QAQC Checklist

Demolition Work (Partition Removal)

Project Name Date


Project Number Completed By

# Description Yes No Comments

Pre - Demolition

Health and safety procedures have been reviewed and


1
approved.
All power to the area has been disconnected and verified as
2
dead. Sign off sheets have been completed.
Area has been confirmed free of asbestos or other
3
hazardous materials.
Access (scaffolding) has been erected and sign off has been
4
completed.

5 Pre job inspection and worker sign off has been completed.

Extent of removals has been confirmed, and marked out as


6
required.
Disposal requirements and bin have been arranged and are
7
clear.

8 Other (please specify):

Post - Demolition

9 Area has been cleared of debris.

10 Wall base and tracks have been removed.

11 Any services within the partition have been removed.

12 If in an existing space, all protection has been removed.

13 All cuts have been made cleanly.

Removals have been completed to the satisfactory of the


14
trades and general contractor following.

15 Space is clean and organized.

All materials have been disposed of properly, bin tickets


16
have been received if required.

17 Other (please specify):

Completed By Date
Company Signature

Checked By Date
Company Signature