ELVIRA NOVA RIAVIANA (201910340311201)

ADHITYA HERMAWAN (201910340311203)

BAB V
PERENCANAAN
ALINYEMEN VERTIKAL

Tugas Besar Perencanaan Perkerasan Jalan 81


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

5.1 Perencanaan Alinyemen Vertikal


5.1.1 Lengkung Vertikal 1 Cekung

g0 = 0%
11, 00−10 , 00
g1 = x 100 %=¿0,19 %
530
A = [g1– g0] = [(0,19) –0] = 0,19 %
Syarat kenyamanan

- Jarak pandang henti

VR = 60 km/jam
Jh = 75 m
A ∙ Jh2 0 , 31 ∙752
Jh < Lv, Lv ¿ 2
= 2 = 4,37 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √2 ∙1 , 05+ √ 2 ∙0 , 15)
2 2
100( √ 2 ∙ h1+ √ 2 ∙ h2) 100( √ 2 ∙ 1, 05+ √ 2 ∙ 0 ,15)
Jh > Lv, Lv ¿ 2 ∙ Jh− =2∙ 75−
A 0 ,31
= - 1136,27 m (Diterima)

- Jarak pandang mendahului

VR = 60 km/jam
Jd = 350 m
2 2
A ∙ Jd 0 , 31 ∙350
Jd < Lv, Lv ¿ 2
= 2 = 45,21 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √ 2 ∙1 , 05+ √ 2 ∙1 , 05)

Tugas Besar Perencanaan Perkerasan Jalan 82


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

2 2
100( √ 2 ∙h 1+ √ 2∙ h 2) 100( √2 ∙1 , 05+ √ 2 ∙1 , 05)
Jd > Lv, Lv ¿ 2 ∙ Jd− =2∙ 350− =-
A 0 , 31
2009,68 m (Diterima)

Keluwesan bentuk
Lv = 0,6 x VR
= 0,6 x 60
= 36 m

Syarat Drainase
Lv = 40 x A
= 40 x 0,19
= 7,6 m
Diambil Lv = 36 m
A x Lv
EV =
800
0 ,19 x 36
=
800
= 0,008 m

 Elevasi dan Stasioning

 PVI = STA + 80
Elv. + 10,00
 PLV = STA = STA PVI – (½ . Lv)
= + 80 – (1/2 . 36)
= + 62
Elevasi= Elevasi PVI - g . (1/2 . Lv)

Tugas Besar Perencanaan Perkerasan Jalan 83


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

= + 10,00 + 0,19% (1/2 . 36)


= + 10,03
 S : STA = STA PVI = + 80
Elevasi= Elevasi PVI - EV
= + 10,00 - 0,008
= + 9,992
 PTV : STA = STA PVI + (½ Lv)
= + 80 + (½ . 36)
= + 98
Elevasi= Elevasi PVI - g (1/2 Lv)
= + 10,00 - 0,19% (1/2 . 36)
= + 9,966

5.1.2 Lengkung Vertikal 2 Cembung

11, 00−10 , 00
g1 = x 100 %=0 , 19 %
530
g2 =0%
A = [g2– g1] = [0 – (0,19)] = 0,19 %
Syarat kenyamanan
- Jarak pandang henti

VR = 60 km/jam
Jh = 75 m
2 2
A ∙ Jh 0 , 31 ∙75
Jh < Lv, Lv ¿ 2
= 2 = 4,37 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √ 2 ∙1 , 05+ √ 2 ∙0 , 15)

Tugas Besar Perencanaan Perkerasan Jalan 84


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

2 2
100( √ 2 ∙ h1+ √ 2 ∙ h2) 100( √ 2 ∙ 1, 05+ √ 2 ∙ 0 ,15)
Jh > Lv, Lv ¿ 2 ∙ Jh− =2∙ 75−
A 0 ,31
= - 1136,27 m (Diterima)

Keluwesan bentuk
Lv = 0,6 x VR
= 0,6 x 60
= 36 m
Syarat Drainase
Lv = 40 x A
= 40 x 0,19
= 9,6 m
Diambil Lv = 36 m
A x Lv
EV =
800
0 ,19 x 36
= = 0,008 m
800
 Elevasi dan Stasioning

