Professional Documents
Culture Documents
Nav 6 Final
Nav 6 Final
QUIZ 1 LAMPERA
Chartplotter – is a device used in maritime navigation that integrates GPS data with an
electronic navigation chart (ENC).
IMO Resolution A.817 (19) – ECDIS Performance Standard is defined in what IMO
Resolution?
Raster Chart – is a grid map that is created by scanning the original paper chart.
Global Navigation Security System – This refers to a constellation of satellites providing
signals from space transmitting positioning and timing data.
DVD - The following are ways to updates charts on ECDIS EXCEPT___
IMO ECDIS model course (1.27) – Navigation officers onboard their ship using ECDIS are
trained to existing standards such as the ____
GMDSS – Which of the following is NOT a component of ECDIS?
Electronic Chart Display Information System – What is the meaning of ECDIS?
July 2012 – The requirements for the installation of an ECDIS has been in force in____
ENC – It is also called vector map in which all data stored as individual elements.
QUIZ 1 ATANACIO
IHO – Who authorized and set up maps based on the standards S52 and S57?
Raster – It is a traditional variant ECDIS which navigation charts are charted out into ECS
format.
June 1, 2012 – When does the ECDIS being used on board the ship of more than 30000GT.
& passenger ship more than 500GT.?
Vector ECDIS – It is used by government naval vessels that adheres to the forms set up by
the IHO.
RNC – What is a grip map made scanning the original paper chart and is in an exact copy of
the card?
ENC data – What is available from official hydrographic institutions?
It is a direct copy of paper map and decrease reliability – Which of the following that is
not include on the advantage of RNC?
Electronic chart displays and information system – What does ECDIS acronym means?
ECDIS – It a system that conforms the regulation of the IMO.
Code: shxxxt69uWu
1. Lesson 1
Prelim:
1.0 MAJOR ELEMENTS OF ECDIS:
a. COMPUTER
b. DISPLAY
c. SOFTWARE
d. IMO COMPLIANT ELECTRONIC NAVIGATION CHART
1.1. INTRODUCTION & FAMILIARIZATION PLAN
ECDIS is an acronym for Electronic Chart Display and Information System. This is a
computer system that conforms to the regulations of the International Maritime Organization
andmakes it possible to view electronic charts. It can be used in some cases as a substitute for
paper charts on board merchant ships. The requirements for ECDIS are stipulated in
the SOLAS -Convention. Not officially recognized systems are electronic chart
systems mentioned. From June 1, 2012 ECDIS is phased in for all vessels larger than 3000 GT and
passenger ships larger than 500 GT. To qualify as an ECS ECDIS system must:comply with the IMO
Performance Standards for ECDIS (IMO Resolutions A817 (19) and MSC.232 (82));use by the
International Hydrographic Organization (IHO) authorized maps;Set up the maps and present
according to the IHO standards S52 and S57.
Types of ECDIS
There are two different types of ECDIS and both are used in different sectors of
marineareas, in spite of the technology involved being the same.
Vector ECDIS: The vector variation of the electronic chart system is used mainly by
government naval vessels than commercial ones. The Vector ECDIS adheres to the norms set up
bythe International Hydrographic Organization and is well advanced in the sense that, it can be
pre-programmed to indicate any threat to a naval vessel’s position in case other ships and
navalvessels are also in a similar location in the water.
Raster ECDIS: These are a more traditional variant of the ECDIS. In these, navigational
charts that are charted out in paper are scanned and converted into the Electronic Chart System
format. Because of such a conversion, it so happens that if one wants to zoom in or zoom out a
particular navigational route, the process is quite easy and feasible. For the purpose of display the
navigational charts in this particular electronic chart system, the technology of Raster Chart
DisplaySystem (RCDS) is used in case there is an absence of the Electronic Navigational Charts.
The concept of ECDIS is something that is gaining more and more popularity in today’s times. This is
mainly because the concept has been officially allowed to be incorporated in the naval vessels and
ships. By adopting this method of marking and charting navigational routes, it has become easier
to avoid any unwanted accidents as this electronic chart system uses modern technology rather
than
human aid.The ECDIS as an electronic Chart System is something that allows shipping companies
and ship owners a lot of mental freedom when it comes to the safety of the vessel in the water.
Because of this technology, it can be said that the aspect of navigation has become faster, simpler
and sleeker.
For inland developed its own complementary system: Inland ECDIS
There are two major types of electronic nautical charts, namely
1. RNCs (Raster Navigational Charts) and 2. ENC ( Electronic Navigational Charts ).
Raster Navigational Chart
A Raster Navigational Chart is a grid map that is created by scanning the original paper chart and is
an exact copy of that card. The card is made up of thousands of tiny dots that make up a
flat, digital pose image. Such a card is similar to the familiar paper product and, although it is an
electronic card are hardly manipulated. The officially published raster map is called Raster
Navigational Chart, abbreviated RNC. English ARCS is the most famous RNC service. The acronym
stands for Admiralty Raster Chart Service and consists of 2800 grid maps or RNC, whichenable
global coverage is available from the same quality and accuracy as of the charts.
Benefits of RNCs
Easy so cheaply from existing maps.
They look like paper maps so is also easy to interpret older seafarers information from the
card.Of all the areas in the world are RNCs available.
Disadvantages of RNCs
It is a direct copy of a paper map, at far zoom the individual pixels become visible and
decreasesreliability.
There is no metadata available about objects in the map such as buoys and
lights.This card takes up more memory space as the RNC resolution increases.
Electronic Navigational Chart
Are also called vector maps. In fact, ENC officially published vector maps. ENCs are maps in
which all data is stored as individual elements. The built-in intelligence provides the vector map
many more options for navigation -support than an RNC or raster map.
The intelligent vector data stored in 'layers' and contain all the contours that are on nautical
charts, such as coastlines, buoys, lights, and so on. These contours and their characteristic
properties, such as position, color and shape are stored in a database through which the data can
be selectively madevisible. For this reason seem ENC to a lesser extent in the traditional cards.
What is the difference between a raster chart and a vector chart?
Many CHS charts are available in digital form as either a Raster Navigational Chart (RNC) in the
BSB format or as an Electronic Navigational Chart (ENC) in the S-57 vector format. Both kinds of
electronic charts, when used with navigation software, relieve the navigator of many of the
traditional paper chart routines, and contribute to safer navigation.
RNCs are simply an electronic image of the paper charts and as such provide no more
informationthan that available on the paper chart. Raster charts are digitized by scanning the
paper chart. Eachtiny segment of each line on a chart is converted to a raster picture element or
pixel. Similar to a television picture, when magnified they appear as dots on a grid. Beyond geo-
referencing, there is no intelligence inherent in the raster image. Many recreational boaters have
adopted raster electronic chart systems because the charts are less expensive and the navigation
software requiredto use these charts has been tailored to meet the needs of the recreational
boater.
ENCs are vector charts or "smart charts" and are coded with additional information not available
inpaper or raster charts. ENCs carry a wealth of geo-spatial intelligence through a database of
information associated with them. On an ENC the user can click on different features, such as a
light or buoy, and retrieve additional information about the feature. For example, a wharf
appears only as an image on an RNC, but an ENC can identify it as a wharf and attach attributes to
the wharf, such as height, length, age, ownership, number of berths – data that might otherwise
be available only by consulting the relevant printed Sailing Directions.
ENCs also provide users with more control over the display of the chart, including the ability to
turndifferent layers of information on and off. Because ENCs offer more powerful navigational
flexibility and tools, they are typically used by commercial ships. When displayed on an Electronic
Chart Display and Information System (ECDIS) and integrated with other data, such as GPS
position, radar, planned route, heading, speed and draught, ENCs become part of a powerful
system that allows mariners to know their ship’s position instantly and accurately and to be
warned of dangerous situations.
Various information of ECDIS system enter. A number of things are obliged:
1. ENC data; This is available from official hydrographic institutions.
2. Colors and symbols; these are standard, and can be retrieved and laid down when a user wants.
3. The position of the vessel; ECDIS should always reflect the position of the vessel on the map, by
means of data entry of positioning equipment.
4. Changes of the shell; one must be able to zoom and ECDIS must, even if the user has to be small
scale,
can give warnings.
5. Display Mode; This is the north or the own course can be put up. When one takes the ship and the
other
card with a rate change.
6. Depth figures; where is the depth.
7. Other navigational warnings; the RADAR or ARPA (Automatic Radar Plotting Aid) must be
added.
The sources that may come in are:
a. GNSS (GPS, GALILEO, GLONASS.Etc.) and Loran, to find the right spot on the earth and those
in the project card.
b. The price of the gyrocompass , to see what the direction is, what dangers and what direction. The
speed of the ship will be generated through the designation of the log through the NMEA interface
is so precise positioning data (NMEA National Marine Electronics Association; NMEA
0183 Standard for Interfacing Marine Electronic Devices, data record).
c. The radar can be connected both raw data from a raster scan radar, or a synthetic ARPA, so that
other ships in the card can be put.
This information is recorded by ECDIS and projected on the screen with the right card
underneath. It is not just a program to run in ENCs, but it also provides information. For
example,one can accentuate special things, or dimming, such as buoys or certain depth lines.
Benefits ENC
The card takes up less memory space because the data in the map as vector saved
Objects in the chart (buoys or lights) can metadata be obtained which can be quickly retrieved the
light character or shape.It is possible for certain specific information layers to omit or just adding
to
clarify the 'picture'.The planned route can be checked for sufficient depth because the depth map
is an information layer.During navigation can be made use of "looking ahead function posing a risk
ofgrounding and collision with solid objects decreases.
Disadvantages of the ENC
Not all the regions in the vector map are available as ENC.
The danger is that omitted vital information when used improperly.
An electronic chart display and information system, or ECDIS, is a navigation system that uses
digitized information, specifically electronic navigation charts. It allows navigators to access digital
navigation data in an easy and fast manner to aid them in ship navigation. It can be used instead
of paper charts used in traditional navigation, but it needs to comply to the standards and
regulations set by the International Maritime Organization, or IMO.
Here is some more information about the ECDIS and how it is used:
a. Are All Electronic Chart Navigation Systems Considered ECDIS?
Not all navigation systems that use electronic charts can be considered an ECDIS. A navigation
system needs more than just the ability to read digital charts to be considered an ECDIS. It needs
toincorporate other information into electronic navigational charts, or ENCs, like global navigation
satellite system , (GNSS) global positioning system data, or GPS data, fathometer data and radar
data in assisting navigators plotting courses and voyage routes. Other information and data can be
used to be layered into the usual digital navigation information as long as they all comply to
standards and regulations of the IMO. This means that only digital navigation systems that use
IMOcompliant data are to be considered ECDIS.
b. Components of an ECDIS
The major elements that compose an ECDIS are the computer system (including all essential
hardware to make it work), a display, software and, of course, IMO compliant electronic navigation
charts. For an ECDIS to be considered an ECDIS, it needs to be installed according to the standards
and regulations set by the IMO. Installation includes the setup of the computer hardware, the
displayand the application software.
c. Capabilities of an ECDIS
The functions of an ECDIS include planning, plotting and monitoring routes, displaying of
electronic navigation charts in different modes by accessing a database of IMO compliant digital
charts, warnings and alarms, customization of display colors and sizes, tracking of ships, recording
and playback of navigational events and logging of preset navigation targets. With this features
andfunctions, the navigators of a ship can safely plot their course using several sources of
approved data. Other tools for monitoring course and planning of routes can be utilized but the
ECDIS can function as the main navigational tool in a ship.
d. Using and Maintaining an ECDIS
Using and maintenance of an ECDIS goes beyond just displaying electronic navigation charts. Its
display can be controlled in terms of brightness, color and size, so some training is required to use
and interpret the data presented on the ECDIS display. It needs to be regularly checked for optimal
performance. Constant monitoring of its temperature, vibration and any kind of electromagnetic
interference must be observed to make sure that is functioning properly. Calibration should be
administered every once in a while to make sure that it is providing the correct data to navigators
in a safe and accurate manner. Performance standards set by the IMO should be satisfied first
before anECDIS is approved for official use in a marine navigation.
IMO RESOLUTION A.817 (19) PERFORMANCE STANDARDS FOR ELECTRONIC CHART
DISPLAY AND INFORMATION SYSTEMS (ECDIS) Note: The IMO Performance Standards forECDIS
are reproduced in this publication for convenience, with the kind permission of the IMO.
1. The primary function of the ECDIS is to contribute to safe navigation.
2. ECDIS with adequate back-up arrangements may be accepted as complying with the up-to-date
charts required by regulation V/20 of the 1974 SOLAS Convention.
3. In addition to the general requirements for ship borne radio equipment forming part of the global
maritime distress and safety system (GMDSS) and for electronic navigational aids contained in
IMO resolution A.694 (17) *, ECDIS should meet the requirements of this performance standard.
4. ECDIS should be capable of displaying all chart information necessary for safe and efficient
navigation originated by, and distributed on the authority of, government authorized hydrographic
offices.
5. ECDIS should facilitate simple and reliable updating of the electronic navigational chart.
6. ECDIS should reduce the navigational workload compared to using the paper chart. It should
enable the mariner to execute in a convenient and timely manner all route planning, route
monitoring and positioning currently performed on paper charts. It should be capable of
continuously plotting the ship's position.
7. ECDIS should have at least the same reliability and availability of presentation as the paper chart
published by government authorized hydrographic offices.
8. ECDIS should provide appropriate alarms or indications with respect to the information displayed
or malfunction of the equipment.
1.2 PURPOSE OF ECDIS
it should enable the mariner to execute in a convenient and timely manner all route planning,
route monitoring and positioning currently performed on paper charts. It should be capable of
continuously plotting the ship's position. Should have at least the same reliability and availability
of presentation as the paper chart published by government authorized hydrographic offices and
shouldprovide appropriate alarms or indications with respect to the information displayed or
malfunction of the equipment.
should reduce the navigational workload compared to using the paper chart.
Sources : Course Notes on Navigation 6 Operational Use of Electronic Chart Display and
Information System ( ECDIS ) compiled by Capt. P.L. Punay
1.3 VALUE TO NAVIGATION
An Electronic Chart Display and Information System ("ECDIS") is a geographic information system
used for nautical navigation that complies with International Maritime Organisation (IMO)
regulations as an alternative to paper nautical charts. IMO refers to similar systems not meeting
theregulations as electronic chart systems (ECSs).
An ECDIS system displays the information from electronic navigational charts (ENC) or Digital
Nautical Charts (DNC) and integrates position information from position, heading and speed
through water reference systems and optionally other navigational sensors. Other sensors which
could interface with an ECDIS are radar, Navtex, Automatic Identification System AIS), and depth
sounders. From Wikipedia
1.4 CORRECT AND INCORRECT USE OF ECDIS
With the advent of technology, the use of Electronic Chart Display and Information Systems
(ECDIS) is becoming increasingly popular. While the use of an ECDIS does have its advantages, it
can have a negative impact if not used correctly and this is known to be a causative factor in major
claims such as collisions and groundings. Due to the perceived cause of these incidents we would
like to draw our Members’ attention to Regulation 19 of chapter V of the Safety Of Life At Sea
(SOLAS) convention which permits an ECDIS to be carried as part of the on board navigational
system, provided it meets the chart carriage requirements as detailed in regulation. The ECDIS
mustbe type approved and in order to do so and it must meet the required performance standards
(MSC.1/Circ.1503, ECDIS – Guidance for good practice).
It is important to remember that personnel operating the ECDIS must have undergone
appropriateECDIS training. It is understood that the ECDIS training and certification
requirements, as per the2010 Manila amendments to the STCW code will not be in force before
1st January 2017. The amendments to the STCW Convention via circular STCW.7/Circ18 – 22
May 2012 include a limitation on the STCW deck officer endorsement of the Certificate of
Competency (COC). This renders the COC invalid for service onboard ECDIS equipped vessels in
the event no evidence is available to demonstrate that a deck officer has undergone the
required ECDIS training. It is therefore advised in the interim, that Members should ensure
navigating officers on board their ships using ECDIS are trained to existing standards such as the
IMO ECDIS model course (1.27).Notwithstanding the statutory training mentioned above,
Members should ensure that navigating officers are familiar with the specific ECDIS model
available on board through a familiarisation program. As far as practicable, it is advantageous
that the same make and model of ECDIS is installed on all fleet vessels to assist this
familiarisation process. This would help to reduce the incorrect use of the ECDIS such as not
including the correct layers of the electronic chart and helping to ensure that all the data
available on the corresponding paper chart is displayed on the ECDIS.
If paper charts are the primary means of navigation on board the vessel, then it is imperative that
allnavigation, including, but not limited to, chart work, passage planning and position fixing is
carriedout using the paper charts. The primary source of navigation, whether paper charts or an
ECDIS, should be kept updated at all times in accordance with SOLAS Chapter V/27.
If a non-type approved ECDIS is discovered fitted on board a vessel, it is strongly recommended
that the ECDIS be decommissioned to stop unauthorised usage. The prohibited use of these
systemsmust further be emphasised by displaying prominent notices upon the equipment to show
it is not tobe used for navigation. Such measures should also be included in the shipboard
navigation procedures. Further details on the requirements of ECDIS can be found on the IMO
website following the link: www.imo.org.
1.6 VESSEL POSITION
of the
world. DNCs are published by the National Geospatial-Intelligence Agency
f. EBL - Electronic Bearing Line
A feature in a radar that is used to determine the relative bearing of an object from the
observing ship’s bearing
g. EC - Electronic Chart
h. ECDIS - Electronic Chart Display and Information
System
i. ENC - Electronic Navigational Chart
j. GPS - Global Positioning System
k. HDT - Heading True Used to send heading information from the gyro-compass to other devices
including radar and ECDIS
l. IBS - Integrated Bridge System
m. RENC - Regional ENC Coordination Centre, RENC validates and distributes ENCs from
producing nations to end-users. Only two currently exist, PRIMAR in Norway and IC-ENC in the
UK
o. RNC - Raster Nautical Chart
p. SENC - System Electronic Navigational Chart
q. SOG - Speed Over Ground, The GPS system‟s approximation of the ship‟s speed in relation to the
installed chart
r. TCS - Track Control System, Via a connection with the autopilot, TCS in an ECDIS controls that
the ship‟s GPS position follows a pre-planned track
s. TTM - Tracked Target Status, Used to send tracked target information from ARPA to ECDIS
t. VDR - Voyage Data Recorder
u. VRM - Variable Range Marker, A feature of radar used to determine relative distance to any
target seen on the screen
v. VTS - Vessel Traffic Services
w. WEND - Worldwide Electronic Navigational Chart Data Base
source: www.ecdis-info.com/
The System Electronic Navigation Chart (SENC) is the database created by an ECDIS from the
ENC data.
Raster Navigation Chart (RNC) is a Raster-formatted Chart produced by a National Hydrographic
Office.
Raster Chart Display System (RCDS) is a system which displays official Raster-formatted charts on
an ECDIS system. https://www.google.com.ph/
On board there were two DGPS receivers, named as No1 and No2. In ECDIS the primary position
source was given as POS 1 and secondary as POS 2. Despite assumption POS 1 could be DGPS
receiver No 1 and POS 2 – receiver No2 respectively, that wasn’t the case.
In reality the primary position was fed by receiver No2. Primary position source is the first source
for position displayed on ECDIS, high-accurate and reliable, normally it’s differential GPS receiver.If
for any reason this position source fails or becomes unreliable, ECDIS will change over to use
secondary position source. www.nautinst.org./
Data Port Assigned to its Connected Sensor
Knowledge of selecting data ports, and assesses sensor input values and use of functions that
areintegrated with other navigational systems.
