Professional Documents
Culture Documents
Rigging Plan Installation of Stelling
Rigging Plan Installation of Stelling
Note :
Contractor propose tu use this Lifting Plan for all Stelling Installation at Tank Farm 1,
Tank Farm 2, Tank Farm 3, and Tank Farm 4, due to this area is the largest area of installation of Stelling