22
DATE

the type using an intermediate chamber. The sandwich type is preferred.


REV. NO.

Double diaphragm pumps shall be provided with a diaphragm rupture signaling


A

DISCIPLINE
system. For this signaling system, a pressure detector (pressure transmitter) shall
ENGINEER
be used for dry designs and a conductivity probe shall be used for pumps having
SBK an intermediate fluid between the diaphragms.
DATE 2-MAR-22_
ENGINEERING Pump shall have an electronic automatic adjustable length stroke controller,
MANAGER
capable of remote land local control without stopping the pump. Stroke length shall
JHK
be adjustable, both locally and by a control signal from the remote control room.
DATE 2-MAR-22
CERTIFIED
Mechanical lost motion capacity adjustment is not permitted.
MWK Each pump shall have a minimum operating capacity of 30 – 110% of the
DATE 2-MARN-22
recommended dosing rate.
CONSTRUCTION
AGENCY For each of the chemical injection points, pump shall be specified to cover the full
________________ range of flow specified for all dosing modes (i.e. including normal and shock).
DATE ___________
Pumps shall have adjustable speed (stroke rate) or stroke length to enable
OPERATIONS different dosing rates from the same pump.
________

DATE ___________
DATE _____________

10.2.2 STORAGE TANK


CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

Storage tank shall be designed, manufactured, tested and inspected in accordance


with 32-SAMSS-030 and 175-325100 or 32-SAMSS-002 and 175-325300;
datasheets and the mentioned specifications.
APPROVAL/CERTIFICATION REQUIREMENTS,

The storage tank shall be provided with quick opening for chemical loading and
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

inspection.

Access platform and ladder shall be provided for maintenance purpose.


MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 43


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Chemical storage tanks shall, as a minimum, be equipped with fill nozzle, utility
ENG’G CERT

MWK

nozzle, vent, pressure relief, overflow, discharge, low point drain, level and
temperature instrumentation.
SBK

Anti-swirl baffles (vortex breakers) shall be provided on liquid outlet nozzles


upstream of a pump suction side.

Block valves shall be installed directly at the tank nozzles. If more than one line
connects to the same nozzle, valves shall be installed in each line, in addition to
the nozzle block valve.
DESCRIPTION

The Package VENDOR shall complete tank data sheet Form SA-2696 for review
by BUYER.

SUPPLIER shall propose appropriate means of loading for each selected chemical
10-14329-0003 ISSUED FOR REVIEW

in accordance with COMPANY standards and procedures.

10.2.3 PULSATION SUPPRESSION DEVICES

Pressure pulsation suppression devices shall be furnished by the SUPPLIER as


JO/EWO

necessary to meet the following criteria. Unfiltered peak to peak pulsation levels
``

shall not exceed 3% of:


2-MAR-22

- Rated suction pressure or 100 kPa gauge (15 psig) whichever is less;
DATE

- Rated discharge pressure or 100 kPa gauge (15 psig) whichever is less.
REV. NO.

The SUPPLIER shall be responsible for ensuring that the following situations are
DISCIPLINE
ENGINEER avoided:
SBK
- Cavitation in the suction or discharge of the pump;
DATE 2-MAR-22_
ENGINEERING
- Over delivery due to suction losses or uncontrolled delivery;
MANAGER
- Exceeding maximum allowable working pressure of pressure containing parts
JHK (including auxiliaries).
DATE 2-MAR-22
CERTIFIED The SUPPLIER shall provide any fittings required for charging the pulsation
MWK dampers. These shall be securely fastened to the pump.
DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________ 10.2.4 LUBRICATIONS


DATE ___________

OPERATIONS
Lubrication shall be recommended by SUPPLIER based on SAUDI ARAMCO
Standard, and recommendation charge for the initial charge, pre-commissioning
________

DATE ___________
and start-up and commissioning shall be provided by SUPPLIER.
DATE _____________
CONTROL NUMBER

BY: ______________

BUYER can request equivalent lube oil and grease types and SUPPLIER shall
VERIFICATION

review and confirm compatibility.


EDSD

10.2.5 MATERIALS
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

SUPPLIER shall verify and advise material constructions suitable for the service
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

chemical and operating condition.

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 44


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

All materials of construction shall be selected in accordance with Company and


Project Standards, ‘Materials Selection for Pipelines, Piping and Process
ENG’G CERT

MWK

Equipment’, SAES-L-132. Inferior material than specified on Mechanical Data


SBK

Sheet is not acceptable, and higher grade than specified materials on Mechanical
Data Sheet can be applicable as per SUPPLIER’s recommendation, but shall have
COMPANY’s approval.

The site is located in a desert area which is characterised as a dusty, saline


atmosphere. SUPPLIER shall select material for each equipment proper to site
condition and all operation condition case.
DESCRIPTION

10.2.6 ELECTRIC MOTORS


10-14329-0003 ISSUED FOR REVIEW

The electric motors shall be induction as specified on the motor data sheets and
shall be designed in accordance with SAUDI ARAMCO material specification 17-
SAMSS-503 and SAUDI ARAMCO engineering standard SAES-P-113.
Motors shall be based on full voltage.
For LV motor between 1 HP (0.75 kW) and 500 HP (370 kW), the supply voltage
JO/EWO

shall be 480 V and the rated voltage of the motor shall be 460 V.
``

All motors shall be suitable for the Hazardous area classification specified on the
data sheet.
2-MAR-22
DATE

Totally enclosed motors shall have at least one drain hole with a plug at each end.
Motors shall be provided with a minimum of 2 suitable grounding terminal lugs.
REV. NO.

DISCIPLINE Degree of protection for motor shall be minimum "IP55" in accordance with IEC
ENGINEER
60529.
SBK

DATE 2-MAR-22_
Degree of protection for terminal box shall be “NEMA 4X” in accordance with
ENGINEERING NEMA 250 or “IP55” in accordance with IEC 60529.
MANAGER

JHK
The terminal box shall have Type 300 series stainless steel hardware (Bolts, nuts
DATE 2-MAR-22
and etc.).
Motor winding insulation shall be Class “F” with an allowable Class “B”
CERTIFIED

MWK
Temperature rise above the ambient of 50℃ as per NEMA MG 1, Part12, Part 20
DATE 2-MARN-22
or Part 21, or IEC 60034-1 limits as applicable.
CONSTRUCTION
AGENCY The Space heater rated voltage shall be 230V.
________________
Space heaters shall be provided for motors rated 75 kW (100 HP) and above.
DATE ___________

OPERATIONS If Space heaters are provided, a caution nameplate shall be provided stating
________
CAUTION : SPACE HEATERS MAY BE ENERGIZED.
DATE ___________
The orientation of terminal box shall be adjustable in each 90 deg wise.
DATE _____________
CONTROL NUMBER

BY: ______________

Main terminal boxes for electric motors shall be one step oversized per NEMA MG
VERIFICATION
EDSD

1.
Cooling fan shall be of the non-sparking, non-corrosive type, and per the IEEE Std.
841, section 6.4.
Installations in hazardous locations shall be per the National Electrical Code, with
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

the following additions and exceptions:

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 45


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

- IEC or Ex labeled equipment/component meeting requirement of IEC 60079 and


ENG’G CERT

MWK

certified by one of the agencies in the Approved IECEx Certification Bodies


(ExCBs) under IECEx Certified Equipment Scheme is acceptable. Method of
SBK

protection must be marked and must correspond with NEC Article 505
requirements for suitable protection method(s) for the hazardous area where the
equipment is applied.
- Increased safety (protection type “e”) motors and terminal boxes are not
permitted Class I, Zone 1 or Zone 2 locations.
- Equipment listed and marked in accordance to NEC for use in Zone 0, 1, or 2
DESCRIPTION

locations shall be permitted in Class I, Division 2 locations for the same gas and
with a suitable temperature class.
10-14329-0003 ISSUED FOR REVIEW

10.2.7 COUPLINGS AND COUPLING GUARDS

Lubricated couplings are not permitted.


Guards on pumps located in electrically classified areas shall be of the non-
sparking type.
JO/EWO

Coupling guards with inspection cover (or window) shall be provided and shall
``

sufficiently enclose the coupling and the shafts to prevent any personnel from
contacting parts during operation of the equipment train.
2-MAR-22
DATE

This cover or window must be securely fixed and require a tool or key to enable
them to be opened.
REV. NO.

