IKEA BKK3
AT EMSPHERE SUKHUMVIT
FROM TAP OFF BUS DUCT 1600A - MAIN AREA FROM ESSENTIAL DISTRIBUTION BOARD 250A - MAIN AREA Owner
(BY LL) (BY LL)
CABLE AND RACE WAY SEE LOAD SCHEDULE CABLE AND RACE WAY SEE LOAD SCHEDULE
SMDB1 (EE ROOM 1 - MAIN AREA) SEMDB1 (EE ROOM 1 - MAIN AREA) IKANO (THAILAND) LIMITED
38 Moo 6, BANGKAEW SUB-DISTRICT,
3x5A 3x5A BANGPLEE DISTRICT, SAMUTPRAKARN 10540
ALL CB IC > 40 kA HRC FUSE R S T ALL CB IC > 18 kA HRC FUSE R S T TEL. +662 708 7999, FAX +662 108 1009
AT 415 VAC, 50Hz. AT 415 VAC, 50Hz.
FORM 3B - This drawing is the design intent only. The Contractor
M shall take responsible for shop drawings, calculation
submission, thickness indicative and material sizes.
ACB 3P MCCB 3P - This drawing to be read in conjunction with structural
drawings and ME drawings.
1600AT 250AT - Apart form back of house, all finishing and details
ST 1600AF 250AF to be confirmed by Interior Designer.
- Apart from specification herein, the Contractor shall
read in conjunction with the Landscape drawings for
3xCT DUM NOTE 3xCT DUM NOTE Landscape area.
1600/5A HRC FUSE 1. SIZE OF HRC FUSE FOR SPD AS 250/5A HRC FUSE 1. SIZE OF HRC FUSE FOR SPD AS
(SEE NOTE 1) (SEE NOTE 1)
PER MANUFACTURER RECOMMENDATION. PER MANUFACTURER RECOMMENDATION.
50 64 51N 4xCT SURGE ARRESTER SURGE ARRESTER
51 1600/5A (CLASS 1+2) (CLASS 1+2) LIFE SAFETY
ESSENTIAL POWER 200A
Cu BUSBAR 1600A. 3P, 4W, 415/240VAC, 50Hz, 100%N, 50%G Cu BUSBAR 250A. 3P, 4W, 415/240VAC, 50Hz, 100%N, 50%G
SUPPLY FROM LL
(TO BE CONFIREN BY LL)
L E D
3-EAMCC-01 87/2, Soi Phaholothin 5
Company Limited
T : 66 [0] 2 619 5656
L
N1 N2 N3 N4 N5 N6 N7 N8 N9 E1 E2 E3 E4 E5 E6 SMOKE Phaholyothin Rd., E : fos.architect@gmail.com
C
3x5A 3x5A 3x5A 3x5A 3x5A 3x5A 3x5A Thailand 10400
AN
NOTE Contractor to verify all dimensions on site before commencing work. Figured
C
dimensions given are to be taken in preference to scaling. Copyright of designs
MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P shown herein is retained by this office. Authority is required for any reproduction.
630AT DUM 630AT DUM 630AT DUM 100AT 100AT 150AT 200AT 125AT DUM 150AT DUM 125AT DUM 32AT DUM FIRE RESISTANT CABLE C Copyright Foundry of Space Co., Ltd.