1. Select between primary and secondary position source.
2. Observe automatic change over to secondary position source.
3. Familiarity with the data reference system of each connected sensor:
Geodetic system, Antenna position, Transducer position, Clock or time source
4. Knowledge of the data port assigned to each connected sensor
5. Monitor, identify and to a limited extent decode the data stream for each attached sensor:
Select a sensor and monitor the data stream (live or simulated), generally recognize
thesentence
syntax associated with the sensor, Where possible, associate data with displayed
navigationalinformation
6. Assess the plausibility of sensor input values to ECDIS.
7. Assess the impact on displayed information when a sensor port is improperly. www.nautinst.org./
Impact on Displayed Information when a Sensor port is improperly Selected
1. Demonstrate the variety of methods that chart data can be loaded and changed: Automatically,
Manually for the presently loaded route, manually from the total portfolio, Manually displayed by
the cursor position, during the activity of the operator using the graphics cursor.
2. Assess the inaccuracies and ambiguities caused by improper selection of a chart for display:
When own ship position is on display, chart data list is sorted by scale, When own ship position is
not on display (viewing elsewhere), chart data Jist is sorted by name( alpha), ECDIS displays largest
scale data (smallest
area) on the topmost layer, but the user may prioritize by format, especially ENC to keep ECDIS in
the ECDIS mode, Automatic chart loading may be switched on or off or held to a user-selected
chart(fixed)
2.4 CHANGING SETTINGS
How to Obtain Information on Charted Objects
1. Manually test the major functions of hardware, keyboard, mouse I trackball, sensor data, and
chart data.
2. Primary information panel: Primary task panels, Primary information panel, Ship, Alarm, Chart,
Logbook,
ARPA, Configuration, Add Info (user layers), Route
3. Demonstrate alarm and function status indications: Alarms, time, position update, heading and
speed
log, Route keeping, heading vectors, chart scale, track, logbook functions.
Demonstrate Error of Interpretation by the Incorrect Selection of Safety
Values
1. Demonstrate errors of interpretation by the incorrect selection of safety values: Safety depth;
Safety contour; Least depth alarm; anti –grounding alarms, Alarms for sailing along a route.
2. Adjust track length and precision.
Check an or Select Preferred Operation Settings in Primary Information Panel
Check navigational conditions (own ship progress, charts displayed, etc.), Check routing
events(including manual notations), Check system events, Display additional data groups
Familiarity with the range of information recorded in the log table (voyage recording
Familiarity with the range of information recorded in the log table (voyage recording):
Check
navigational conditions (own ship progress, charts displayed, etc.), Check routing events
(includingmanual notations), Check system events, Display additional data groups.
2.5 Chart Scaling
Overscale and underscale refer to the display of electronic chart data at too large and too
small ascale, respectively. In the case of overscale, the display is “zoomed in” too close, beyond the
standard of accuracy to which the data was digitized. Underscale indicates that larger scale data is
available for the area in question. ECDIS provides a warning in either case. (msi.nga.mil/)
- Overscale of the display will spread out chart and user information with the possible loss of
familiar cues for estimating
distance
- Underscale of the display may cause some information to be hidden
- Underscale with SCAMIN off will result in unacceptable clutter due to data density
(webcache.googleusercontent.com)
a. Demonstrating Scaling of Electronic Chart Display
- Scale and select scale value
- With chart autoload switched on, use zoom function
- (Zoom) and use cursor to draw quadrangle
around area to view
(webcache.googleusercontent.com)
b.
Recognizing, Interpreting Errors Due to Scaling
Many electronic chart
positional discrepancies that are observed today originate from graphical chart
compilation techniques of the past. The manual application of survey data of varying scales to
the
fixed chart scale was a source of error that often introduced biases
manual application of survey data of varying scales to the fixed chart scale
was a source of error that often introduced biases. In the past, source
information at large scales would often have to be reduced with a copy
machineso it could be overlaid and transferred to the master version of the
chart.
Today, when NOAA survey crews and contractors obtain DGPS positions on
prominent shoreline features, and compare those positions to the chart,
biasesmay be found that are on the order of 2 millimeters at the scale of
the chart (e.g., 20 meters on 1:10,000-scale chart). High accuracy aerial
photography reveals similar discrepancies between the true shoreline and
the charted shoreline. It stands to reason that other important features
such as dredged channel limits and navigational aids also exhibit these
types of biases.
Unfortunately, on any given chart, the magnitude and the direction of
these discrepancies will vary in different areas of the chart. Therefore, no
systematic adjustment can easily be performed that will improve the
inherentaccuracy of the paper or electronic chart. (ntl.bts.gov/)
Lesson 1 – Elements of ECDIS
1. ECDIS Performance Standard is defined in what IMO Resolution?
a. June 2012
b. July 2012
c. June 2013
d. July 2013
3. are maps specifically designed to meet the requirements of marine navigation, showing
amongst other things depths, nature of bottom, elevations, configuration and characteristics of
coast, dangers and aids to navigation.
a. Nautical Charts
b. Admiralty Charts
c. Raster Charts
d. Vector Charts
a. DVD
b. e-mail
c. online
d. flash disk
a. Nautical Charts
b. Admiralty Charts
c. Raster Charts
d. Vector Charts
a. GMDSS
b. RADAR
c. AIS
d. GPS
8. is a device used in marine navigation that integrates GPS data with an electronic
navigational chart (ENC).
a. Plotter
b. Charter
c. Printer
d. Chartplotter
9. This refers to a constellation of satellites providing signals from space transmitting positioning
and timing data.
10. Navigating officers on board their ships using ECDIS are trained to existing standards such as the
.
a. IMO ECDIS model course (1.25)
NAV. 6 QUIZZES
4. The following are ways to updates charts in ECDIS EXCEPT . Flash Disk
5. What is the meaning of ECDIS? Electronic Chart Display and Information System
8. Navigating officers onboard their ship using ECDIS are trained to existing
standards such as the . IMO ECDIS model course (1.27)
9. is a grid map that is created by scanning the original paper chart. Raster
Charts
10. The following are ways to updates charts on ecdis exept. Flash Disk
COMPILATION OF QUIZZES
(catamaran)
Electronic Navigational Chart (ENC) – the data base, standardized content, structure
and format, issued for the used with ECDIS.
System Electronic Navigational Chart (SENC) – The data base resulting the
transformation of the ENC by ECDIS for appropriate use.
Standard Display – means the SENC information that should be shown when chart is first
displayed.
Display Base – means the level of SENC information which cannot be removed from the display.
S-52 – the Data (ENC), display aspects, color tolerance which allowed to display.
S-57 – the System (SENC), digital hydrographic data, deals more with different graphical objects
and symbology.
International Hydrographic Organization (IHO) – has the responsibility for standardizing the
chart objects for ECDIS.
National Hydrographic Office (NHO) – the publisher of official data for electronic chart of the
maritime nations.
Nautical Chart – a chart specially designed to meet the requirements of the marine navigation
showing depths of waters, nature of bottom, elevation, configuration and characteristics of
coast, danger and aid to navigation.
Raster Chart Display System (RCDS) – all data is in one layer and one format. Digitized picture of
a chart.
Digital Nautical Chart (NC) – used in conjunction with Navy Navigation Version of integrated
bridge.
Paper Chart – is a nautical chart that complies with the above requirements and in accordance
with technical resolutions by IHO.
Chart Data – is a data used in paper and electronic charts
Hydrographic Source Data – is a data gathered in many different ways from different sources,
used in compilation and maintenance of nautical chart products.
Which of the following will be the configured correctly to ensure that the correct waypoint
information is being displayed? Track history on
What is being selected and required water area for planning the whole passage on route planning
by chart? Sea Areas
What is included in an anchor circle tribute that is triggered by the ECDIS’ Consistent Common
Reference Point (CCRP)? Danger
What should represent the maximum swing circle of the vessel on an anchor guard zone on the
chart? Diameter
What should be positioned on the vessel’s hawse pipe at the moment the anchor is let go? User
chart anchor circle
What is called to the addition and removal of all chart’s entries such as manual corrections and
voyage Planning? User’s Chart Layers
What should be verified especially when ECDIS is connected to auto pilot? Position
Which of the following parameters should appropriately be ensured that the display is configured
for route monitoring? Headline
What is being used in route monitoring, planning and review? Retrieving Stored Plan
What is a source of error that often introduces biases?Manual application of survey data varying
scales to the fixed chart
Which of the following is the required information category? Warnings and messages
Which of the following which is not included on the chat palette display of ECDIS? Morning
What is generally controlled when verifying position especially when ECDIS is connected to auto
pilot? Observed Position
What is being applied in ECDIS routing planning in turning maneuvering characteristic of own
ship? Curved Track
Which of the following in not included in the configuration parameters appropriately in route
planning by table? Track History
Which of the following is the purpose of retrieving a stored plan? For use in route monitoring
Where can you input the waypoint data alphanumeric in waypoint selection when constructing a
route plan?Route Planning Table
Which of the following is not included to be checked in order to endure that the correct waypoint
information is being displayed and are configured correctly? Secondary Track Off
Which of the following is not included in reviewing the alarm settings used as a vessel proceeding
along a monitored route? Examine result graphically on appropriate scale chart data
Which of the following is not included in modifying the setting XTE in previously saved
route?Guard vector for crossing safety contour
Where should the checking of previously created and saved route for crossing dangers of
navigation be based?Setting-track distance
What is called to a zoomed in display that is too close beyond the standard accuracy? Over scale
What indicates the larger scale data, and display may cause some information to be hidden?
Under scale
Which of the following will results to unacceptable clutter due to the data density, if it is turned
off?Under scale with SCAMIN
What is the function on the electronic chart that enables the operator to change the scale? Zoom
Which of the following reveals similar discrepancies between the true shoreline and the charted
shoreline?High Accuracy Aerial Photography
What ECDIS alarm will sound as the vessel accumulates her track error allowance?Route
monitoring alarm
It is a measurement process calculating ECDIS information having the unit in meters and
decimeters.Depth
What aspect of ECDIS does have its unit of measurement use in calculation of related
information? Information layers
What is the most significant ECDIS information for any ships caught in emergency situation at
sea? Position
What would be the repercussion in using an under – scale chart in coastal navigation?The display
may cause inevitably some information to be hidden
What type of chart is suitable to be use in passing twelve miles west of Philippines?
Coastal chart
Using an over – scaled chart in coastal navigation will attest and signify. The display is too close
The determination of “alert for wheel“ prior arrival at waypoint is related to.
Vessel’s maneuvering characteristic
When does the depth and contours or route monitoring alarm will sounds?waypoint arrival circle
It refers in identifying and responding to an immediate primary and secondary warning signal.
System and position alarms
The “safe water pass “ is most related to. Depth related information
What indication does using an under – scaled chart in coastal navigation will result?
It indicates that larger scale data is available for the area in question
How does a “General chart” directly affects when it is use in coastal navigation?It pose a clear
danger as all the information is small and obscured
When does any alarm signal becomes an apparent threat to navigation?When any of the alarm
system is not working
How do you identify and respond to a chart related alarm?When the chart data is unknown
In verifying the ship’s position especially when ECDIS is connected to autopilot steering is related
to.
Vessel’s maneuvering characteristic
What is the significant manifestation to a chart related alarm? The anti – grounding monitoring is
off
Which of the following is not included on the action of configuring parameters appropriately to
ensure that the display is configured for route monitoring? Departure circle off
What is the purpose of retrieving a stored plan? For planning and review
Which of the following is not included in checking if ECDIS is configured correctly to ensure that
the correct waypoint information is being displayed? Secondary track is on
Which of the following Category Zone of confidence indicates 6 asterisks inside the inverted
triangle? Zoc A1
Which of the following is excluded in modifying the setting XTE in previously saved route?Check
the route for crossing danger of navigation according to setting of XTE zones
Which of the following Category Zone of confidence indicates 5 asterisks inside the inverted
triangle? Zoc A2
Where is the assessing of a route plan based? Safety check
Which of the following is not included on reviewing the alarm setting used as a vessel proceeding
along a monitored route? XTE does not exceed the value set in the route data table
Which of the following Category Zone of confidence indicates 4 asterisks inside the inverted
triangle? Zoc B
Which of the sensor alarms will be triggered when an alarm message “Lost GPS1 switch to GPS2”
is displayed in the alarm box? GPS alarms
How is the checking of the plan done? Checking a previously created and saved route for crossing
dangers of navigation according to the setting- track distance
How is the route scheduling done? Observing calculations of progress along the planned route
Which of the following is excluded in using the chart and route planning? Observing calculations
of progress along the planned route
What is the source of often-introduced biases in manual application of survey data of varying
scales to the fixed chart? Error
Which of the following Category Zone of confidence indicates that the area is unassessed? Zoc U
Which of the following is the checking plan that is used for safety?
Assessing a route plan based on safety check
What is the purpose of a stored plan to be retrieved? For use in route monitoring
Which of the following is not included on route planning by chart?Observing the alarm triggering
while proceeding along the modified route
Which of the following is excluded in reviewing the alarm setting used as a vessel proceeding
along a monitored route? Deviation of the rudder course angle as set-in planned route
Which of the following is excluded in modifying the setting XTE in previous route?
Observing the guard ring for crossing an isolated danger
How would you identify an area on the chart to be cross hatched and annotated as “NO GO
AREA”?When chart depth contour is equal to or lower than the calculated ship’s “safety depth”
Which of the following results when a calculated Height of tide is subtracted from the sum of the
ship’s dynamic draft, ship’s squat, and company required extra draft? Safety Depth
Which of the following “Safety Alarms” will be triggered when the value of the sea depth at the
current ship’s position is lower than the safety depth value entered in the Chart Setting, Technical
Channel? Grounding Alarm
What was the standard adopted by the IHO to protect the ENCs from any unauthorized or illegal
copying?
S-63: The IHO Data Protection Scheme
When does any alarm signal become an apparent threat to navigation?
When any other alarm is not working
Which of the following is not included in the discussion of various hydro-meteorological data that
could be available in the ECDIS data base? Humidity
What is generally being controlled when verifying positioning especially when ECDIS is connected
to autopilot? Observed position
What will be the cause when ECDIS curve is provided were cautioned to be exercised as it may
project a momentary rate of turn, rather than sophisticated hydrodynamic calculations? Limited
accuracy
Which of the following is being centered in waypoints with circumference, which intersects the
wheel over point on the ECDIS route in determining methods of alert for wheel over when
approaching? Arrival circle
What characteristic of own ship applies to curve track in ECDIS route planning in determining
methods of alert for wheel over when approaching waypoints? Turn radius maneuvering
Modul1e 1
Compiled by:
2/ Mate Jerry A. Alingalan
COURSE CREDITS: Units: 2 Lecture: 1 Hr./Week Laboratory: 3 Hrs./Week Contact Hr. 4 hr./Week
Maintain the safety of navigation through the use of ECDIS and associated navigation
system to assist command decision making
COURSE OUTLINE:
PRELIM FINAL
5. Work station start, stop & layout5. System reset and back up
14. Sensors
MIDTERM
Course Requirements:
1. Laboratory activity
2. Formative exams
3. Summative exams
Grade Components
Summative Tests 42%
Prelim – 20%
Midterm-
30% Tentative
Final – 50%
a. Scaling
b. Display category
c. Safety values
Welcome Students
Good day my dear students. It’s been awhile that we haven’t seen each other and miss
all the bygones in our school because of the present situation we all have and
experienced yetsomehow life must go on so does our future and so let us all dwell and
embrace the new blended learning instruction.
I am 2nd Mate Jerry A. Alingalan task as your instructor for this subject ‘ECDIS’.
Electronic Chart Display Information System is the most modern and sophisticated
navigationalequipment used nowadays by all seafarers worldwide in the conduct of safe
navigation.
However, OOW should always bear in mind that all advance navigational instrument and
equipment are only aid but still the best navigator is us, therefore, the knowledge, judgement
andskill of the navigator plus the technology able the ship to depart and arrive safely to her
destination.
2/Mate Jerry A. Alingalan
09052727123 (Globe)
Email: jery.alingalan@jblfmu.edu.ph
Table of
Contents
Module Page
Number
Title
2.1 Sensors 2
0 5
https://www.google.com/search?q=ECDIS+VIDEO&rlz=1C1CHBF_enPH884PH884&oq=ECDIS+VID
EO&aq s=chrome..69i57j0l4.70897j0j7&sourceid=chrome&ie=UTF-8
Video title:
1. What is ECDIS?
2. ECDIS Introduction
3. ECDIS
8. Overreliance on ECDIS
Module 1
Lesson 1 - Elements of ECDIS
Learning Outcomes
At the end of the lesson, you should be able to:
2. introduce revised IMO Performance Standard for ECDIS (June 2006, Resolution MSC)
6. Proficiency in the use of ECDIS includes assessing the integrity of the system and all
data at all times
Q. What is an ECDIS?
A. ECDIS is defined in the IMO ECDIS Performance Standards (IMO Resolution A.817(19)) as
follows:
Electronic Chart Display and Information System (ECDIS) means a navigation information system
which, with adequate back up arrangements, can be accepted as complying with the up-to-date
chart required by regulation V/19 & V/27 of the 1974 SOLAS Convention, by displaying selected
information from navigation sensors to assist the mariner in route planning and route monitoring,
and by displaying additional navigation-related information if required.
Put in simpler terms it is a computer-based navigation system that integrates electronic navigational
charts (ENC), position information from the Global Positioning System (GPS) and other navigational
sensors, such as radar, fathometer and automatic identification systems (AIS) to provide an
alternative to paper navigation charts.
A. At its 86th session from May 26 to June 5 2009, the IMO‟s Maritime Safety Committee approved
new regulations making the carriage of ECDIS mandatory.
The resulting amendments to SOLAS Chapter V regulation 19.2 require ships engaged on
international voyages to be fitted with ECDIS according to the table below.
A. To comply with the IMO regulations you will be required to install an ECDIS with type approval
from the recognised organisations or marine classification societies nominated by flag states within
the timescale shown in the above timetable. The primary method for navigation will be ECDIS but a
back up is required in the event of a failure. The back up can either be a secondary ECDIS (known
as a dual system) connected to an independent power supply and GPS position input or the
traditional paper charts.
A. Nautical charts are maps specifically designed to meet the requirements of marine navigation,
showing amongst other things depths, nature of bottom, elevations, configuration and characteristics
of coast, dangers and aids to navigation. IMO requirements are for all vessels engaged on
Nautical charts can be in analogue form (paper charts) or digital (electronic charts). However, only
charts issued by or on the authority of a government and official Hydrographic Office are classified
as official charts and authorised to fulfil carriage requirements. Any other type of chart (private
charts) are not permitted as tools for navigation under the IMO SOLAS convention.
There are two types of OFFICIAL digital/electronic charts – Raster Navigational Charts (RNC) and
Electronic Navigational Charts (ENC) which are known as vector charts:
Raster (RNC) – this is purely a scanned and passive image of a paper chart.
Vector (ENC) – these maps are manipulative by the user to show specific user-defined information
and the features are drawn from a series of points, lines and area shapes. Also, warning alarms can
be created to aid avoidance of disaster i.e. grounding of vessel.
Q. What is an ENC?
ENC is an acronym for Electronic Navigation Chart which is a file containing the official chart data
that an ECDIS utilises.
ENC means the database, standardised as to content, structure and format, issued for use with
ECDIS on the authority of government-authorised Hydrographic Offices. The ENC contains all the
chart information useful for safe navigation, and may contain supplementary information in addition
to that contained in the paper, which may be considered necessary for safe navigation.
