Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

SHALINI M J

Mob: 8867276571
Email ID: mjshalini16@gmail.com

Seeking a responsible position in the area of, Project Electrical Engineering and establishing Inter-
personal skills to the development of the organization and to enhance my career.

Professional Synopsis
Had been to Vienna (Austria) for The Training in ELCAD software.

[1] Over 8+ years of experience in making Engineering Drawings and related documentation using ELCAD, AUTOCAD
tools. Making layout routing diagrams, cable schedule, manufacturing drawings, as-built drawings & contribute
largely to the plant engineering activities / documentation.
[2] Presently lastly working worked with M/s. Andritz Technologies Private Limited, Bangalore.
1[3] Trained in ELCAD software at Vienna, Austria.
2 Associated with ABB Ltd, Peenya, Bangalore up to November 2005.
3[4] Associated with BHEL EDN, Mysore Road, Bangalore up for 1 year as Technical Apprentice Trainee.
4[5] A strategic planner with expertise in preparing Circuit diagrams, hardware GA’s, Schematic drawings for
Automation Projects.
5[6] Skillful in liaising with internal departments and timely completion of projects.
6[7] Strong relationship management, communication skills with the ability to network with Project Members.

Career Highlights
Since November ’2005 associated with ANDRITZ TECHNOLOGIES PVT. LIMITED, Bangalore as
Asst. Engineer (Electrical)

Projects Worked:

1. Designing Automation Schematics for PLC RIO Panels, MCC Panels. Drives Panels to for Acid Regeneration Plant
(ARP)

Clients:
M/s JSW STEEL LTD., Toranagallu, Bellary.
Salem Steel Plant. Salem, TamilNadu.
Tata Steel Plant. Jamshedpur.
SAFAL STEEL (PTY) LTD. South Africa.
AGS (Al Ghurair Steel & Iron), Abu Dhabhi
DPL (Dharampal Premchand Ltd.,), Tripura
Location: Toranagallu, Bellary.

Key Roles and responsibilities:

 Preparation of Automation Schematic diagrams, Control box drawings as per the I/O list.
 Preparation of General Arrangement Drawings (GA) for PLC panels and Control boxes..
 Preparation of Internal General Arrangement Drawings (IGA).
 Preparation of Bill of Material.
 Preparation of Cable Schedule, Terminal drawings etc Using ELCAD.
 Checking up of all type of Panels, Control desk and Control boxes physically as per GA.
 Checking up of the Panel Internal Assy. & Panel Wiring as per IGA.
 Co-ordination with Planning & Testing as a part of Project Execution.
 Preparations of File Dividers, File Flaps using Microsoft office.
 Creating new symbols, new symbol libraries.

2. Designing Automation Schematics for PLC RIO Panels, MCC Panels. Drives Panels to PYROMARS and
NEUTRALIZATION.

Client: Salem Steel Plant.


Location: Salem, TamilNadu.
Key Roles and responsibilities:

 Preparation of Automation Schematic diagrams, Control box drawings as per the I/O list.
 Preparation of General Arrangement Drawings (GA) for PLC panels and Control boxes..
 Preparation of Internal General Arrangement Drawings (IGA).
 Preparation of Bill of Material.
 Preparation of Cable Schedule, Terminal drawings etc Using ELCAD.
 Checking up of all type of Panels, Control desk and Control boxes physically as per GA.
 Checking up of the Panel Internal Assy. & Panel Wiring as per IGA.
 Co-ordination with Planning & Testing as a part of Project Execution.
 Preparations of File Dividers, File Flaps using Microsoft office.
 Creating new symbols, new symbol libraries.

 3. Designing Automation Schematics for PLC RIO Panels, MCC Panels. Drives Panels to Acid Regeneration
Plant (ARP)

 Client: Tata Steel Plant.
 Location: Jamshedpur.

 Key Roles and responsibilities:

 Preparation of Automation Schematic diagrams, Control box drawings as per the I/O list.
 Preparation of General Arrangement Drawings (GA) for PLC panels and Control boxes.
 Preparation of Internal General Arrangement Drawings (IGA).
 Preparation of Bill of Material.
 Preparation of Cable Schedule, Terminal drawings etc Using ELCAD.
 Checking up of all type of Panels, Control desk and Control boxes physically as per GA.
 Checking up of the Panel Internal Assy. & Panel Wiring as per IGA.
 Co-ordination with Planning & Testing as a part of Project Execution.
 Preparations of File Dividers, File Flaps using Microsoft office.
 Creating new symbols, new symbol libraries.

 4. Designing Automation Schematics for PLC RIO Panels, MCC Panels. Drives Panels to Acid Regeneration
Plant (ARP)

 Client: SAFAL STEEL (PTY) LTD.
 Location: South Africa.

