Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

11.

00
PEMERINTAH KABUPATEN
10.00 KUTAI KARTANEGARA
9.00
8.00
7.00 DETAIL A
6.00
5.00
4.00 DINAS PEKERJAAN UMUM
HWL.+3.036 BIDANG SUMBER DAYA AIR
3.00
2.00 PROVINSI KALIMANTAN TIMUR
MWL.+1.024
1.00 Lokasi :
LWL.+0.000
0.00
-1.00 KECAMATAN MARANG KAYU

-2.00 Pekerjaan :
-3.00
-5.00(m) -4.00 PERENCANAAN PEMBANGUNAN
PENGAMAN ABRASI PANTAI BIRU
KECAMATAN MARANG KAYU
3.05

3.18

2.49

1.18
1.65
1.59
1.53
1.47
1.40
Elevasi Existing
Sumber Dana :

4.00
3.50
3.00
2.00
1.00
Elevasi Rencana
APBD 2023

Jarak (m) 12.50 12.50 9.74 0.86 0.77 12.39

DRAFTER
POTONGAN MELINTANG P4
Skala 1 : 200

RAMA WIJAYA, ST
DRAFTER

TEAM LEADER

ERWIN PRASETYA, ST
TEAM LEADER

Nama Gambar :

POTONGAN MELINTANG
RENCANA BUIS BETON P28
DAN DETAIL A

Skala :

1 : 200
1 : 75

DETAIL A Jumlah Gambar 78


57
Skala 1 : 75 Nomor Lembar 57