The use of ENCs in an approved and certified ECDIS and with appropriate back up arrangements is
the only paperless chart option for vessel navigation.
Q. What is a SENC?
A. SENC is an acronym for System Electronic Navigational Chart. An ECDIS converts ENC data into
its own internal SENC format for optimal chart image creation. SENC data can differ between
manufacturers.
“The System Electronic Navigational Chart (SENC) means a database resulting from the
transformation of the ENC by ECDIS for appropriate use, updates to the ENC by appropriate means
and other data added by the mariner. It is this database that is actually accessed by ECDIS for the
display generation and other navigational functions and is the equivalent to an up-to-date paper
chart.”
Q. What is RCDS?
A. RCDS is an acronym for Raster Chart Display System. A vessel is permitted to sail in RCDS
mode if approved by their flag state for geographical areas where there are no ENCs available. For
Flag state conformance, vessels must also carry up to date paper charts for these areas. Using
RCDS mode in ENC available geographic areas is forbidden. If sailing in RCDS mode then paper
charts become the primary form of navigation and the electronic chart is simply an aid to navigation.
ECDIS is a complex, safety-relevant, software based system with multiple options for display and
integration. The ongoing safe and effective use of ECDIS involves many stakeholders including
seafarers, equipment manufacturers, chart producers, hardware and software maintenance providers,
shipowners and operators, and training providers. It is important that all these stakeholders have a clear
and common understanding of their roles and responsibilities in relation to ECDIS.
a. COMPUTER
b. DISPLAY
c. SOFTWARE
ECDIS https://www.google.com.ph/
Vector ECDIS: The vector variation of the electronic chart system is used mainly by government naval
vessels than commercial ones. The Vector ECDIS adheres to the norms set up by the International
Hydrographic Organization and is well advanced in the sense that, it can be pre-programmed to indicate
any threat to a naval vessel‟s position in case other ships and naval vessels are also in a similar location in
the water.
Raster ECDIS: These are a more traditional variant of the ECDIS. In these, navigational charts that are
charted out in paper are scanned and converted into the Electronic Chart System format. Because of
such a conversion, it so happens that if one wants to zoom in or zoom out a particular navigational
route, the process is quite easy and feasible. For the purpose of display the navigational charts in this
particular electronic chart system, the technology of Raster Chart Display System (RCDS) is used in
case there is an absence of the Electronic Navigational Charts.
The concept of ECDIS is something that is gaining more and more popularity in today‟s times.
This is mainly because the concept has been officially allowed to be incorporated in the naval vessels and
ships. By adopting this method of marking and charting navigational routes, it has become easier to avoid
any unwanted accidents as this electronic chart system uses modern technology rather than human aid.
The ECDIS as an electronic Chart System is something that allows shipping companies and ship owners
a lot of mental freedom when it comes to the safety of the vessel in the water. Because of this technology,
it can be said that the aspect of navigation has become faster, simpler and sleeker.
A Raster Navigational Chart is a grid map that is created by scanning the original paper chart and is an
exact copy of that card. The card is made up of thousands of tiny dots that make up a flat, digital pose
image. Such a card is similar to the familiar paper product and, although it is an electronic card are
hardly manipulated. The officially published raster map is called Raster Navigational Chart, abbreviated
RNC. English ARCS is the most famous RNC service. The acronym stands for Admiralty Raster Chart
Service and consists of 2800 grid maps or RNC, which enable global coverage is available from the
same quality and accuracy as of the charts.
Benefits of RNCs
Easy so cheaply from existing maps.
They look like paper maps so is also easy to interpret older seafarers information from the card.
Of all the areas in the world are RNCs available.
Disadvantages of RNCs
It is a direct copy of a paper map, at far zoom the individual pixels become visible and decreases
reliability.
There is no metadata available about objects in the map such as buoys and lights.
This card takes up more memory space as the RNC resolution increases.
The intelligent vector data stored in 'layers' and contain all the contours that are on nautical charts, such as
coastlines, buoys, lights, and so on. These contours and their characteristic properties, such as position,
color and shape are stored in a database through which the data can be selectively made visible. For this
reason seem ENC to a lesser extent in the traditional cards.
In the various information of ECDIS system enter. A number of things are obliged:
2. Colors and symbols; these are standard, and can be retrieved and laid down when a user wants.
3. The position of the vessel; ECDIS should always reflect the position of the vessel on the map,
by means of data entry of positioning equipment.
4. Changes of the shell; one must be able to zoom and ECDIS must, even if the user has to be small scale,
can give warnings.
5. Display Mode; This is the north or the own course can be put up. When one takes the ship and the
other card with a rate change.
7. Other navigational warnings; the RADAR or ARPA (Automatic Radar Plotting Aid) must be added.
c. The radar can be connected both raw data from a raster scan radar, or a synthetic ARPA, so that other
ships in the card can be put.
This information is recorded by ECDIS and projected on the screen with the right card underneath. It is
not just a program to run in ENCs, but it also provides information. For example, one can accentuate
special things, or dimming, such as buoys or certain depth lines.
Benefits ENC
The card takes up less memory space because the data in the map as vector saved
Objects in the chart (buoys or lights) can metadata be obtained which can be quickly retrieved the light
character or shape.It is possible for certain specific information layers to omit or just adding to clarify
the 'picture'.The planned route can be checked for sufficient depth because the depth map is an
information layer.During navigation can be made use of "looking ahead function posing a risk of
grounding and collision with solid objects decreases.
About ECDIS
written by: Kristina Dems•edited by: Rhonda Callow•updated: 10/21/2010
What is ECDIS?
An electronic chart display and information system, or ECDIS, is a navigation system that uses
digitized information, specifically electronic navigation charts. It allows navigators to access digital
navigation data in an easy and fast manner to aid them in ship navigation. It can be used instead of
paper charts used in traditional navigation, but it needs to comply to the standards and regulations set
by the International Maritime Organization, or IMO.
Here is some more information about the ECDIS and how it is used:
a. Are All Electronic Chart Navigation Systems Considered ECDIS?
Not all navigation systems that use electronic charts can be considered an ECDIS. A navigation system
needs more than just the ability to read digital charts to be considered an ECDIS. It needs to incorporate
other information into electronic navigational charts, or ENCs, like global navigation satellite system ,
(GNSS) global positioning system data, or GPS data, fathometer data and radar data in assisting
navigators plotting courses and voyage routes. Other information and data can be used to be layered into
the usual digital navigation information as long as they all comply to standards and regulations of the
IMO. This means that only digital navigation systems that use IMO compliant data are to be considered
ECDIS.
b. Components of an ECDIS
The major elements that compose an ECDIS are the computer system (including all essential hardware
to make it work), a display, software and, of course, IMO compliant electronic navigation charts. For an
ECDIS to be considered an ECDIS, it needs to be installed according to the standards and regulations set
by the IMO. Installation includes the setup of the computer hardware, the display and the application
software.
c. Capabilities of an ECDIS
The functions of an ECDIS include planning, plotting and monitoring routes, displaying of electronic
navigation charts in different modes by accessing a database of IMO compliant digital charts, warnings
and alarms, customization of display colors and sizes, tracking of ships, recording and playback of
navigational events and logging of preset navigation targets. With this features and functions, the
navigators of a ship can safely plot their course using several sources of approved data. Other tools for
monitoring course and planning of routes can be utilized but the ECDIS can function as the main
navigational tool in a ship.
Constant monitoring of its temperature, vibration and any kind of electromagnetic interference must be
observed to make sure that is functioning properly. Calibration should be administered every once in a
while to make sure that it is providing the correct data to navigators in a safe and accurate manner.
Performance standards set by the IMO should be satisfied first before an ECDIS is approved for official
use in a marine navigation.
2. ECDIS with adequate back-up arrangements may be accepted as complying with the up-to-date charts
required by regulation V/20 of the 1974 SOLAS Convention.
3. In addition to the general requirements for ship borne radio equipment forming part
of the global maritime distress and safety system (GMDSS) and for electronic
navigational aids contained in IMO resolution A.694 (17) *, ECDIS should meet the
requirements of this performance standard.
4. ECDIS should be capable of displaying all chart information necessary for safe and
efficient navigation originated by, and distributed on the authority of, government authorized
hydrographic offices.
5. ECDIS should facilitate simple and reliable updating of the electronic navigational chart.
6. ECDIS should reduce the navigational workload compared to using the paper chart. It should
enable the mariner to execute in a convenient and timely manner all route planning, route
monitoring and positioning currently performed on paper charts. It should be capable of
continuously plotting the ship's position.
7. ECDIS should have at least the same reliability and availability of presentation as the paper
chart published by government authorized hydrographic offices.
8. ECDIS should provide appropriate alarms or indications with respect to the information
displayed or malfunction of the equipment.
Should have at least the same reliability and availability of presentation as the paper
chartpublished by government authorized hydrographic offices and should provide
appropriatealarms or indications with respect to the information displayed or
malfunction of the equipment. should reduce the navigational workload compared to
using the paper chart.
Sources : Course Notes on Navigation 6 Operational Use of Electronic Chart Display and Information System ( ECDIS ) compiled by Capt.
P.L. Punay
It is important to remember that personnel operating the ECDIS must have undergone
appropriate ECDIS training. It is understood that the ECDIS training and certification
requirements, as per the 2010 Manila amendments to the STCW code will not be in force
before1st January 2017. The amendments to the STCW Convention via circular STCW.7/Circ18
– 22 May 2012 include a limitation on the STCW deck officer endorsement of the Certificate of
Competency (COC). This renders the COC invalid for service onboard ECDIS equipped vessels in
the event no evidence is available to demonstrate that a deck officer has undergone the
required ECDIS training. It is therefore advised in the interim, that Members should ensure
navigating officers on board their ships using ECDIS are trained to existing standards such as the
IMO ECDIS model course (1.27).
Notwithstanding the statutory training mentioned above, Members should ensure that
navigating officers are familiar with the specific ECDIS model available on board through a
familiarization program. As far as practicable, it is advantageous that the same make and model
of ECDIS is installed on all fleet vessels to assist this familiarization process. This would help to
reduce the incorrect use of the ECDIS such as not including the correct layers of the electronic
chart and helping to ensure that all the data available on the corresponding paper chart is
displayed on the ECDIS.
If paper charts are the primary means of navigation on board the vessel, then it is imperative
that all navigation, including, but not limited to, chart work, passage planning and position
fixing is carried out using the paper charts. The primary source of navigation, whether paper
charts or an ECDIS, should be kept updated at all times in accordance with SOLAS Chapter V/27.
Proficiency in the Use of ECDIS Includes Assessing the Integrity of the System and AllData at
All Times
https://www.google.com.ph/
Interpret the ECDIS Start Windows for Sensors Requested, Sensors Found, and Selected
Charts Initializing
https://www.google.com.ph/
ECDIS should be provided with means for either automatically or manually carrying
A Chartplotter is a device used in marine navigation that integrates GPS data with an electronic
navigational chart (ENC). The chartplotter displays the ENC along with the position, heading
and speed of the ship, and may display additional information from radar, automatic
informationsystems (AIS) or other sensors. As appropriate to particular marine applications,
chartplotters may also display data from other sensors, such as echolocators/sonar.
https://www.google.com.ph/
https://www.google.com.ph/
Determine Fix Quality (Status) 0f GNSS
The term ‘global navigation satellite system’ (GNSS) refers to a constellation of satellites
providing signals from space transmitting positioning and timing data. By definition, a GNSS
provides global coverage.
GNSS receivers determine location by using the timing and positioning data encoded in the
signals from space. The USA’s NAVSTAR Global Positioning System (GPS) and Russia’s
Global'naya Navigatsionnaya Sputnikovaya Sistema (GLONASS) are examples of GNSS.
Europe is in the process of launching its own independent GNSS, Galileo. Since 2011, four
Galileo satellites have been launched and used as part of the In-Orbit Validation phase,
allowing the first autonomous position fix to be calculated based on Galileo-only signals in
March 2013. The Commission aims to have the full constellation of 30 Galileo satellites
(which includes six in- orbit active spares) in operation before the end of this decade."
Galileo will be interoperable
with GPS and GLONASS. This interoperability will allow manufacturers to develop terminals
that work with Galileo, GPS and GLONASS. https://www.egnos.porta.eu\
https://www.google.com.ph/
https://www.google.com.ph/
Graphically Monitor own ships Approach to Isolated Dangers by Means of a Guard Ring
https://www.google.com.ph/
https://www.google.com.ph/
Many think that because they use electronic chart on their ship they have an ECDIS. Nothing could be
further from the truth. ECDIS stands for Electronic Chart Display and Information System and ECS
stands for Electronic Chart System. While the difference is subtle it is very important. The ECDIS
specification
have been defined by various organization and approved by IMO. The very definition of ECDIS
means that to meet the carriage requirements users MUST use official Electronic Navigation Chart
(ENCs). If you have a type approved ECDIS on your ship, using ENCs produced by a Private Data
Provider makes your machine revert to the status of ECS.
accuracy of course indicator performance, compass error on the accuracy of course indication,
shallow water on the accuracy of log performance , log correction on the accuracy of speed
calculation, disturbance (sea state} on the accuracy of echo sounder performance and
b. The current electronic chart display and information system performance standard adopted by
the organization. www.imo.org/
The GPS system‟s calculation of the ship‟s heading in relation to the installed chart system
DGPS - Differential Global Positioning System
A vector-based digital product designed to give navigators an up-to-date seamless database of the
world. DNCs are published by the National Geospatial-Intelligence Agency
A feature in a radar that is used to determine the relative bearing of an object from the observing
ship‟s bearing
EC - Electronic Chart
Used to send heading information from the gyro-compass to other devices including radar and ECDIS
IBS - Integrated Bridge System
The GPS system‟s approximation of the ship‟s speed in relation to the installed chart
TCS - Track Control System
Via a connection with the autopilot, TCS in an ECDIS controls that the ship‟s GPS position follows a
pre-planned track
TTM - Tracked Target
Status
A feature of radar used to determine relative distance to any target seen on the screen
VTS - Vessel Traffic Services
THESUBTLEBUTIMPORTANTDISTINCTIONBETWEENANECDISAND ECS
Whilst the difference is subtle it is very important. The ECDIS specifications have been defined by
various organizations and approved by IMO. The very definition of ECDIS means that to meet the
carriage requirements users MUST use official Electronic Navigation Charts (ENCs). If you have a type
approved ECDIS on your ship, using ENCs produced by a Private Data Provider makes your machine
revert to the status of an ECS. The IMO regulations stipulate that when carrying a type approved ECDIS
with official ENCs, navigators meet the carriage requirements and thus can reduce their paper chart
indices. This is not so for ECS. Using an ECDIS therefore reduces the expenses associated with the
carriage of paper charts: initial purchase, replacement, freight, correction service, etc. There are other
advantages too that are difficult to quantify including improved safety, navigators training and comfort
with the new technology, voyage recording and playback capabilities and others. The criteria for official
ENCs have been defined (and changed many times) and are listed in the S-57 specifications.
Unfortunately these criteria were defined at a time when few hydrographic offices around the World were
in a position to produce ENCs in this format (many still are not). This fact resulted in two trends of
philosophy, one followed by the Hydrographic Offices and the other one followed by Private Data
Providers (PDP). C-Map, Transas and Navionics and others are “en-block” referred to as “Private Data
Providers - PDP”. These companies realized that they had the know-how to produce Vector charts in what
is technically the same or very close to the description of S-57. However they are not hydrographic offices
and therefore their data cannot be considered as official and should be referred to as “Electronic Chart
Database- ECD”. Whilst some Hydrographic Offices invested in technology and production capability to
produce and distribute S-57, some did nothing (due to lack of resources or interest or other reasons).
Others created technology to produce Raster format, which is a facsimile of the paper charts, and a few
years ago IMO approved that in the absence of official ENCs, the type approved ECDIS could use official
Raster charts.
Further information on Electronic Navigation Charts, including ECDIS vs. ECS, the variety of data,
Private Data Providers, the value of ENCs, coverage and AIS, can be found in George Arts‟ newsletter in
„Latitude Longitude‟, issued by Marine Press of Canada.
howard.snaith@intertanko.com
NOAA ENCs conform with the International Hydrographic Office (IHO) S-57 international
exchange format, comply with the IHO ENC Product Specification, and areprovided with
incremental updates that supply Notice to Mariners corrections and other critical changes.
NOAA ENCs and updates are available for free download. NOAA ENC data may be used to
fuel Electronic Chart and Display Information Systems (ECDIS).
www.nauticalcharts.noaa.gov/
The System Electronic Navigation Chart (SENC) is the database created by an ECDIS fromthe
ENC data.
The Relationship between ECDIS Data and the information Presented on the Display
https://www.google.com.ph/
TERMS AND DEFINITIONS:
System Electronic Navigational Chart (SENC) – The data base resulting the
transformation of the ENC by ECDIS for appropriate use.
Standard Display – means the SENC information that should be shown when chart is
firstdisplayed.
Display Base – means the level of SENC information which cannot be removed from the display.
S-52 – the Data (ENC), display aspects, color tolerance which allowed to display.
S-57 – the System (SENC), digital hydrographic data, deals more with different graphical objects
and symbology.
International Hydrographic Organization (IHO) – has the responsibility for standardizing the
chart objects for ECDIS.
National Hydrographic Office (NHO) – the publisher of official data for electronic chart of the
maritime nations.
Nautical Chart – a chart specially designed to meet the requirements of the marine navigation
showing depths of waters, nature of bottom, elevation, configuration and characteristics of
coast,danger and aid to navigation.
Raster Chart Display System (RCDS) – all data is in one layer and one format. Digitized picture
of a chart.
Digital Nautical Chart (NC) – used in conjunction with Navy Navigation Version of integrated
bridge.
Paper Chart – is a nautical chart that complies with the above requirements and in accordance
withtechnical resolutions by IHO.
e. Navigational Warnings
1. Starting and setting up ECDIS; connecting data sensors: satellite and radio navigation system receivers,
radar, gyrocompass, log, echo-sounder; accuracy and limitations of these sensors, including effect of
measurements errors and ship's position accuracy, maneuvering on the accuracy of course indicators
performance, compass error on the accuracy of course indication, shallow water on the accuracy of log
performance, log correction on the accuracy of speed calculation, disturbance (sea state) on the accuracy
of an echo-sounder performance; and
2. The current electronic chart display and information system performance standards adopted by the
Organization. www.imo.org/
3. Route planning
4. Route monitoring
5. Alarm handling
8. Chart updating
https://www.google.com.ph/
Assess the inaccuracies and ambiguities caused by improper selection of chart for display: When own
ship position is on display, chart data list is sorted by scale, When own ship position is not on display
(viewing elsewhere), chart data Jist is sorted by name( alpha), ECDIS displays largest scale data
(smallest area) on the topmost layer, but the user may prioritize by format, especially ENC to keep
ECDIS in the ECDIS mode, Automatic chart loading may be switched on or off or held to a user-selected
chart (fixed) Display updates in order to review content and to establish their inclusion in the SENC:
Review their contents, Determine that they have been included in the SENC. Demonstrate and analyze
the data and chart alarms resulting from over scaling (zooming in) and under scaling (zooming out)
Demonstrate and analyze the data and chart alarms resulting from use of a non WGS84 geodetic datum.
2.1 SENSORS
Demonstrate the variety of methods that chart data can be loaded and changed: Automatically,
Manually for the presently loaded route, manually from the total portfolio, manually displayed by the
cursor position, during the activity of the operator using the graphics cursor.