DISCIPLINE
ENGINEER 10.2.8 FOUNDATION AND STRUCTURE BASE FRAME
SBK

DATE 2-MAR-22_ Fabrication of structure base frame shall be in accordance with 12-SAMSS-007
ENGINEERING
MANAGER
“Fabrication of Structural and Miscellaneous Steel”.
JHK SUPPLIER shall be responsible for the proper design of the base plate and for the
DATE 2-MAR-22 elimination of any unacceptable characteristics such as harmonic vibration.
CERTIFIED
Package components shall be skid mounted. The structure base frame shall
MWK
complete with the followings:
DATE 2-MARN-22

 Lifting lugs
CONSTRUCTION
AGENCY

________________  Earthing boss as per standard drawing attached


DATE ___________

OPERATIONS  Supports for all on-skid equipment, piping and instrumentation


________

DATE ___________  Overall sunshade, if required


DATE _____________
CONTROL NUMBER

BY: ______________

Base frame shall be provided with four (4) lifting lugs installed such that the center
VERIFICATION
EDSD

of gravity of the package is midway between opposite lugs, to allow a single point
lift.
Lifting lugs on the base frame shall be magnetic particle examined.
SUPPLIER shall demonstrate that sufficient access is being provided for
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

maintenance and operations by the use of 3D drawings or modeling during the


design phase. These shall be reviewed and approved by COMPANY / BUYER
prior to commencement of manufacture.
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 46


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

All equipment shall be mounted within the dimensions of the baseplate with no
ENG’G CERT

MWK

parts overhanging the skid edge.


Anchor bolts/nuts will be provided by CONTRACTOR. SUPPLIER shall design and
SBK

provide the recommended anchor bolts/nuts and washers on SUPPLIER Drawing


according to the project standard drawing AA-036322-001, Anchor Bolt Details
Inch and Metric Sizes.

10.2.9 EARTHING BOSSES AND GROUNDING PADS


DESCRIPTION

Stainless steel earthing (grounding) bosses for baseplate (structural base frame)
shall be provided at diagonal positioned and wiring throughout inclusive of cable
gland and lugs as per standard drawing, which will be provided at the detail design
phase. Tapped hole shall be provided for stainless steel bolt which will be supplied
10-14329-0003 ISSUED FOR REVIEW

by others.

10.2.10 CONTROL AND INSTRUMENTATION

The Vendor shall provide and install the necessary instrumentation and junction
JO/EWO

boxes required to monitor and protect the Chemical Injection Package and all
``

Vendor supplied associated auxiliary systems over the full range of operating
conditions. Refer to 861-J-TD-821303, C&I Package Equipment Specification.
2-MAR-22
DATE

The instrument and control shall be in accordance with the project specification
“34-SAMSS-831 - Instrumentation for Package Units”
REV. NO.

DISCIPLINE
The equipment within the Vendor scope shall be monitored, protected and
ENGINEER controlled by the CONTRACTOR’s Process Control System (PCS). This shall be
SBK provided by others and consist of, but is not limited to:
 DCS for basic process control
DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK  ESD for emergency shutdown


DATE 2-MAR-22
CERTIFIED
 MPS Machinery Protection System consisting of the following sub-systems:
MWK

DATE 2-MARN-22 - VMS for rotating equipment vibration monitoring


CONSTRUCTION - CMS for condition and predictive monitoring of machinery
AGENCY

________________ All equipment used for machinery protection system shall comply with 34-SAMSS-
DATE ___________ 625.
OPERATIONS
The monitor(s) / module(s) for the machinery protection and condition monitoring
________
system(s) covered by 34-SAMSS-625 for monitoring bearing temperature and
DATE ___________
vibration shall be outside of Vendor scope and shall be supplied by others for
DATE _____________

installation into the Process Interface Building.


CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

The Vendor scope includes all on-skid equipment of instrumentation; cabling and
separate junction boxes for Foundation Fieldbus, ESD, DCS analog, DCS digital,
VMS probes / transducers and bearing temperature signals as required by SAUDI
ARAMCO specifications and Vendor recommendation.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

The MPS probes that are supplied by the Vendor shall be compatible with the
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

project MPS. There will be a common VMS / CMS, but the Vendor has yet to be
determined.
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 47


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

The Vendor shall indicate if there are any distance limitations to be considered
ENG’G CERT

MWK

between the control equipment and the installed equipment.


The Vendor shall provide all junction boxes at skid edge in a vibration free
SBK

environment for ease of CONTRACTOR interface.


All on-skid wiring between the Vendor instruments and the skid-edge junction box
shall be included in Vendor scope of supply and shall be pre-installed by the
Vendor.
Cables between skid mounted instruments and junction boxes shall be supplied
armoured, suitable for the area classification and routed on aluminium trays.
DESCRIPTION

The Vendor shall provide all field instrumentation, including primary connections,
and shall clearly define during the bid phase if any instrument is supplied loose.
Where instruments are supplied loose, Vendor shall provide detailed installation
10-14329-0003 ISSUED FOR REVIEW

details documenting the arrangement, activities and materials required for the
process, pneumatic, electrical and support hook-ups.
Instruments interfaced with the Distributed Control System (DCS) shall be
Foundation Fieldbus. Instrument systems wired to the Emergency Shutdown
(ESD) shall use 4-20mA signals with a superimposed HART protocol for smart
communications.
JO/EWO

``

The interface junction boxes shall be supplied by Vendor, inclusive of all


appropriate certified (if required) cable glands and plugs, including cable glands for
the multicore cable that are in CONTRACTOR scope. The interface junction boxes
2-MAR-22
DATE

shall be predrilled and plugged for CONTRACTOR cables.


REV. NO.

The Vendor shall supply all required documentation to support safety requirements
A

DISCIPLINE
for the package, as well as documentation for the DCS / ESD Vendor such as:
ENGINEER
 Logic diagrams
SBK

 Narratives for the equipment protection system and control logic


DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK  Ladder diagrams / application program documentation


DATE 2-MAR-22
CERTIFIED
 Cause and effects
MWK

DATE 2-MARN-22  Set points for trips and alarms


CONSTRUCTION
AGENCY  Instrument index / list
________________

DATE ___________  Instrument specification sheets (Data sheets)


OPERATIONS

________
The Vendor shall resolve all comments and actions arising out of the HAZOP and
DATE ___________ SIL reviews to ensure compliance with SAUDI ARAMCO, Project and International
Code requirements.
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

Control signals and measured value signals shall not be affected by stray AC
EDSD

voltage or other interference of any type normally found in an industrial facility. The
Vendor shall provide shielded cables.
Unless otherwise specifically approved by COMPANY switch type instruments
shall not be used. Instead transmitter type instruments shall be installed by
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Vendor.

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 48


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

The Vendor shall complete all COMPANY instrument datasheets using the formats
ENG’G CERT

MWK

listed in Appendix 2.8 for all supplied instruments.


Junction boxes shall have sufficient number of terminals to terminate all wires from
SBK

the cable formation chosen. This format will be advised to Vendor during detailed
engineering.
The Vendor shall provide multi-sided sunshades on all Vendor provided transmitter
racks, gauge boards and local control panels.
Junction boxes shall be supplied with 316L SS material.
DESCRIPTION

SUPPLIER shall provide detailed P&ID, process description, process control


philosophy, logic diagram, cause and effect diagram for all instrumentation, control
valves, relief valves etc. as per the referenced P&ID and as necessary to provide
the signals identified below and for the safe and reliable operation and control of
10-14329-0003 ISSUED FOR REVIEW

the equipment.
The Vendor shall provide multi-sided sunshades on all Vendor provided transmitter
racks, gauge boards and local control panels.
SUPPLIER shall provide strainer for chemical injection pumps, and differential
pressure transmitter requirement to be evaluated on case by case basis dependent
JO/EWO

upon fluid service and included in P&ID, if required.


``

Instrumentation shall include but not limited to:


 The dosing package tank shall be provided with a local gauge and
2-MAR-22
DATE

transmitter to provide remote level indication, including high and low level
alarms.
REV. NO.

DISCIPLINE
ENGINEER
 A temperature gauge shall be supplied on the tank for indication of bulk
fluid temperature.
SBK

 A pressure gauge shall be supplied on each pump discharge.


DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK  Pressure and flow transmitters shall be supplied on the common discharge
DATE 2-MAR-22 manifold.
CERTIFIED

MWK  Pump shall have an external PSV with the PSV discharge line piped back
DATE 2-MARN-22 to the tank.
CONSTRUCTION
AGENCY  Double diaphragm pumps shall be provided with a diaphragm failure signal
________________ system.
DATE ___________

OPERATIONS  Instrumentation shall be wired to skid edge Junction Box for wiring to the
________ DCS by others.
DATE ___________

 All junction boxes, cable trays, instruments and panels shall be suitable for
DATE _____________
CONTROL NUMBER

BY: ______________

highly corrosive environment.


VERIFICATION
EDSD

Sunshades shall be suitably sized and installed to provide full protection to the
transmitter body, including any Liquid-Crystal Display (LCD) display, from solar
radiation.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 49


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

10.2.11 PRESSURE SAFETY VALVE


ENG’G CERT

MWK

Each positive displacement pump shall have an external PSV with independent
SBK

discharge line piped back to the tank above the high high liquid level.
A pressure relief valve must be installed on the pump discharge to vent fluid back
into the suction line if pressure builds up. The actual pump internal relief valve
setting shall be between 110% and 120% of the rated discharge pressure.
Pressure relief valves with operating pressure greater than 15 psig shall carry
ASME code stamp “UV” as per ASME Section VIII.
DESCRIPTION

Pressure relief valves shall have a minimum process connection size of ¾ -inch
threaded or 1-inch flanged.
Pressure relief valve minimum flange rating for the inlet connection shall be ASME
10-14329-0003 ISSUED FOR REVIEW

Class 150 as per ASME B16.5 and the outlet flange rating shall follow the relevant
piping material specification.

10.2.12 ELECTRICAL SYSTEM

SUPPLIER shall provide a complete system of electrical accessories in


JO/EWO

compliance with 17-SAMSS-515 Auxiliary Electrical Systems for skid mounted


``

equipment and all applicable referenced specifications and standards.


2-MAR-22
DATE

10.2.13 PIPING
REV. NO.

DISCIPLINE
ENGINEER All Vendor auxiliary connections to CONTRACTOR interface pipework shall be
SBK
flanged.
DATE 2-MAR-22_ As far as possible all piping interfaces shall be grouped and brought to the skid
ENGINEERING
MANAGER edge.
JHK Flange connections overhanging the baseplate skid edge are not permitted.
DATE 2-MAR-22
CERTIFIED All tubing and tubing fittings on the package shall utilize US fittings and US sized
MWK
tubing.
DATE 2-MARN-22
All bolting material for flange joints installed in highly (C5-I) or severely corrosive
CONSTRUCTION
(C5-M) environments shall be protected based on para 6.2.7 of SAES-A-134.
AGENCY

________________ Piping systems shall be generally designed and constructed in compliance with the
DATE ___________ requirements of ASME B31.3 piping codes.
OPERATIONS
Design of piping shall be in compliance with the Saudi Aramco Engineering
________ Standard SAES-L-310, Design of Plant Piping.
DATE ___________
Piping material specification shall be in compliance with TD-821107, PIPING
DATE _____________
CONTROL NUMBER

BY: ______________

MATERIAL SPECIFICATION and the Saudi Aramco Engineering Standard SAES-


VERIFICATION

L-105, Piping Line Classes.


EDSD

SUPPLIER shall be responsible for all aspects of individual piping flexibility and
supporting requirements during detailed design.
SUPPLIER shall ensure a clear access of 750mm is maintained from 2 sides for all
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

items, covering the following as a minimum and not restricted to:


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Equipment nozzles

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 50


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

 Spectacle blinds, Spacers and Blinds


ENG’G CERT

MWK

 All type of Valves


SBK

 Actuators

 Instruments

SUPPLIER shall design piping systems to eliminate dead legs to the maximum
extent possible. In locations at which the introduction of a dead leg cannot be
avoided, SUPPLIER shall keep the length of the dead leg to an absolute minimum.
DESCRIPTION

The drain valves shall ideally be mounted immediately on the branch outlet from
the main line (and as close possible to the strainer drain flange/outlet), to minimize
dead leg and associated corrosion issues.
10-14329-0003 ISSUED FOR REVIEW

SUPPLIER shall take into account the need for flexibility in piping to allow for
removal of valves, spectacle blinds, blinds / spacers and any other removable
specialty items. Jacking bolts shall be provided as required.
SUPPLIER shall provide all valves 6 inch & above, spectacle blinds, blinds and
spacers and all removable items weighing more than 25 kgs. with ‘’open to sky’’ as
JO/EWO

basis of the design and shall ensure that those are accessible by cranes/mobile
``

lifts. Any difficulties to meet the ‘’open to sky’’ requirements shall require
CONTRACTOR approval and, in such cases, necessary lifting beam / monorails
2-MAR-22
DATE

with chain & hoist shall be provided to enable their removal and reinstatement.
SUPPLIER shall provide 3D model generated by SP3D 2018 Version and
REV. NO.

Equipment Tag Number, Nozzle Number and Line Number shall be included in
A

DISCIPLINE
ENGINEER
model property.
SBK

DATE 2-MAR-22_
ENGINEERING
10.2.14 TEST AND INSPECTION
MANAGER

JHK  PUMP
DATE 2-MAR-22
CERTIFIED
The pumps shall be tested and inspected in accordance with 31-SAMSS-009, API
675 third edition, inspection & testing requirement form 175-311500, project
MWK
specification and equipment datasheets.
DATE 2-MARN-22

CONSTRUCTION
Test certificates only are required for pump types with proven SAUDI ARAMCO
AGENCY operating experience.
________________

DATE ___________ Hydrostatic test and performance test shall be in accordance with API 675.
OPERATIONS

________

DATE ___________
 ELECTRIC MOTOR DRIVES
DATE _____________

Each motor shall be tested in accordance with 17-SAMSS-503, Inspection and


CONTROL NUMBER

BY: ______________
VERIFICATION

Testing Requirements Form 175-170200, Project Specification, this Material


EDSD

Requisition, and Equipment Data Sheets. All motor feet shall be fastened to the
test base or ground for the exact vibration test.
Test certificate shall be provided.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

INSTRUMENTS AND SAFETY RELIEF VALVE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 51


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Instruments, local pushbutton station shall be tested and inspected in accordance


ENG’G CERT

MWK

with Inspection & Testing Requirements Form 175-340200.

Safety Relief Valves shall be tested and inspected in accordance with Inspection &
SBK

Testing Requirements Form 175-341900.

Relief Valve Authorization and Test Report Record (SA-3099A) shall be submitted.

 STORAGE TANK
DESCRIPTION

Tank shall be tested and inspected in accordance with Inspection & Testing
Requirements Form 175-325100 or 175-325300 respectively.
10-14329-0003 ISSUED FOR REVIEW

 COMPLETE RUNNING TEST


Complete running test shall be conducted for package prior to shipping to ensure
that the package is designed and supplied properly for the functional operation as
required by the P&ID and datasheets.
JO/EWO

``

 FIELD TESTING
2-MAR-22
DATE

The following field testing will be conducted under presence of SUPPLIER


supervisor if required.
REV. NO.

DISCIPLINE • Performance Test


ENGINEER

SBK
As soon as possible after the installation is completed, a field performance test
DATE 2-MAR-22_
shall be conducted on each equipment. SUPPLIER shall present the test and
ENGINEERING verify taken data in an acceptable manner. The test should confirm, as a minimum,
MANAGER
that the equipment can meet the design rating of flow and pressure.
JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 52


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

APPENDIX 1 – DEFINITIONS
ENG’G CERT

MWK
SBK

The following words and expressions used in this Material Requisition have the meanings
given to the below:
 BUYER means HYUNDAI ENGINEERING CO., LTD. or HYUNDAI
ENGINEERING AND CONSTRUCTION CO., LTD.
 COMPANY means SAUDI ARABIAN OIL COMPANY (SAUDI ARAMCO).

DESCRIPTION

SUPPLIER/VENDOR means any person, firm, partnership, COMPANY,


corporation or combination thereof with whom BUYER has sent the RFQ
(Request for Quotation) or placed the PURCHASE ORDER.
 SUB-SUPPLIER means any person, firm, partnership, company, corporation
10-14329-0003 ISSUED FOR REVIEW

or combination thereof other than BUYER supplying GOODS or parts thereof


in connection with the PURCHASE ORDER to SUPPLIER.
 PURCHASE ORDER means the PURCHASE ORDER placed on SUPPLIER
by BUYER which shall incorporate Terms and Conditions of Purchase, the
Material Requisition, drawings, specifications and other documents referred to
JO/EWO

in the PURCHASE ORDER, and any written amendments thereto.