 PVI = STA + 610


Elv. + 11

 PLV = STA = STA PVI – (½ . Lv)


= + 610 – (1/2 . 36)
= + 592
Elevasi= Elevasi PVI + g1 . (1/2 . Lv)
= + 11,00 + 0,19% (1/2 . 36)
= + 11,03

Tugas Besar Perencanaan Perkerasan Jalan 85


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

 S : STA = STA PVI = 1 + 180


Elevasi= Elevasi PVI + EV
= + 11,00 + 0,008
= + 11,008

 PTV : STA = STA PVI + (½ Lv)


= + 610 + (½ . 36)
= + 628
Elevasi= Elevasi PVI + g (1/2 Lv)
= + 11,00 – 0,19% (1/2 . 36)
= + 10,96
5.1.3 Lengkung Vertikal 3 Cembung

g2 = 0%
8 , 80−11
g3 = x 100 %=¿ - 5,5 %
40
A = [g3– g2] = [(-5,5) –0] = 5,5 %
Syarat kenyamanan

- Jarak pandang henti

Tugas Besar Perencanaan Perkerasan Jalan 86


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

VR = 60 km/jam
Jh = 75 m
2 2
A ∙ Jh 1 , 94 ∙75
Jh < Lv, Lv ¿ 2
= 2 = 27,37 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √ 2 ∙1 , 05+ √ 2 ∙0 , 15)

2 2
100( √ 2 ∙ h1+ √ 2 ∙ h2) 100( √ 2 ∙ 1, 05+ √ 2 ∙ 0 ,15)
Jh > Lv, Lv ¿ 2 ∙ Jh− =2∙ 75−
A 1 , 94
= - 55,54 m (Diterima)

- Jarak pandang mendahului

VR = 60 km/jam
Jd = 350 m
2 2
A ∙ Jd 1 , 94 ∙350
Jd < Lv, Lv ¿ 2
= 2 = 144,35 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √ 2 ∙1 , 05+ √ 2 ∙1 , 05)

2 2
100( √ 2 ∙h 1+ √ 2∙ h 2) 100( √ 2 ∙1 , 05+ √ 2 ∙1 , 05)
Jd > Lv, Lv ¿ 2 ∙ Jd− =2∙ 350−
A 1 , 94
= 267,01 m (Diterima)

Keluwesan bentuk
Lv = 0,6 x VR
= 0,6 x 60
= 36 m

Syarat Drainase
Lv = 40 x A
= 40 x 5,5
= 22 m
Diambil Lv = 36 m
A x Lv
EV =
800

Tugas Besar Perencanaan Perkerasan Jalan 87


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

5 ,5 x 36
=
800
= 0,25 m

 Elevasi dan Stasioning

 PVI = STA 1 + 110


Elv. + 11,00

 PLV = STA = STA PVI – (½ . Lv)


= 1 + 110 – (1/2 . 36)
= 1 + 92
Elevasi= Elevasi PVI - g . (1/2 . Lv)
= + 11,0 – 0% (1/2 . 36)
= + 11,0

 S : STA = STA PVI = 1 + 1110


Elevasi= Elevasi PVI - EV
= + 11,0 – 0,25
= + 10,75

 PTV : STA = STA PVI + (½ Lv)


= 1+ 110 + (½ . 36)
= 1 + 128
Elevasi= Elevasi PVI - g (1/2 Lv)

Tugas Besar Perencanaan Perkerasan Jalan 88


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

= + 8,80 – 5,5% (1/2 . 36)


= + 2,75

5.1.4 Lengkung Vertikal 4 Cembung

6−8 ,80
g3 = x 100 %=−5 , 6 %
50
g4 =-5,6%
A = [g4– g3] = [-5,6– (-5,5)] = 0,1 %

Syarat kenyamanan
- Jarak pandang henti

VR = 60 km/jam
Jh = 75 m
A ∙ Jh2 1 , 94 ∙75 2
Jh < Lv, Lv ¿ 2
= 2 = 27,37 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √2 ∙1 , 05+ √ 2 ∙0 , 15)