Understanding the performance limits of sensors and assesses their impact on the safe use of ECDIS.
1. Familiarity with the performance limits of devices for position, course over ground, heading, speed,
depth, radar, and AIS, especially concerning:
2. Understanding the need for selecting sensor data displayed in ECDIS that is appropriate and
unambiguous, and accurate. Demonstrate the impairment of ECDIS when sensor
performance
deteriorates. www.pmo.ir/
https://www.google.com.ph/
Activated when ECDIS receives no data from the external output device, Displayed in the second line of
the Information Area as they occur, Use Alarm button or free cursor on 2nd-line message to disable the
sound and message from the display, Alarm submenu function remains orange parameter returns to set
limits, or when function is deliberately turned off, Correct response is to check the operation and
connection of the relevant sensor. www.pmo.ir/
On board there were two DGPS receivers, named as No1 and No2. In ECDIS the primary position
source was given as POS 1 and secondary as POS 2. Despite assumption POS 1 could be DGPS receiver
No 1 and POS 2 – receiver No2 respectively, that wasn‟t the case.
In reality the primary position was fed by receiver No2. Primary position source is the first source for
position displayed on ECDIS, high-accurate and reliable, normally it‟s differential GPS receiver. If for
any reason this position source fails or becomes unreliable, ECDIS will change over to use secondary
position source. www.nautinst.org./
Data Port Assigned to its Connected Sensor
Knowledge of selecting data ports, and assesses sensor input values and use of functions that are
integrated with other navigational systems.
5. Monitor, identify and to a limited extent decode the data stream for each attached sensor:
Select a sensor and monitor the data stream (live or simulated), generally recognize the sentence syntax
associated with the sensor, Where possible, associate data with displayed navigational information
7.
Assess the impact on displayed information when a sensor port is improperly. www.nautinst.org./
1. Demonstrate the variety of methods that chart data can be loaded and changed: Automatically,
Manually for the presently loaded route, manually from the total portfolio, manually displayed by the
cursor position, during the activity of the operator using the graphics cursor.
2. Assess the inaccuracies and ambiguities caused by improper selection of a chart for display: When own
ship position is on display, chart data list is sorted by scale, When own ship position is not on display
(viewing elsewhere), chart data list is sorted by name (alpha), ECDIS displays largest scale data (smallest
area) on the topmost layer, but the user may prioritize by format, especially ENC to keep ECDIS in the
ECDIS mode, Automatic chart loading may be switched on or off or held to a user-selected chart (fixed)
1. Manually test the major functions of hardware, keyboard, mouse I trackball, sensor data, and chart
data.
2. Primary information panel: Primary task panels, Primary information panel, Ship, Alarm,
Chart, Logbook, ARPA, Configuration, Add Info (user layers), Route
3. Demonstrate alarm and function status indications: Alarms, time, position update, heading and speed
log, Route keeping, heading vectors, chart scale, track, log book functions.
1. Demonstrate errors of interpretation by the incorrect selection of safety values: Safety depth;
Safety contour; Least depth alarm; anti –grounding alarms, Alarms for sailing along a route.
Familiarity with the range of information recorded in the log table (voyage recording
Familiarity with the range of information recorded in the log table (voyage recording): Check
navigational conditions (own ship progress, charts displayed, etc.), Check routing events (including
annual notations), Check system events, Display additional data groups
- Over scale of the display will spread out chart and user information with the possible loss of familiar
cues for estimating distance.
- Under scale with SCAMIN off will result in unacceptable clutter due to data density
(webcache.googleusercontent.com)
a. Demonstrating Scaling of Electronic Chart Display
- (Zoom) and use cursor to draw quadrangle around area to view (webcache.googleusercontent.com)
(https://www.google.com.ph/)
REFERENCES:
T1 – Norris, A. (2010) ECDIS and Positioning London: The Nautical
T3 – Hecht, et al. (2011) The Electronic Chart, Fundamentals, Functions, Data essentials A Texbook for
rd
ECDIS Use and Training (3 Revised Edition) Lemmer, The Neitherlands: Geomares publishing.R3
Module 2
Compiled by:
COURSE CREDITS: Units: 2 Lecture: 1 Hr./Week Laboratory: 3 Hrs./Week Contact Hr. 4 hr./Week
Maintain the safety of navigation through the use of ECDIS and associated navigation system to assist
command decision making
COURSE DESCRIPTION: This course covers the requirements of 1978 STCW as amended Table A-II/1
and Table A-II/2 with enhancement from the IMO Model course 7.02. Specifically, the course covers
Competence 3.1 topics of the Marine Transportation at the operational level.
COURSE OUTLINE:
PRELIM FINAL
5. Work station start, stop & layout 5. System reset and back up
11. Open Sea 10. Coastal and restricted waters (Underway ECDIS
14. Sensors
MIDTERM
Course Requirements:
1. Laboratory activity
2. Formative exams
3. Summative exams
Grade Components
Prelim – 20%
night palette.
required.
Welcome Students
Good day my dear students. It‟s been awhile that we haven‟t seen each other and miss all the bygones in our
school because of the present situation we all have and experienced yet somehow life must go on so does our
future and so let us all dwell and embrace the new blended learning instruction.
I am 2nd Mate Jerry A. Alingalan task as your instructor for this subject „ECDIS‟.
Electronic Chart Display Information System is the most modern and sophisticated navigational equipment
used nowadays by all seafarers worldwide in the conduct of safe navigation. However, OOW should always
bear in mind that all advance navigational instrument and equipment are only aid but still the best navigator
is us, therefore, the knowledge, judgement and skill of the navigator plus the technology able the ship to
depart and arrive safely to her destination.
2/Mate Jerry A. Alingalan
09052727123 (Globe)
Email: jery.alingalan@jblfmu.edu.ph
Table of Contents
https://www.google.com/search?rlz=1C1CHBF_enPH884PH884&ei=CeQHX8ehKL6Sr7wPlcKCy
AQ&q=GN SS+VIDEO&oq=GNSS+VIDEO&gs_lcp=CgZwc3ktYWIQAzICCAAyBggAEAUQHjIGCAAQB
RAeMgYIABAIEB46
BAgAEEc6BAgAEEM6BggAEAcQHjoHCAAQsQMQQzoICAAQsQMQkQI6CAgAEAcQChAe
UMOL5AFYofPkA
WD6u-UBaABwA3gAgAGkBYgB_iuSAQM1LTmYAQCgAQGqAQdnd3Mtd2l6&sclient=psy-
ab&ved=0ahUKEwiHytG64sHqAhU-yYsBHRWhAEkQ4dUDCAw&uact=5
Video Title:
https://www.google.com/search?rlz=1C1CHBF_enPH884PH884&ei=A_gHX7SlFLSTr7wPpbOaq
AQ&q=AIS
+VIDEO&oq=AIS+VIDEO&gs_lcp=CgZwc3ktYWIQAzIGCAAQBxAeMgYIABAHEB4yBggAE
AcQHjIGCAAQBxA
eMgYIABAHEB4yBggAEAcQHjIGCAAQBxAeMgYIABAHEB4yBggAEAcQHjIGCAAQBxAe
OgQIABBHOgQIABB DOgIIADoICAAQsQMQkQI6CggAELEDEIMBEENQ16gIWN3aCGCT-
AhoAHABeACAAdAFiAHFHZIBBTUtNS4xmAEAoAEBqgEHZ3dzLXdpeg&sclient=psy-
ab&ved=0ahUKEwj0soPB9cHqAhW0yYsBHaWZBkUQ4dUDCAw&uact=5
What is AIS and how does it work?
Module 2
Learning Outcomes
3. Assess all errors, inaccuracies and ambiguities caused by improper data management
6. Explain the performance limits of devices for the position, course overground
Units, Data Layers, and Calculations ECDIS uses the following units of measure: (msi.nga.mil/)
• Position: Latitude and longitude will be shown in degrees, minutes, and decimal minutes, normally based
on WGS-84 datum.
• Height: Meters
• Speed: Knots and tenths ECDIS requires data layers to establish a priority of data displayed.
The minimum number of Information categories required and their relative priority from highest to
lowest are listed below:
• Radar information
• User‟s data
• Manufacturer‟s data
ECDIS allows the mariner to change the color palette that is used to display an ENC. Three different color
tables have been designed to provide the maximum clarity and contrast between features on the display under
three different lighting conditions on the bridge, namely Day, Dusk and Night. Each symbol is rendered in a
different color appropriate for the lighting condition that the color table is meant for. This design provides
maximum contrast for the display on a sunny day, as well as preserving night vision on a dimly lit bridge in
the evening. This allows the mariner to look back and forth between the chart on the ECDIS display and out
to sea through the bridge window without the mariner‟s eyes needing to readjust to a difference in light
intensity.
• The Day Color Table, meant to be used in bright sunlight, uses a white background for deep water and
looks the most like a traditional paper chart.
• The Dusk Color Table uses a black background for deep water and colors are subdued, but slightly
brighter than those used in the Night Color Table.
• The Night Color Table, meant to be used in the darkest conditions, uses a black background for deep
water and muted color shades for other features. The images on the right portray Nantucket Island using
each of the three color tables. The symbols shown in the remainder of this document use the day color
palette. : (msi.nga.mil/)
b. Observing Effect on Information Layers and Status Indications when Chart Data is Loaded
and when Chart Area
- Observe function of SCAMIN on and off when acquired chart area is underscaled (zoomed too far out)
- Observe indication of scale value - Layers additional to ENC must not be excessive so as to obscure the
standard
c. Difference between Information layers, User’s chart layers and event graphic Information
Layers - Determine native scale of chart data as it is loaded
User’s Chart Layer - The addition and removal of own chart entries such as manual corrections and voyage
planning
Event Graphic - Information categories required and their relative priority from highest to lowest are listed
below:
• Radar information
• User‟s data
• Manufacturer‟s data
a. Identifying and Responding to Alarms for Primary and Secondary Positioning Systems
Identify and respond to alarms for primary and secondary positioning systems, such us:
- Generally, only “observe position” is controlled - Where an ECDIS curved predictor is provided, caution
to be
Exercised as it may only project a momentary rate of turn, rather than sophisticated hydrodynamic
calculations, and
Determine methods of alert for wheel over when approaching waypoints, such as:
- Turn radius maneuvering characteristics of own ship apply to curved track in ECDIS route planning
- Arrival circle centered on waypoint with circumference intersecting wheel over point on ECDIS route
(webcache.googleusercontent.com)
- Generally, only “observe position” is controlled - Where an ECDIS curved predictor is provided, caution
to be exercised as it may only project a momentary rate of turn, rather than sophisticated hydrodynamic
calculations, and therefore have limited accuracy (webcache.googleusercontent.com)
Determine methods of alert for wheel over when approaching waypoints, such as:
- Turn radius maneuvering characteristics of own ship apply to curved track in ECDIS route planning
- Arrival circle centered on waypoint with circumference intersecting wheel over point on ECDIS route
(webcache.googleusercontent.com)
Check: Ensure that the display is configured for Route Monitoring. Action: Configure the following
parameters appropriately:
- Headline
- COG Vector
- HDG Vector
- Align by HDG
- Course/Leg/Speed On
- XTD On
- Radius On
Waypoint selection
Check: Ensure that the correct Waypoint information is being displayed. Action: Check that the following are
configured correctly:
c. Establishing Procedures to Name, Link, Rename, Archive, Retrieve and Data Route Files
a. Selecting the Sea Areas and the Required Waters for Planning the Whole Passage
a. Reviewing the Alarm Setting used as a Vessel Proceeding along a Monitored Route
- xte(cross track error)exceeds the value set in the route data table
- Guard vector for entering special purpose areas - Guard ring for crossing an isolated danger
(webcache.googleusercontent.com)
- Re-check the route for crossing danger of navigation according to the setting of XTE zones
- Observe the alarm triggering while proceeding along the modified route leg
a. Checking a Previously Created and Saved Route for Crossing Dangers of Navigation
according to
the
Setting-track Distance
Ex. Simulator exercise – coastal & restricted waters (navigational arms & route scheduling
b. Using the ETA Application in ECDIS, Calculating Time or Speed at a Selected Waypoint on
a Monitored Route
3.8 Use Charts and Route Planning
a. Reviewing the ECDIS Function for creating Mariner’s Notes (user’s chart)
c. Creating, Saving and Moving an Anchor Circle Guard Zone on a User Chart
- An anchor circle can include a “danger” attribute triggered by the ECDIS Consistent Common Reference
Point (CCRP)
- The diameter should represent the maximum swing circle of the vessel
- The User Chart anchor circle should be positioned on the vessel‟s hawse pipe at the moment the anchor is
let go
- Anchor Guard Zone functions provided on ECDIS (as on GNSS units) generally do not reference the
position of the
Modul1e 3
Compiled by:
COURSE CREDITS: Units: 2 Lecture: 1 Hr./Week Laboratory: 3 Hrs./Week Contact Hr. 4 hr./Week
Maintain the safety of navigation through the use of ECDIS and associated navigation system to assist
command decision making
COURSE DESCRIPTION: This course covers the requirements of 1978 STCW as amended Table A-II/1
and Table A-II/2 with enhancement from the IMO Model course 7.02. Specifically, the course covers
Competence 3.1 topics of the Marine Transportation at the operational level.
COURSE OUTLINE:
PRELIM FINAL
5. Work station start, stop & layout 5. System reset and back up
11. Open Sea 10. Coastal and restricted waters (Underway ECDIS
14. Sensors
MIDTERM
Course Requirements:
1. Laboratory activity
2. Formative exams
3. Summative exams
Grade Components
Prelim – 20%
Assessment #2 – Create a route plan and conduct a School Laboratory Poseidon Simulator safe
passage in coastal and waters
using ECDIS.
Welcome Students
Good day my dear students. It‟s been awhile that we haven‟t seen each other and miss all the bygones in our
school because of the present situation we all have and experienced yet somehow life must go on so does our
future and so let us all dwell and embrace the new blended learning instruction.
I am 2nd Mate Jerry A. Alingalan task as your instructor for this subject „ECDIS‟.
Electronic Chart Display Information System is the most modern and sophisticated navigational equipment
used nowadays by all seafarers worldwide in the conduct of safe navigation. However, OOW should always
bear in mind that all advance navigational instrument and equipment are only aid but still the best navigator
is us, therefore, the knowledge, judgement and skill of the navigator plus the technology able the ship to
depart and arrive safely to her destination.
2/Mate Jerry A. Alingalan
09052727123 (Globe)
Email: jery.alingalan@jblfmu.edu.ph
Table of Contents
4.6 Responsibility 17
Module 3
Learning Outcomes
2. Determine speed and heading inputs used in ARPA targets data calculation
Final:
Radar overlay (a raw radar image overlaid on an electronic chart) is the best means of verifying
cartographic data and the output of navigation sensors. The radar overlay feature of an ECDIS not only
duplicates the radar itself, as some navigators know, but can also be used to verify the entire navigational
system. The purpose of this article is to explain how this works.
Radar-ECDIS Integration
Radar-ECDIS integration technologies include “digital NMEA integration” and radar processors. The former
allows for input of tracked target data into ECDIS, provided the radar has ARPA; the latter allows
analog-digital transformation of the video signal from the radar and input of this signal into the ECDIS, as
can be seen in Figure 1.
With the advent of GPS, DGPS and modern data communication it has become feasible to provide an
automatic reporting device (transponder) to control and monitor the maritime environment of a ship.
An automatic reporting system has been developed for the maritime industry using the maritime VHF band
for the transmission and reception of its data signals, and has been defined as “Universal Advanced
Identification System
(Universal AIS). AIS system will display on the screen the latest position information of all vessels within
range of the AIS.
Data Flow
The application reads data from the serial RS-232 interface to which the AIS transponder is connected. These
raw bytes are then sent to the AIS module which calls the hardware driver (DPI) to evaluate the received
data. After the driver has returned the result of the evaluation to the API the AIS module processes this
information. Finally the information is passed on to the application which is then able to display AIS targets
and messages on screen, both addressed and broadcast.
Guard Range
The Guard Range is a radius (in nautical miles) defining a circle around the ship.
All AIS targets within this range will be marked as dangerous. The default value for the Guard Range is 1.0
nm.
Timeout
If its AIS signal is not updated within the set amount of seconds an AIS target will be erased from the Chart
Display. The Timeout value applies to all AIS targets on
Note: When many AIS targets are displayed overall performance may decrease.
AIS Target Symbols
The symbols displayed and described in the following are based on a proposal of the DGON (Deutsche
Gesellschaft fuer Ortung und Navigation – German Institute of Navigation)
-Intruder.
-Activated AIS target with heading marker and past positions on request.
When an AIS symbol is clicked on with the left mouse button and information window opens. In this window
the principal information about the target is shown. This information is displayed and updated until the target
leaves the detection range, or the user selects another target from the list, or the AIS target display is turned
off or the window is closed.
Another target may be selected by choosing it from the list of available targets. These targets are sorted by
ship name, if available. Otherwise the unique MMSI number is shown in the selection box. However,
clicking on another target symbol in the chart also selects this target.
Find a Target
Targets within the detection range are listed in the selection box. Depending on the current chart range some
of these targets may not be displayed in the chart area. To locate a target click on the Find button in the AIS
Target Info window. The chart will scroll and the selected target will be displayed in the center of the chart
area.
Target information may be retrieved directly from the AIS information. When AIS targets are available,
simply activate Track AIS Target and click on the target of interest. Target information is used for CPA
calculation. The detection of the target's direction may take some time. Usually, the Automatic
Chart Feed function is used to keep the ship's position within the view. In some situations the position of an
upcoming vessel or the calculated CPA area is of higher interest than the ship's own position. Select Center
Target or Center CPA to keep the current position of the target or the CPA centered.
Select Center None to turn off the tracking.
The CPA Display including tracking and target display is turned off automatically a certain time after both
ships have passed each other. (www.ceact.com)
a. Determining Speed and Heading Inputs used in ARPA Targets Data Calculations
The method of procurement of electronic charts is different when compared to paper charts. Unlike paper
charts which are only purchased once, until a new edition is published or a chart is cancelled,
electronic charts are purchased through a license system called “permits”. Permits are used to control the
permission to use a chart. They prevent unofficial copying and distribution.
In this article I would like to elaborate procedures to order charts and to keep them updated onboard. In the
earlier days, paper charts had to be ordered and corrected to the latest week prior commencement of a
voyage. With Induction of Electronic Charts, this process is much easier and faster. The chart cells for the
forthcoming voyage can be activated almost immediately by purchasing the license to activate them, usually
by sending an email to the chart provider. Once the base DVDs are received, charts can be updated in a very
short period of time.
ENCs are issued by or on behalf of a national hydrographic authority and comply with specifications of the
International Hydrographic Organization (IHO). To use the ENCs ships has to contact an official ENC
distributor.
This article highlights the chart or chart permit procuring procedure through Chart distributor and methods
for chart correction and updating for ECDIS.
a. Reviewing Chart Data Structure, Terminology and Installation Procedures Ordering cell permit is a three
step process which includes the following:
We can use the Chartco Passage Manager to get the details of charts for the intended voyage.
Step 2 – Automated routing selecting the departure and arrival ports via intended regions can assist
navigating officer as he plans route for the voyage. It will then show the route from departure port to
destination port. Here is an example of a route from Singapore to Mumbai, India. This is a preliminary
passage planning for finding out charts for the intended route. Several other factors like weather condition,
No Go areas to be avoided due to navigational hazards especially for long voyages. This is a short route and
hence uses rhumb line courses as default; however, for long ocean voyages, for E.g. from Yokohama, Japan
to Mexico the route also shows GC track options.
