P158.01 - Dar - Report-0080 - 10.11. 22

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Form No.

: SPM/PA/DAR/008/00

DAILY ACTIVITY REPORT # 0080

Project No. P158.01

INFRASTRUCTURE WORKS OF PARCEL-1 AT "SANTORINI" CLUSTER AT Date 10-Nov-22


Project Name
"DAMAC LAGOONS" MASTER DEVELOPMENT Day Thursday

Days Elapsed 080 of 420

Main Contractor Shapoorji Pallonji Mideast LLC TEMPERATURE:


Sub Contractor MAX 38
Consultant Khatib & Alami MIN 27

WEATHER SUNNY √ CLOUDY RAINY DUSTY Total Staff 23


HUMIDITY HIGH √ MEDIUM LOW 18% WIND 24 Km/h Total Labor 158
. Total Manpower 181

CONTRACTOR'S MANPOWER EQUIPMENT


NO NO NO
SL No. IN-DIRECT DIRECT LABOR Type STATUS
Day Night Day Night Day Night I=IDLE

1 PROJECT MANAGER 1 - Shared

2 QC ENGINEER 1 - Shared

3 MEP COORDINATOR 1

4 SAFETY OFFICER 1 - Shared

5 DC/SECRETARY 1 - Shared

Sub Total 1 0 Sub Total 0 0 Sub Total 0 0 0


TOTAL 1 Total 0
SUB-CONTRACTOR'S MANPOWER
NO NO NO
SL No. STAFF DIRECT LABOR Type STATUS
Day Night Day Night Day Night I=IDLE

1 PROJECT MANAGER 1 GENERAL FOREMAN 1 MAJOR EQUIPMENT


2 CONSTRUCTION MANAGER 1 FOREMAN 6 WATER TANKER 3
3 TECH. MANAGER ASST. FOREMAN 2 HIAB CRANE 2
4 QC MANAGER CHARGE HAND 8 SIX WHEEL TRUCK 2
5 HSE Manager CARPENTER 25 SHOVEL 1
ARCHITECT/ DRAFT MAN
6 /COORDINATOR 3 MASON 12 BOBCAT 1
7 QS 1 PIPE FITTTER EXCAVATOR 8 4
8 PROJECT ENGINEER 2 STEEL FIXER 21 GRADER 1
9 QA/QC ENGINEER 3 SURVEYOR 5 PLATE COMPACTOR 5
10 PLANNING ENGINEER 1 UNSKILLED 68 BOOM LOADER 1
11 ENGINEER - MEP 1 PLASTERER TOTAL 22 0 6
12 SITE ENGINEER 1 CHAINMAN 9
13 DC/SECRETARY 1 ELECTRICAN 1
14 ASST. OFFICE ENGINEER 1 TOTAL 158 0 OTHER EQUIPMENT
15 SAFETY OFFICER 2 STEEL BAR BENDING MACHINE 1
16 ASST. SAFETY OFFICER 2 WOOD CUTTER 4
17 IT ASSISTANT 1 DEWATERING PUMP 1
INDIRECT DIRECT LABOR
18 ASSISTANT QS 1 GENERATOR 1
19 TIME KEEPER 1 TOTAL 7 0 0
20 STORE KEEPER 1
21 ASST. DC 1 VEHICLE
22 ASST.STORE KEEPER 1 LABOUR BUS 2
23 NIGHT WATCHMAN 1 PICK UP TRUCKS 3
24 OFFICE BOYS/CLEANER 5 TOYOTA HIACE 1
25 OPERATORS / DRIVERS 29
26 TOTAL 38 1 TOTAL 6 0 0
27
Sub Total 22 0 Sub Total 197 0 Sub Total 35 0 6
TOTAL 219 Total 35
SUB-CONTRACTOR'S MANPOWER
Lifting
Contractor Name Unit H Carp S/F Paint Scaff Elect plum AC Tech Weld Cleaner Office Boy Watchman Driver/ opp Rigger Security Supr. Total

XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
Sub Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Consultant (Name): Chadi ElBoustani Signature: Date:

Contractor (Name): Arijit Dey Signature: Date:

Sub Contractor 11/11/2022


Loai Alzeer Signature: Date:
(Name):