``

 GOODS mean all items and services to be provided whether expressly or by


implication under the Purchase Order.
2-MAR-22
DATE

 SDI (or VDR) – Supplier Document Index (or Vendor Data Register)
REV. NO.

 ITP – Inspection and Test Plan


A

DISCIPLINE
ENGINEER

SBK The following words and/or expression, unless otherwise specifically clarified, used in
DATE 2-MAR-22_ COMPANY documents and/or drawings shall be considered as follows.
ENGINEERING
MANAGER  Shall  Must
JHK
 Recommended  Mandatorily Required
DATE 2-MAR-22
CERTIFIED
 Preferred  Supplied or Applied
MWK
 SA means SAUDI ARAMCO
DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 53


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

APPENDIX 2 – DETAILED SCOPE OF SUPPLY


SBK

SUPPLIER shall supply the listed equipment items complete with all ancillary equipment
necessary to meet the conditions as defined in this Section and the Equipment Data
Sheets in Section 7.
The equipment shall perform all the duties as specified on the Equipment Data Sheets.
SUPPLIER shall also be responsible for providing / co-coordinating detail design of all
DESCRIPTION

equipment and components within the scope of supply, providing expediting services,
progress reports, organizing SUPPLIER and SUB-SUPPLIER co-ordination / kick-off /
design review meetings, resolving engineering questions relating to equipment within the
scope of supply and package interfaces.
10-14329-0003 ISSUED FOR REVIEW

SUPPLIER shall select SUB-SUPPLIERS for equipment and materials from COMPANY
Regulated Vendor List. SUPPLIER shall fill up his SUB-SUPPLIERS using Sub-Vendor
Listing & Manufacturing Method Statement and submit it for COMPANY’s prior approval.
SUPPLIER’s scope of supply shall include, but is not limited to, the following items
detailed in the tabulation:
JO/EWO

``

Item Description SUPPLIER


2-MAR-22
DATE

compliance
REV. NO.

1.0 Main components


A

DISCIPLINE
ENGINEER
1.1 Chemical Injection Packages shall include:
SBK

DATE 2-MAR-22_ 1.1.1 Produced Water Chemical Injection Package (861-U-


ENGINEERING
MANAGER
0403) consisting of the following injection skids;


JHK

DATE 2-MAR-22
Produced Water Chemical Injection Package
CERTIFIED skid 1- Biocide
MWK

DATE 2-MARN-22
 Produced Water Chemical Injection Package
skid 2- Corrosion inhibitor
CONSTRUCTION
AGENCY

________________
 Produced Water Chemical Injection Package
DATE ___________ skid 3- Oxygen Scavenger
OPERATIONS

________
 Produced Water Chemical Injection Package
DATE ___________
skid 4- Scale inhibitor
DATE _____________
CONTROL NUMBER

BY: ______________

1.1.2 Biocide Dosing Package (826-U-2301)


VERIFICATION
EDSD

1.1.3 Cooling Water System Chemical Injection Package


(861-U-2302) consisting of the following injection skids;

 Cooling water system chemical injection


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

package skid 1 - Oxygen scavenger


BY DRAWING COMPLETION CERTIFICATE

 Cooling water system chemical injection


MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 54


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

package skid 2 - Corrosion inhibitor

 Cooling water system chemical injection


package skid 3 - Sodium hypochlorite

 Cooling water system chemical injection


package skid 4 - Biocide
DESCRIPTION

 Cooling water system chemical injection


package skid 5 - Dispersant
10-14329-0003 ISSUED FOR REVIEW

 Cooling water system chemical injection


package skid 6 - Scale inhibitor

1.1.4 Hypochlorite Dosing Package (862-U-2902)

1.1.5 Gas Corrosion Inhibitor Injection Package (863-U-3001)


JO/EWO

``

1.1.6 Liquid Corrosion Inhibitor Injection Package (863-U-


3001)
2-MAR-22
DATE

1.1.7 Caustic Injection Package (869-U-1003/2003/3003)


REV. NO.

1.1.8 Antifoam Injection Package (869-U-1004/2004/3004)


DISCIPLINE
ENGINEER

SBK
1.1.9 BFW Chemical Dosing Package (869-U-
DATE 2-MAR-22_
1009/2009/3009) consisting of the following injection
ENGINEERING skids
MANAGER

JHK
 BFW Dosing chemical skid 1 – phosphate
DATE 2-MAR-22
CERTIFIED
Injection
MWK
 BFW Dosing chemical skid 2 - Oxygen
DATE 2-MARN-22
scavenger Injection
CONSTRUCTION
AGENCY
1.1.10 Ammonium Sulfate Dosing Package (869-U-
________________

DATE ___________
1010/2010/3010)
OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 55


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

1.2 Chemical Storage Tank (required for each skid) as per


32-SAMSS-002 or 32-SAMSS-030 included;

 One (1X100%) chemical storage tank for each


chemical injection skid

 Two (2X100%) for chemical storage tanks for


DESCRIPTION

Produced Water Chemical Injection Package


skid 1- Biocide

 nozzles for chemical outlet to pump, vent, drain,


10-14329-0003 ISSUED FOR REVIEW

chemical loading & dilution, Overflow, N2


Purging, manhole, instruments etc.

 N2 blanket system for item no. 862-U-2301, 862-


U-2902, 869-U-1010/ 2010/3010.
JO/EWO

 Pressure control valves at up/downstream, PG,


``

PSV, isolation valve and bird screen at ATM


vent line.
2-MAR-22
DATE

 The seal loop type overflow line


REV. NO.

DISCIPLINE
ENGINEER
 Level gauge selected in accordance with SAES-
J-100
SBK


DATE 2-MAR-22_
ENGINEERING
Temperature gauge for each tank
MANAGER

JHK  Level transmitter (for Low and high alarms)


DATE 2-MAR-22
CERTIFIED
 Platform, ladders c/w cages and/or steps,
MWK handrails
DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 56


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

1.3 Positive displacement dosing pumps as per SAES-G-006,


31-SAMSS-009, equipment datasheets and API 675 third
edition including associated accessories:

 Electric motor in accordance with 17-SAMSS-


503 and IEEE 841
DESCRIPTION

 Variable speed motor in accordance with 17-


SAMSS-503 and IEEE 841 (For 863-U-3001 /
863-U-3002)
10-14329-0003 ISSUED FOR REVIEW

 Coupling and non-sparking coupling guard with


inspection cover

 Calibration pot with vent routed back to storage


tank.
JO/EWO

``

 Suction / Discharge pulsation dampers as per


para 3.6.1 of 31-SAMSS-009
2-MAR-22
DATE

 Diaphragm rupture detector unit (detector +


REV. NO.

pressure transmitter)
A


DISCIPLINE
ENGINEER Remote electronic automatic adjustable length
SBK
stroke controller (remote / local)
DATE 2-MAR-22_
ENGINEERING
MANAGER
 Back pressure valves, if required
JHK
 Suction strainer for positive displacement dosing
DATE 2-MAR-22
CERTIFIED
pump inlet (Y type, flanged with blow off valve)
MWK
 Pressure relief valves on pump discharges with
DATE 2-MARN-22
lines routed back to the storage tank
CONSTRUCTION


AGENCY

________________
Pressure gauges on each pump discharge
DATE ___________

OPERATIONS
 Sight glasses and flow metering/monitoring
device on each common discharge
________


DATE ___________
Pressure transmitter and flow transmitter on
DATE _____________
CONTROL NUMBER

BY: ______________

common discharge manifold based on P&ID


VERIFICATION
EDSD

 Check valves on each pump discharges

 Suction and discharge manifolds


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 57


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

1.4 Agitator for below chemical injection packages;

 869-U-1003/2003/3003 Caustic Injection


Package

 869-U-1004/2004/3004 Antifoam Injection


Package
DESCRIPTION

 869-U-1009/2009/3009 BFW Chemical Dosing


Package
10-14329-0003 ISSUED FOR REVIEW

 869-U-1010/2010/3010 Ammonium Sulfate


Dosing Package

 862-U-2301 Biocide Dosing Package


JO/EWO

862-U-2302 Cooling Water System Chemical


Injection Package
``

 Wherever, if required
2-MAR-22
DATE
REV. NO.

DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 58


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

1.5 Structural steel base frame completed with:

 Mechanical, electrical, instrumentation & control


equipment necessary for safe reliable operation
and control of equipment

 Interconnecting piping and valves between all


DESCRIPTION

equipment items

 Drain and drain connections with a common


header at skid edge
10-14329-0003 ISSUED FOR REVIEW

 Flanged piping terminations including vent and


drain nozzles to ASME B16.5

 All bolting and gaskets for flanges within the


JO/EWO

package scope of supply.


``

 Spectacle blind flanges as per isolation


philosophy
2-MAR-22
DATE

 Supports for all on-skid equipment, piping and


REV. NO.

instrumentation
A

DISCIPLINE
ENGINEER
 Grounding (earthing) bosses, diagonally
SBK
positioned & wiring throughout inclusive of cable
DATE 2-MAR-22_
ENGINEERING
glanding and lugs
MANAGER

JHK  Lifting lugs on skids and equipment


DATE 2-MAR-22
CERTIFIED
 Stairways, platforms, stairs, ladders and
MWK handrails to provide access for operation, and
DATE 2-MARN-22 maintenance (if necessary)
CONSTRUCTION
AGENCY  Foundation bolts/nuts/washer (only design) as
________________
per project standard drawing
DATE ___________

OPERATIONS
 Overall sunshade (removable type) for all
________ chemical injection packages
DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 59


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

1.6 Chemical transfer pumps, one for each chemical as per


Datasheet;

(Air operation type)

 vertical orientation and air operating type.


DESCRIPTION

 Filter / regulator / lubricator for the air line

 Exhaust muffler
10-14329-0003 ISSUED FOR REVIEW

 Earthing cable on a reel with clamp for


attachment to a suitable local earthing /
grounding point.

 Flexible Suction and Discharge hoses.


JO/EWO

1.7 Package Local Panel with


``

 Pump Start / Stop Bush Button


2-MAR-22
DATE

 Emergency Stop
REV. NO.

DISCIPLINE
ENGINEER
 Pump Selector Switch and Running Status
Indication Lamp
SBK


DATE 2-MAR-22_
ENGINEERING
Local / Remote Selector Switch
MANAGER

JHK 1.8 Junction box located at skid edge


DATE 2-MAR-22
CERTIFIED
1.9 All required field instrumentation wired to skid edge
MWK

DATE 2-MARN-22
junction box for wiring to the DCS (wiring from junction box
to DCS by others).
CONSTRUCTION
AGENCY

________________ 1.10 ASME “U” stamping for pressure retaining


DATE ___________
equipment/vessels.
OPERATIONS

________ 1.11 Cleaning and drying of all pressure containing parts after
DATE ___________
hydrostatic test at shop as per code and specifications
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

1.12 PWHT for stress relieve as per code and standard, if


EDSD

required

1.13 PMI (Positive Material Identification) procedure and report


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

for alloy steel


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

1.14 Hydrostatic test for all pressure containing parts and piping
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 60


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

1.15 All vent and drain piping & valves, manifolded, fully
supported and brought to a skid edge flange.

1.16 Stainless steel shims for mounting of main equipment


items are required.

1.17 Stainless steel nameplates, to be mechanically affixed


DESCRIPTION

with etched lettering.

1.18 All on-skid cable trays.


10-14329-0003 ISSUED FOR REVIEW

1.19 Pickling & passivation for stainless steel welded parts


and acid cleaning only for stainless steel part as per
ASTM A380

1.20 Packaging and shipment materials required for transmit


of the equipment from Vendor facility to site and for long
JO/EWO

term storage at site for the duration as specified in


``

section 6.10.
2-MAR-22
DATE

1.21 Special tools. The Vendor shall provide all special tools
that are Vendor specific design and that
REV. NO.

CONTRACTOR could not obtain from other sources are


A

DISCIPLINE required for installation, testing, pre-commissioning,


ENGINEER
commissioning, operation, scheduled and un-scheduled
SBK maintenance. As a minimum:
DATE 2-MAR-22_
ENGINEERING
MANAGER 1.22 All Vendor documentation as specified in Appendix 4.
JHK

DATE 2-MAR-22
1.23 Lifting equipment quotation as per section 6.6.
CERTIFIED

MWK
Note; OPTIONAL QUOTE ITEM
DATE 2-MARN-22
1.24 Special lifting equipment quotation as per section 6.6.
CONSTRUCTION
AGENCY

________________ 2.0 Engineering services


DATE ___________

OPERATIONS
2.1 Performing / co-ordinating all calculations, simulations,
________
analysis etc. and providing all the documents / drawings
DATE ___________
as specified in this material requisition and all
referenced specifications and standards, and / or the
DATE _____________
CONTROL NUMBER

BY: ______________

equipment data sheets including process and


VERIFICATION

mechanical guarantees. This shall include all data for


EDSD

CONTRACTOR design of equipment foundations.


All mechanical data sheet shall be provided as per
Company format which will includes all kinds of material of
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

construction and information by SUPPLIER provided.


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 61


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

2.2 Providing BUYER with all the electrical & utility data to
enable BUYER to design and install electrical & utility
supplies to all consumers within SUPPLIER’s scope.

2.3 Providing CONTRACTOR with all the information


necessary to enable CONTRACTOR to design and
install foundations, holding down bolts etc.
DESCRIPTION

2.4 Providing CONTRACTOR with all skid edge piping


interface details.
10-14329-0003 ISSUED FOR REVIEW

2.5 Reviewing the CONTRACTOR’s designed start-up and


shut-down systems, protection systems and all
instrument integration aspects.

Any future participation in the relevant PCS acceptance


testing would be subject to separate day rates and is
JO/EWO

not covered by this requisition.


``

2.6 Reviewing mechanical handling study (produced by


2-MAR-22
DATE

others) to determine handling space and weight of


major components during installation and maintenance.
REV. NO.

This will enable CONTRACTOR to design lifting and


A

DISCIPLINE handling space and determine final plot space for easy
ENGINEER
access during installation and maintenance.
SBK

DATE 2-MAR-22_ 2.7 Co-ordinating all the required activities with the relevant
ENGINEERING
MANAGER Sub-Vendors.
JHK

DATE 2-MAR-22
2.8 Performing all studies required by the COMPANY
CERTIFIED standards and specifications
MWK

DATE 2-MARN-22
2.9 Provide 3D model and participate in 30%, 60% and
90% model reviews.
CONSTRUCTION
AGENCY

________________ File format of the 3D models to be advised by the


DATE ___________ Vendor later.
OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 62


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

2.10 Attend and participate in the following meetings at


CONTRACTORs office:

 Kick-off meeting

 HAZOP review
DESCRIPTION

 SIL review

 Pre-inspection meetings
10-14329-0003 ISSUED FOR REVIEW

 Technical clarification meetings

 Constructability and maintenance reviews

 Safety reviews
JO/EWO

 Expediting meetings
``

 3D model reviews
2-MAR-22
DATE

2.11 Provide monthly reports to CONTRACTOR. Format and


REV. NO.

date of submission to be agreed during kick-off


A

DISCIPLINE meeting.
ENGINEER

SBK 2.12 Submitting equipment noise datasheets in COMPANY


DATE 2-MAR-22_
format SA-7305 for each equipment
ENGINEERING
MANAGER

JHK 2.13 Issue and maintain an up to date Vendor document


DATE 2-MAR-22 index (VDI) of submitted documents.
CERTIFIED

MWK 2.14 Keep an up to date correspondence log of all incoming


DATE 2-MARN-22 and outgoing correspondence between CONTRACTOR
and Vendor.
CONSTRUCTION
AGENCY

________________ 2.15 Co-ordinate and notify required inspection and testing


DATE ___________ activities.
OPERATIONS

________ 2.16 Provide completed information for Spare Parts Data


DATE ___________ Package in CONTRACTOR provided format.
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION

2.17 For Vendor document commenting, for each submitted


EDSD

document complete and update a comment log for


close out resolution of CONTRACTOR comments.

2.18 Provide details of proposal for field services as stated in


section 7.1.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 63


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

2.19 Provide details of proposal for operation and


maintenance training as stated in section 7.2.

2.20 All certificate including SASO certificates

3.0 Spare parts


DESCRIPTION

3.1 Pre-commissioning, commissioning and start-up


spares.

