Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Work Method Statement for Cleaning,

Grinding, Touch Up and Skim Coat Existing


Wall
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 1 of 10

Method Statement Title:


Work Method Statement for Cleaning, Grinding, Touch Up and Skim
Coat Existing Wall

Reviewed by Kinetics Approved by


KSM Project
Submitted by Manager
Contractor Project Engineer Construction
QA/QC EHS
Manager

Signature
:

Name:

Date:

Time:

Rev. 5 Rev. date: 20210810


Work Method Statement for Cleaning,
Grinding, Touch Up and Skim Coat Existing
Wall
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 2 of 10

Table of Content

Section Description

1.0 Introduction

2.0 Resources

2.1 Material

2.2 Machinery & Equipment

2.3 Manpower Involved/Plan

2.4 Contractor Involved

3.0 Primary Requirement

3.1 Coordination Requirement

3.2 Others Operation Requirement

3.3 Receiving

3.4 Handling

3.5 Storage

4.0 Work Activity Methodology/ Arrangement

4.1 Site Preparation

4.2 Mobilization & Installation

5.0 Inspection, Testing, and Commissioning Proposal

6.0 List of Attachment / Appendices / References / Drawing

7.0 Hirarc Assessment

Rev. 5 Rev. date: 20210810


Work Method Statement for Cleaning,
Grinding, Touch Up and Skim Coat Existing
Wall
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 3 of 10

1.0 Introduction
This document shall address the typical works for cleaning, grinding, touch up and skim coat works.
The existing wall at the said area are required to be cleaned and grinded for receiving the skim coat
finishing.

1.1 The construction standard above is shown as following: -

IMCS Specification: -

IMCS SECTION DESCRIPTION


IMCS 09_91_13_00 (09915) Painting- Building

2.0 Resources

2.1 Materials

All materials used on site must be approved type and they are as follows: -

No Type / Brand Name Description of Materials


1 Base Grey 380 YTL
2 Quick Skim 388 YTL
3 QuickMix Thin Plaster Series (386+ or 386) TBC
4 Quick Render 387 YTL
5 Corner Beads TBC
6 Clean Water N/A

2.2 Machinery and Equipment

No Type / Model Quantity


1 Grinder 4 Nos
2 Plastic Canvas (20ftx30ft) Various
4 Vacuum 1 Nos
5 Scraper Various
6 Extension Wire Various
7 Plaster Tray Various
8 Plaster Tools Various
9 Scissor Lift 2 Nos
10 Exhaust Fan 2 Nos
11 Erect mobile tubular scaffold with roller (If require, 1 Nos
Option 2 after scissor lift)
12 Spirit Level 1 Nos

Rev. 5 Rev. date: 20210810


Work Method Statement for Cleaning,
Grinding, Touch Up and Skim Coat Existing
Wall
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 4 of 10

13 Squareness 1 Nos
14 Taping Rod 1 Nos
15 Electrical Mixer 1 Nos

2.3 Manpower Involved / Plan

Designation / Name (Kinetics) Key Person Quantity


Manager: / 1
Engineer: / 1
Supervisor: / 1
EHS: / 1
QA/QC: / 1

Designation / Name (DPV) Key Person Quantity


Manager: / 1
Engineer: / 1
Supervisor: / 1
EHS: / 1
QA/QC / 1
QA/QC: / 1

2.4 Contractor Involved

Company Type / Model Quantity


CSA Contractor 1 lot

Rev. 5 Rev. date: 20210810


Work Method Statement for Cleaning,
Grinding, Touch Up and Skim Coat Existing
Wall
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 5 of 10

3.0 Primary Requirement

3.1 Coordination Requirement


3.1.1 Identification of existing services and structure around the working area.

3.2 Other Operation Requirement


3.2.1 Work access to the construction area need to confirm and approved by Kinetics.

3.2.2 Location for storage and the type of material to store must be approved by
Kinetics.

3.3 Receiving
3.3.1 All delivery materials to the site shall be informed to the site manager/ to have the
plan for unloading. Upon arrival of materials at the storage yard, the materials
controller will match delivery notes and shall verify the consignment.