Page 1 of 6
Form No.: SPM/PA/DAR/008/00

DAILY ACTIVITY REPORT # 0080

Project No. P158.01

INFRASTRUCTURE WORKS OF PARCEL-1 AT "SANTORINI" CLUSTER AT Date 10-Nov-22


Project Name
"DAMAC LAGOONS" MASTER DEVELOPMENT Day Thursday

Days Elapsed 080 of 420

MATERIALS DELIVERED TO SITE VISITORS TO SITE


ITEM UNIT QTY

ACTIVITIES

ACTIVITY P.Day R.Day


SL NO UOM Total Report Day Remaining Location ZONE REMARK
Cumm Cumulative

A Mobilization Work
A.1 XX
A.2 XX
B Engineering Activities

B.1 Submission for Material Inspection Request 2

B.2 Submission for Shop Drawing 2

B.3 Submission for an Inspection request - SWD & SEW 19

B.4 Submission for Material Submittal 1

B.5 Preparation for Shop Drawing

B.6 Preparation for Method Statement

B.7 Preparation for Inspection Request

B.8 Preparation for Material Submittal

B.9 XX

B.10 XX

C Construction Activities
C.1
C.2 Excavation - Storm Water (G&H)
C.3 Excavation & Formation for SWD network ( Subsurface) Lm 188 31 0 31 157 Subsurface
C.4 Total 188 31 0 31 157
C.5 Excavation & Formation for SWD network (Lateral Line) LM 171 0 0 0 171 Lateral Line
C.6 Excavation & Formation for SWD network Lm 310 246 0 246 64 RD_01
C.7 Excavation & Formation for SWD network Lm 310 139 0 139 171 RD_02
C.8 Excavation & Formation for SWD network Lm 303 228 0 228 75 RD_03
C.9 Total 1,094 613 481
C.10 Pipe laying - Storm Water (G&H)
C.11 Pipe laying for SWD network (Subsurface) Lm 188 0 0 0 188 Subsurface
C.12 Total 188 0 0 0 188
C.13 Pipe laying for SWD network (Lateral Line) Lm 171 0 0 0 171 Lateral Line
C.14 Pipe laying for SWD network Lm 310 273 0 273 37 RD_01
C.15 Pipe laying for SWD network Lm 310 133 0 133 177 RD_02
C.16 Pipe laying for SWD network Lm 303 133 0 133 170 RD_03
C.17 Total 1,094 539 555
C.18 Excavation - Storm Water (E&F)
C.19 Excavation & Formation for SWD network ( Subsurface) Lm 464 19 0 19 445 Subsurface
C.20 Total
C.21 Excavation & Formation for SWD network ( Lateral Line) Lm 630 25 0 25 605 Lateral Line
C.22 Excavation & Formation for SWD network Lm 63 0 40 40 23 RD-MC_03
C.23 Excavation & Formation for SWD network Lm 186 0 0 0 186 RD_04
C.24 Excavation & Formation for SWD network Lm 194 91 0 91 103
C.25 Excavation & Formation for SWD network Lm 185 104 0 104 81 RD_06
C.26 Excavation & Formation for SWD network Lm 180 105 0 105 75 RD_07
C.27 Excavation & Formation for SWD network Lm 177 144 0 144 33 RD_08
C.28 Excavation & Formation for SWD network Lm 160 88 0 88 72 RD_09
C.29 Excavation & Formation for SWD network Lm 82 70 0 70 12 RD_MC_01
C.30 Total 1,857 602 1,190
C.31 Pipe Laying - Storm Water (E&F)
C.32 Excavation & Formation for SWD network (Subsurface) Lm 464 0 0 0 464 Subsurface
C.33 Total
C.34 Excavation & Formation for SWD network ( Lateral Line) Lm 630 0 0 0 630 Lateral Line
C.35 Excavation & Formation for SWD network Lm 63 0 0 0 63 RD-MC_03
C.36 Pipe laying for SWD network Lm 186 0 0 0 186 RD_04
C.37 Pipe laying for SWD network Lm 194 90 0 90 104 RD_05
C.38 Pipe laying for SWD network Lm 185 27 0 27 158 RD_06
C.39 Pipe laying for SWD network Lm 180 72 0 72 108 RD_07
C.40 Pipe laying for SWD network Lm 177 66 0 128 49 RD_08
C.41 Pipe laying for SWD network Lm 160 0 0 0 160 RD_09
C.42 Excavation & Formation for SWD network Lm 82 0 48 48 34 RD_MC_01
C.43 Total 1,857 365 1,492
C.44 Main Line - Storm Water
C.45 Lowering for SWD Main Line (GRP 400 MM) Lm 431 214 0 214 217