3.2 Operational spares (Option)


10-14329-0003 ISSUED FOR REVIEW

Spare Parts List for Operation shall be submitted and


approved by SUPPLIER.

3.3 Operational Materials (Consumable)


JO/EWO

Operating Materials such as first fill of Lube Oil and


``

Grease, and touch-up paint


2-MAR-22
DATE

3.4 Spare Parts Data Package (SPDP)


REV. NO.

SUPPLIER shall provide a spare part data package


A

DISCIPLINE
(SPDP) as specified in COMPANY Procedure SAEP-
ENGINEER
3101 Appendix C and D.
SBK

DATE 2-MAR-22_ Refer to Section 12.4 for full specification details.


ENGINEERING
MANAGER
4.0 Testing and Inspection
JHK

DATE 2-MAR-22
CERTIFIED 4.1 System and components testing, inspection and
preparation for shipping in accordance with the
MWK

DATE 2-MARN-22
Equipment Data Sheets, referenced Standards,
Specification and all the relevant COMPANY’s
CONSTRUCTION
AGENCY
inspection 175 Forms and enclosed in Section 9.
________________

DATE ___________
4.2 Positive Displacement Pump
OPERATIONS

________
4.2.1 The pumps shall be tested in accordance with API 675,
DATE ___________ Project Specifications, testing requirement form 175-
DATE _____________

311500, this Material Requisition and Equipment Data


CONTROL NUMBER

BY: ______________
VERIFICATION

Sheets.
EDSD

4.2.2 Witnessed pumps dismantling shall be conducted only in


the event of unsatisfactory performance and/or
APPROVAL/CERTIFICATION REQUIREMENTS,

mechanical running tests.


THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

4..3 Electric Motor

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 64


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Item Description SUPPLIER


ENG’G CERT

MWK

compliance
SBK

4.3.1 Motors shall be tested in accordance with IEEE 841


modified by 17-SAMSS-503, Inspection Form 175-
170200, Project Specifications, this Material Requisition,
technical Specification and Equipment Data Sheets.

4.4 Storage Tank


DESCRIPTION

4.4.1 Storage tank shall be tested and inspected in


accordance with 32-SAMSS-030 and 175-325100 or
10-14329-0003 ISSUED FOR REVIEW

32-SAMSS-002 and 175-325300; datasheets.

4.5 Miscellaneous Test

4.5.1 Positive material identification testing in accordance


with SAES-A-206
JO/EWO

``

4.5.2 Safety relief valves shall be tested and inspected in


accordance with inspection and testing requirements
2-MAR-22
DATE

form 175-341900.
REV. NO.

4.5.3 Instruments, local pushbutton station shall be tested


DISCIPLINE
ENGINEER
and inspected in accordance with inspection and testing
SBK
requirements form 175-340200.
DATE 2-MAR-22_
ENGINEERING
MANAGER 4.6 Inspection Access
JHK

DATE 2-MAR-22
Free access to the manufacturing plants for the
CERTIFIED
BUYER/COMPANY inspectors or nominated
MWK

DATE 2-MARN-22
representative.

CONSTRUCTION
AGENCY
4.7 Final Inspection
________________

DATE ___________ Final inspection of all equipment items at SUPPLIER or


OPERATIONS SUB-SUPPLIER facilities prior to shipment.
________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________

Exclusions
VERIFICATION
EDSD

The following are out of SUPPLIERs work scope unless otherwise stated in
this Material Requisition:

 Foundations and grouting


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Any off-skid piping between interconnecting skids


 Any off-skid electrical power cabling
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 65


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

 Cable glands for BUYER’s cables


ENG’G CERT

MWK

 Power cabling to off-skid panels and MCC


SBK

 Instrument cabling from skid to DCS


 Site installation
 Fire proofing
 Any area lighting
DESCRIPTION

10-14329-0003 ISSUED FOR REVIEW


JO/EWO

``
2-MAR-22
DATE
REV. NO.

DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 66


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

APPENDIX 3 – CLARIFICATION / EXCEPTION LIST


ENG’G CERT

MWK

SUPPLIER shall state list all clarifications and deviations from this Material Requisition
SBK

and referenced Standards, Specifications, Forms, Drawings and Codes in the following. If
no exception is taken from a specific document, then SUPPLIER is deemed by BUYER /
COMPANY to be in full compliance with that document.
If the bid is fully compliant, SUPPLIER shall submit the list marked “NO DEVIATIONS”.
No deviations from the requirements of this Material Requisition are allowed except those
DESCRIPTION

listed in the below table.

Document Description (Doc. No.):


BUYER
No Doc. No./ Category Original SUPPLIER SUPPLIER
10-14329-0003 ISSUED FOR REVIEW

Conclusion
. References (C or D) Requirements Proposed Reasoning /
Clarifications Justification
/ Deviations
1
2
JO/EWO

``

3
4
2-MAR-22
DATE

5
REV. NO.

DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED
The above list shall be submitted with the quotation, using the attached form in this
Material Requisition.
MWK

DATE 2-MARN-22
.

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 67


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENG’G CERT PMT OPRNS
THIS INDICATES THAT REV. NO. _____A_____ VERIFICATION

MWK
A 2-MAR-22 10-14329-0003 ISSUED FOR REVIEW SBK MWK

JHK
OF THIS DRAWING IS COVERED, FOR ALL

SBK
APPROVAL/CERTIFICATION REQUIREMENTS, CONTROL NUMBER

AGENCY

________
DATE 2-MAR-22
MANAGER
ENGINEER

CERTIFIED
DISCIPLINE

DATE 2-MAR-22_
BY DRAWING COMPLETION CERTIFICATE BY: ______________

DATE 2-MARN-22

OPERATIONS
ENGINEERING

CONSTRUCTION

DATE ___________
DATE ___________
________________
(DCC)NO. _______________________________
DATE _____________

``

JAFUARAH
Saudi Aramco 2616-ENG (10/2002)

MATERIAL REQUISITION

CHEMICAL INJECTION PACKAGE

JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)


DOC
DWG.TYPE

SAUDI ARABIA
SECTION 11. QA/QC REQUIREMENT

861
PLANT .NO
Refer to the QA-QC Requirements attached in Section 11.

U
INDEX

2
SAUDI ARABIAN OIL COMPANY

JO / EWO: 10-14329-0003
DRAWING NO.

TE-419843

DOC CLASS: 2 DSN:


76
68
OF
SHT. NO.

A
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

SECTION 12. SPARE PARTS


SBK

SUPPLIER shall provide separate quotations and relevant list of spare parts
according to project requirements and definitions here below listed.

12.1 START-UP SPARE PARTS (BASE)


DESCRIPTION

Start-Up Spare Parts are parts or components required during construction, pre-
commissioning, and commissioning. SUPPLIER shall provide the Start-Up Spare
Parts associated with all SUPPLIER-furnished Materials. SUPPLIER shall provide
for BUYER / COMPANY’s Approval list with full details of Start-Up Spare Parts to
10-14329-0003 ISSUED FOR REVIEW

be provided by SUPPLIER at the time the Purchase Order is issued.

SUPPLIER shall provide the List of Start-Up Spare Parts with bid reply.
JO/EWO

12.2 OPERATING SPARE PARTS (OPTIONAL)


``

Operating Spare Parts are spare parts or components that are required for
continuous operation of the plant, equipment, or system after commissioning of the
2-MAR-22
DATE

equipment and capital spare parts, if any. SUPPLIER shall provide for BUYER /
COMPANY’s Approval all Operating Spare Parts required data as stated in SAEP-
REV. NO.

3101.
DISCIPLINE
ENGINEER
SUPPLIER shall provide the List of Operating Spare Parts with bid reply.
SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER
12.3 OPERATING MATERIALS (OPTIONAL)
JHK

DATE 2-MAR-22
CERTIFIED
Operating Materials are consumable materials that are required for the continuous
operation of the equipment and are consumed in the normal course of operations
MWK
and, therefore, require periodic replenishment. SUPPLIER shall supply all required
DATE 2-MARN-22
quantities of chemicals, filtration materials, lubricants, desiccants, industrial gases,
CONSTRUCTION emulsifiers, batteries, transformer oils, and any other catalysts, operating fluids,
AGENCY
consumable, and materials required for the initial charge, pre-commissioning and
________________

DATE ___________
Start-Up, and commissioning of the equipment. SUPPLIER shall also provide a
forecast of the initial charge and Start-Up quantities of all items referenced in this
OPERATIONS
Paragraph to BUYER. The forecast shall include quantities expected during Start-Up
________
and normal maximum and minimum operating conditions as well as during summer
DATE ___________
and winter operating conditions, and any other limiting conditions.
DATE _____________
CONTROL NUMBER

BY: ______________

SUPPLIER shall provide the List of Operating Materials with bid reply.
VERIFICATION
EDSD

12.4 SPARE PARTS DATA PACKAGE (SPDP)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

The followings cover the Spare Parts Data Package requirements.


