Download as pdf
Download as pdf
You are on page 1of 3
| Faiz Enterprises Quotation: Ref: 01, Date: 04/10/2021 You're Ref: What's App From: M.Taqveem Faiz (Project Engineer, Cell: 0300766017) MIS: To: Mr. Nazim Subject: Quotation for Supply of 505 Controller & CPC-Il Woodward’s Dear Sir, With reference to your valuable enquiry regarding subject matter. We are pleased to submit our quote with Maximum possible discount for your kind review and order. CPC-IT CPC Current-to-Pressure Converter Oil contamination resistant (1020/16) Precise fluid pressure control 1,800,000 Rs 1,800,000 Stable & linear valve control Included valve linearization table (Full range <0.2%) Make: Surplus Woodward’s Ex- Stock %+92 300 7660017 &« faizenterprises11@gmail.com IF) Faiz Enterprise All Type Engineering Solutions Turbine Governor Control 505, Model:505- Digital ‘Supply: AC/DC (24VDC) 7 Rs Nos | 4 Condition: Surplus Item 7 ‘axons 1,950,000 For Condensing Steam turbine Make: Woodward's 3 | Wiring for 505 controller & CPCI |...) | 290,000 Rs - Termination of cables 200,000 Installation , Commissioning with Configuration - Configuration & Commissioning o Nos} 1 | 300,000 eS of Turbine Governor Controller _| Nos ETN - Loop Test - All Running test pass - Start up Support 5 | RPM SENSOR Nos | 3 | 150,000 S TYPE 450,000 MPU RPM SENSOR MAKE WOOWORD 6 ‘SERVO HYDRAULICS UNIT (PART OF TURBINE) | Nos | 4 800,000 800,000 Throttling Valve (Part of turbine) Z If Required (not decided) PENDING PENDING ‘Total Amount PKR: 5,500,000/- Note: 1-Faulty instrument's replacement will be provided by clients. Operation of Steam turbine & Startup Schedule & Running Plan will be provided by clients Price of Throttling Valve is not included Terms & Conditions: %+92 300 7660017 «x « faizenterprises11@gmail.com | Faiz Enterprises All Type Engineering Solutions « All prices are without any tax. 2. GST & other taxes are not include in quoted and would be charged as per Actual. . The quoted prices are excluding of general sale tax. |. Payment: 100% advance with PO. ak we . Equipment will be delivered after 2~4 weeks after receiving PO and advance . Prices are valid for 10 days. aos . TIC would be responsible for scope of supply of materials mentioned in quotation, Any additional required hardware or technical support or Services would be charge additionally. 8. Running test pass guaranty. 9. All items will be supplied from Surplus items & ex stock. 10. If you have any query please don’t hesitate to contact us. 11. Food & accommodation and Pickup & drop to our staff will be provided by costumer if any Requirement. Note: + All the prices are subject to Tax (if any). For FAIZ ENTERPRISES Signature: %+92 300 7660017 ix « faizenterprises11@gmail.com

You might also like