2 2
100( √2 ∙ h1+ √2 ∙ h2) 100( √2 ∙ 1, 05+ √2 ∙ 0 ,15)
Jh > Lv, Lv ¿ 2 ∙ Jh− =2∙ 75− = - 55,54
A 1 , 94
m (Diterima)

Keluwesan bentuk

Tugas Besar Perencanaan Perkerasan Jalan 89


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

Lv = 0,6 x VR
= 0,6 x 60
= 36 m
Syarat Drainase
Lv = 40 x A
= 40 x 0,1
=4m
Diambil Lv = 36 m

A x Lv
EV =
800
0 ,1 x 36
=
800
= 0,0045 m
 Elevasi dan Stasioning

 PVI = STA 1 + 150


Elv. + 8,80

 PLV = STA = STA PVI – (½ . Lv)


= 1 + 150 – (1/2 . 36)
= 1 + 132
Elevasi= Elevasi PVI + g . (1/2 . Lv)
= + 8,80 + 5,5% (1/2 . 36)
= + 9,79

 S : STA = STA PVI = 1 + 1150

Tugas Besar Perencanaan Perkerasan Jalan 90


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

Elevasi= Elevasi PVI + EV


= + 8,80 + 0,0045
= + 8,8045

 PTV : STA = STA PVI + (½ Lv)


= 1 + 150 + (½ . 36)
= 1 + 168
Elevasi= Elevasi PVI + g (1/2 Lv)
= + 6 + 5,6% (1/2 . 36)
= + 7,008
5.1.5 Lengkung Vertikal 5 Cekung

6 , 00−8 , 80
g4 = x 100 %=¿ -5,6 %
50
g5 = 0%
A = [g5– g4] = [(0) –(-5,6)] = 5,6%
Syarat kenyamanan
- Jarak pandang henti

VR = 50 km/jam
Jh = 55 m
2 2
A ∙ Jh 1 ∙75
Jh < Lv, Lv ¿ 2
= 2 = 14,11 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √ 2 ∙1 , 05+ √ 2 ∙0 , 15)

Tugas Besar Perencanaan Perkerasan Jalan 91


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

2 2
100( √2 ∙ h1+ √2 ∙ h2) 100( √2 ∙ 1, 05+ √2 ∙ 0 ,15)
Jh > Lv, Lv ¿ 2 ∙ Jh− =2∙ 75−
A 1
= - 248,75 m (Diterima)

Keluwesan bentuk
Lv = 0,6 x VR
= 0,6 x 60
= 36 m

Syarat Drainase
Lv = 40 x A
= 40 x 5,6
= 22,4 m
Diambil Lv = 36 m
A x Lv
EV =
800
5 ,6 x 36
=
800
= 0,25 m

 Elevasi dan Stasioning

 PVI = STA 1 + 200


Elv. + 6,00

 PLV = STA = STA PVI – (½ . Lv)


= 1 + 200 – (1/2 . 36)

Tugas Besar Perencanaan Perkerasan Jalan 92


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

= 1 + 182
Elevasi= Elevasi PVI - g . (1/2 . Lv)
= + 6,00 – 5,6% (1/2 . 36)
= + 4,99

 S : STA = STA PVI = 1 + 1200


Elevasi = Elevasi PVI - EV
= + 6,00 – 0,25
= + 5,75
 PTV : STA = STA PVI + (½ Lv)
= 1+ 200 + (½ . 36)
= 1 + 218
Elevasi= Elevasi PVI + g (1/2 Lv)
= + 6,00 +0% (1/2 . 36)
= + 6,00
5.1.6 Lengkung Vertikal 6 Cekung

g6 =0%
6 , 80−6 ,00
g7 = x 100 %=2 , 6 %
30
A = [g6– g5] = [2,6– (0)] = 2,6 %
Syarat kenyamanan