Page 8
The right hand column under the ENC/AVCS displays all the charts and user can select the charts as required
from each category.
The charts can be selected by clicking on the chart area in the map. The selected chart will have yellow lines
and will display cell name.
As mentioned earlier it is also important to take weather conditions into account while selecting charts. The
route from EDCIS can be exported and analyzed using MetManager which is a weather monitoring software
Map. Also during passage planning the waypoints can be adjusted accordingly. An example of MetManager
is shown below:
Step 3 – Once all the required charts are selected we need to send a request to the Chart Distributor. This is
done by selecting the option –„Add selected products to basket‟ at the right hand bottom corner. A Shopping
Basket icon at the bottom indicates that there are items within the basket.
Once that‟s done another option of „Create Order‟ will pop up at the bottom. „Order Address
Information‟ window pops up where order information has to be filled for e.g. name and email address. Once
the order is created successfully an Order Output Summary is generated where the order files need to be sent
to the nominated chart agent. It also prompts you to print the order for reference. On clicking Yes, it
generates a PDF order form for your records. The orders are then sent to an „OUTPUT
folder‟. You can then open the folder and attach the order files to an email and finally send to the nominated
admiralty chart agent.
The AVCS ENC Permits will then be supplied to your vessel by your admiralty chart agent in a zipped file.
The contents should be extracted to a media, for example USB flash drive or floppy disk that can be read by
the system. The permits are normally purchased for a period of 3, 6, 9 or 12 months. On receiving the permits
it is put into the ECDIS and this will allow it to display the chart as a SENC (System Electronic Navigational
Chart) and receive updates which will be discuss later.
Step 2: Click the „Load File‟ button. The Load File button is used to initiate the ENC permit installation to
the ECDIS. When selected a Permit Load window will be displayed. In this window the user will have to
identify the source, folder or external drive where the ENC permits are stored.
Step 3: Choose the correct drive from the look in list box, drive „E‟ for USB memory device or „A‟ for
floppy disc.
Step 4: Permits are available in two formats: one in PMT format and the other in TXT format. The user must
highlight the „PERMIT.TXT‟ file and then click open to install the ENC Permits. After importing the cell
permits successfully, the ENCs of the desired voyage will be available in the ECDIS. A backup of the permits
can also be created by using the „Backup‟ button in the selected drive. The format is always PMT.
The officer in charge must note that the expiry date of a permit controls the loading of Base charts and their
updates to the ECDIS. If a permit has expired, it is not possible to load a chart or its updates which was
issued after the expiration date of the permit. The user can view the chart forever however it will not
complete the requirements for having up-to-date charts.
A graphical coverage of all the charts loaded in the hard disc can be viewed in the Chart Catalogue. The
catalogue can be viewed from the Chart Menu. The „View Filter‟ section can be used to display charts for
which permits are available. The charts appear color coded. The easiest method to check if charts are
up-to-date is to view the catalogue and check that the names of all required charts appear in green. The names
of charts which are not up-to-date appear in orange.
(www.marineinsight.com)
Charts on ECDIS need to be updated and corrected on a regular basis. Unlike paper charts where the
procedure involves manual insertion of the corrections, corrections to ENCs are made automatically.
ECDIS allows updating the existing charts and installing new charts too. Admiralty Vector Charts data is
delivered on a series of CDs labeled Base and Update or DVDs. New ENCs can be loaded with an ENC Base
CD/DVD. This base CD is issued every 6 to 8 weeks. The name of the countries included on the Base
CD/DVD is written on top of the cover. Only those ENC Base CDs/DVDs are needed to be loaded for which
permits are available. The Base disc label contains the date and week of issue. After all the relevant Base
discs have been installed, the ECDIS can now be updated. However now a days information is collated into a
single base DVD. There is no different DVD for base cells. When using the AVCS DVD service only one
disc needs to be installed because it contains the entire base ENCs and Updates up to the date of its issue.
Charts are updated on a weekly basis and the ENC Update CD/DVD is issued every week. The only
exception to this is in a week when AVCs Base discs are re-issued. In this instance a AVCs Update CD will
not be issued. The Update CD contains all new ENCs, new edition of ENCs and ENC updates issued since
the last set of Base discs were issued. The ENC Update CD is cumulative; so in case you receive more than
one CD, just load the latest CD received. In the case of DVDs you would most likely to have two DVDs.
DVD contains base and update data for the complete week.
a. Explain Why Electronic Chart Data is Maintained with up-to date Corrections
The Master shall keep and maintain the latest editions of Charts (of a large enough scale) & Nautical
Publications for the areas which the merchant vessel routinely trades. In addition he is to also keep selected
Charts and nautical Publications taking into consideration the possibility of an emergency entry into such
waters.
There are currently two methods of carrying out electronic chart corrections, either via Weekly Updates, CD
or downloaded weekly from a recognized electronic chart supplier‟s data. The preferred method will be
decided by the Management Office depending on the communications equipment onboard the vessel but in
the majority of cases the lack of internet access will determine the update CD as the best option. This regular
update CD should be arranged through vessel management office under a folio management contract, similar
to that which should be in place for the paper charts and publications onboard.
In circumstances where the electronic chart data is used for reference only, such systems must be maintained
up-to-date. If the electronic chart software onboard is not being maintained with regular updates, the system
must be switched off. Where such equipment is recorded on the Safety Equipment certification of the vessel,
Class will also require notification.
Uncorrected chart data appearing on the electronic chart may cause confusion to the navigator compared with
data recorded on the paper chart and this is obviously a dangerous condition for the vessel.
Vessels using ECDIS as the primary means of navigation, as specifically approved by their flag state, must be
subject to regular software updates as this will have been a condition of the ship-specific approval.
All corrections to charts and publications are available through a contractor who is authorized by various
major hydrographic organizations. All corrections to active Charts (current portfolio) are also available via
email and blocks correction to publications as well as full Notice to Mariners sent monthly by disc in mail
packet.
Charts must also be corrected with any local Notices to Mariners issued by a port.
For ships fitted with ECDIS (Electronic Chart Display System), the Company (through a contractor) supplies
disc containing updates of charts. However, it is emphasized that the where primary means of navigation is
the paper chart and ECDIS is only an aid to navigation. (shipbusiness.com)
A responsible officer should immediately correct the present voyage charts & publications upon receipt of the
corrections, followed by other charts and publications.
Only current editions of Charts and Publications are to be used. Cancelled editions must be clearly marked
so, in pen, and removed from the confines (territory) of the wheelhouse.
If there is a change in the route or the trading pattern, the previous charts must corrected until Master is sure
that the vessel will not revert to that route in the foreseeable future.
Vessel using Digitrace should thoroughly familiarize / reading the instruction manual for correction of Charts
and Nautical Publications .
Temporary (T) & Preliminary (P) notice numbers are to be recorded in Chart Correction Record . Such
information is readily available in weekly notices to mariners or from the Digitrace system as well as from
the monthly Digitrace update CDs (containing complete Notices to Mariners with corrections for all Charts &
Publications).
Applicable T & P corrections shall then be made in Pencil on all charts to be used for the current voyage.
After correcting affected voyage charts for applicable T & P corrections, the correction number shall be
entered in Pencil at the location of correction as well as on the bottom of chart.
After making such correction, suitable annotation shall be made in the Chart Correction Record to indicate
that the correction has been physically made on the chart. Any cancelled T & P notices should be struck out
in the Chart Correction Record and erased from the corresponding charts.
A copy of the current In-Force list (usually published monthly) shall be filed along with the Chart Correction
Record and used for monitoring and verification of current T & P notices in force.
Navigational Warnings promulgated through Notices to Mariners (Navareas / Hydrolant / Hydropac) should
be filed area wise as long as valid (removed when cancelled), in a dedicated file, and relevant ones marked
on voyage charts.
Navigational warnings received through EGC or Navtex should also be marked on chart if applicable and the
printout retained for 1 year. It is necessary for the Officer on Watch and Master to sign on the printouts and
for all officers to sign on the Weather Faxes. (shipbusiness.com)
If the back-up is an electronic device, it should be capable of displaying at least the information equivalent to
the standard display as defined in this performance standard.
2. It should not be possible to alter the contents of the electronic chart information.
3. The chart or chart data edition and issuing date should be indicated.
Updating
The information displayed by the ECDIS back-up arrangements should be up-to-date for the entire voyage.
Scale
1. if the information is displayed at a larger scale than that contained in the database; and
2. if own ship‟s position is covered by a chart at a larger scale than that provided by the system.
If radar and other navigational information are added to an electronic back-up display, all the corresponding
requirements for radar information and other navigation information of this performance standard should be
met.
If an electronic device is used, the display mode and generation of the neighboring area should be in
accordance with section 8 of this performance standard.
The back-up arrangements should be able to keep a record of the ship‟s actual track, including positions and
corresponding times.
Reliability
The back-up arrangements should provide reliable operation under prevailing environmental and normal
operating conditions. (www.nauticalcharts.noaa.gov)
Adequate back-up arrangements should be provided to ensure safe navigation in case of an ECDIS failure.
1. Facilities enabling a safe take-over of the ECDIS functions should be provided to avoid that an ECDIS
failure develops into a critical situation.
2. A back-up arrangement should be provided facilitating means for safe navigation of the remaining part of
the voyage in case of an ECDIS failure. (webcahe.googleusercontent.com)
b. Discuss Back-up Procedures in Standalone ECDIS failure Event
ECDIS must be able to record the complete track for the entire voyage with time marks at least once every
four hours. ECDIS should also have the capability to preserve the record of the previous 12 hours of the
voyage.
It is a requirement that the recorded information be inaccessible to alteration. Preserving voyage files should
follow procedures for archiving data. Unless radar overlay data is being recorded, voyage files tend to be
relatively small, permitting backup onto low-capacity media, and purging from system memory at regular
intervals. (This form of backing up should not be confused with the network master- slave backup system.)
Adequate backup arrangements must be provided to ensure safe navigation in case of ECDIS failure. This
includes
provisions to take over ECDIS functions so that an ECDIS failure does not develop into a critical situation,
and
a means of safe navigation for the remaining part of the voyage in case of complete failure. (msi.nga.mil)
a. Discuss ECDIS Data Management to work with Files Associated with ECDIS Operations
b. Discuss ECDIS Data Management to Transfer Selected Data Files between Storage Media
c. Examine Display Functions of own Ship Track and Tracks of AIS and ARPA Targets
b. Discuss ECDIS Data Management to work with Files Associated with ECDIS Operations
c. Discuss ECDS Data Management to transfer Selected Data files between Storage Media
d. Examine Display functions of own ship Track and Tracks of AIS and ARPA Targets
4.6 Responsibility
a. Review COLREGS
b. Review IMO as Amended
NAV 6 Quizes
Which of the following will be the configured correctly to ensure that the correct
waypointinformation is being displayed? Track history on
What is being selected and required water area for planning the whole passage on route planning
bychart?
Sea Areas
What is included in an anchor circle tribute that is triggered by the ECDIS’ Consistent Common
Reference Point (CCRP)? Danger
What should represent the maximum swing circle of the vessel on an anchor guard zone on
thechart? Diameter
What should be positioned on the vessel’s hawse pipe at the moment the anchor is let
What should be verified especially when ECDIS is connected to auto pilot? Position
Which of the following parameters should appropriately be ensured that the display is
configuredfor route monitoring? Headline
What is being used in route monitoring, planning and review? Retrieving Stored Plan
Which of the following is the required information category? Warnings and messages
Which of the following which is not included on the chat palette display of ECDIS? Morning
What is being applied in ECDIS routing planning in turning maneuvering characteristic of own
ship?
Curved Track
Which of the following is the purpose of retrieving a stored plan? For use in route monitoring
Where can you input the waypoint data alphanumeric in waypoint selection when
constructing aroute plan?
Which of the following is not included to be checked in order to endure that the correct
waypointinformation is being displayed and are configured correctly? Secondary Track Off
Which of the following is not included in reviewing the alarm settings used as a vessel
proceedingalong a monitored route? Examine result graphically on appropriate scale chart data
Which of the following is not included in modifying the setting XTE in previously saved route?
Where should the checking of previously created and saved route for crossing dangers of
navigationbe based?
Setting-track distance
based?Safety Check
What is called to a zoomed in display that is too close beyond the standard accuracy? Over scale
What indicates the larger scale data, and display may cause some information to be hidden?
Underscale
Which of the following will results to unacceptable clutter due to the data density, if it is turned
What is the function on the electronic chart that enables the operator to change the scale? Zoom
Which of the following reveals similar discrepancies between the true shoreline and the
chartedshoreline?
What ECDIS alarm will sound as the vessel accumulates her track error allowance? Route
monitoring alarm
It is a measurement process calculating ECDIS information having the unit in meters and
decimeters. Depth
What aspect of ECDIS does have its unit of measurement use in calculation of related
information?Information layers
What is the most significant ECDIS information for any ships caught in emergency situation at sea?
Position
Philippines?Coastal chart
Using an over – scaled chart in coastal navigation will attest and signify.
When does the depth and contours or route monitoring alarm will sounds? waypoint arrival circle
result?It indicates that larger scale data is available for the area in question
How does a “General chart” directly affects when it is use in coastal navigation?
The correct answer is: It pose a clear danger as all the information is small and
How do you identify and respond to a chart related alarm? When the chart data is unknown
In verifying the ship’s position especially when ECDIS is connected to autopilot steering is related
to.
What is the significant manifestation to a chart related alarm? The anti – grounding monitoring
isoff
Which of the following is not included on the action of configuring parameters appropriately
toensure that the display is configured for route monitoring? Departure circle off
What is the purpose of retrieving a stored plan? For planning and review
Which of the following is not included in checking if ECDIS is configured correctly to ensure that
the correct waypoint information is being displayed? Secondary track is on
Which of the following Category Zone of confidence indicates 6 asterisks inside the
invertedtriangle? Zoc A1
Which of the following is excluded in modifying the setting XTE in previously saved route?
Check the route for crossing danger of navigation according to setting of XTE zones
Which of the following Category Zone of confidence indicates 5 asterisks inside the
invertedtriangle? Zoc A2
Which of the following is not included on reviewing the alarm setting used as a vessel
proceedingalong a monitored route? XTE does not exceed the value set in the route data table
Which of the following Category Zone of confidence indicates 4 asterisks inside the
invertedtriangle? Zoc B
Which of the sensor alarms will be triggered when an alarm message “Lost GPS1 switch to GPS2”
is displayed in the alarm box? GPS alarms
How is the checking of the plan done? Checking a previously created and saved route for
How is the route scheduling done? Observing calculations of progress along the planned route
Which of the following is excluded in using the chart and route planning? Observing calculations
of progress along the planned route
What is the source of often-introduced biases in manual application of survey data of varying
scalesto the fixed chart? Error
Which of the following Category Zone of confidence indicates that the area is unassessed? Zoc U
Which of the following is the checking plan that is used for safety?
What is the purpose of a stored plan to be retrieved? For use in route monitoring
route
Which of the following is excluded in reviewing the alarm setting used as a vessel proceeding
alonga monitored route? Deviation of the rudder course angle as set-in planned route
Which of the following is excluded in modifying the setting XTE in previous route?
GOAREA”?
When chart depth contour is equal to or lower than the calculated ship’s “safety depth”
Which of the following results when a calculated Height of tide is subtracted from the sum of
theship’s dynamic draft, ship’s squat, and company required extra draft? Safety Depth
Which of the following “Safety Alarms” will be triggered when the value of the sea depth at the
current ship’s position is lower than the safety depth value entered in the Chart Setting,
What was the standard adopted by the IHO to protect the ENCs from any unauthorized or
illegalcopying?
Which of the following is not included in the discussion of various hydro-meteorological data
What will be the cause when ECDIS curve is provided were cautioned to be exercised as it may
Limitedaccuracy
Which of the following is being centered in waypoints with circumference, which intersects
thewheel over point on the ECDIS route in determining methods of alert for wheel over when
What characteristic of own ship applies to curve track in ECDIS route planning in determining
methods of alert for wheel over when approaching waypoints? Turn radius maneuvering
Midterm:
Units, Data Layers, and Calculations ECDIS uses the following units of measure: (msi.nga.mil/)
• Position: Latitude and longitude will be shown in degrees, minutes, and decimal minutes, normally based on WGS-84
datum.
• Height: Meters
• Speed: Knots and tenths ECDIS requires data layers to establish a priority of data displayed.
The minimum number of Information categories required and their relative priority from highest to lowest are
listed below:
• Radar information
• User‟s data
• Manufacturer‟s data
ECDIS allows the mariner to change the color palette that is used to display an ENC. Three different color tables have
been designed to provide the maximum clarity and contrast between features on the display under three different
lighting conditions on the bridge, namely Day, Dusk and Night. Each symbol is rendered in a different color
appropriate for the lighting condition that the color table is meant for. This design provides maximum contrast for the
display on a sunny day, as well as preserving night vision on a dimly lit bridge in the evening. This allows the mariner to
look back and forth between the chart on the ECDIS display and out to sea through the bridge window without the
mariner’s eyes needing to readjust to a difference in light intensity.
• The Day Color Table, meant to be used in bright sunlight, uses a white background for deep water and looks the most
like a traditional paper chart.
• The Dusk Color Table uses a black background for deep water and colors are subdued, but slightly brighter than those
used in the Night Color Table.
• The Night Color Table, meant to be used in the darkest conditions, uses a black background for deep water and muted
color shades for other features. The images on the right portray Nantucket Island using each of the three color tables.
The symbols shown in the remainder of this document use the day color palette. : (msi.nga.mil/)
b. Observing Effect on Information Layers and Status Indications when Chart Data is Loaded and Chart
Area
- Observe function of SCAMIN on and off when acquired chart area is underscaled (zoomed too far out)
- Observe indication of scale value - Layers additional to ENC must not be excessive so as to obscure the standard
display is Under scaled(webcache.googleusercontent.com)
c. Difference between Information layers, User’s chart layers and event graphic
Information Layers - Determine native scale of chart data as it is loaded
User’s Chart Layer - The addition and removal of own chart entries such as manual corrections and voyage planning
notes EX-2 Simulator exercise-open sea. (webcache.googleusercontent.com)
• Radar information
• User’s data
• Manufacturer’s data
a. Identifying and Responding to Alarms for Primary and Secondary Positioning Systems
Identify and respond to alarms for primary and secondary positioning systems, such us:
Event Graphic - Information categories required and their relative priority from highest to lowest are listed below:
What aspect of ECDIS does have its unit of measurement use in calculation of related information?
The correct answer is: The display may cause inevitably some information to be hidden
What would be the repercussion in using an under – scale chart in coastal navigation?
When does the depth and contours or route monitoring alarm will sounds?
What ECDIS alarm will sound as the vessel accumulates her track error allowance?
What type of chart is suitable to be use in passing twelve miles west of Philippines?
The correct answer is: The display is too close
In verifying the ship’s position especially when ECDIS is connected to autopilot steering is related
to.
Using an over – scaled chart in coastal navigation will attest and signify.
The correct answer is: Vessel’s maneuvering characteristic
It is a measurement process calculating ECDIS information having the unit in meters and
decimeters.
What is the most significant ECDIS information for any ships caught in emergency situation at sea?
Which is the first prioritized information required as categorized from highest to lowest?
The correct answer is: It pose a clear danger as all the information is small and obscured
How does a “General chart “ directly affects when it is use in coastal navigation?