3.3.2 Receiving/Handling/Storage for all materials must comply manufacturer’s


recommendation & IMCS

3.3.3 Upon arrival of the material, the consignment shall be verified by the supervisor to
match the packing list and inspected by Kinetics QAQC & Client.

3.3.4 All material received at site shall be visually inspected for any damages in order to
avoid of work.

3.3.5 Deliver each container with labeling intact which identifies manufacturer, type of
material, brand name, brand code, coverage, surface preparation, drying time,
cleanup, color designation, and instructions for mixing and reducing.

3.4 Handling
3.4.1 Proper methods & equipment, i.e., trolley or pallet jack to be used for transferring
of the materials or tools.

3.4.2 Supervisor shall monitor the work and ensure the work is complied with all safety
requirements.

3.5 Storage
3.5.1 Proper barricade & barrier ownership tag to be used for materials storage.

3.5.2 Proper containment tray to be used for materials storage.

3.5.3 Store materials in a sheltered dry place that is free from excessive moisture.

Rev. 5 Rev. date: 20210810


Work Method Statement for Cleaning,
Grinding, Touch Up and Skim Coat Existing
Wall
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 6 of 10

3.5.4 Daily housekeeping shall be carried out to ensure the cleanness of the area.

4.0 Work Activity Methodology / Arrangement

4.1 Site Preparation


4.1.1 Planning the best route for the access to get in and out

4.1.2 Investigate & coordinate of existing buildings, structure, M&E which may affected
the progress of the works.

4.1.3 Identify the storage location for materials, tool and equipment.

4.1.4 The working areas must be barricade using barricade cone and safety tape to
avoid people to enter the working areas.

4.2 Mobilization & Installation

No Activity Sequence
1 a) To inform related Project Manager, System Owner and KINETICS EHS
management before start work for the day.

b) To obtain the entire relevant valid EHS document, SIPP and PTP before
start work.

c) To assign all the workers, stuff to attend safety induction before start work.

d) Get the valid permit for the workers and machinery to enter the site.

2 a) Inform the Project Manager or person in charge before start work

b) Detail of the activity to be performed shall be informed/briefed and


explained before starting work.

c) Precautions must be taken before and during activity in accordance with


DOSH standard and Intel Safety standard.

d) During the progress of activity, the work shall be under the continuous
supervision of an experienced foreman.

e) Provide safeguards, including related signages, barricades, temporary


fences, warning lights and other similar items that are required for protection
of all personnel during all activity involved.

Rev. 5 Rev. date: 20210810


Work Method Statement for Cleaning,
Grinding, Touch Up and Skim Coat Existing
Wall
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 7 of 10

3 Mobilization of tools and workers

a) To inform related Project Manager, System Owner and EHS Management


before start work for the day.

b) Obtained the entire relevant valid EHS document before start work.

c) All Vehicles to comply the wheel stopper when loading material.

d) Shall be use manpower to mobilize the materials into the work location and
storage area.

e) Get advised from KINETICS project management team for the location for
material storage.

f) Shall be used forklift to mobilize the materials into the work area if
necessary.

g) Pallet Jack shall be used during work where necessary for mobilize the
material to work location needed.

4 To brief the workers on the job sequence and streamline their job for hazard
avoidance prior work starts.

5 Hard barricade all working area by using tubular scaffolding.

6 To prepare the power supply to the working area by using extension wire for
temporary lighting at night.

7
Method statement

a) Working platform to reach the height level of wall by using:

I. Scissor lift/ Erect mobile tubular scaffold with roller

b) To prepare the power supply to the working area by using extension


wire for electrical tools e.g., grinder.

c) Barricade the perimeter of working area.

d) Work started with grinding the wall to receive the skim coat by using grinder
angle and scrapper.

