Professional Documents
Culture Documents
July-2020 CDR
July-2020 CDR
July-2020 CDR
Notification
Notification No. 37
Errata No.1/IRC:SP:59-2019
To
IRC:SP:59-2019 “Guidelines for Use of Geosynthetics in Road Pavements and Associated Works”
(First Revision)
2. Annexure- Layer Coefficient Ratio: Layer coefficient for geogrid Layer Coefficient Ratio: Layer coefficient for geogrid
IV, is taken on the basis on the laboratory tests/filed tests; is taken on the basis of the laboratory tests/field tests;
(A)-vi. or it can be provided by the manufacturer. or it can be provided by the manufacturer.
Page No. 86
3. Annexure-
IV,
Fig. IV-1
Page No. 87
Notification No. 38
Errata No.1/IRC:SP:37-2010
To
IRC:SP:37-2010 “Guidelines for Evaluation of Load Carrying Capacity of Bridges” (First Revision)
S. Clause No. For Read
No Page No.
1 Table in clause Reference of IRC Codes Reference of IRC Codes
3.1.2, IRC:SP:40-1993 Guidelines on IRC:SP:40-2019 Guidelines on Repair, Strengthening &
Page # 4 Techniques for Strengthening and Rehabilitation of Concrete Bridges” (First Revision)
Rehabilitation of Bridges
IRC:SP:51-1999 “Guidelines for IRC:SP:51-2015 Guidelines for Load Testing of Bridges” (First
Load Testing of Bridges” Revision)
Special Report 17 State of Art: Non- IRC-HRB Special Report 17, 1996 State of the Art: Non-
Destructive Testing Techniques of Destructive Testing Techniques of Concrete Bridges
Concrete Bridges