The correct answer is: When any of the alarm system is not working
The correct answer is: Large scale chart
It refers in identifying and responding to an immediate primary and secondary warning signal.
What indication does using an under – scaled chart in coastal navigation will result?
The correct answer is: It indicates that larger scale data is available for the area in question
QUIZ COMPILATION
Which of the following shall you use to sweeten up the bilges or bilge tanks to remove bad odors after
washing down them with freshwater?
Chloride of lime
What is provided in the aft of hold on some modern ships that do not have bilge well?
Drain well
Which of the following are designed on some general cargo ships for the carriage of small amount of liquid
cargo in bulk such as vegetable oil, coconut oil and other delicate liquid cargoes?
Deep tanks
Which of the following are the short pieces of planking that form part of a vessel‟s lining and capable to be
removed to gain access to the bilge well?
Limber boards
Which of the following refers to a fore and aft water drainage of a general cargo vessel wherein the first layer
of floor dunnage must be laid lengthwise to prevent cargo from making contact with the tank top?
Bilge well
Which of the following permanent dunnages are fitted in the ship‟s cargo hold to prevent sweat on the ship‟s
framing plates from coming in contact with the cargoes?
Sweat boards
What gas may be introduced to the cargo compartment to eliminate odors by oxidizing the offending
molecules?
Ozone
Which of the following is not a purpose of laying dunnages against the sides and bottom of the hold of a
vessel?
What dunnage is laid to prevent the consequences of leakage, sweat formation, bad weather, vertical shipping
loads etc., which could damage a particular cargo?
Top dunnage
Which of the following is normally fitted to a bilge suction line to prevent cargo residues to enter?
The cargo which gives off fumes and may contaminate other adjacent cargoes in the hold is known as:
Odorous cargo
Liquids in containers
Which can be prevented only by segregating two lots of cargo into separate holds?
Which of the following does not leave any residues after discharging?
Clean cargo
The cargo that is highly susceptible to damage by tainting from odorous cargoes is:
Delicate cargoes
It refers to the use of materials to separate blocks of cargo by port and/or consignee whose purpose is to
prevent mixture of cargoes of the same kind but for different consignees with different shipping marks and
for different ports of destination.
Separation
These are the geometrical designs placed on cargo in various colors so that the next port of destination can be
noted without reading carefully all the printings upon the case.
Port marks
Keeping certain cargoes separated because of their inherent characteristics is known as:
Segregation
Which of the following results when a cargo for certain port is not discharged and will be carried up to the
next port?
Over carriage
What results if the warm moist air within the cargo spaces condenses as the ship becomes colder moving
from a hot to a cold climate?
Ship’s sweat
Which of the following is a criterion in the occurrence of ship‟s sweat in the cargo holds?
The dew point in the cargo hold must exceed the temperature of the ship’s structure.
Which of the following may form on exposed surfaces of the stow as a consequence of large amounts of
warm, moist air being persistently introduced into a hold containing substantially colder cargo?
Cargo sweat
Your ship has loaded a grain cargo in bulk- a hygroscopic cargo. The voyage is from cold to warm regions.
Which of the following actions is needed to prevent cargo damage and claims?
Dew point
The process in which the moisture or water vapor or the humidity is removed from the air keeping its dry
bulb (DB) temperature constant is called:
Dehumidification
Your ship has loaded a cargo of coffee beans in bulk- a hygroscopic cargo. The voyage is from Indonesia to
Northern China expecting winter upon arrival. Which of the following is to be taken consideration?
It is the actual amount of water vapor in the air compared with the saturation amount of water vapor in the air
at the same temperature and pressure.
Relative humidity
According to the Dewpoint Rule, in what condition of the cargo spaces shall you provide ventilation?
If the dewpoint of the air inside the hold is higher than the dewpoint of the air outside the hold.
How would you take action if the outside dew point temperature is lower or equal to that within the cargo
hold?
These are cargoes like meat, fish prawns and poultry products generally carried at temperatures very much
lower than 0 °C.
Frozen Cargo
Which of the following type of cargoes does not need pre-cooling before loading?
Banana
Which of the following is required for reefer space in order that when the cargo is loaded, the correct
carrying temperature of the cargo will no longer change?
Pre-cooling
When fruits are carried as a reefer cargo, the most frequent cause of being infected at the discharge port is:
The fresh fruits, vegetables, and dairy products are chilled at the correct temperatures ranging from:
How would you take action if you load fruit in reefer spaces and notice that the fruit is starting to mold?
These are cargoes whose freshness are preserved by the refrigerated compartments and be delivered to the
consignee without damage at the port of destination after an ocean voyage of several days.
Perishable cargo
12 deg. F to 20 deg. F
What is the basic principle to be followed when stowing refrigerated cargo?
Provide suitable air channels for the cool air to circulate throughout the stowed cargo block
What is the fitting mounted at the lower end of the derrick which allows the derrick or boom to be moved or
pivoted transversely?
Gooseneck
The most common system used in general cargo vessels where two derricks are coupled or joined by a union
hook is called:
Union purchase
Which of the following is not an advantage of a deck crane over a convention derrick or cargo booms?
One-man operation
A band or collar on the top end of a boom to which the topping lift, midship guy, and outboard guys are
secured is called:
Spider band
What is the additional wire rope attached to the head of each boom and led to the deck beside the regular
outboard guy?
Preventer guy
The wire ropes used for topping lifts, cargo runners, guys and preventers showing damage such as badly
flattened or with heavy kinks are cut and should be replaced. How would you act when blocks are found to
be rusty blocks?
They should be overhauled
Lower it to its cradle on deck with clamps to prevent it from being dislodged
Which of the following supports the lifted cargo, leads through the lizard and up to the boom through the
derrick head block?
Cargo fall/runner
This is used for lifting a number of small articles such as drums of paint or oil, cases containing bottles or
cans and other packages that can be lifted conveniently by one man.
Which of the following is the action of the Cargo Officer when wire ropes such as cargo runners are found to
have damage?
Replace immediately
Who issues the Gear Certification covering the proof loads and the angle at which each boom is tested and
the standard of upkeeping chain, wire slings, and other loose gears used for cargo operations?
Persons should not go down or up the hold using the in way of the square of the hatch while work is
in progress.
Ladder
Which of the following is a good practice before arrival in a port whether for loading or discharging cargo to
find if all surveys of cargo gears are in order?
Which of the following is not included in the visual inspections of cargo officer before the;
Stenciled SWL
How mechanical hatch covers should be secured when in open position to prevent them from accidental
movement?
When there is no cargo operation, the hatches if left open should be provided with adequate fencing around
with a minimum height of
1 meter
Effective means of closed communication should be established between the ship's deck officers and the
cargo terminal throughout the cargo operation. Which of the following is not included in the communication
link between the two?
operations
Who should submit the proposed loading/unloading plan to the cargo terminal representative to allow
sufficient time for any modifications and enable the terminal to prepare accordingly?
NAV6
MIDTERM QUIZ COMPILATION
Quiz 1
1. What aspect of ECDIS does have its unit of measurement used in calculation of related information?
a. Chart scaling
b. Chart setting
c. Chart selection
d. Information layers
2. It is a measurement process calculating ECDIS information having the unit in meters and decimeters.
a. Speed
b. Depth
c. Height
d. Distance
3. What is the most significant ECDIS information for any ships caught in emergency situation at sea?
a. Speed
b. Position
a. RADAR information
5. It refers in identifying and responding to an immediate primary and secondary warning signal.
a. Route planning
b. Information layers
8. When does the depth and contours or route monitoring alarm will sound?
a. Over speeding
10. What ECDIS alarm will sound as the vessel accumulates her track error allowance?
12. What type of chart is suitable to be use in passing twelve miles west of Philippines?
a. Pilot chart
b. Harbor chart
c. Coastal chart
d. General chart
14. How does a “General chart “directly affects when it is use in coastal navigation?
c. It poses an apparent threat to navigation because of the satellite derive position error affected
d. It directly affects coastal navigation due to the difference of measurement of scaled coordinates
a. Over-scaled
b. Under-scaled
c. Minimum scaled
d. Adequately scaled
16. Using an over – scaled chart in coastal navigation will attest and signify.
17. What indication does using an under – scaled chart in coastal navigation will result?
c. It implies that small scale date is available for the area in question
d. It indicates that larger scale data is available for the area in question
18. What would be the repercussion in using an under – scale chart in coastal navigation?
19. In verifying the ship‟s position especially when ECDIS is connected to autopilot steering is related to.
20. The determination of “alert for wheel “prior arrival at waypoint is related to.
1. Which of the following is not included on the action of configuring parameters appropriately to ensure that
the display is configured for route monitoring?
a. Radius on
d. XTD on
3. Which of the following is not included in checking if ECDIS is configured correctly to ensure that the
correct waypoint information is being displayed?
a. Track history is on
b. Radius is auto
d. Secondary track is on
4. Which of the following Category Zone of confidence indicates 6 asterisks inside the inverted triangle?
a. Zoc A1
b. Zoc B
c. Zoc C
d. Zoc A2
5. Which of the following is excluded in modifying the setting XTE in previously saved route?
a. Check the route for crossing danger of navigation according to setting of XTE zones
c. Observe the alarm triggering while proceeding along the modified route
d. Re-check the route for crossing danger of navigation according to setting of XTE zones
6. Which of the following Category Zone of confidence indicates 5 asterisks inside the inverted triangle?
a. Zoc C
b. Zoc B
c. Zoc A2
d. Zoc A1
c. Safety check
b. XTE does not exceed the value set in the route data table
9. Which of the following Category Zone of confidence indicates 4 asterisks inside the inverted triangle?
a. Zoc A1
b. Zoc C
c. Zoc A2
d. Zoc B
10. Which of the sensor alarms will be triggered when an alarm message “Lost GPS1 switch to GPS2” is
displayed in the alarm box?
c. GPS alarms
d. Heading alarms
a. Checking a previously created and saved route for crossing dangers of navigation according
to the setting- track distance
c. Discussing various hydro-meteorological data that could be available in the ECDIS data base
d. Assessing a route plan based on alarm check
b. Creating, saving and moving an anchor circle guard zone on user chart
13. Which of the following is excluded in using the chart and route planning?
d. Create, save and move an anchor circle guard zone on user chart
14. What is the source of often-introduced biases in manual application of survey data of varying scales to
the fixed chart?
a. Display
b. Error
c. Danger
d. Swing circle
15. Which of the following Category Zone of confidence indicates that the area is unassessed?
a. Zoc C
b. Zoc B
c. Zoc A1
d. Zoc U
16. Which of the following is the checking plan that is used for safety?
b. Observe the alarm triggering while proceeding along the modified route leg
b. Observing the alarm triggering while proceeding along the modified route
d. Sea areas selection and the required waters for planning the whole passage
19. Which of the following is excluded in reviewing the alarm setting used as a vessel proceeding along a
monitored route?
a. Deviation of the rudder course angle as set-in planned route
20. Which of the following is excluded in modifying the setting XTE in previous route?
c. Observing the alarm triggering while proceeding along the modified route leg
d. Re-checking the route from crossing danger of navigation according to the setting of XTE zones
21. How would you identify an area on the chart to be cross hatched and annotated as “NO GO AREA”?
a. When chart depth contour is equal to or higher than the calculated ship‟s safety depth”
c. When chart depth contour is equal to or lower than the calculated ship’s “safety depth”
22. Which of the following results when a calculated Height of tide is subtracted from the sum of the ship‟s
dynamic draft, ship‟s squat, and company required extra draft?
a. Safety Height
b. Safety Draft
c. Safety Contour
d. Safety Depth
23. Which of the following “Safety Alarms” will be triggered when the value of the sea depth at the current
ship‟s position is lower than the safety depth value entered in the Chart Setting, Technical Channel?
c. Grounding Alarm
d. User-defined Alarm
24. What was the standard adopted by the IHO to protect the ENCs from any unauthorized or illegal
copying?
25. When does any alarm signal become an apparent threat to navigation?
26. Which of the following is not included in the discussion of various hydro-meteorological data that could
be available in the ECDIS data base?
a. Current
b. Humidity
c. Weather
d. Tides
27. What is generally being controlled when verifying positioning especially when ECDIS is connected to
autopilot?
a. GPS position
b. Fixed position
c. D.R. position
d. Observed position
28. What will be the cause when ECDIS curve is provided were cautioned to be exercised as it may project a
momentary rate of turn, rather than sophisticated hydrodynamic calculations?
a. Unlimited accuracy
b. Full accuracy
c. Clear accuracy
d. Limited accuracy
29. Which of the following is being centered in waypoints with circumference, which intersects the wheel
over point on the ECDIS route in determining methods of alert for wheel over when approaching?
a. Departure circle
b. Fixed circle
c. Point circle
d. Arrival circle
30. What characteristic of own ship applies to curve track in ECDIS route planning in determining methods
of alert for wheel over when approaching waypoints?
Navigation 6 Quizzes
Midterm Quiz 1
1. Which of the following is not included on the chart palette display of ECDIS? Morning
3. What indicates the larger scale data, and the display may cause some information to be hidden? Under
scale
4. What will result unacceptable clutter due to data density, if it is off? Under scale with SCAMIN
5. What is the function on the electric chart that able the operator to change the scale? Zoom
6. What is a source of error that often-introduced biases? Manual application of survey data varying scales to
the
fixed chart
7. Which of the following is the required information category? Warnings and messages
9. What reveals similar discrepancies between the true shoreline and the charted shoreline? High accuracy
aerial photography
10. What do you call of a zoomed in display that is too close beyond the standard of accuracy to which the
data was digitized? Over scale
1. What is included in an anchor circle attribute trigger by the ECDIS Consistent Common Reference
Point (CCRP)?
- Danger
2. Where can you input waypoint alphanumeric in waypoint selection when constructing a route
plan?
4. What do you call of the addition and removal of all chart‟s entries such as manual corrections and
voyage Planning?
- Safety check
6. Which is not included in Modifying the Setting XTE in Previously Saved Route?
7. Which of the following parameters should appropriately Ensure that the display is configured for
Route Monitoring?
- Headline
10. What should be verified especially when ECDIS is connected to auto pilot?
- Position
11. What is being selected and the required waters for planning the whole passage on route planning
by chart?
- Sea areas
12. Which of the following is not included in reviewing the alarm settings used as a vessel
proceeding along a configured route?
13. What should represent the maximum swing circle of the vessel on an anchor guard zone on the
chart?
- Diameter
14. What should be positioned on the vessel‟s hawse pipe at the moment the anchor is let go?
15. What is being applied in ECDIS routing planning in turning manoeuvring characteristics of own
ship?
- Curved track
16. What generally controlled when verifying position especially when ECDIS is connected to auto
pilot?
- Observe position
17. Where does the checking of previously created and saved route for crossing dangers of
navigation based?
- Setting-track distance
- Arrival Circle
19. Which of the following will be configured correctly to ensure that the correct waypoint
information is being displayed?
- Track history on
20. Which of the following is not included in the configuration parameters appropriately in route
planning by table?
- Track history
Q10
2. Which of the following is excluded on reviewing the alarm setting used as a vessel proceeding along a
monitored route?
3. Which of the following is excluded in modifying the setting XTE in previous route?
4. What will be the cause when ECDIS curved is provided were cautioned to be exercised as it may project
a momentary rate of turn, rather than sophisticated hydrodynamic calculations?
5. What is the source that often-introduced biases in manual application of survey data of varying scales to
the fixed chart?
- Error
6. Which of the following is not included in checking if ECDIS is configured correctly to ensure that the
correct waypoint information is being displayed?
7. Which of the following is not included on the action of configuring parameters appropriately to ensure that
the display is that the display is configured for route monitoring?
8. Which of the following is excluded in using the chart and route planning?
- Observing calculations of progress along the planned route
10. What characteristics of own ship applied to curved track in ECDIS route planning in determining
methods of alert for wheel over when approaching waypoints?
11. Which of the following is not included on the action of configuring parameters appropriately to ensure
that the display is that the display is configured for route monitoring?
12. Which of the following is not included in the discussion of various hydro-meteorological data that could
be available in the ECDIS data base?
- Humidity
14. What is being centered on waypoints with circumference intersecting wheel over point on ECDIS route in
determining methods of alert for wheel over when approaching?
-Arrival circle
- Observing the alarm triggering while proceeding along the modified route
17. What is generally being controlled when verifying positioning especially when ECDIS is connected to
autopilot?
- Observe position
- Checking a previously created and saved route for crossing dangers of navigation according to the setting-
track distance
19. Which of the following is excluded in modifying the setting XTE in previously saved route?
- Check the route for crossing danger of navigation according to setting of XTE zones
20. Which of the following is not included on reviewing the alarm setting used as a vessel proceeding along a
monitored route?
Quiz 1 Final
1. What do you call of an electronic charts are purchased through a license system and are used to
control the permission to use a chart, they prevent unofficial copying and distribution? Permit
2. What back up equipment on ECDIS that able to keep record of the ship‟s actual track, including
positions and corresponding times? VDR
3. What should be should be provided and enabled on ECDIS function to avoid ECDIS failure to
develop into a critical situation? Safe take-over
4. What should be included to take over ECDIS functions so that ECDIS failure does not develop
into critical situation, and a means of safe navigation for the remaining part of the voyage in case
of complete failure? Provisions
5. What should ECDIS must be able to record for the entire voyage with time marks at least once
every four hours? Complete track
6. What should be up-to-date for the entire voyage displayed by the ECDIS back-up arrangements?
Display
7. What can you find on the BA layer of the chart setting on ECDIS? Admiralty information overlay
9. Which of the following is not included to be met, if radar and other navigational information are
added to an electronic back-up display? Check list
11. Where can you adjust the deep, safety and shallow contours on ECDIS? BA layers
12. What is the best reason why Electronic Chart Data is maintained with up to date corrections? It
will not cause confusion to the navigator
13. What back up arrangements should be provided to ensure safe navigation in case of an ECDIS
failure? Adequate
14. Who is responsible of issuing on or behalf the ENC to the ships? IHO
How often does the new ENC based CD/DVD being issued? 6 to 8 weeks
15. What should be provided by the back-up arrangements operations under prevailing
environmental and normal operating conditions? Reliability
16. How often does the charts on ECDIS need to be updated and corrected? Regular basis
17. How many hours should ECDIS be capable of preserving the record voyage data? 12
18. What should be taken into account when selecting electronic charts on ECDIS? Weather
condition
19. What is being emphasized as the primary means of navigation when the ship is fitted with
ECDIS? Paper charts
Quiz 2 Finals
1. What will happen to the overall performance of AIS when many targets are displayed? Decrease
2. What is a system displayed on the screen the latest position information of all vessels within its
range? AIS
3. What is the best means of verifying cartographic data and the output of navigation sensors? Radar
overlay
5. Which of the following is not included in providing an automatic reporting device (transponder) to
control and monitor the maritime environment of a ship? AIS
6. What is the color of the catalogue that indicates the names of all required charts? Green
7. What is being used in choosing available targets from the list of AIS shown in the selection box?
MMSI no.
