Project Management Report: Aniqa Viqar Ahmed Javed Bisma Salam Salma Viqar Romana Mahmood Mba-V-D
Project Management Report: Aniqa Viqar Ahmed Javed Bisma Salam Salma Viqar Romana Mahmood Mba-V-D
Project Management Report: Aniqa Viqar Ahmed Javed Bisma Salam Salma Viqar Romana Mahmood Mba-V-D
ANIQA VIQAR AHMED JAVED BISMA SALAM SALMA VIQAR ROMANA MAHMOOD MBA-V-D
TABLE OF CONTENTS
1. 2. DESCRIPTION OF THE PROJECT SHOWCASE ....................................................................................... 3 PROJECT SCOPE STATEMENT ................................................................................................................ 5 2.1 PROJECT OBJECTIVE ............................................................................................................................ 5 2.2 DELIVERABLES ..................................................................................................................................... 5 2.3 MILESTONES ........................................................................................................................................ 5 2.4 TECHNICAL REQUIREMENTS ............................................................................................................... 6 2.5 LIMITATIONS AND EXCLUSIONS .......................................................................................................... 6 2.6 CUSTOMER REVIEW ............................................................................................................................ 6 3. PROJECT PRIORITY MATRIX ................................................................................................................... 7 3.1 TIME .................................................................................................................................................... 7 3.2 COST .................................................................................................................................................... 7 3.3 PERFORMANCE ................................................................................................................................... 8 4. 5. 6. WORK BREAKDOWN STRUCTURE ......................................................................................................... 9 RESPONSIBILITY MATRIX ..................................................................................................................... 10 DEVELOPING A PROJECT PLAN............................................................................................................ 11 6.1 NETWORK INFORMATION................................................................................................................. 11 6.2 6.3 6.4 7. NETWORK DIAGRAM OF PROJECT ................................................................................................ 0 ACTIVITY ON NODE NETWORK...................................................................................................... 0 CRITICAL PATH ................................................................................................................................ 0
COST AND FINANCES OF THE PROJECT ................................................................................................. 0 Initial Cash Outlay ..................................................................................................................................... 0 Investment by each partner...................................................................................................................... 1 Forecasted Income Statement - Show Case ............................................................................................. 2 NPV - Show Case ....................................................................................................................................... 4 Payback Period - Show Case ..................................................................................................................... 4 Annual Return to each partner ................................................................................................................. 4
8. RISK ASSESSMENT OF THE PROJECT ......................................................................................................... 5 8.1 RISK PORTFOLIO FOR LAUNCHING SHOWCASE .................................................................................. 5 8.1.1 RENTING HOUSE .......................................................................................................................... 5 8.1.2 CAF ............................................................................................................................................. 5 8.1.3 SHOWCASE ................................................................................................................................... 5
8.1.4 MARKETING.................................................................................................................................. 5 8.1.5 FINANCES ..................................................................................................................................... 6 8.2 RISK ASSESSMENT FORM................................................................................................................. 7 8.3 RISK SEVERITY MATRIX ................................................................................................................... 9 8.4 RISK RESPONSE MATRIX................................................................................................................ 10 9. THE SOCIAL IMPACT ASSESSMENT.......................................................................................................... 12 10. GANTT CHART ....................................................................................................................................... 13 11. MINUTES OF MEETING.......................................................................................................................... 14
Our team: Aniqa Viqar Ahmed Javed Bisma Salam Salma Viqar RomanaMehmood
2.2 DELIVERABLES
A 5090 (5500 square feet) finished outlet. A furnished cafe with all the appliances to include range, oven, microwave, dishwasher, fryers, refrigerator, television, Wi-Fi and comfortable seating arrangements. High efficiency central cooling and heating system with programmable thermostat. Centralized point of sale system in order to facilitate the designers.
2.3 MILESTONES
The project will initiate on 1st July, 2011. Secure all permits and approvals by July 14, 2011. Place finalization and renting it on July 28, 2011. Framing, sheathing, plumbing, electrical, wooden flooring, false ceiling and mechanical inspection passed August2, 2011. Secure vendor contracts by August 4, 2011. Renovation work begins on August 5, 2011. Applying for a telephone, internet and cable connections by July 29, 2011. Order for Inventory management software on July 31, 2011. Meeting with designers from 1 August to 11 August. Renovation work completed by October 24, 2011. Hiring sales staff by 14September, 2011. Purchasing the kitchen appliances, electronic equipment and miscellaneous items by 3 November, 2011. Secure contract with designers by August 11, 2011. Training of sales force by 24September, 2011. Marketing campaign started from October 25, 2011. Setting up the caf with furniture, Wi-Fi and television and music system November 11, 2011. Launch November 16, 2011.