- Jarak pandang henti

Tugas Besar Perencanaan Perkerasan Jalan 93


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

VR = 60 km/jam
Jh = 75 m
2 2
A ∙ Jh 1 ∙75
Jh < Lv, Lv ¿ 2
= 2 = 14,11 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √ 2 ∙1 , 05+ √ 2 ∙0 , 15)

2 2
100( √ 2 ∙ h1+ √ 2 ∙ h2) 100( √ 2 ∙ 1, 05+ √ 2 ∙ 0 ,15)
Jh > Lv, Lv ¿ 2 ∙ Jh− =2∙ 75−
A 1
= - 248,75 m (Diterima)

- Jarak pandang mendahului

VR = 60 km/jam
Jd = 350 m
A ∙ Jd 2 1 ∙3502
Jd < Lv, Lv ¿ 2
= 2 = 145,83 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √2 ∙1 , 05+ √ 2 ∙1 , 05)
2 2
100( √ 2 ∙h 1+ √ 2∙ h 2) 100( √ 2 ∙1 , 05+ √ 2 ∙1 , 05)
Jd > Lv, Lv ¿ 2 ∙ Jd− =2∙ 350−
A 1
= − 140 m (Diterima)

Keluwesan bentuk
Lv = 0,6 x VR
= 0,6 x 60 = 36 m

Syarat Drainase
Lv = 40 x A
= 40 x 2,6 = 10,4 m
Diambil Lv = 36 m
A x Lv 2 ,6 x 36
EV = = = 0,12 m
800 800

Tugas Besar Perencanaan Perkerasan Jalan 94


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

 Elevasi dan Stasioning

 PVI = STA 1+220


Elv. + 6,00

 PLV = STA = STA PVI – (½ . Lv)


= 1 + 220 – (1/2 . 36)
= 1 + 212
Elevasi= Elevasi PVI - g . (1/2 . Lv)
= + 6,00 - 0% (1/2 . 36)
= + 6,00

 S : STA = STA PVI = 1 + 1220


Elevasi = Elevasi PVI + EV
= + 6,00 - 0,12
= + 5,88
 PTV : STA = STA PVI + (½ Lv)
= 1 + 220 + (½ . 36)
= 1 + 238
Elevasi= Elevasi PVI + g (1/2 Lv)
= + 6,00 + 2,6% (1/2 . 36)
= + 6,45

Tugas Besar Perencanaan Perkerasan Jalan 95


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

5.1.7 Lengkung Vertikal 7 Cekung

g7 = 2,6%
9 , 00−6 ,80
g8 = x 100 %=¿ 2,75 %
80
A = [g8– g7] = [(2,75) –2,6] = 0,15 %
Syarat kenyamanan
- Jarak pandang henti

VR = 60 km/jam
Jh = 75 m
A ∙ Jh2 0 , 61 ∙75 2
Jh < Lv, Lv ¿ 2
= 2 = 8,61 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √2 ∙1 , 05+ √ 2 ∙0 , 15)

2 2
100( √2 ∙ h1+ √2 ∙ h2) 100( √2 ∙ 1, 05+ √2 ∙ 0 ,15)
Jh > Lv, Lv ¿ 2 ∙ Jh− =2∙ 75−
A 0 ,61
= - 503,68 m (Diterima)

Keluwesan bentuk
Lv = 0,6 x VR
= 0,6 x 60
= 36 m

Tugas Besar Perencanaan Perkerasan Jalan 96


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

Syarat Drainase
Lv = 40 x A
= 40 0,15
=6m
Diambil Lv = 36 m
A x Lv
EV =
800
0 ,15 x 36
=
800
= 0,007m
 Elevasi dan Stasioning

 PVI = STA 1+ 250


Elv. + 6,80

 PLV = STA = STA PVI – (½ . Lv)


= 1+ 250 – (1/2 . 36)
= 1 + 132
Elevasi= Elevasi PVI + g . (1/2 . Lv)
= + 6,00 + 2,6% (1/2 . 36)
= + 6,47

