DMG Est 4

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
OEM Parts Other Parts Paint & Materials Line item Markup Parts & Material Total Labour Rate 182 Hours @ $30.00 38445642 gy) 38408642 18 RAM oy ‘B00 CLASS BLACK 6ae014 Replace RepairHrs Total Hrs ‘Sheet Metal (SM) MechiElec (ME) Frame (FR) Refinish (RF) $58.00 ‘$85.00 $58.00 $58.00 182 — $1,055.60 Labour Total Sublet Repairs Harmonized Sales Tax Gross Total Less: Deductible ‘Net Total (Final Bill) Hrs 283 70 182 @ 13,000% PH: 202 - PR: 202, OM $2,696.65 $2,810.27 $546.00 $575.00 $6,427.92 353 $2,047.40 53.5 Hours: $3,103.00, $165.00 $1,260.47 $10,956.39 $500.00- $10,456.39 ‘Alternate Parts ¥/02/01/00/01/01 Cumulative 02/01/00/01/01 Postal Code: M2J 3N3 Canada Rate Name Ontario ‘Audatex Estimating 10.12.96 ES 17/01/2022 10:37 AM REL 10.12.96 DT 01/12/2021 DB 18/01/2022 Province Disclosu (© 2022 Audatex North America, Inc. 2.5 HRS WERE ADDED TO THIS ESTIMATE BASED ON AUDATEX’S TWO-STAGE REFINISH FORMULA. ESTIMATE CALCULATED USING THE 2.5 HOUR MAXIMUM ALLOWANCE FOR TWO-STAGE REFINISH OF NON-FLEX, EXTERIOR ‘SURFACES. THIS ESTIMATE HAS BEEN PREPARED ON BEHALF OF TRAVELERS CANADA, THIS IS NOT AN AUTHORIZATION TO REPAIR. OWNER TO PRESENT ESTIMATE TO REPAIRER BEFORE REPAIRS ESTIMATE WRITTEN TO INDUSTRY ACCEPTED REPAIR STANDARDS. MAY CONTAIN ORIGINAL EQUIPMENT MANUFACTURER (OEM) NON-OEM OR LIKE KIND AND QUALITY PARTS(LKQ)AS. APPROPRIATE. THE ACTUAL PART TYPE IS DETAILED WITHIN THE ESTIMATE. ‘THE VEHICLE OWNER MUST RECEIVE COPY OF ESTIMATE PRIOR TO COMMENCING REPAIRS. replace OEM NG= Replace NAGS Panta

You might also like