DETAILED ESDTIMATE

Project No.
Name of Project: PCSO- RENOVATION
Project Location:
Contract Duration

Item Description Qty. Unit


1 DEMOLITION OF EXISTING PARKING BARRIER 1 lumpsum
Materials
consumables

Labor Qty. Duration (Days)


skilled
unskilled

Equipment Qty. Duration (Days)


Jack Hammer drill
tools

Item Description Qty. Unit


2 Re-flooring for PWD Ramp 1 lumpsum
Materials
Portland Cement
Sand
Gravel
Stainless Steel Tubing (1/2" dia.x 2m)
10mm SRB

Labor Qty. Duration (Days)


Skilled
Unskilled

Equipment Qty. Duration (Days)


Tools

Item Description Qty. Unit


3 Comfort Room Construction
Materials
Portland Cement
Sand
Gravel
10mm DRB
4" thk CHB
Wall and Ceiling Paint
Electrical Wire
Light Bulb
4" PVC (3mX2.6m)
90 deg. 4" elbow fitting
Consumables

Labor Qty. Duration (Days)


Skilled
Unskilled

Equipment Qty. Duration (Days)


Tools
Hand Drill

Item Description Qty. Unit


4 WALL AND CEILING RE-PAINT
Materials
Top coat latex paint (Lemon Yellow)
Top coat latex paint (Blue)
Top coat latex paint (Red)
Top coat latex paint (Beige)
Flat Latex Primer
Consumables

Labor Qty. Duration (Days)


Foreman
Skilled
Unskilled

Equipment Qty. Duration (Days)


Tools

Item Description Qty. Unit


5 WINDOW AND DOOR GRILLS
Materials
Unit Cost Amount

Rate/Day

Rate/Day

Unit Cost Amount

Rate/Day

Rate/Day

Unit Cost Amount


Rate/Day

Rate/Day

Unit Cost Amount

Rate/Day

Rate/Day

Unit Cost Amount