 S : STA = STA PVI = 1 + 250


Elevasi= Elevasi PVI - EV
= + 6,00 – 0,027

Tugas Besar Perencanaan Perkerasan Jalan 97


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

= + 5,973

 PTV : STA = STA PVI + (½ Lv)


= 1 + 250 + (½ . 36)
= 1 + 268
Elevasi= Elevasi PVI + g (1/2 Lv)
= + 4,00 + 2,75% (1/2 . 36)
= + 4,49
5.1.8 Lengkung Vertikal 8 Cekung

g8 =2,75%
10−9
g9 = x 100 %=2 , 5 %
40
A = [g8– g9] = [2,75– (2,5)] = 0,25 %
Syarat kenyamanan

- Jarak pandang henti

VR = 60 km/jam
Jh = 75 m

Tugas Besar Perencanaan Perkerasan Jalan 98


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

A ∙ Jh2 0 , 61 ∙75 2
Jh < Lv, Lv ¿ 2
= 2 = 8,61 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √2 ∙1 , 05+ √ 2 ∙0 , 15)

2 2
100( √ 2 ∙ h1+ √ 2 ∙ h2) 100( √ 2 ∙ 1, 05+ √ 2 ∙ 0 ,15)
Jh > Lv, Lv ¿ 2 ∙ Jh− =2∙ 75−
A 0 ,61
= - 503,68m (Diterima)

- Jarak pandang mendahului

VR = 60 km/jam
Jd = 350 m
A ∙ Jd 2 0 , 61 ∙3502
Jd < Lv, Lv ¿ 2
= 2 = 45,39 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √2 ∙1 , 05+ √ 2 ∙1 , 05)

2 2
100( √ 2 ∙h 1+ √ 2∙ h 2) 100( √2 ∙1 , 05+ √ 2 ∙1 , 05)
Jd > Lv, Lv ¿ 2 ∙ Jd− =2∙ 350−
A 0 , 61
= −877,05 m (Diterima)

Keluwesan bentuk
Lv = 0,6 x VR
= 0,6 x 60
= 30 m

Syarat Drainase
Lv = 40 x A
= 40 x 0,25
= 10 m
Diambil Lv = 36 m

A x Lv
EV =
800
0 ,25 x 36
=
800

Tugas Besar Perencanaan Perkerasan Jalan 99


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

= 0,011 m

 Elevasi dan Stasioning

 PVI = STA 1 + 330


Elv. = + 9,00
 PLV = STA = STA PVI – (½ . Lv)
= 1 + 330 – (1/2 . 36)
= 1 + 312
Elevasi= Elevasi PVI - g . (1/2 . Lv)
= + 9,00 – 2,75% (1/2 . 36)
= + 8,5

 S : STA = STA PVI = 1 + 330


Elevasi= Elevasi PVI + EV
= + 9,00 - 0,011
= + 8,989

Tugas Besar Perencanaan Perkerasan Jalan 100


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

 PTV : STA = STA PVI + (½ Lv)


= 1 + 330 + (½ . 36)
= 1 + 348
Elevasi= Elevasi PVI + g (1/2 Lv)
= + 9,00 + 2,5% (1/2 . 36)
= + 9,45

5.1.9 Lengkung Vertikal 9 Cembung

g9 =2,5%
10 ,00−9 , 00
g10 = x 100 %=0 , 45 %
220
A = |g9 – g10| = |2,5 – 0,45| = 2,05 %
Syarat kenyamanan
- Jarak pandang henti

VR = 60 km/jam
Jh = 75 m
2 2
A ∙ Jh 1 , 15 ∙75
Jh < Lv, Lv ¿ 2
= 2 = 16,22 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √ 2 ∙1 , 05+ √ 2 ∙0 , 15)

2 2
100( √2 ∙ h1+ √2 ∙ h2) 100( √2 ∙ 1, 05+ √2 ∙ 0 ,15)
Jh > Lv, Lv ¿ 2 ∙ Jh− =2∙ 75−
A 1 ,15

Tugas Besar Perencanaan Perkerasan Jalan 101


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

= - 196,73 m (Diterima)