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SUPPLIER shall comply with SPDP requirements as per SAEP-3101 Appendix C& D.

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 69


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

a) SAEP-3101 : Equipment and Spare Parts Data Requirements


ENG’G CERT

MWK

b) SAEP-3101 Appendix C : Instruction to SUPPLIER for providing spare parts and


SBK

operating materials data for new equipment purchased by BUYER / COMPANY.


c) SAEP-3101 Appendix D : Spare Parts Data Package (SPDP) Check List
SUPPLIER shall prepare and submit SPDP packages to BUYER by the agreed
Delivery Date which is 1) Same delivery date as NMR 602 or 2) Prior to Shipment
of Equipment.

SUPPLIER shall be responsible and shall ensure that the requirements of SAEP-
DESCRIPTION

3101, Appendix C & D are passed to SUB-SUPPLIERS and included in the PO for
SUB-SUPPLIER compliance. SUPPLIER shall be informed of COMPANY lessons
learned where most of the delays in the final approval of SPDP packages are due
to:
10-14329-0003 ISSUED FOR REVIEW

1. SUB-SUPPLIERS’ lack of urgency and attention to detail


2. SUB-SUPPLIERS’ failure to follow the instruction of the SAEP-3101 Appendix
C and D in terms of timely submittals, packaging formatting, and supporting
documentation, specifically;
JO/EWO

a) Late submittals past the delivery date agreed


``

b) Missing, incomplete and/or erroneous documents


c) Documents not in final certified and/or IFC status
2-MAR-22
DATE

SUPPLIER is encouraged to add REMEDIES to the SUB-SUPPLIER’s PO for late


REV. NO.

delivery of SPDP and ensure that final payment is linked to the final submittal and
A

DISCIPLINE approval of the SUB-SUPPLIER data requirements. Moreover, BUYER may


ENGINEER
invoke any additional REMEDY or a combination thereof in the event the SPDP
SBK Package approval is late, due to SUPPLIER and/or SUB-SUPPLIER failure to
DATE 2-MAR-22_
meet requirements, and as a direct result the pre-Mechanical Completion work
ENGINEERING
MANAGER activities during construction are subsequently delayed which create additional
JHK
cost, expenses and liabilities for the COMPANY.
DATE 2-MAR-22
CERTIFIED

MWK
12.5 SPECIAL TOOLS
DATE 2-MARN-22
SUPPLIER shall provide any special tools required for installation, field-testing,
CONSTRUCTION
AGENCY
commissioning, operation or maintenance / overhauling of the whole equipment
________________
supplied, including all auxiliaries, if required.
DATE ___________
SUPPLIER shall provide the List of Special Tools with bid reply. If any category
OPERATIONS
doesn’t apply, SUPPLIER shall provide the confirmation statement.
________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 70


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

SECTION 13. NON MATERIAL REQUIREMENT


SBK

13.1 NON MATERIAL REQUIREMENT

This section defines the scope of documentation and issue purpose for documents
to be provided by SUPPLIER as a minimum.
SUPPLIER shall provide all documentation listed in VDR attached in folder
DESCRIPTION

‘Section 13’ and as required by COMPANY’s NMR (Non Material Requirements)


Forms - refer to Section 9.6.
The drawings and documentation shall be prepared in accordance with “Instruction
10-14329-0003 ISSUED FOR REVIEW

for Vendor Data (JUS&ICS-PM-PD-1002)” attached as a project specification for


SUPPLIER’s compliance.
SUPPLIER document shall be in accordance with COMPANY’s NMR, Technical
Specification, BUYER’s requirement and all applicable international standards.
SUPPLIER shall submit VDR list for BUYER’s review and approval. The VDR list
shall be mutually agreed and finalized between SUPPLIER and BUYER.
JO/EWO

SUPPLIER shall properly check and confirm Calendar Weeks stated in Non
``

Material Requirements attached in section 9 filled by BUYER and submit it in his


Quotation.
2-MAR-22
DATE
REV. NO.

DISCIPLINE
13.2 DRAWING AND DOCUMENTS REQUIREMENT
ENGINEER

SBK SUPPLIER shall supply all necessary drawings, calculations and procedures in the
DATE 2-MAR-22_ quantities specified in SUPPLIER DOCUMENT REQUIREMENTS SCHEDULE.
ENGINEERING
MANAGER
The following documents shall be submitted with the quotation, as a minimum:
JHK

DATE 2-MAR-22
- Deviation & Clarification List
CERTIFIED
- Experience List for similar service
MWK

DATE 2-MARN-22
- Equipment Leaflet / Catalogue
- Equipment List with Specification including Auxiliary Items
CONSTRUCTION
AGENCY

________________
- Equipment Data Sheets and Performance Curve including Auxiliary Equipment
DATE ___________
- General Arrangement Drawing including Loading Data and Nozzle Location
OPERATIONS
- Package Layout Drawing (Plot Plan), if required
________

DATE ___________ - Piping and Instrument Diagram & Process Flow Diagram
DATE _____________
CONTROL NUMBER

BY: ______________

- Process description & process control philosophy


VERIFICATION
EDSD

- Utility Consumption List


- Electrical Load List
- Start-up Spare Parts List
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

- Operating Spare Parts List


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

- Operating Material List

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 71


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

- Capital Spare Parts List


ENG’G CERT

MWK

- Special Tool List


SBK

- Quality Assurance Plan


- Inspection and Test Plan (ITP)
- Instruction for Handling, Transportation and Long Term Preservation
- Installation, Operation and Maintenance Manual
- Project Risk Management Plan
DESCRIPTION

- VDR list with NMR


- Manufacturing and fabrication & assembly, delivery schedule
- Sub-Vendor Listing and Manufacturing Method Statement (Refer to Sec.8)
10-14329-0003 ISSUED FOR REVIEW

13.3 SUPPLIER DOCUMENT

SUPPLIER shall provide all documentation listed in SUPPLIER DOCUMENT


JO/EWO

REQUIREMENTS SCHEDULE attached in folder ‘Section 13’.


``

SUPPLIER shall comply with the specific instructions specified in BUYER’s


“Instruction for Vendor Data (JUS&ICS-PM-PD-1002)” which is attached to this MR
2-MAR-22
DATE

for SUPPLIER’s compliance.


REV. NO.

Specifically, for an MR with a SAID-Dummy PO number which will be given by


A

Company shall be reflected in the respective drawings/documents.


DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 72


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

SECTION 14. NOTE TO SUPPLIER


SBK

 All literature, documentation, correspondence and other printed matter pertaining to


this Material Requisition shall be in the English language and pages shall be standard
8.5 x 11 inch for binding.

 NMR 603 requirements are to be delivered to BUYER immediately either shipped or


DESCRIPTION

mailed separately from GOODS after final inspection of GOODS.

 All drawings, datasheets, certificates, etc., supplied by SUPPLIER shall show the
following information:
10-14329-0003 ISSUED FOR REVIEW

BUYER’s Name
BUYER’s PURCAHSE ORDER Number
BUYER’s Line Item Number
BUYER’s Job Order Number
BUYER’s Plant Number
JO/EWO

BUYER’s Equipment Tag Number


``

BUYER’s Equipment Service Name


SUPPLIER’s Order Number
2-MAR-22

SUPPLIER’s Name and Address


DATE

SUPPLIER’s Document Number


REV. NO.