630AF 630AF 630AF 250AF 250AF 250AF 250AF 250AF 250AF 250AF 100AF
COMPLY BS 6387 CAT. CWZ
3xCT 3xCT 3xCT 3xCT 3xCT 3xCT 3xCT
630/5A 630/5A 630/5A 125/5A 150/5A 125/5A 32/5A E
E N
N
SPARE
SPARE
SPARE
SPACE
SPACE
SPACE
SPACE
400AF
400AF
Architects
IN WIREWAY 300x100
IN WIREWAY 300x100
IN WIREWAY 300x100
2(4-240)/G-50 LSOH
2(4-300)/G-50 LSOH
2(4-300)/G-50 LSOH
4-95/G-16 LSOH
4-70/G-16 LSOH
4-10/G-4 LSOH
Structural engineer
WEERAKIJ LERTBUNDITKUL
CB
D
M-3DB1 M-3DB2 M-3DB3 M-3EPB3A M-3EPB4B M-3EPB3C 4EPB3 KANOKWAN ARTUDORN
(MAIN AREA (MAIN AREA (MAIN AREA (MAIN AREA (MAIN AREA (MAIN AREA (4th.FLOOR)
E
OUT
3rd.FLOOR) 3rd.FLOOR) 3rd.FLOOR) 3rd.FLOOR) 3rd.FLOOR) 3rd.FLOOR) Electrical engineer
FROM CB BOX 800A - TOWER AREA FROM ESSENTIAL DISTRIBUTION BOARD 250A - TOWER AREA
IN
BY PASS
AUTO/MANUAL
OUT IN
E L UPS
OUT
L LOAD PANEL
IN NALATTHAWAN
TIRADA
SUTTIPAN
CHEGSAKUL
C
OUT IN KANPICHA PICHAYAGAN
(BY LL) (BY LL)
N
Sanitary engineer
A
CABLE AND RACE WAY SEE LOAD SCHEDULE CABLE AND RACE WAY SEE LOAD SCHEDULE TASSANEE PHATIWET
RACK - 1
RACK - 1
RACK - 1
RACK - 1
SMDB2 (EE ROOM 4/1 - TOWER AREA) SEMDB2 (EE ROOM 4/2 - TOWER AREA) RONNAKON VUTTHANUNT
SPARE
SPARE
SPACE
SPACE
SPACE
SPARE
SPARE
SPACE
400AF
250AF
250AF
250AF
Project No. : 522670
:
IN WIREWAY 300x100
IN WIREWAY 300x100
Drawn by I.SURADET
2(4-185)/G-35 LSOH
Checked : -
4-35/G-10 LSOH
4-4/G-4 LSOH
4-6/G-4 LSOH
4-6/G-4 LSOH
4-4/G-4 LSOH
Plot Date : 20-06-2023
Cad File : IKEA-E-0100
Sheet title
T-3DB1 T-3DB2 T-3EPB1 T-3EPB2 BUSWAY - OUTLET T-3EPB3 3-EAMCC-01
FOR LIGHTING ELECTRICAL SYSTEM SCHEMATIC
(ESSEN.)
NOTE
Owner
NORMAL POWER
SUPPLY FROM LL
Company Limited
87/2, Soi Phaholothin 5 T : 66 [0] 2 619 5656
Phaholyothin Rd., E : fos.architect@gmail.com
Phayathai, Bangkok www.fos.co.th
Thailand 10400
ESSENTIAL POWER
SUPPLY FROM LL
SEMDB1
M-3EPB3A M-3EPB1A M-3EPB2A
Structural engineer
WEERAKIJ LERTBUNDITKUL
KANOKWAN ARTUDORN
Electrical engineer
NALATTHAWAN SUTTIPAN
MCC
MCC TIRADA CHEGSAKUL
M-3DB1 M-3PB1A M-3PB2A M-3PB3A 3-AMCC-03
T-3DB1 T-3PB1 T-3PB4 T-3PB5 3-AMCC-04
KANPICHA PICHAYAGAN
Sanitary engineer
TASSANEE PHATIWET
SHOP DRAWING
LEVEL 3rd.FL.
Revision
No. Date Description
NORMAL ESSENTIAL
POWER SUPPLY POWER SUPPLY
FROM LL FROM M-3EPB1C
GPB2 GEPB
GPB1
LEVEL GROUND.FL.
Sheet title
ELECTRICAL RISER DIAGRAM
Sheet No.
IKEA-E-0100/1
Project
IKEA BKK3
AT EMSPHERE SUKHUMVIT
4RP1 Owner
TOWER ZONE ZONE B (EE ROOM-2) ZONE A (EE ROOM-1) ZONE C (EE ROOM-3)
IKANO (THAILAND) LIMITED
38 Moo 6, BANGKAEW SUB-DISTRICT,
BANGPLEE DISTRICT, SAMUTPRAKARN 10540
TEL. +662 708 7999, FAX +662 108 1009
LCP LCP
submission, thickness indicative and material sizes.
LC LC - This drawing to be read in conjunction with structural
drawings and ME drawings.
- Apart form back of house, all finishing and details
M-3ERP1B M-3ERP1A to be confirmed by Interior Designer.
- Apart from specification herein, the Contractor shall
read in conjunction with the Landscape drawings for
Landscape area.