Page 2 of 6 Main Line


Form No.: SPM/PA/DAR/008/00

DAILY ACTIVITY REPORT # 0080

Project No. P158.01

INFRASTRUCTURE WORKS OF PARCEL-1 AT "SANTORINI" CLUSTER AT Date 10-Nov-22


Project Name
"DAMAC LAGOONS" MASTER DEVELOPMENT Day Thursday

Days Elapsed 080 of 420

C.46 Excavation & Formation for SWD network Lm 431 214 0 214 217 Main Line
C.47 Pipe laying for SWD network (GRP 400MM) Lm 431 214 0 214 217
C.48 Total
C.49 Main Line - Sewerage
C.50 Access prepration for the deep excavations Nos. 12 6 18 Zone G&H/ E&F
C.51 Excavation & Formation for Sewrage Network Lm 77 30 107 RD_02
C.52 Build UP Laboratory Room 1 1 Site Office In Progress
C.53 Formation & Shutter Fixing for Manholes PCC 28 0 28 Zone G&H/ E&F
C.54 Lowering for Sewerage Main Line Lm 277 232 0 232 45 RD_02
C.55 Lowering for Sewerage Main Line Lm 98 68 0 68 30 RD_09
C.56 Concrete casting of Manholes type (H) Nos. 105 9 0 9 96 Pre-cast yard
C.57 Concrete casting of Manholes Blinding (PCC) Nos. 105 18 0 18 87 Zone G&H
C.58 Laying of Aggregate for the top surrounding Lm 180 72 0 72 108 RD_07
C.59 Excavation & Formation for Sewrage Network (Lateral Line) 72 0 72 Zone G&H
C.60 Laying of Aggregate for the top surrounding Lm 185 27 0 27 158 RD_06
C.61 Laying of Aggregate for the top surrounding Lm 177 128 0 128 49 RD_08
C.62 Access prepration for the deep excavations Nos. 18 4 22 Zone G&H/ E&F
C.63 Excavation & Formation for Sewrage Network Lm 0 25 Main Line
C.64 Lowering for Sewerage Main Line Lm 0 120 Main Line In Progress
C.66 Leveling and formation Lm 44 0 44 44 0 Line A01-6-6
C.67 Excavation & Formation for SWD network Lm 211 0 50 50 161 RD_13
C.68 Excavation & Formation for SWD network Lm 161 0 70 70 91 RD_14
C.69 Pipe laying for Sewrage network Lm 98 0 48 48 50 RD_09
C.70
C.71
C.72
C.73
C.74
C.75
C.76

Consultant (Name): Chadi ElBoustani Signature: Date:

Contractor (Name): Arijith Dey Signature: Date:

Sub Contractor 11/11/2022


Loai Alzeer Signature: Date:
(Name):

Page 3 of 6
Form No.: SPM/PA/DAR/008/00

DAILY ACTIVITY REPORT # 0080

Project No. P158.01

INFRASTRUCTURE WORKS OF PARCEL-1 AT "SANTORINI" CLUSTER AT Date 10-Nov-22


Project Name
"DAMAC LAGOONS" MASTER DEVELOPMENT Day Thursday

Days Elapsed 080 of 420

Main Contractor Shapoorji Pallonji Mideast LLC


Sub Contractor SIMI Contracting LLC
Consultant Khatib & Alami

Consultant (Name): Chadi ElBoustani Signature: Date:

Contractor (Name): Arijit Dey Signature: Date:

Sub Contractor 11/10/2022


Loai Alzeer Signature: Date:
(Name):

