P158.01 - Dar - Report-0080 - 10.11. 22
P158.01 - Dar - Report-0080 - 10.11. 22
P158.01 - Dar - Report-0080 - 10.11. 22
: SPM/PA/DAR/008/00
2 QC ENGINEER 1 - Shared
3 MEP COORDINATOR 1
5 DC/SECRETARY 1 - Shared
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
XXX No. 0
Sub Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Page 1 of 6
Form No.: SPM/PA/DAR/008/00
ACTIVITIES
A Mobilization Work
A.1 XX
A.2 XX
B Engineering Activities
B.9 XX
B.10 XX
C Construction Activities
C.1
C.2 Excavation - Storm Water (G&H)
C.3 Excavation & Formation for SWD network ( Subsurface) Lm 188 31 0 31 157 Subsurface
C.4 Total 188 31 0 31 157
C.5 Excavation & Formation for SWD network (Lateral Line) LM 171 0 0 0 171 Lateral Line
C.6 Excavation & Formation for SWD network Lm 310 246 0 246 64 RD_01
C.7 Excavation & Formation for SWD network Lm 310 139 0 139 171 RD_02
C.8 Excavation & Formation for SWD network Lm 303 228 0 228 75 RD_03
C.9 Total 1,094 613 481
C.10 Pipe laying - Storm Water (G&H)
C.11 Pipe laying for SWD network (Subsurface) Lm 188 0 0 0 188 Subsurface
C.12 Total 188 0 0 0 188
C.13 Pipe laying for SWD network (Lateral Line) Lm 171 0 0 0 171 Lateral Line
C.14 Pipe laying for SWD network Lm 310 273 0 273 37 RD_01
C.15 Pipe laying for SWD network Lm 310 133 0 133 177 RD_02
C.16 Pipe laying for SWD network Lm 303 133 0 133 170 RD_03
C.17 Total 1,094 539 555
C.18 Excavation - Storm Water (E&F)
C.19 Excavation & Formation for SWD network ( Subsurface) Lm 464 19 0 19 445 Subsurface
C.20 Total
C.21 Excavation & Formation for SWD network ( Lateral Line) Lm 630 25 0 25 605 Lateral Line
C.22 Excavation & Formation for SWD network Lm 63 0 40 40 23 RD-MC_03
C.23 Excavation & Formation for SWD network Lm 186 0 0 0 186 RD_04
C.24 Excavation & Formation for SWD network Lm 194 91 0 91 103
C.25 Excavation & Formation for SWD network Lm 185 104 0 104 81 RD_06
C.26 Excavation & Formation for SWD network Lm 180 105 0 105 75 RD_07
C.27 Excavation & Formation for SWD network Lm 177 144 0 144 33 RD_08
C.28 Excavation & Formation for SWD network Lm 160 88 0 88 72 RD_09
C.29 Excavation & Formation for SWD network Lm 82 70 0 70 12 RD_MC_01
C.30 Total 1,857 602 1,190
C.31 Pipe Laying - Storm Water (E&F)
C.32 Excavation & Formation for SWD network (Subsurface) Lm 464 0 0 0 464 Subsurface
C.33 Total
C.34 Excavation & Formation for SWD network ( Lateral Line) Lm 630 0 0 0 630 Lateral Line
C.35 Excavation & Formation for SWD network Lm 63 0 0 0 63 RD-MC_03
C.36 Pipe laying for SWD network Lm 186 0 0 0 186 RD_04
C.37 Pipe laying for SWD network Lm 194 90 0 90 104 RD_05
C.38 Pipe laying for SWD network Lm 185 27 0 27 158 RD_06
C.39 Pipe laying for SWD network Lm 180 72 0 72 108 RD_07
C.40 Pipe laying for SWD network Lm 177 66 0 128 49 RD_08
C.41 Pipe laying for SWD network Lm 160 0 0 0 160 RD_09
C.42 Excavation & Formation for SWD network Lm 82 0 48 48 34 RD_MC_01
C.43 Total 1,857 365 1,492
C.44 Main Line - Storm Water
C.45 Lowering for SWD Main Line (GRP 400 MM) Lm 431 214 0 214 217
C.46 Excavation & Formation for SWD network Lm 431 214 0 214 217 Main Line
C.47 Pipe laying for SWD network (GRP 400MM) Lm 431 214 0 214 217
C.48 Total