LCP LCP
M-3RP1B M-3RP1A
LC LCP
M-3RP1C
Control Room. Local Switch Local Switch
M
Light sensor
M
Light sensor Local Switch Local Switch Local Switch Local Switch
LC LCP LCP
T-3ERP1 M-3ERP1C Architects
M M
KANPICHA PICHAYAGAN
Local Switch Local Switch
Sanitary engineer
LCP
TASSANEE PHATIWET
B1RP1
RONNAKON VUTTHANUNT
PONGRAPEE NILWATCHARAPORN
CCTV ROOM AT 3rd FLOOR
NOTE Mechanical engineer
IR
CHUTIWAT TEEMUANGSONG
K
A B C D E F G H I J K L A B C D E F G H
K A B
Un
C D
Un K
Un
0...10V
A B
0V
Un C
0...10V 0V
D Un1 E F G Un2 H
8 Key Input Unit 1. LIGHTING MIMIC DIAGRAM TO BE PROVIDED AT CCTV ROOM TO SHOW ON/OFF STATUS OF LIGHTS AT PUBLIC AREAS, MARKET HALL,
SA/S 12.16.5.1
A
I
B
I
C
I
D
I
E
I
F
I
G
I
H
I
I
I
J
I
K
I
L
I
SD/S 8.16.1
A
I
B
I
C
I
D
I
E
I
F
I
G
I
H
Un=250/440V
In=16A
JRA/S 4.230.5.1
A B C D
FCA/S 1.2.2.2
A
C
C
E
F
F
/
G
H
G a
a
b
b
/
c
c H
LS 25.0
SHOWROOM,WAREHOUSE, CHECKOUT. KRITCHALAT ONRATN
ABB i-bus EIB ABB i-bus EIB
C
2. OFFICE MEETING AND CONFERENCE ROOMS - LIGHT TO BE DIMABLE.
ABB i-bus EIB ABB i-bus
EIB KNX ? EIB KNX ? EIB KNX
? KNX
?
0-10V
a / b / c /
Un=250/440V Un=230V AC
In=16/20AX
C-Load
A B C D E F G H
In=6A
Un1/2=250/440V AC
In1=6A
In2=20AX (C-Load)
ABB
3. PUBLIC TOILETS - MOTION PIR SENSOR TO SWITCH ON LIGHTS WHEN MOTION DETECTED AND OFF LIGHTS WHEN NO MOTION DETECTED M&E. Contractor :
Switch / Relay DALI-Gateway Dim 1-10V. Shutter Fan Coil Touch screen Split Unit Gateway Motion detector Light Sensor Room Thermostat Multi Switch FOR 15 MINUTES (ACTIVATED ONLY DURING OFF BUSINESS HOURS). TAIKISHA (THAILAND) CO.,LTD.
4. PRESENCE AND MOTION DETECTION ARE ADJUSTABLE BETWEEN 1 TO 90 SECONDS. 6th Thaniya Building
Wifi Router 5. LIGHTING RELAY CONTROL NUMBER 62 Silom Road,Suriyawong
Internet Bangrak,Bangkok 10500
6. CABLING SYSTEM FOR VIDEO, DATA AND COMMUNICATION SYSTEM COMPLYING WITH IT REQUIREMENTS AND 75m. MAX LENGTH. Tel: +66 2236 8055-9
7. MANUAL SWITCH SHALL BE PROVIDED IN LIGHTING CONTROL PANEL (RP)
SHOP DRAWING
Twisted pair with shield 20AWG.
Door Entry Busch-ControlTouch IN GENERAL AREA FOR L3, L3M IN GRID CEILING AREA IN GENERAL AREA FOR B1, G, 4
HUB (KNX-cable signal) Revision
SWITCH x - xRPxx - x x - xRPxx - x - x x - xRPx - x
No. Date Description
IP Router Line Coupler Power Supply
LAN
L1 N PE
N N T
KNX
ON
LAN/LINK
IPR/S 3.1.1 ON
Main Line
Line
LK/S 4.2 SV/S 30.640.3.1
Us =85....265V AC
50/60Hz
Un 30V DC,I1
Un 30V DC,I2
RELAY NUMBER RELAY NUMBER
KNX/IP can connection to other system
KNX/Telegram
-5 ฐC..45 ฐC
I=I1+I2<640mA
RELAY NUMBER
KNX
2 1 I2 I1
- + - + - + Un 30V DC Un 30V DC - +
KNX Software
& IP Interface ELECTRICAL ROOM ZONE (A = EE ROOM-1, B = EE ROOM-2, C = EE ROOM-3) RELAY PANEL NUMBER RELAY PANEL NUMBER
KNX-Smart Building Automation System NUMBER OF LEVEL ELECTRICAL ROOM ZONE (A = EE ROOM-1, B = EE ROOM-2, C = EE ROOM-3) NUMBER OF LEVEL
AREA (M = MAIN AREA, T = TOWER) NUMBER OF LEVEL AREA (M = MAIN AREA, T = TOWER)
AREA (M = MAIN AREA, T = TOWER)
I I
Un=250/440V
Cad File :
In=16A
ABB i-bus EIB
?
IKEA-E-0101
EIB KNX
0-10V
A B
Twisted pair with shield 20AWG. Twisted pair with shield 20AWG. Twisted pair with shield 20AWG.
