REPORT OF INSPECTION

DISCHARGING SUPERVISION

FOR

PT. INDOCHEMICAL CITRA KIMIA

MT. NAN LIAN 19 VOY: 2321

ETHYL ACETATE

AT JETTY OF PT. POLYCHEM LINDO BULK TANK TERMINAL


MERAK - BANTEN

REPORT NO. PET-2301JKT.849


PERIOD : OCTOBER 16 - 17, 2023

BY:
PT. TRIBHAKTI INSPEKTAMA
OCTOBER 2023
REPORT OF INSPECTION
DISCHARGING SUPERVISION

THIS IS TO REPORT THAT, upon the request of PT. INDOCHEMICAL CITRA KIMIA the
assigned surveyor of PT. TRIBHAKTI INSPEKTAMA, did attend on October 16 - 17, 2023 at
bulk Chemical terminal installation of PT. POLYCHEM LINDO BULK TANK TERMINAL,
Merak - Banten, Indonesia and subsequently on board of MT. NAN LIAN 19 VOY NO : 2321
on October 16 - 17, 2023 to conduct quantity superintending of the discharging.

A. INTRODUCTION
Representing : PT. INDOCHEMICAL CITRA KIMIA
Appointment Ref. : Email dated on OCTOBER 14, 2023
Description of Goods : Ethyl Acetate in Bulk
BL Quantity : 1,909.984 MT
Vessel Name/ Voyage No : “MT. NAN LIAN 19 V: 2321”
Ships Tank Nomination : 2 P/S, 5 P/S
Jetty : PT. POLYCHEM LINDO BULK TANK TERMINAL
Shore Tank Nomination : T.215
Date of Inspection : October 16 - 17, 2023
O.B.Q : Nil & dry / No found free water
Draft : Arrival FWD 5.40 M and AFT 6.20 M
Departure FWD 5.30 M and AFT 6.50 M

B. TIME LOG
ACTIVITY MONTH TIME
Vessel Arrived OCTOBER 16, 2023 06.35
Notice of Readiness tendered OCTOBER 16, 2023 06.35
Dropped Anchor OCTOBER 16, 2023 06.35
Free Pratique Granted OCTOBER 16, 2023 -
Anchor Aweigh OCTOBER 16, 2023 -
Pilot On Board OCTOBER 16, 2023 16.20
First Line Ashore OCTOBER 16, 2023 17.00
All Made Fast OCTOBER 16, 2023 17.15
Gangway Down OCTOBER 16, 2023 17.20
Surveyor on Board OCTOBER 16, 2023 17.25
Safety & Key Meeting OCTOBER 16, 2023 17.25 - 17.50
Ullaging/Sampling OCTOBER 16, 2023 17.50 - 18.50
Figure / Calculation OCTOBER 16, 2023 17.50 - 18.50
Notice of Readiness Accepted OCTOBER 16, 2023 18.40
Hose Connected OCTOBER 16, 2023 18.40
Commenced Discharged OCTOBER 16, 2023 19.00
Completed Discharged OCTOBER 17, 2023 05.10
Tank Inspection OCTOBER 17, 2023 05.10 - 05.20
Line Blowing OCTOBER 17, 2023 05.20 - 05.25
Hose Disconnected OCTOBER 17, 2023 05.40
Documents Completed OCTOBER 17, 2023 06.00
Surveyor Leave OCTOBER 17, 2023 06.15
Vessel Unberth OCTOBER 17, 2023 07.30

Page | 1
C. PARTICULARS TIME AND PLACE OF DISCHARGING
The cargo was pumped out from ships tank no. 2 P/S, 5 P/S from MT. NAN LIAN 19
V:2321 at PT. POLYCHEM LINDO BULK TANK TERMINAL, Merak - Banten, Indonesia
by means of ships manifold of Commond lines connected to nominated shores cargo tanks
No. T-215 on October 16 - 17, 2023.

D. SUMMARY QUANTITY
Kilo liter Kilo liter US Bbls Metric Long
Description
Observed @15oC @60oF Tons Tons
Loading Ratio, R1
BL figure - - - 1,909.984 -
Ships Figure At Loading Port - - - 1,906.817 -
Ships Figure Before Discharge - - - 1,907.057 -
Shore Received - - - 1,900.746 -
Remark:

E. COMPARISON FIGURES
Kilo liter Kilo liter US Bbls Metric Long
Description
Observed @15 oC @ 60 oF Tons Tons
Loading Ratio, R1
BL figure Total - - - 1,909.984 -
Ships Figure At Loading Port - - - 1,906.817 -
Difference - - - -3.167 -
Percentage - - - -0.17 -
Voyage Losses, R2
Ships Figure At Loading Port - - - 1,906.817 -
Ship Figure Before Discharge - - - 1,907.057 -
Difference - - - +0.240 -
Percentage - - - +0.01 -
Discharge ratio, R3
Ship Figure Before Discharge - - - 1,907.057 -
Outturn Figure - - - 1,900.746 -
Difference - - - -6.311 -
Percentage - - - -0.33 -
Outturn Ratio, R4
BL figure - - - 1,909.984 -
Outturn Figure - - - 1,900.746 -
Difference - - - -9.238 -
Percentage - - - -0.48 -
Remark: -

F. PERTINENT DOCUMENTS

Page | 2
Loading port documents:
Terminal document
1. Bill Of Lading

Vessel document
1. Vessel’s Ullage/Sounding After Loading
2. Last 3 Cargo
3. Cargo Stowage Plan
4. Calibration Certificate
5. Ship’s Particulars

Surveyor document (SGS)


1. Ullage Report After Loading

Discharging port documents:


Surveyor document
1. Time Sheet
2. Ships Ullage / Sounding Report
3. Certificate Of Dryness
4. Notice Of Apparent Discrepancy B/L v.s SFBD
5. Shore Measurement
6. Notice Of Apparent Discrepancy B/L v.s AR
7. Shore Valve Sealing Report
8. Sample Report

Vessel document
1. Notice Of Readiness
2. Time Sheet
3. Vessel’s Ullage Report Before Unloading
4. Dry Certificate (After Unloading)

This inspection has been carried out to the best of our knowledge and ability where
responsibility is limited to the exercise of reasonable care.

Jakarta, October 19, 2023


Signed on behalf of
PT TRIBHAKTI INSPEKTAMA

JONIUS SIHOTANG
Inspection Manager

Page | 3