8. Which of the following is the easiest method to check if charts are up-to-date? View catalogue
9. What do you call the application, that reads data from the serial RS-232 interface to which the AIS
transponder is connected? Data flow
10. What is being used in exporting and analyzing route from the ECDIS which is a weather
monitoring software map? MetManager
11. Where should the graphical coverage of all the charts loaded in the hard disc can be viewed?
Chart catalogue
12. What range is a radius (in nautical miles) defining a circle around the ship. All AIS targets within
this range will be marked as dangerous? Guard range
13. What includes “digital NMEA integration” and radar processors? Radar-ECDIS integration
14. What will happen to the CPA display including tracking and target display in certain time after
both ships have passed each other? Turn off automatically
15. What will happen to the AIS target, if signal is not updated within the set amount of seconds
from the chart display? Erased
16. What is being applied to all AIS targets on the chart display with a default value of 360 seconds?
Time out
17. Which of the following can be used to display charts for which permits are available? View filter
18. What should the officer in charge, must note on the permit controls, the loading of Base charts
and their updates to the ECDIS? Date of expiry
19. What can be used to verify the entire navigational system? Radar overlay
20. What is being used for CPA calculation in AIS tracking? Target information
Quiz 3 Finals
1. Which of the following is not included on the contents of updated CD? Cumulative ENC
2. What is the color of the charts which are not up-to-date? Orange
3. How often dos the updated ENC CD/DVD is being issued? Weekly
4. What notice numbers are to be recorded in Chart Correction Record? Temporary (T) &
Preliminary (P)
6. What vessel should thoroughly familiarize/reading the instruction manual for correction of Charts
and Nautical Publications? Using Digitrace
7. Who is responsible for keeping and maintaining the latest edition charts? Master
9. Who should immediately correct the present voyage charts & publications upon the receipt of the
corrections? Responsible officer
10. Which of the following should not be done if only current editions of Charts and Publications are
to be used? Remove from the chart room
-Target information
What will happen to the CPA Display including tracking and target display in certain
time after both ships have passed each other?
What is the color of the catalogue that indicates the name of all required charts
onECDIS?
-Green
What is the color of the charts which are not up to date on ECDIS?
-Orange
-Weekly
Which of the following should not be done if only current editions of Charts and
Publications are to be used?
-Using Digitrace
What shall be written in Pencil on all charts to be used for the current voyage?
-IHO
What range with a radius in nautical miles defines a circle around the ship where all
AIS targets within this range will be marked as dangerous?
-Guard range
What will happen to the AIS target if signal is not updated within the set number of
seconds from the chart display?
-Erased
What is being applied to all the AIS targets on the chart display with a default value
of 360 seconds?
-Time out
What will happen to the overall performance of the AIS when many targets are
displayed?
-Decrease
What is being used in choosing available targets from the list of AIS shown in the
selection box?
-MMSI no.
How often are the updated ENC CD/DVD being issued?
-Weekly
-Cumulative ENC
-Master
charts?2
Who should immediately correct the present voyage chart and publications upon
receipt of the corrections?
-Responsible officer
How many colors are there in the Vector Chart Display window in the ECDIS
display?
-four
How many choices are there in the depth selection found in the units display
windowin the ECDIS?
-three
How many choices are there in the Speed selection found in the units display
windowin the ECDIS?
-four
Which of the following function in the ECDIS when creating a route should you clickif
you want to continue your desired route?
-append waypoint
How many color schemes are used in the ECDIS display configuration?
-three
How many choices are there in the distance selection found in the units display
window in the ECDIS?
-four
-Radar overlay
-Radar-ECDIS integration
-AIS
What is a system displayed on the screen which shows the latest position
informationof all vessels within its range?
-AIS
What is called to the application that reads data from the serial RS-232 interface
towhich the AIS transponder is connected?
-Data flow
How often are the new ENC based CD/DVD being issued?6
to 8 weeks
What is the best reason why Electronic Chart Data is maintained with up-to-date
corrections?
What is being used in exporting and analyzing route from ECDIS which is a weather
monitoring software map?
-Met Manager
What should the officer in charge take note on the permit controls the loading of
Basecharts and their updates to the ECDIS?
-Date of expiry
What should be provided and enabled on ECDIS function to avoid ECDIS failure to
develop into a critical situation?
What should ECDIS be capable to record for the entire voyage with time marks at
least once every four hours?
-Complete track
How many hours should ECDIS be capable of preserving the record of the voyage?
12
What should be included to take over ECDIS functions so that an ECDIS failure does
not develop into a critical situation and a means of safe navigation for the remaining
part of the voyage in case of complete failure?
-Provisions
What is being emphasized as the primary means of navigation even when the ship is
fitted with ECDIS?
-Paper chart
What should be kept up to date for the entire voyage that is displayed by the ECDIS
backup arrangement?
-Display
Which of the following should be met that is not included if radar and other
navigational information are added to an electronic back-up display?
-Check list
What backup equipment on the ECDIS is able to keep a record of the ships actual
track including positions and corresponding times?
-VDR
-Reliable
What is called to an electronic chart that are purchased through a license system
and is used to control the permission to use a chart? These prevent unofficial
copying anddistribution.
-permit
What organization is responsible for issuing on behalf of the ENC to the ships?
-IHO
-Weather condition
How often should the charts on ECDIS need to be updated and corrected?
-Regular basis
Where is a graphical coverage of all the charts loaded in the hard disc be viewed?
-Chart catalogue
-chart menu
Which of the following can be used to display charts for which permits are available?
Which of the following is the easiest method to check if charts are up-to-date?
-View catalogue
What is the best means of verifying cartographic data and the output of
navigationsensors?
-Radar overlay
It is the exact time of ECDIS system capability of keeping the previous navigational
record.
-Twelve hours
When does the ENC update CD/DVD that is primarily intended for chart correction is
scheduled for its delivery on board ship?
-Every week
How many miles is the AIS default distance limit in using the guard range function?
Which system works on ECDIS that has become feasible in providing an automatic
reporting that is use to monitor and control maritime environment of a ship?
What is the information in the main menu on the chart co passage manager to get
andhave all the details needed for the intended voyage from Singapore to Mumbai?
-Route and passages
What is the process employed in verifying cartographic data and knowing navigation
sensors?
It allows the analog digital transformation of the video signal into ECDIS
-Radar-ECDIS integration
How can the ordering and updating procedure of an ENC becomes much easier and
faster?
-Geographic information
Ships actual track position time and all navigation information when underway is
officially log on.
-Voyage recording
How many hours is the logging of all ships track information during the entire voyage
on ECDIS?
NAV 6 QUIZ 2
1. What is the requirement for the personnel who is operating the ECDIS based on STCW
manila amendments? Training
2. What the IMO model course for the taking ECDIS? IMO 1.27
3. What should be strongly recommended if you found out a non-typed approved
ECDIS is discovered fitted on board vessel? Decommissioned
4. Who required that the primary source of navigation, paper chart or ECDIS should be
kept updated at all times Chapter V/27? SOLAS
5. Who regulates which permits an ECDIS to be carried as part of the onboard
navigational system, provided it meet the chart carriage requirements as detailed in
regulation? SOLAS
6. Which of the following equipment, does not interface on the ECDIS? Magnetic
compass
7. Who regulates the use of ECDIS as an alternative to paper nautical charts? IMO
8. What device used in marine navigation that integrates SPS data with an ENC? Chart
plotter
9. What ECIDS should have as paper charts published by government authorized
hydrographic office? Reliability & availability
10. What system is used by receivers to determine their location anywhere on earth? GPS
Elements of ECDIS
Computer
Display
Software
IMO compliant navigational chart
Electronic Chart Display and Information System (ECDIS) is a computer system that
conforms to the regulations of the International Maritime Organization and makes
it possible to view electronic charts. It can be used in some cases as a substitute for
paper charts on board merchant ships. From June 1, 2012 ECDIS is phased in for all
vessels larger than 3000 GT and passenger ships larger than 500 GT
which stipulated in the SOLAS Convention.
ECDIS is a complex, safety-relevant, software based system with multiple options for
display and integration. The ongoing safe and effective use of ECDIS involves
many stakeholders including seafarers, equipment manufacturers, chart
producers, hardware and software maintenance providers, shipowners and
operators, and training providers. It is important that all these stakeholders have a
clear and common understanding of their roles and responsibilities in relation to
ECDIS.
The ECDIS Guidance for Good Practice, referred to as "Guidance", draws together
relevant guidance from seven previous ECDIS circulars into a single, consolidated
document. The guidance is laid out in seven sections, namely:
Understanding ECDIS
Not all navigation systems that use electronic charts can be considered an ECDIS.
A navigation system needs more than just the ability to read digital charts to be
considered an ECDIS. It needs to incorporate other information into electronic
navigational charts, or ENCs, like global navigation satellite system , (GNSS) global
positioning system data, or GPS data, fathometer data and radar data in assisting
navigators plotting courses and voyage routes. Other information and data can
be used to be layered into the usual digital navigation information as long as they
all comply to standards and regulations of the IMO. This means that only digital
navigation systems that use IMO compliant data are to be considered ECDIS.
B. Components of an ECDIS
The major elements that compose an ECDIS are the computer system (including all
essential hardware to make it work), a display, software and, of course, IMO
compliant electronic navigation charts. For an ECDIS to be considered an ECDIS, it
needs to be installed according to the standards and regulations set by the IMO.
Installation includes the setup of the computer hardware, the display and the
application software.
C. Capabilities of an ECDIS
The functions of an ECDIS include planning, plotting and monitoring routes,
displaying of electronic navigation charts in different modes by accessing a
database of IMO compliant digital charts, warnings and alarms, customization of
display colors and sizes, tracking of ships, recording and playback of navigational
events and logging of preset navigation targets. With this features and functions,
the navigators of a ship can safely plot their course using several sources of
approved data. Other tools for monitoring course and planning of routes can be
utilized but the ECDIS can function as the main navigational tool in a ship.
PURPOSE OF ECDIS
It should enable the mariner to execute in a convenient and timely manner all
route planning, route monitoring and positioning currently performed on paper
charts. It should be capable of continuously plotting the ship's position. Should
have at least the same reliability and availability of presentation as the paper
chart published by government authorized hydrographic offices and should
provide appropriate alarms or indications with respect to the information displayed
or malfunction of the equipment should reduce the navigational workload
compared to using the paper chart.
VALUE TO NAVIGATION
An ECDIS system displays the information from electronic navigational charts (ENC)
or Digital Nautical Charts (DNC) and integrates position information from position,
heading and speed through water reference systems and optionally other
navigational sensors. Other sensors which could interface with an ECDIS are radar,
Navtex, Automatic Identification System AIS), and depth sounders.
CORRECT AND INCORRECT USE OF ECDIS
Proficiency in the use of ECDIS includes assessing the integrity of the system and all
data at all times
With the advent of technology, the use of Electronic Chart Display and Information
Systems (ECDIS) is becoming increasingly popular. While the use of an ECDIS does
have its advantages, it can have a negative impact if not used correctly and this is
known to be a causative factor in major claims such as collisions and groundings.
Due to the perceived cause of these incidents we would like to draw our
Members‟ attention to Regulation 19 of chapter V of the Safety Of Life At Sea
(SOLAS) convention which permits an ECDIS to be carried as part of the on board
navigational system, provided it meets the chart carriage requirements as detailed
in regulation. The ECDIS must be type approved and in order to do so and it must
meet the required performance standards (MSC.1/Circ.1503, ECDIS – Guidance for
good practice).
If paper charts are the primary means of navigation on board the vessel, then it is
imperative that all navigation, including, but not limited to, chart work, passage
planning and position fixing is carried out using the paper charts. The primary
source of navigation, whether paper charts or an ECDIS, should be kept updated
at all times in accordance with SOLAS Chapter V/27.
A Chartplotter is a device used in marine navigation that integrates GPS data with
an electronic navigational chart (ENC). The chartplotter displays the ENC along
with the position, heading and speed of the ship, and may display additional
information from radar, automatic information systems (AIS) or other sensors. As
appropriate to particular marine applications, chartplotters may also display data
from other sensors, such as echolocators/sonar.
Many think that because they use electronic charts on their ship they have an
ECDIS. Nothing could be further from the truth. ECDIS stands for Electronic Charts
Display and Information System and ECS stands for Electronic Chart System.
Whilst the difference is subtle it is very important. The ECDIS specifications have
been defined by various organizations and approved by IMO. The very definition
of ECDIS means that to meet the carriage requirements users MUST use official
Electronic Navigation Charts (ENCs). If you have a type approved ECDIS on your
ship, using ENCs produced by a Private Data Provider makes your machine revert
to the status of an ECS.
1. Starting and setting up ECDIS; connecting data sensors: satellite and radio
navigation system receivers, radar, gyrocompass, log, echo-sounder; accuracy
and limitations of these sensors, including effect of measurements errors and ship's
position accuracy, manoeuvring on the accuracy of course
indicators performance, compass error on the accuracy of course indication,
shallow water on the accuracy of log performance, log correction on the
accuracy of speed calculation, disturbance (sea state) on the accuracy of an
echo-sounder performance; and
The GPS system‟s calculation of the ship‟s heading in relation to the installed
chart system
EC - Electronic Chart
and ECDIS
Only two
Via a connection with the autopilot, TCS in an ECDIS controls that the ship‟s
GPS position
Whilst the difference is subtle it is very important. The ECDIS specifications have
been defined by various organizations and approved by IMO. The very definition
of ECDIS means that to meet the carriage requirements users MUST use official
Electronic Navigation Charts (ENCs). If you have a type approved ECDIS on your
ship, using ENCs produced by a Private Data Provider makes your machine revert
to the status of an ECS.
The IMO regulations stipulate that when carrying a type approved ECDIS with
official ENCs, navigators meet the carriage requirements and thus can reduce their
paper chart indices. This is not so for ECS.
Using an ECDIS therefore reduces the expenses associated with the carriage of
paper charts: initial purchase, replacement, freight, correction service, etc. There
are other advantages too that are difficult to quantify including improved safety,
navigators training and comfort with the new technology, voyage recording and
playback capabilities and others.
The criteria for official ENCs have been defined (and changed many times) and
are listed in the S-57 specifications. Unfortunately these criteria were defined at a
time when few hydrographic offices around the World were in a position to
produce ENCs in this format (many still are not). This fact resulted in two trends of
philosophy, one followed by the Hydrographic Offices and the other one followed
by Private Data Providers (PDP).
C-Map, Transas and Navionics and others are “en-block” referred to as “Private
Data Providers - PDP”. These companies realized that they had the know-how to
produce Vector charts in what is technically the same or very close to the
description of S-57. However they are not hydrographic offices and therefore their
data cannot be considered as official and should be referred to as “Electronic
Chart Database- ECD”.
Whilst some Hydrographic Offices invested in technology and production
capability to produce and distribute S-57, some did nothing (due to lack of
resources or interest or other reasons). Others created technology to produce
Raster format, which is a facsimile of the paper charts, and a few years ago IMO
approved that in the absence of official ENCs, the type approved ECDIS could use
official Raster charts.
Further information on Electronic Navigation Charts, including ECDIS vs. ECS, the
variety of data, Private Data Providers, the value of ENCs, coverage and AIS, can
be found in George Arts‟ newsletter in „Latitude Longitude‟, issued by Marine Press
of Canada.
NOAA Electronic Navigational Charts (NOAA ENC) are vector data sets that
represent NOAA's newest and most powerful electronic charting product. NOAA
ENCs conform with the International Hydrographic Office (IHO) S-57 international
exchange format, comply with the IHO ENC Product Specification, and are
provided with incremental updates that supply Notice to Mariners corrections and
other critical changes. NOAA ENCs and updates are available for free download.
NOAA ENC data may be used to fuel Electronic Chart and Display Information
Systems (ECDIS).
Standard Display – means the SENC information that should be shown when chart
is first displayed.
Display Base – means the level of SENC information which cannot be removed
from the display.
S-52 – the Data (ENC), display aspects, color tolerance which allowed to display.
S-57 – the System (SENC), digital hydrographic data, deals more with different
graphical objects and symbology.
National Hydrographic Office (NHO) – the publisher of official data for electronic
chart of the maritime nations.
Raster Chart Display System (RCDS) – all data is in one layer and one format.
Digitized picture of a chart.
Digital Nautical Chart (NC) – used in conjunction with Navy Navigation Version of
integrated bridge.
Paper Chart – is a nautical chart that complies with the above requirements and in
accordance with technical resolutions by IHO.
Demonstrate the variety of methods that chart can be loaded and change
On board there were two DGPS receivers, named as No1 and No2. In ECDIS the
primary position source was given as POS 1 and secondary as POS 2. Despite
assumption POS 1 could be DGPS receiver No 1 and POS 2 – receiver No2
respectively, that wasn‟t the case.
In reality the primary position was fed by receiver No2. Primary position source is
the first source for position displayed on ECDIS, high-accurate and reliable,
normally it‟s differential GPS receiver. If for any reason this position source fails or
becomes unreliable, ECDIS will change over to use secondary position
source. www.nautinst.org./
Knowledge of selecting data ports, and assesses sensor input values and use of
functions that are integrated with other navigational systems.
Select a sensor and monitor the data stream (live or simulated), generally
recognize the sentence syntax associated with the sensor, Where possible,
associate data with displayed navigational information
1. Demonstrate the variety of methods that chart data can be loaded and
changed: Automatically, Manually for the presently loaded route, manually from
the total portfolio, Manually displayed by the cursor position, during the activity of
the operator using the graphics cursor.
Check and or select preferred operation settings in the primary tasks panels and
on the primary information panels
Evaluate the range of information recorded in the log table (voyage recording)
Overscale and underscale refer to the display of electronic chart data at too large
and too small a scale, respectively. In the case of overscale, the display is
“zoomed in” too close, beyond the standard of accuracy to which the data was
digitized. Underscale indicates that larger scale data is available for the area in
question. ECDIS provides a warning in either case. (msi.nga.mil/)
- Overscale of the display will spread out chart and user information with the
possible loss of familiar cues for estimating
distance
- Underscale with SCAMIN off will result in unacceptable clutter due to data
density (webcache.googleusercontent.com)
Many electronic chart positional discrepancies that are observed today originate
from graphical chart compilation techniques of the past. The manual application
of survey data of varying scales to the fixed chart scale was a source of error that
often introduced biases. In the past, source information at large scales would often
have to be reduced with a copy machine so it could be overlaid and transferred
to the master version of the chart. Today, when NOAA survey crews and
contractors obtain DGPS positions on prominent shoreline features, and compare
those positions to the chart, biases may be found that are on the order of 2
millimeters at the scale of the chart (e.g., 20 meters on 1:10,000-scale chart). High
accuracy aerial photography reveals similar discrepancies between the true
shoreline and the charted shoreline. It stands to reason that other important
features such as dredged channel limits and navigational aids also exhibit these
types of biases. Unfortunately, on any given chart, the magnitude and the
direction of these discrepancies will vary in different areas of the chart. Therefore,
no systematic adjustment can easily be performed that will improve the inherent
accuracy of the paper or electronic chart. (ntl.bts.gov/)
There are two different types of ECDIS and both are used in different sectors of marine areas, in
spite of
the technology involved being the same.
Vector ECDIS: The vector variation of the electronic chart system is used mainly by
government naval vessels than commercial ones. The Vector ECDIS adheres to the norms set
up by the International Hydrographic Organization and is well advanced in the sense that, it can
be pre-programmed to indicate
anythreattoanavalvessel‟spositionincaseothershipsandnavalvesselsarealsoinasimilarlocation in
the water.
Raster ECDIS: These are a more traditional variant of the ECDIS. In these, navigational
charts that are charted out in paper are scanned and converted into the Electronic Chart
System format. Because of such a conversion, it so happens that if one wants to zoom in or
zoom out a particular navigational route, the process is quite easy and feasible. For the
purpose of display the navigational charts in this particular electronic chart system, the
technology of Raster Chart Display System (RCDS) is used in case there is an absence of the
Electronic Navigational Charts.