(KNX-cable signal)
WIRING DIAGRAM : RELAY ON/OFF
(KNX-cable signal)
WIRING DIAGRAM : DIMMER PHASE
(KNX-cable signal)
RS232
D- D+
TERM
T1 RS485 /DMX
S1 S2 S3
: :
Twisted pair with shield 20AWG. Twisted pair with shield 20AWG.
(KNX-cable signal) (KNX-cable signal)
Sheet No.
WIRING DIAGRAM : DIMMER DALI WIRING DIAGRAM : DIMMER DMX Gateway
TOWER ZONE ZONE B (EE ROOM-2) ZONE A (SERVER ROOM) ZONE C (EE ROOM-3)
IKANO (THAILAND) LIMITED
38 Moo 6, BANGKAEW SUB-DISTRICT,
UTP CAT6 LSZH (TYP.) BANGPLEE DISTRICT, SAMUTPRAKARN 10540
UTP CAT6 LSZH (TYP.) UTP CAT6 LSZH (TYP.) TEL. +662 708 7999, FAX +662 108 1009
AP C AP
AP FIBER PATCH CORD OM4 Company Limited
87/2, Soi Phaholothin 5 T : 66 [0] 2 619 5656
3M-CP-2(42 U) Phaholyothin Rd., E : fos.architect@gmail.com
C C Phayathai, Bangkok www.fos.co.th
C C Thailand 10400
SERVER RACK 3
Contractor to verify all dimensions on site before commencing work. Figured
3-CP-1(42 U) AP 3-CP-2(42 U) dimensions given are to be taken in preference to scaling. Copyright of designs
C C C shown herein is retained by this office. Authority is required for any reproduction.
SERVER ROOM SERVER ROOM C Copyright Foundry of Space Co., Ltd.
RACK 1 RACK 4
C
CONTROL ROOM 2/2 EE ROOM 3
2x12 CORE MULTI-MODE OPTICAL OM3 IN 25MM (DIA.) IMC CONDUIT C
3rd FLOOR
UTP CAT6 LSZH (TYP.)
Architects
G-CP-1(15 U)
C
RACK 6 AP Structural engineer
WEERAKIJ LERTBUNDITKUL
GROUND (G) (GOOD UNLOADING)
KANOKWAN ARTUDORN
Electrical engineer
C NALATTHAWAN SUTTIPAN
TIRADA CHEGSAKUL
C
KANPICHA PICHAYAGAN
AP
Sanitary engineer
BASEMENT (B1) TASSANEE PHATIWET
RONNAKON VUTTHANUNT
NOTE : THE CONTRACTOR SHALL COORDINATE WITH 2 ISP
IN EMSPHERE TO PROVIDE 2 SETS OF FIBER OPTICS PONGRAPEE NILWATCHARAPORN
CABLE 2x10G INDOOR MULTI-MODE LSZH, 2x12 CORE OM4
FIBER OPTIC CABLE IN 25 mm IMC FROM ISP NODE TO IKEA
RACK 19", 15U Mechanical engineer
SERVER ROOM IN SEPARATE ITEMS.
SERVER ROOM CHUTIWAT TEEMUANGSONG
FROM SERVER F/O MEDIA CONVERTER KRITCHALAT ONRATN
FROM SERVER F/O MEDIA CONVERTER FROM SERVER F/O MEDIA CONVERTER FROM SERVER F/O MEDIA CONVERTER Drawn by : I.SURADET
Checked : -
4x24 PORT UTP SWITCH 8x24 PORT UTP SWITCH 10x24 PORT UTP SWITCH Plot Date : 17-06-2023
(BY OTHER) (BY OTHER) (BY OTHER)
Cad File : IKEA-E-0102
Sheet No.