Keluwesan bentuk
Lv = 0,6 x VR
= 0,6 x 60
= 36 m

Syarat Drainase
Lv = 40 x A
= 40 x 2,05
= 8,2 m
Diambil Lv = 36 m
A x Lv
EV =
800
2 ,05 x 36
=
800
= 0,09 m

 Elevasi dan Stasioning

 PVI = STA 1 + 370


Elv. + 11,00

 PLV = STA = STA PVI – (½ . Lv)


= 1 + 370 – (1/2 . 36)
= 1 + 352
Elevasi= Elevasi PVI + g . (1/2 . Lv)
= + 11,00 + 2,5% (1/2 . 36)

Tugas Besar Perencanaan Perkerasan Jalan 102


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

= + 11,45

 S : STA = STA PVI = 1 + 370


Elevasi= Elevasi PVI + EV
= + 11,00 + 0,09
= + 11,09

 PTV : STA = STA PVI + (½ Lv)


= 1 + 370 + (½ . 36)
= 1 + 388
Elevasi= Elevasi PVI + g (1/2 Lv)
= + 11,00 + 0,45% (1/2 . 36)
= + 11,081

5.1.10 Lengkung Vertikal 10 Cekung

g10 = 0,45%
14 , 5−11, 00
g11 = x 100 %=2 , 33 %
150
A = |g11 – g10| = |2,33– 0,45| = 1,85 %
Syarat kenyamanan

- Jarak pandang henti

Tugas Besar Perencanaan Perkerasan Jalan 103


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

VR = 60 km/jam
Jh = 75 m
A ∙ Jh2 1 , 15 ∙752
Jh < Lv, Lv ¿ 2
= 2 = 16,22 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √2 ∙1 , 05+ √ 2 ∙0 , 15)

2 2
100( √2 ∙ h1+ √2 ∙ h2) 100( √2 ∙ 1, 05+ √2 ∙ 0 ,15)
Jh > Lv, Lv ¿ 2 ∙ Jh− =2∙ 75−
A 1 ,15
= - 196,73 m (Diterima)

- Jarak pandang mendahului

VR = 50 km/jam
Jd = 250 m
2 2
A ∙ Jd 1 , 15.350
Jd < Lv, Lv ¿ 2
= 2 = 85,57 m (Ditolak)
100( √ 2∙ h 1+ √ 2∙ h 2) 100( √ 2 ∙1 , 05+ √ 2 ∙1 , 05)

2 2
100( √ 2 ∙h 1+ √ 2∙ h 2) 100( √2 ∙1 , 05+ √ 2 ∙1 , 05)
Jd > Lv, Lv ¿ 2 ∙ Jd− =2∙ 350−
A 1 , 15
= -30,43 m (Diterima)

Keluwesan bentuk
Lv = 0,6 x VR
= 0,6 x 60
= 36 m
Syarat Drainase
Lv = 40 x A
= 40 x 1,85
= 74m
Diambil Lv = 74 m

Tugas Besar Perencanaan Perkerasan Jalan 104


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

A x Lv
EV =
800
1, 85 x 74
=
800
= 0,17 m

 Elevasi dan Stasioning

 PVI = STA 1 + 590


Elv. + 10,00

 PLV = STA = STA PVI – (½ . Lv)


= 1 + 590 – (1/2 . 74)
= 1 + 553
Elevasi= Elevasi PVI – g1 . (1/2 . Lv)
= + 10,00 – 0,45% (1/2 . 74)
= + 9,83
 S : STA = STA PVI = 1 + 590
Elevasi= Elevasi PVI - EV

Tugas Besar Perencanaan Perkerasan Jalan 105


ELVIRA NOVA RIAVIANA (201910340311201)
ADHITYA HERMAWAN (201910340311203)

= + 10,00 – 0,17
= + 9,83

 PTV : STA = STA PVI + (½ Lv)


= 1 + 590 + (½ . 74)
= 1 + 627
Elevasi= Elevasi PVI – g2 (1/2 Lv)
= + 10,00 – 2,33% (1/2 . 74)
= + 9,14

Tugas Besar Perencanaan Perkerasan Jalan 106