 Key Roles and responsibilities:

 Preparation of Automation Schematic diagrams, Control box drawings as per the I/O list.
 Preparation of General Arrangement Drawings (GA) for PLC panels and Control boxes..
 Preparation of Internal General Arrangement Drawings (IGA).
 Preparation of Bill of Material.
 Preparation of Cable Schedule, Terminal drawings etc Using ELCAD.
 Checking up of all type of Panels, Control desk and Control boxes physically as per GA.
 Checking up of the Panel Internal Assy. & Panel Wiring as per IGA.
 Co-ordination with Planning & Testing as a part of Project Execution.
 Preparations of File Dividers, File Flaps using Microsoft office.
 Creating new symbols, new symbol libraries.

25. Designing Automation Schematics for PLC RIO Panels, MCC Panels. Drives Panels to Cold Annealing and Pickling
Line (CAPL)

Client: M/s JINDAL STAINLESS LTD.,


Location: Hissar, Haryana.

Key Roles and responsibilities:

 Preparation of Automation Schematic diagrams, Control box drawings as per the I/O list.
 Preparation of General Arrangement Drawings (GA) for PLC panels and Control boxes..
 Preparation of Internal General Arrangement Drawings (IGA).
 Preparation of Bill of Material.
 Preparation of Cable Schedule, Terminal drawings etc Using ELCAD.
 Checking up of all type of Panels, Control desk and Control boxes physically as per GA.
 Checking up of the Panel Internal Assy. & Panel Wiring as per IGA.
 Co-ordination with Planning & Testing as a part of Project Execution.
 Preparations of File Dividers, File Flaps using Microsoft office.
 Creating new symbols, new symbol libraries.

6. Designing Automation Schematics for PLC RIO Panels, MCC Panels. Drives Panels to Acid Regeneration Plant (ARP)

Client: M/s JINDAL STAINLESS LTD.,


Location: Toranagallu, Bellary.

7. Designing Automation Schematics for PLC RIO Panels, MCC Panels. Drives Panels to Acid Regeneration Plant (ARP)

Client: M/s AGS (Al Ghurair Steel & Iron)


Location: Abu Dhabhi.

8. Designing Automation Schematics for PLC RIO Panels, MCC Panels. Drives Panels to Acid Regeneration Plant (ARP)

Client: M/s DPL (Dharampal Premchand Ltd.,)


Location: Tripura. And etc.

“Got word of appreciation from the client for On Time Delivery and for showcasing problem solving
skills. Received departmental achievers award for successful completion of the project”.

Previous Experience(s)

2. Dec ’03 - Nov ’05, M/s ABB Ltd., Peenya Industrial Area, Bangalore as
Assistant Design Engineer - Cranes Department.

Clients for whom I worked :


 M/s Tisco Growth Shop.
 M/s Birla Copper Ltd.
 M/s Bhushan Steels.
 M/s National Lignite Corporation.
 M/s Hindustan Zink Ltd. Etc

Roles and Responsibilities:


 Preparation of Automation Schematic diagrams.
 Preparation of General Arrangement Drawings (GA).
 Preparation of Internal General Arrangement Drawings (IGA).
 Preparation of Bill of Material or Preparation of List of Apparatus (LA).
 Preparation of Wiring Tables as per Circuit (Scheme) Diagrams
 Preparation of List of Labels & Rating Plate Details.
 Checking up of all type of Panels Physically as Per GA.
 Checking up of the Panel Internal Assy. & Panel Wiring as per IGA.

3. Undergone One year Apprentice Training in “M/s. Bharat Heavy Electricals Ltd.”,
Mysore Road, Bangalore-26.

Roles and Responsibilities:

 Preparation of Project Documents and Hardware Schematic Drawings for Boiler Control Projects.

Creation and Correction of Mechanical drawings Like


 General assembly drawings.
 Manufacturing Items
 Sub assembly drawings.
Preparing & drafting Electrical Schematics diagrams of
 Unit Control Panels.
 Relay Control Panels
 Rack and Cubicle wiring diagram
Using Auto Cad.

Data Entry related to Engineering Information Like


 Bill of Material (BOM).
 Engineering Information Release sheet (EIRS).
 Manufacturing Information Documents (MID).

Academic

Diploma in Electronics and Communication Engineering – I Class. (Board of Technical Examination, Bangalore)

IT Skills
M S Word, M S Excel, Power point and Internet Usage

I consider my personal strength to include adaptability, flexibility to learn quickly. I have well-developed inter-
personal skills with both staff and client while maintaining professional attitude. I am able to make decisions
independently and confident of abilities to succeed as a good and effective person. I am currently seeking a
position which will allow me to utilize my skills, knowledge and experience to their full potential.

Shalini M J

You might also like