Image Credits: admiralty.co.uk
The concept of ECDIS is something that is gaining more and more popularity in today‟s times.
This is mainly because the concept has been officially allowed to be incorporated in the naval
vessels and ships. By adopting this method of marking and charting navigational routes, it has
become easier to avoid any unwanted accidents as this electronic chart system uses modern
technology rather than human aid. The ECDIS as an electronic Chart System is something that
allows shipping companies and ship owners a lot of mental freedom when it comes to the
safety of the vessel in the water. Because of this technology, it can be said that the aspect of
navigation has become faster, simpler and sleeker.
For inland developed its own complementary system: Inland
ECDISThere are two major types of electronic nautical
charts, namely
1. RNCs (Raster Navigational Charts) and 2. ENC ( Electronic
Navigational Charts ). Raster Navigational Chart
A Raster Navigational Chart is a grid map that is created by scanning the original paper chart
and is an exact copyof that card. The card is made up of thousands of tiny dots that make up a
flat, digitalpose image. Such a card is similar to the familiar paper product and, although it is an
electronic card are hardly manipulated. The officially published raster map is called Raster
Navigational Chart, abbreviated RNC. English ARCS is the most famous RNC service. The
acronym stands for Admiralty Raster ChartServiceand consists of 2800 grid maps or RNC,
which enable global coverage is available from the same quality and accuracy as of the charts.
Benefits of RNCs
Easy so cheaply from existing maps.
They look like paper maps so is also easy to interpret older seafarers information from
the card. Of all the areas in the world are RNCs available.
Disadvantages of RNCs
It is a direct copy of a paper map, at far zoom the individual pixels become visible and
decreases reliability.
There is no metadataavailable about objects in the map such as buoys
and lights. This card takes up more memory space as the RNC resolution
increases.
About ECDIS
written by: Kristina Dems•edited by: Rhonda Callow•updated: 10/21/2010
What is ECDIS?
Proficiency in the Use of ECDIS Includes Assessing the Integrity of the System and All Data at
All Times
https://www.google.com.ph/
Perform Standard ECDIS Work Station Start
https://www.google.com.ph/
Determin
e Fix
Quality
(Status) 0f
GNSS
The term ‘global navigation satellite system’ (GNSS) refers to a constellation of satellites
providing signals from space transmitting positioning and timing data. By definition, a GNSS
provides global coverage.
GNSS receivers determine location by using the timing and positioning data encoded in the
signals from space. The USA’s NAVSTAR Global Positioning System (GPS)and Russia’s
Global'naya Navigatsionnaya Sputnikovaya Sistema (GLONASS) are examples of GNSS.
Europe is in the process of launching its own independent GNSS, Galileo. Since 2011, four
Galileo satellites have been launched and used as part of the In-Orbit
Validation phase, allowing the first autonomous position fix to be
calculated based on Galileo-only signals in March 2013. The Commission
aims to have the full constellation of 30 Galileo satellites (which
includes six in- orbit active spares) in operation before the end of
this decade." Galileo will be interoperable
with GPS and GLONASS. This interoperability will allow manufacturers to develop terminals that
work with Galileo, GPS and GLONASS. https://www.egnos.porta.eu\
https://www.google.
com.ph/
1.9 HEADING AND DRIFTVECTORS
https://www.google.com.ph/
Graphically Monitor own ships Approach to Isolated Dangers by Means of a Guard Ring
https://www.google.com.ph/
Many think that because they use electronic chart on their ship they have an ECDIS. Nothing
could be further from the truth. ECDIS stands for Electronic Chart Display and Information
System and ECS stands for Electronic Chart System. While the difference is subtle it is very
important. The ECDIS specification
have been defined by various organization and approved by IMO. The very definition of
ECDIS means that to meet the carriage requirements users MUST use official Electronic
Navigation Chart (ENCs). If you have a type approved ECDIS on your ship, using ENCs
produced by a Private Data Provider makes your machine revert to the status of ECS.
1.11 OPENSEA
a. Starting and setting up ECDIS, connecting data sensors: satellite and radio navigation system
receivers, radar, gyro compass, log, echo sounders, accuracy and limitations of thesesensors,
includingeffectofmeasurementerrorsandship‟spositionaccuracy,maneuveringonthe
accuracy of course indicator performance, compass error on the accuracy of course
indication, shallow water on the accuracy of log performance , log correction on the
accuracy of speed calculation, disturbance (sea state} on the accuracy of echo
sounder performance and
b. The current electronic chart display and information system performance standard adopted by
the organization.www.imo.org/
1.12 CHART QUALITY AND
ACCURACY AIS - Automatic
Identification System ARPA –
Automatic Radar Plotting Aid COG -
Course OverGround.
TheGPSsystem‟scalculationoftheship‟sheadinginrelationtotheinstalledchartsystem
DGPS - Differential Global PositioningSystem
An enhancement to GPS that uses a network of fixed, ground-based reference stations
to broadcast the difference between the positions indicated by the satellite system and
the known fixed positions
DNC - Digital Nautical Charts
A vector-based digital product designed to give navigators an up-to-date seamless
database of the world. DNCs are published by the National Geospatial-Intelligence
Agency
EBL - Electronic Bearing Line
A feature in a radar that is used to determine the relative bearing of an object from the
observing ship‟s bearing
EC - Electronic Chart
ECDIS - Electronic Chart Display and Information
System ENC - Electronic Navigational Chart
GPS - Global Positioning
System HDT - Heading True
Used to send heading information from the gyro-compass to other devices including radar
and ECDIS IBS - Integrated Bridge System
RENC - Regional ENC Coordination Centre
RENC validates and distributes ENCs from producing nations to end-users. Only two
currently exist, PRIMAR in Norway and IC-ENC in the UK
RNC - Raster Nautical Chart
SENC - System Electronic Navigational
Chart SOG - Speed Over Ground
TheGPSsystem‟sapproximationoftheship‟sspeedinrelationtotheinstalledchart
TCS - Track Control System
Viaaconnectionwiththeautopilot,TCSinanECDIScontrolsthattheship‟sGPSpositionfollowsa
pre-planned track
TTM - Tracked
TargetStatus
Used to send tracked target information from ARPA to
ECDIS VDR - Voyage Data Recorder
VRM - Variable Range Marker
A feature of radar used to determine relative distance to any target seen on the
screen VTS - Vessel Traffic Services
WEND - Worldwide Electronic Navigational Chart Data Base source: www.ecdis-info.com/
Many think that because they use electronic charts on their ship they have an ECDIS. Nothing
could be further from the truth. ECDIS stands for Electronic Charts Display and Information
System and ECS stands for Electronic Chart System.
Whilst the difference is subtle it is very important. The ECDIS specifications have been defined
by various organizations and approved by IMO. The very definition of ECDIS means that to
meet the carriage requirements users MUST use official Electronic Navigation Charts (ENCs).
If you have a type approved ECDIS on your ship, using ENCs produced by a Private Data
Provider makes your machine revert to the status of an ECS. The IMO regulations stipulate
that when carrying a type approved ECDIS with official ENCs, navigators meet the carriage
requirements and thus can reduce their paper chart indices. This is not so for ECS. Using an
ECDIS therefore reduces the expenses associated with the carriage of paper charts: initial
purchase, replacement, freight, correction service, etc. There are other advantages too that are
difficult to quantify including improved safety, navigators training and comfort with the new
technology, voyage recording and playback capabilities and others. The criteria for official
ENCs have been defined (and changed many times) and are listed in the S-57 specifications.
Unfortunately these criteria were defined at a time when few hydrographic offices around the
World were in a position to produce ENCs in this format (many still are not). This fact resulted in
two trends of philosophy, one followed by the Hydrographic Offices and the other one followed
by Private Data Providers (PDP). C-Map, Transas and Navionics and others are “en-block”
referred to as “Private Data Providers - PDP”. These companies realized that they had the
know-how to produce Vector charts in what is technically the same or very close to the
description of S-57. However they are not hydrographic offices and therefore their data cannot
be considered as official and should be referred to as “Electronic Chart Database- ECD”. Whilst
some Hydrographic Offices invested in technology and production capability to produce and
distribute S-57, some did nothing (due to lack of resources or interest or other reasons). Others
created technology to produce Raster format, which is a facsimile of the paper charts, and a few
years ago IMO approved that in the absence of official ENCs, the type approved ECDIS could
use official Raster charts.
Further information on Electronic Navigation Charts, including ECDIS vs. ECS, the variety of
data, Private Data Providers, the value of ENCs, coverage and AIS, can be found in George Arts‟
newsletter in „Latitude Longitude‟, issued by Marine Press of Canada.
howard.snaith@intertanko.com
ENC data.
Raster Navigation Chart (RNC) is a Raster-formatted Chart produced by a National
Hydrographic Office.
Raster Chart Display System (RCDS) is a system which displays official Raster-formatted
charts on an ECDIS system. https://www.google.com.ph/
Electronic Navigational Chart (ENC) – the data base, standardized content, structure
and format, issued for the used with ECDIS.
System Electronic Navigational Chart (SENC) – The data base resulting the
transformation of the ENC by ECDIS for appropriate use.
Standard Display – means the SENC information that should be shown when chart is first
displayed.
Display Base – means the level of SENC information which cannot be removed from the display.
S-52 – the Data (ENC), display aspects, color tolerance which allowed to display.
S-57 – the System (SENC), digital hydrographic data, deals more with different graphical objects
and symbology.
International Hydrographic Organization (IHO) – has the responsibility for standardizing the
chart objects for ECDIS.
National Hydrographic Office (NHO) – the publisher of official data for electronic chart of the
maritime nations.
Nautical Chart – a chart specially designed to meet the requirements of the marine navigation
showing depths of waters, nature of bottom, elevation, configuration and characteristics of
coast, danger and aid to navigation.
Raster Chart Display System (RCDS) – all data is in one layer and one format. Digitized picture of
a chart.
Digital Nautical Chart (NC) – used in conjunction with Navy Navigation Version of integrated
bridge.
Paper Chart – is a nautical chart that complies with the above requirements and in accordance
with technical resolutions by IHO.
Chart Data – is a data used in paper and electronic charts
Hydrographic Source Data – is a data gathered in many different ways from different sources,
used in compilation and maintenance of nautical chart products.
ECDIS Data may include the following:
a. Geographical info,depths
b. Lighthouse symbols,buoys
c. Own Ship vector, pasttrack
d. Range rings, bearinglines
e. NavigationalWarnings
f. Planned work, Chartwork
g. Shallow water, Boarderlines.
h. Fix accuracy in othersystem
1.13 CHARTORGANIZATION
Errors Affecting the Performance of ECDIS in the open Sea
An elementary understanding should be attained of the principles of ECDIS,
together with a full practical knowledge of:
1. Starting and setting up ECDIS; connecting data sensors: satellite and radio navigation system
receivers, radar, gyrocompass, log, echo-sounder; accuracy and limitations of these sensors, including
effect of measurements errors and ship's position accuracy, maneuvering on the accuracy of course
indicators performance, compass error on the accuracy of course indication, shallow water on the
accuracy of log performance, log correction on the accuracy of speed calculation, disturbance (sea state)
on the accuracy of an echo-sounder performance;and
2. The current electronic chart display and information systemperformancestandards adopted
by the Organization.www.imo.org/
Management
https://www.google.com.ph/
Assess the inaccuracies and ambiguities caused by improper selection of chart for display:
When own ship position is on display, chart data list is sorted by scale, When own ship position
is not on display (viewing elsewhere), chart data Jist is sorted by name( alpha), ECDIS displays
largest scale data (smallest area) on the topmost layer, but the user may prioritize by format,
especially ENC to keep ECDIS in the ECDIS mode, Automatic chart loading may be switched
on or off or held to a user-selected chart (fixed) Display updates in order to review content and
to establish their inclusion in the SENC: Review their contents, Determine that they have been
included in the SENC. Demonstrate and analyze the data and chart alarms resulting from over
scaling (zooming in) and under scaling (zooming out) Demonstrate and analyze the data and
chart alarms resulting from use of a non WGS84 geodetic datum.
Demonstrate the variety of methods that chart data can be loaded and changed:
Automatically, Manually for the presently loaded route, manually from the total portfolio,
manually displayed by the cursor position, during the activity of the operator using the
graphics cursor.
2.3 PORTS AND DATAFEEDS
Performance Limits of Devices for Position, Course Over the Ground, Heading,
Speed, Depth, RADAR and AIS
Understanding the performance limits of sensors and assesses their impact on the safe use of
ECDIS.
1. Familiarity with the performance limits of devices for position, course over ground, heading,
speed, depth, radar, and AIS, especiallyconcerning:
Availability, Accuracy, Integrity.
2. Understanding the need for selecting sensor data displayed in ECDIS that is appropriate and
unambiguous, and accurate. Demonstrate the impairment of ECDIS when sensorperformance
deteriorates. www.pmo.ir/
https://www.google.com.ph/
Various Sensors Alarms and
Indications Analyze Various Sensor Alarms and Indications:
Activated when ECDIS receives no data from the external output device, Displayed in the
second line of the Information Area as they occur, Use Alarm button or free cursor on 2nd-line
message to disable the sound and message from the display, Alarm submenu function remains
orange parameter returns to set limits, or when function is deliberately turned off, Correct
response is to check the operation and connection of the relevant sensor. www.pmo.ir/
Knowledge of selecting data ports, and assesses sensor input values and use of
functions that are integrated with other navigational systems.
1. Select between primary and secondary positionsource.
2. Observe automatic change over to secondary positionsource.
3. Familiarity with the data reference system of each connectedsensor:
4. Knowledge of the data port assigned to each connectedsensor
5. Monitor, identify and to a limited extent decode the data stream for each attachedsensor:
Select a sensor and monitor the data stream (live or simulated), generally recognize the
sentence syntax associated with the sensor, Where possible, associate data with displayed
navigational information
6. Assess the plausibility of sensor input values toECDIS.
7. Assess the impact on displayed information when a sensor port is improperly.www.nautinst.org./
Impact on Displayed Information when a Sensor port is improperly Selected
1. Demonstrate the variety of methods that chart data can be loaded and changed:
Automatically, Manually for the presently loaded route, manually from the total portfolio, manually
displayed by the cursor position, during the activity of the operator using the graphicscursor.
2. Assess the inaccuracies and ambiguities caused by improper selection of a chart for display:
When own ship position is on display, chart data list is sorted by scale, When own ship position is not on
display (viewing elsewhere), chart data list is sorted by name (alpha), ECDIS displays largest scale data
(smallest area) on the topmost layer, but the user may prioritize by format, especially ENC to keep ECDIS
in the ECDIS mode, Automatic chart loading may be switched on or off or held to a user-selected chart
(fixed)
2.5 CHANGINGSETTINGS
How to Obtain Information on Charted Objects
1. Manually test the major functions of hardware, keyboard, mouse I trackball, sensor data, and
chart data.
2. Primary information panel: Primary task panels, Primary information panel, Ship, Alarm,
Chart, Logbook, ARPA, Configuration, Add Info (user layers),Route
3. Demonstrate alarm and function status indications: Alarms, time, position update, heading
andspeed log, Route keeping, heading vectors, chart scale, track, log bookfunctions.
Familiarity with the range of information recorded in the log table (voyage recording
Familiarity with the range of information recorded in the log table (voyage recording): Check navigational
conditions (own ship progress, charts displayed, etc.), Check routing events (including annual notations),
Check system events, Display additional data groups
- Over scale of the display will spread out chart and user information with the possible loss of
familiar cues for estimatingdistance.
- Under scale of the display may cause some information to behidden
- Under scale with SCAMIN off will result in unacceptable clutter due to datadensity
(webcache.googleusercontent.com)
a. Demonstrating Scaling of Electronic ChartDisplay
- Scale and select scalevalue
- With chart auto load switched on, use zoomfunction
- (Zoom) and use cursor to draw quadrangle around area to view(webcache.googleusercontent.com)
(https://www.google.com.ph/)
Module 2
Learning Outcomes
• Position: Latitude and longitude will be shown in degrees, minutes, and decimal minutes, normally based on
WGS-84 datum.
• Depth: Depths will be indicated in meters and decimeters.
• Height: Meters
• Distance: Nautical miles and tenths, or meters
• Speed: Knots and tenths ECDIS requires data layers to establish a priority of data displayed.
The minimum number of Information categories required and their relative priority from highest to lowest are listed
below:
• The Day Color Table, meant to be used in bright sunlight, uses a white background for deep water and looks the
most like a traditional paper chart.
• The Dusk Color Table uses a black background for deep water and colors are subdued, but slightly brighter than
those used in the Night Color Table.
• The Night Color Table, meant to be used in the darkest conditions, uses a black background for deep water and
muted color shades for other features. The images on the right portray Nantucket Island using each of the three
color tables. The symbols shown in the remainder of this document use the day color palette. : (msi.nga.mil/)
b.Observing Effect on Information Layers and Status Indications when Chart Data is Loaded and when Chart
Area
Event Graphic - Information categories required and their relative priority from highest to lowest are listed below:
- Turn radius maneuvering characteristics of own ship apply to curved track in ECDIS route planning
- Arrival circle centered on waypoint with circumference intersecting wheel over point on ECDIS route
(webcache.googleusercontent.com)
3.1 Vessel Maneuvering Characteristics
a. Verifying Positioning especially when ECDIS is connected to Autopilot
- Generally, only “observe position” is controlled - Where an ECDIS curved predictor is provided, caution to be
exercised as it may only project a momentary rate of turn, rather than sophisticated hydrodynamic calculations, and
therefore have limited accuracy (webcache.googleusercontent.com)
b. Determining Methods of Alert for Wheel over when Approaching Waypoints
Determine methods of alert for wheel over when approaching waypoints, such as:
- Turn radius maneuvering characteristics of own ship apply to curved track in ECDIS route planning
- Arrival circle centered on waypoint with circumference intersecting wheel over point on ECDIS route
(webcache.googleusercontent.com)
3.2 Route Planning by Table
Route display setup
Check: Ensure that the display is configured for Route Monitoring. Action: Configure the following parameters
appropriately:
- Headline
- COG Vector
- HDG Vector
- Ship by Contour or Symbol
- Align by HDG
- Course/Leg/Speed On
- XTD On
- Arrival Circle Off
- Radius On
- WPT Names On (witherbypublishinggroup.com)
a. Retrieving a Stored Plan
- For use in route monitoring
- For planning and review (webcache.googleusercontent.com)
b. Constructing a Route Plan by Inputting Waypoint Data Alphanumerically into a Route Planning Table
Waypoint selection
Check: Ensure that the correct Waypoint information is being displayed. Action: Check that the following are
configured correctly:
a. Selecting the Sea Areas and the Required Waters for Planning the Whole Passage
b. Obtaining Track Courses and Distances from the Chart
c. Obtaining Relevant Route Planning Information
3.4 Track Limits
a. Reviewing the Alarm Setting used as a Vessel Proceeding along a Monitored Route
- Deviation of the current course angle as set in planned route
- xte(cross track error)exceeds the value set in the route data table
- Guard vector for crossing safety contour
- Guard vector for entering special purpose areas - Guard ring for crossing an isolated danger
(webcache.googleusercontent.com)
b. Modifying the Setting XTE in Previously Saved Route
- Re-check the route for crossing danger of navigation according to the setting of XTE zones
- Observe the alarm triggering while proceeding along the modified route leg
- Examine results graphically on appropriate scale chart data (webcache.googleusercontent.com)
Setting-track Distance