Scope
Quality
Time
Performance
PERFORMANCE
COST
3.1 TIME
Time is a constraint because we have planned to launch an outlet and caf on a specific date for which extensive advertisement has been done and contracts have been made with the designers to launch their products on a specified date.
3.2 COST
Since we have a limited budget and tend not to exceed the specified amount our team have opted cost as an enhancer as we are inclined to optimize our project success on the stipulated budget and make the best of the resources to reduce cost.
3.3 PERFORMANCE
Viewing our project we think that time and cost are the most important elements though not compromising on the performance level but giving leeway to it but making sure performance does not lower making it hard to meet the schedule.
SHOWCASE OUTLET
Renting house
Showcase
Cafe
Finances
HR
Marketing
Inspection
Budget
Advertisement
Air conditioning
Paint
Paint
Lights
Lights
Flooring
Wooden Flooring
5. RESPONSIBILITY MATRIX
PROJECT TEAM ANIQA AHMED BISMA SALMA ROMANA R S R R R S R R R S R S R R
TASK Applying for permits and approvals Searching and renting house Contracting with vendors Managing Finances Meeting with designers Meeting for outsourcing caf Ordering a tailor made inventory management software Purchasing kitchen and electronic appliances Hiring and Training of sales force Advertising and marketing campaign Launch R= Responsible S= Support
S R
R R S
S S R R
R R R R
10
DESCRIPTION
Showcase outlet Approvals and permits Finding and renting house Utility connections & conversion Framing and inspection of house Applying for telephone, cable and internet connections Contracting with vendors Flooring Lighting Paint Air conditioning Order inventory management software Meeting and contracting with designers Purchasing furniture, appliances, crockery and decoration items Hiring sales staff Training sales force Marketing and promotion Dcor and final setting Launch
DURATION PREDECESSOR
14 14 3 5 4 2 38 17 15 10 7 10 10 7 10 20 8 5 A B B B D F G H I C E J K N L M,O P,Q
11
Notes
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Legal fee plus lobbying with CDA officials & District Administration Half month rent paid as commission to the dealer (Rs. 200,000 x 0.5) One year rent paid in advance & one month rent as security (Rs. 200,000 per month) PTCL connection & conversion of electricity & gas tariff to commercial Architect fee for the complete designing of the outlet Complete renovation (flooring, ceiling, paint, lighting etc.) 16 security cameras with recording (complete installation) Wood and metal work in the outlet (racks, shelves etc.) Installation of speakers in all corners of the outlet with base unit at the reception Computer with printer, bar code scanner & custom inventory management software Office table, chairs, couches, tv, water dispenser, mini fridge, computer, fax etc. Cooking appliances, baking ovens, deep friers, freezers, point of sale etc. Metal logo at the reception, wall art for the beautification of the outlet Interior designer for consultation for the decore and setup of the outlet 3 standing / tower air conditioners & 12 wall mounted split units 5 - 40 inches Sony Bravia LCDs with Dish Tv Purchase of a slightly used Shehzore pick up van for the delivery of furniture Advertisement in the newspapers, getting moppies, hoardings & billboards Caf furniture ( tables, chairs, couches, wall paintings etc.) Generator will work on natural gas and also have an automatic start system Launch of the outlet through a renowned PR / event management company
1 2 3 4
5 6 7 8 9 10 11 12 13 14 15 16 17 18
2,400,000 450,000 120,000 60,000 360,000 600,000 120,000 25,000 25,000 20,000 144,000 50,000 25,000 800,000 5,199,000
2,640,000 495,000 130,000 65,000 400,000 672,000 132,000 35,000 40,000 25,000 162,000 50,000 30,000 750,000 5,626,000
