Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Tabunan Integrated school

Finding:

1. The internet connections of the school is very slow and the students cannot do research as
well as the teachers find it hard to connect.
2. There is no enough space for sports and cultural development
3. Electric meter replacement
4. Electric fans left unattended and series switch system
5. Increasing electric bills
6. Stray dogs inside school vicinity
7. No school evacuation plan
8. There is no evacuation area
9. The school is vulnerable to landslides
10. None compliance of Comprehensive School Safety

Recommendations:

1. The team recommend to find another internet provider to solve the problem
2. The team recommends to find areas suitable and spacious for sports and cultural
development
3. We recommend to write a letter to VECO
4. Give importance on austerity measures abolish the series switch system
5. LED lights must be used for the classroom lights
6. Dogs must be removed and start to construct perimeter fence
7. The school should have evacuation plan displayed
8. The school should find evacuation area for the safety and security of the students
9. Invite experts to check the area
10. CSS monitoring tool must be accomplished

You might also like