Page 3 of 3
DAILY ACTIVITY REPORT #

Project Name DAMAC LAGGON VILLAS Project No. P158.05


Date 17-May-22
Main Contractor SHAPOORJI PALLONJI MIDEAST LLC Day Tuesday

Consultant ARIF & BINTOAK TEMPERATURE:


MAX 34
MIN 28

WEATHER SUNNY √ CLOUDY RAINY DUSTY Manpower for Mobilization 76


HUMIDITY HIGH MEDIUM LOW 66% WIND 20 Manpower for Site Work 95
. Total Manpower 171
CONTRACTOR'S MANPOWER

NO NO NO I=IDLE STATUS
STAFF STAFF EQUIPMENT
Site Mobilizat
Day Night Day Night
Work ion
PROJ MGR 1 FOREMAN 1 1 BACKHOE/JCB 1 ###
CONSTRUCTION MANAGER 1 CHARGE HAND 1 2 WHEEL LOADER 1
PROJECT ENGINEER 1 STEEL FIXER 17 3 TIPPER 2
TECH. MANAGER 1 CARPENTER 0 20 EXCAVATOR 2
ARCHITECT/ DRAFT MAN 2 MASON 6 10 SHOWEL 2
SAFETY OFFICER 2 UNSKILLED / HELPER 11 7 TOWER CRANE 0
ADMIN 1 SCAFFOLDER 0 0 ROLLER COMPACTOR 1 ###
DC/SECRETARY 3 PAINTER 0 3 MOBILE CRANE 1 ###
ENGINEER - MEP 1 ELECTRICIAN 1 3 CONCRETE VIBRATOR 0
LAB TECHNICIAN 1 PLUMPER 1 1 WELDING MACHINE 1 ###
TIMEKEEPER 1 WELDER 0 1 GENERATOR 3

SURVEYOR BAR BENDING/CUTTING


2 MECHANIC/ AC TECH 0 2 0
MACHINE
STORE KEEPER 1 CLEANER 0 1 BOBCAT TELESCOPIC 2 ###
DRIVERS 4 OFFICE BOYS 0 1 BUS/14 SEATER VAN 3
SECURURITY 1 NIGHT WATCHMAN 0 1 PICK UP TRUCKS 1
OPERATOR 2 2 WATER TANKER 2
RIGGER 0 2 TOWER LIGHT 2
OTHER 0 2

Sub Total 23 0 Sub Total 40 62 Sub Total 22 2


TOTAL 23 TOTAL 102 TOTAL 24

SUBCONTRACTOR'S MANPOWER
STAFF NO
SITE MANAGER 1
ENGINEERS 2
FOREMAN 5
CHARGEHAND 1
STORE KEEPER
SURVEYOR 2

TOTAL 11
Driver/
Subcontractor's Name Unit M H Carp S/F Paint Scaff Elect plum AC Tech Weld opp Other Total
MEP subcontractor
NES Road Contracting LLC (Excavation) No 5 5 2 12
Noaf Steel Work ( Fenceing & Sign Board No 3 1 4
work)
JMD Tech Services ( Interlock) No 5 5 10
Moftal Alkhair Tech. Services LLC ( Steel , No 5 4 0 9
Shutter & Concrete)
SPECTRUM TENT ( Store Tent) NO 0 0
Total 5 18 5 0 0 0 0 0 0 0 5 2 35

Page 5 of 6
MATERIALS DELIVERED TO SITE VISITORS TO SITE COMPANY
ITEM UNIT QTY
Pota cabin no 5
Polythine -1000 Gauge roll 35

Cover Block various Sizes no 10000

CONSTRUCTION ACTIVITIES
SL NO ACTIVITY LEVEL LOCATION REMARK
A Mobilization Work
1 Site office cabin - carpentry and painting work
2 Electrical and plumbing work in site office cabin
3 Kerb Stone fixing at office Area
4 Interlock laying at office Area
5 Fencing installation
B Project Activity
1 Earth Work - Levelling and Compaction A 115-123

2 Earth Work - Deep Excavation up to Footing level A106-114

3 Safety work- Barrication around deep excavation, walkway barrication, safety sign board fixing etc
4

Consultant (Name): Signature: Date:

Contractor (Name): Signature: Date:

Page 6 of 6