2,904,000 545,000 140,000 70,000 440,000 752,640 145,200 45,000 50,000 30,000 180,000 50,000 35,000 550,000 5,936,840
3,194,400 599,500 150,000 75,000 484,000 842,957 159,720 45,000 55,000 35,000 192,000 50,000 40,000 350,000 6,272,577
5,481,000
1,041,390
6,752,000
1,282,880
8,332,120
1,583,103
10,546,018
2,109,204
4,439,610
5,469,120
6,749,017
8,436,814
Notes 1 Rs. 700,000 per month in first year and 12 % increase every year 2 Rs. 100,000 per month in first year and 10% increase every year Sales forecast: yr 1 - 500,000 p/m, yr 2 -750,000 p/m, yr 3 -1,000,000 p/m, yr 4 -1,500,000 3 p/m 4 trips per month forecast: yr 1 - 15, yr 2 - 25, yr 3 - 40, yr 4 - 60 5 Rs. 200,000 per month in first year and 10 % increase every year 6 average taken for the whole year & 10 % increase every year 7 average taken for the whole year & Rs. 10,000 increase every year 8 average taken for the whole year & Rs. 5,000 increase every year 9 2 guards at Rs. 30,000 per month for the first year and rounded 10 % increase every year 10 4 sales people at Rs. 50,000 per month for the first year and 12% increase every year 11 1 sweeper at Rs. 10,000 per month for the first year and 10 % increase every year 12 Rs. 10,000 increase in years 2 & 3 with increase in activity and stable for year 4 (EoS) 13 Increase with decreasing proportion due to discounts on large orders and affiliation 14 oil change, filter etc. - inflationary increase forecasted Year 1: Rs. 12,000 p/m - year 2: Rs 13,500 p/m - year 3: Rs. 15,000 p/m - year 4: Rs. 16,000 15 p/m 16 Maintenance of cameras and other fixtures / fittings (fixed) 17 Precautionary head with petty expenses also catered. Rs. 5,000 annual increase forecasted 18 Advertisement in newspapers, through billboards, hoardings, moppies etc. 19 19 % tax rate applied for the first 3 years and 20 % for the 4th year as per govt. policy 19 % tax rate where income is between Rs. 4,550,000 - 8,650,000 & 20 % for above
Year 0 1 2 3 4
389,493
8.1.3 SHOWCASE System freezing: thermostat Fire breakout Electricity and sanitation failures Lighting not up to the standard requirements
8.1.4 MARKETING Wrong choice of message Wrong medium and timings selected where people may overlook
8.1.5 FINANCES Account may cheat or make blunders The budget may exceed
SYSTEM FREEZING(THERMOSTAT)
ANY TIME
ANYTIME IN USE
SHORT CIRCUIT
POST INSTALLATION
START UP
INTERNET ISSUES
ANYTIME
ANYTIME
BUDGET EXCEEDS
ANYTIME
BUDGET EXCEEDS
LIKELIHOOD
EXPECTED
INTERNET ISSUES
FIXTURES BECOME LOOSE
SYSTEM FREEZING
ELECTRICITY AND
HARDW ARE
LIGHT NOT UP TO
THE STANDARD
M ALFUNCTIONING
FIRE BREAKOUT
3
IMPACT
SYSTEM
FREEZING(THERMOSTAT)
MITIGATE
HARDWARE
MALFUNCTIONING (OF THE APPLIANCES USED)
MITIGATE
ROMANA
FIRE BREAKOUT
ACCEPT
WHEN SMOKE
DETECTED
MITIGATE
REINSTALLED BY OTHER
BRANDS
SALMA
MITIGATE
BISMA
INTERNET ISSUES
MITIGATE
DOESNT GET
SOLVED WITHIN ONE HOUR EVEN AFTER REFRESHING THE SYSTEM
ANIKA
MITIGATE
A PERSON TO COUNTER
CHECK THE ACCOUNT PERSON
YEARLY AUDIT
AHMED
BUDGET EXCEEDS
MITIGATE
AHMED
AVOID
ROMANA
10
AVOID
ROMANA
MITIGATE
THE TEAM
ACCEPT
MARKETING IN A MORE
STRONGER WAY
THE TEAM
MITIGATE
BISMA
11
12
Task Q Task O Task M Task K Task I Task G Task E Task C Task A 0 20 40 60 80 100 120 140 160 180 Start Duration
13
MINUTES OF MEETING
No
1
Date
24-03-2011
Duration
30 minutes
Agenda
Brainstorming on the possible projects Alternative options available Pros & cons of each alternate
Attendees
Ahmed Aniqa Bisma Romana Salma Ahmed Aniqa Bisma Romana Salma Ahmed Aniqa Bisma Romana Salma Ahmed Aniqa Bisma Romana Salma Ahmed Aniqa Bisma Romana Salma
06-04-2011
20 minutes
Coming up with the name for project Deciding on scope statement Deciding on location and budget
15-04-2011
30 minutes
29-04-2011
30 minutes
12-05-2011
30 minutes