Rev. 5 Rev. date: 20210810


Work Method Statement for Cleaning,
Grinding, Touch Up and Skim Coat Existing
Wall
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 8 of 10

e) Remove unused materials such as wall plug, etc.

e) Wash and remove any grease on existing wall by using wet cloth.

f) Examine and identify all holes, crack lines, crack areas and hollow wall
on the wall surface.

g) Fill and touch up the crack using base coat with scrapper before
proceeding with the skim coat.

h) Surfaces must be clean, free from dust, oil and any trace of foreign
materials. Wall surface defects exceeding 5mm shall be rectified as
per manufacturer’s recommendation.

i) For unexpected existing wall that only have raw block wall usually
occur after partition wall removed will be apply render coat first
because of unevenness at existing joint termination from stiffener
and lintel beam.

j) Before apply render coat, all surfaces must be clean, free from dust,
oil and any trace of foreign materials that may affect bonding.

e) All substrate defects should be patched up before plastering.

f) For dry or high absorbing substrates, moisten the surface with water
prior to application.

g) Avoid stagnant or frequent water flow on substrate prior to the


plastering application to prevent poor adhesion of plaster on wet
substrate.

h) Mix thoroughly with an electrical mixer for 3-5 minutes until the
desired homogeneous paste is achieved.

i) Ensure the mix is free from lumps before use. Remix for 1 minute if
the mixed paste is left unused for more than 30 minutes.

j) Render coat is applied onto the surface with a trowel. If application


requires a few layers, the underneath layers must be dry before
applying the subsequent layers.

k) The thickness for render coat is max 10mm.

l) Upon completion of render coat, inspect the surface of base coat


applied by visual inspection. The surface must be smooth.

m) Invite Kinetics to inspect on the surface preparation before skim coat.

Rev. 5 Rev. date: 20210810


Work Method Statement for Cleaning,
Grinding, Touch Up and Skim Coat Existing
Wall
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 9 of 10

n) After approved, then only proceed the skim coat work.

e) The thickness for base coat is 3mm.

f) Mix the base coat with water thoroughly with mixer for 3-5 minutes until
the desired homogenous mortar is achieved.

g) Ensure the mix is free from lumps before use.

h) Scoop the base coat, put on steel trowel and apply to the surface
by pressing the base coat well on to the surface for adequate
bonding.

i) If application requires a few layers, the underneath layers must be


dry before applying the subsequent layer.

j) Upon completion of base coat, inspect the surface of base coat applied
by visual inspection. The surface must be smooth.

k) The thickness for finishing skim coat is 1-2mm.

l) Mix the finishing coat with water thoroughly with mixer for 3-5 minutes
until the desired homogenous mortar is achieved.

m) For dry/ high absorbing substrates, moisten the surfaces with water prior
to application.

n) Smoothen the surface before proceeding with painting work.

o) To follow and comply manufacturer’s recommendation.

p) Invite Kinetics to inspect before starting the painting work.

8 COVID 19 Safety Measures to be follow strictly throughout the setup.

9  Housekeeping at end of each working day is a must for any


scaffolding job. Scaffolders on the site must ensure that:

 All equipment has been cleaned and stored correctly away from
access areas

 Never leave equipment in walkways or doors

 All fire exits and emergency access points are kept clear at all times
and is never blocked by equipment or rubbish

Rev. 5 Rev. date: 20210810


Work Method Statement for Cleaning,
Grinding, Touch Up and Skim Coat Existing
Wall
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 10 of 10

 Report any hazards you might find to a supervisor promptly

 Dispose of rubbish quickly and safely

 the gear is consolidated and is all out of harm’s way when handing
over scaffold

 Before leaving the site each day, make sure that clean-up has been
finalized and no hazards are visible.

5.0 Inspection, Testing and Commissioning Proposal


Inspection and test plan (ITP) shall include at the following stage.

a) Perceiving of materials/ machinery


b) In-process inspection during installation
c) Mock-up Inspection
d) Final stage before handover

ITP shall also address the “Hold Point”, where approval on the work activity is required.
Refer to Attachment 1: Inspection and Test Plan
ITP Reference Number

6.0 List of Attachments / Appendices / References/ Drawing


Attachment layout of the location of wall re-painting that require cleaning, grinding, touch up and
skim coat.

Document Reference No. Document title

Rev. 5 Rev. date: 20210810