DISCIPLINE
 All drawings larger than 8.5 x 11 inch shall be folded and inserted in individual 8.5 x
ENGINEER 11 inch Manila pockets which shall have standard three-ring side punching for
SBK insertion in the binders. Binders shall be three-ring type and lettered to how the
DATE 2-MAR-22_ project title and location.
ENGINEERING
MANAGER
 SUPPLIER shall prepare a transmittal cover letter identifying all NMR submissions to
JHK
BUYER with the following: Identifying NMR Sub-Item Number of the attached NMR
DATE 2-MAR-22
CERTIFIED
form(s) (i.e. 601.1; 602.1; 603.1 and etc.). Also Provide the NMR form number and
title and the number of copies. Failure to comply with this basic requirement shall
represent a “SUPPLIER’s error” and a “delivery delay” and shall be subject to
MWK

DATE 2-MARN-22
Remedies as advised by BUYER.
CONSTRUCTION
AGENCY

________________
 In case of any conflict between the requirements of this Material Requisition and the
DATE ___________
attached specifications or data sheet(s), such information shall be immediately
brought to BUYER’s attention for resolution.
OPERATIONS

________
 SUPPLIER shall submit to BUYER a proposed fabrication schedule within fifteen (15)
DATE ___________
working days after the award of PURCHASE ORDER. This schedule shall be subject
DATE _____________

to BUYER’s approval.
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

 The items included in this Material Requisition are subject to inspection by BUYER’s
inspector or his designated representative in accordance with inspection
requirements form(s) SA-175.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

 SUPPLIER shall notify BUYER at least fifteen (15) days before the material is ready
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

for final inspection. The material shall not be shipped until an inspection release has
been obtained, indicating that the material complies with all applicable specifications.
MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 73


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

 SUPPLIER shall mark each shipping crate with PURCHASE ORDER number, and
ENG’G CERT

MWK

line item number(s), using 50.8mm(2inch) high painted letters. Materials shall also be
marked with PURCHASE ORDER number/line item number(s).
SBK

 Any design changes necessary or desired by SUPPLIER which will affect this this
Material Requisition and/or specifications, drawings, etc. shall be brought to the
BUYER’s attention for his written approval prior to proceeding with the work.

 SUPPLIER shall provide qualified engineers to provide technical assistance and


oversight during the installation, commissioning and site acceptance testing of this
DESCRIPTION

equipment. SUPPLIER shall ensure their company representative(s) are able to


obtain entry visas into the kingdom of Saudi Arabia according along with his bid using
an hourly/daily rate plus reimbursable expenses.

 SUPPLIER shall provide certified/stamped as built drawings in full compliance with


10-14329-0003 ISSUED FOR REVIEW

the Contractor’s Vendor Data Submittal Procedure and the specific marking/stamping
requirements of the NMR 602 technical specification form.

 SUPPLIER is required to submit Spare Parts Data Package (SPDP), as per Section
12 of this MR and as per SAEP-3101, appendix C and D.
JO/EWO

 SUPPLIER shall include in his quote the prices of all the Spare Parts.
``

 SUPPLIER shall provide original manufacturer source information for all materials
2-MAR-22
DATE

and spare parts supplied on each PURCHASE ORDER including, but not limit to,
manufacturer’s name, address, sales order number, sales contact name, telephone
REV. NO.

number, fax number and e-mail address.


A

DISCIPLINE
ENGINEER
 Spare parts shall be separately packed with marking. Spare Parts check and
SBK
verification shall be part of the final Packing/Crating inspection to ensure compliance
DATE 2-MAR-22_
ENGINEERING
prior to shipment of materials.
MANAGER

JHK  Nonmaterial Requirement (NMR item 601,602 and 603 on SAUDI ARAMCO 7900
DATE 2-MAR-22 series Forms) are an integral Part of this requirement as are the complete spare parts
CERTIFIED
package as such, notwithstanding the terms of payment provisions in the applicable
MWK conditions of PURCHASE ORDER price may be withheld until all non-material
DATE 2-MARN-22 requirements and spare parts data packages are delivered and accepted by BUYER.
CONSTRUCTION
AGENCY  Material delivery shall not be considered complete until two (2) complete original sets
________________ and one (1) electronic copy of SUPPLIER’s Equipment Operating Instructions and
DATE ___________ Equipment Maintenance Manuals have been transmitted to BUYER and receipt of
OPERATIONS instructions and Manuals has been acknowledge by BUYER.
________

DATE ___________  All correspondence, specification, drawing, or other papers pertaining to procurement
shall bear the following reference:
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

- Name of FACILITES and location

- Symbol or code of FACILITIES

- BUYER’s Quotation request or PURCHASE ORDER number


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

- Equipment plant tag number, if any

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 74


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

- COMPANY Contractor number


ENG’G CERT

MWK

- Corresponding SAUDI ARAMCO Order Number


SBK

 Minimum mandatory requirements for RBI/OSI :


- SUPPLIER to submit Safety Instruction Sheet using SA form in SAES-A-005 in
detail engineering for all static equipment including package inside sub-items.
- SUPPLIER to submit Safety Instruction Sheet using SA form in SAES-L-125 in detail
engineering for all piping of package.
DESCRIPTION

- SUPPLIER to perform initial thickness measurement for CMLs based on SAES-A-


135 for all static equipment and piping including package inside sub-items in
compliance with SAEP-1140, SAEP-1142, SAEP-1146.
10-14329-0003 ISSUED FOR REVIEW

- SUPPLIER to submit equipment OSI drawing containing simplified equipment


drawing, CML location and initial thickness measurement value for all static
equipment including package inside sub-items in PDF files and Microstation (with
Autosacs) files.
- SUPPLIER to submit piping OSI drawing containing simplified piping ISO drawing,
CML location and initial thickness measurement value for all piping of package in
JO/EWO

PDF files and Microstation (with Autosacs) files. (Drawing template and Microstation
``

(with AutoSacs) border file will be informed later.)


2-MAR-22

 WARRANTY PASS-THRU STATEMENT


DATE
REV. NO.

SUPPLIER and BUYER understand that BUYER is contracting with SUPPLIER for
A

DISCIPLINE
the purchase of goods hereunder for ultimate transfer to, and use by, the Saudi
ENGINEER Arabian Oil Company (SAUDI ARAMCO) or its designee in Saudi Arabia. Therefore,
SBK SUPPLIER agrees that, in any event, all rights of BUYER for any failure to meet
DATE 2-MAR-22_ specifications or for any other breach of warranty shall run to the benefit of and be
ENGINEERING
MANAGER
fully enforceable by SAUDI ARAMCO.
JHK
Standard Warranty: period and terms i.e. 12 months from Operations or 18 months
DATE 2-MAR-22
CERTIFIED
from delivery. Also SUPPLIER shall indicate the start and end dates for standard
warranty.
MWK

DATE 2-MARN-22
PREMIUM WARRANTY - (Contract Schedule A, paragraph 10.4) SUPPLIER shall
CONSTRUCTION indicate if they provide PREMIUM WARRANTY to cover the period beyond
CONTACTOR’s Warranty obligations (MCC + 12 months). SUPPLIER shall provide
AGENCY

________________

DATE ___________
premium warranty period and term and cost to BUYER for COMPANY approval.

 Prior to order placement, SUPPLIER’s plant capacity shall be clearly validated to


OPERATIONS

________
avoid confusion and ensure transparency.
DATE ___________

 SUPPLIER shall provide the following as optional price.


DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

a) Pricing for training sessions to be held in the Kingdom of Saudi Arabia.

b) Pricing for trainers to work In Kingdom.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________

c) Pricing for specific training courses outside the Kingdom of Saudi Arabia
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 75


861 U TE-419843
JFGP2 - UTILITIES, SULFUR & INTERCONNECTING SYSTEMS (PKG 3)
OF A
76
JAFUARAH SAUDI ARABIA JO / EWO: 10-14329-0003
DOC CLASS: 2 DSN:
2
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENG’G CERT

MWK

SECTION 15. PACKING SPECIFICATION


SBK

SUPPLIER shall ensure that all equipment and materials are designed and packed for transit
to site without damage and in accordance with the requirements of the documents listed in
Section 8.
SUPPLIER shall refer to packing specifications as follows;
Document No. Description Rev
DESCRIPTION

JUS&ICS-PM-PD-4511 Packing and Shipping Procedure A1


10-14329-0003 ISSUED FOR REVIEW
JO/EWO

``
2-MAR-22
DATE
REV. NO.

DISCIPLINE
ENGINEER

SBK

DATE 2-MAR-22_
ENGINEERING
MANAGER

JHK

DATE 2-MAR-22
CERTIFIED

MWK

DATE 2-MARN-22

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________

DATE ___________
DATE _____________
CONTROL NUMBER

BY: ______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _____A_____

(DCC)NO. _______________________________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MATERIAL REQUISITION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

CHEMICAL INJECTION PACKAGE DOC 76