C.49 Main Line - Sewerage
C.50 Access prepration for the deep excavations Nos. 12 6 18 Zone G&H/ E&F
C.51 Excavation & Formation for Sewrage Network Lm 77 30 107 RD_02
C.52 Build UP Laboratory Room 1 1 Site Office In Progress
C.53 Formation & Shutter Fixing for Manholes PCC 28 0 28 Zone G&H/ E&F
C.54 Lowering for Sewerage Main Line Lm 277 232 0 232 45 RD_02
C.55 Lowering for Sewerage Main Line Lm 98 68 0 68 30 RD_09
C.56 Concrete casting of Manholes type (H) Nos. 105 9 0 9 96 Pre-cast yard
C.57 Concrete casting of Manholes Blinding (PCC) Nos. 105 18 0 18 87 Zone G&H
C.58 Laying of Aggregate for the top surrounding Lm 180 72 0 72 108 RD_07
C.59 Excavation & Formation for Sewrage Network (Lateral Line) 72 0 72 Zone G&H
C.60 Laying of Aggregate for the top surrounding Lm 185 27 0 27 158 RD_06
C.61 Laying of Aggregate for the top surrounding Lm 177 128 0 128 49 RD_08
C.62 Access prepration for the deep excavations Nos. 18 4 22 Zone G&H/ E&F
C.63 Excavation & Formation for Sewrage Network Lm 0 25 Main Line
C.64 Lowering for Sewerage Main Line Lm 0 120 Main Line In Progress
C.66 Leveling and formation Lm 44 0 44 44 0 Line A01-6-6
C.67 Excavation & Formation for SWD network Lm 211 0 50 50 161 RD_13
C.68 Excavation & Formation for SWD network Lm 161 0 70 70 91 RD_14
C.69 Pipe laying for Sewrage network Lm 98 0 48 48 50 RD_09
C.70
C.71
C.72
C.73
C.74
C.75
C.76
Page 3 of 6
Form No.: SPM/PA/DAR/008/00
Page 3 of 3
DAILY ACTIVITY REPORT #
NO NO NO I=IDLE STATUS
STAFF STAFF EQUIPMENT
Site Mobilizat
Day Night Day Night
Work ion
PROJ MGR 1 FOREMAN 1 1 BACKHOE/JCB 1 ###
CONSTRUCTION MANAGER 1 CHARGE HAND 1 2 WHEEL LOADER 1
PROJECT ENGINEER 1 STEEL FIXER 17 3 TIPPER 2
TECH. MANAGER 1 CARPENTER 0 20 EXCAVATOR 2
ARCHITECT/ DRAFT MAN 2 MASON 6 10 SHOWEL 2
SAFETY OFFICER 2 UNSKILLED / HELPER 11 7 TOWER CRANE 0
ADMIN 1 SCAFFOLDER 0 0 ROLLER COMPACTOR 1 ###
DC/SECRETARY 3 PAINTER 0 3 MOBILE CRANE 1 ###
ENGINEER - MEP 1 ELECTRICIAN 1 3 CONCRETE VIBRATOR 0
LAB TECHNICIAN 1 PLUMPER 1 1 WELDING MACHINE 1 ###
TIMEKEEPER 1 WELDER 0 1 GENERATOR 3
SUBCONTRACTOR'S MANPOWER
STAFF NO
SITE MANAGER 1
ENGINEERS 2
FOREMAN 5
CHARGEHAND 1
STORE KEEPER
SURVEYOR 2
TOTAL 11
Driver/
Subcontractor's Name Unit M H Carp S/F Paint Scaff Elect plum AC Tech Weld opp Other Total
MEP subcontractor
NES Road Contracting LLC (Excavation) No 5 5 2 12
Noaf Steel Work ( Fenceing & Sign Board No 3 1 4
work)
JMD Tech Services ( Interlock) No 5 5 10
Moftal Alkhair Tech. Services LLC ( Steel , No 5 4 0 9
Shutter & Concrete)
SPECTRUM TENT ( Store Tent) NO 0 0
Total 5 18 5 0 0 0 0 0 0 0 5 2 35
Page 5 of 6
MATERIALS DELIVERED TO SITE VISITORS TO SITE COMPANY
ITEM UNIT QTY
Pota cabin no 5
Polythine -1000 Gauge roll 35
CONSTRUCTION ACTIVITIES
SL NO ACTIVITY LEVEL LOCATION REMARK
A Mobilization Work
1 Site office cabin - carpentry and painting work
2 Electrical and plumbing work in site office cabin
3 Kerb Stone fixing at office Area
4 Interlock laying at office Area
5 Fencing installation
B Project Activity
1 Earth Work - Levelling and Compaction A 115-123
3 Safety work- Barrication around deep excavation, walkway barrication, safety sign board fixing etc
4
Page 6 of 6