DETAIL 2 : FOR DATA RACK 3-CP-1 DETAIL 3 : FOR DATA RACK 3M-CP-1, 3M-CP-2 DETAIL 2 : FOR DATA RACK 3-CP-2
TELECOMMUNICATION CABLING SYSTEM SCHEMATIC
NTS IKEA-E-0102
Project
TOWER ZONE ZONE A (EE ROOM-1) ZONE B (EE ROOM-2) ZONE C (EE ROOM-3) IKEA BKK3
S S H AT EMSPHERE SUKHUMVIT
FMM 101 receive G. floor alarm signal from LL FCM 444 SUKHUMVIT ROAD, KHLONG TAN,
HS HS HS Ω
(L4 Click & collect zone4)
FMM 101 BANGKOK 10110
receive common alarm signal from LL FCM Ω
FMM 101 receive reset signal from LL FRM IKEA Service lift
M Owner
FRM B fl. Single knock alarm signal to LL FRM IKEA Service lift
FRM B fl. Double knock alarm signal to LL FRM IKEA Service lift
FATB-4
M
FRM G fl. Single knock alarm signal to LL FRM IKEA Service lift
FRM G fl. Double knock alarm signal to LL FRM to Access/Door (L4)
FATB-IKEA
M
FRM 3A fl. Single knock alarm signal to LL FCM NY4 N/O
N/O
AHU-04-01 (Home Delivery, click & collect)
OAU-04-01 (Home delivery, click & collect) IKANO (THAILAND) LIMITED
FRM 3A fl. Double knock alarm signal to LL FCM NY4 N/O
N/O
FCU-04-01 (Customer service) 38 Moo 6, BANGKAEW SUB-DISTRICT,
FCU-04-02 (Recovery)
FRM 3B fl. Single knock alarm signal to LL FCM NY4 N/O
EAF-04-01 (Customer service toilet) BANGPLEE DISTRICT, SAMUTPRAKARN 10540
TEL. +662 708 7999, FAX +662 108 1009
FRM 3B fl. Double knock alarm signal to LL ISO
- This drawing is the design intent only. The Contractor
FRM 4th fl. Single knock alarm signal to LL shall take responsible for shop drawings, calculation
submission, thickness indicative and material sizes.
FRM 4th fl. Double knock alarm signal to LL - This drawing to be read in conjunction with structural
drawings and ME drawings.
FRM Reset signal to LL - Apart form back of house, all finishing and details
to be confirmed by Interior Designer.
FATB-3TM2
N/O
FMM 101 alarm signal form duct smoke detector FMM 101 Flow switch zone alarm signal from LL FMM 101 Flow switch zone alarm signal from LL FMM 101 Flow Switch Zone Alarm Signal From LL
NY4 MFD-22,MFD-23 Contractor to verify all dimensions on site before commencing work. Figured
N/O
to 3-AMCC-04 FRM to Access/Door (3M-5) FCM NY4 N/C
AHU-03-06 (zone4) FCM NY4 N/O
N/O
L3 Café (Panel : M-3PB2B) FMM 101 Flow Switch Zone Alarm Signal From LL dimensions given are to be taken in preference to scaling. Copyright of designs
(Panel : M-3EPB2B) shown herein is retained by this office. Authority is required for any reproduction.
FCM NY4 N/C
AHU-03-09 (zone6/1)
FCM NY4 N/O
L3 Restuarant (Panel : T-3PB2) NY4 N/O
MFD-15,MFD-16 FCM NY4 N/C
AHU 03-01 (Zone 1/1) C Copyright Foundry of Space Co., Ltd.
N/O
(Panel : T-3PB3) N/O
to 3-AMCC-03 FCM NY4 N/C
AHU 03-04 (zone 3/1)
FATB-3BM
N/O
NY4 MFD-24,MFD-25,MFD-01
N/O
to 3-AMCC-04
N/O
(Panel : T-3EPB3) M NY4 N/O
MFD-05,MFD-06
FCM NY4 N/C
AHU-03-07 (zone5/1) NY4 N/O
MFD-11,MFD-12 N/O
To 3-AMCC-01
FATB-3AM
FRM To Access/Door N/O
to 3-AMCC-02
FATB-3CM
FCM NY4 N/C
AHU-03-10 (zone6/2)
NY4 N/O
MFD-17,MFD-18
FRM To Shutter Door N/O
to 3-AMCC-03 FCM NY4 N/C
AHU 03-05 (zone 3/2) FCM NY4 N/C
AHU 03-02 (zone 1/2)
M
FATB-3TM1
N/O
NY4 MFD-26,MFD-27,MFD-02 N/O
N/O
to 3-AMCC-04 FCM N/C
AHU-03-08 (zone5/2) N/O
MFD-13,MFD-14 NY4 MFD-07,MFD-8,MFD-30
FRM To Shutter Door NY4 NY4
N/O N/O
To 3-AMCC-01
to 3-AMCC-02
FCM NY4 N/C
AHU-03-11 (Kitchen rm.) ISO NY4 N/O
MFD-19,MFD-20
M
N/O
to 3-AMCC-03 FCM NY4 N/C
PAU-03-02 (zone 3/1, 3/2, Bistro) FCM NY4 N/C
AHU 03-03 (zone 2)
N/O
NY4 to 3-AMCC-04 N/O
FCM NY4 N/C
PAU-03-03 (zone 4, 5/1, 5/2) NY4 MFD-29 NY4 N/O
MFD-09,MFD-10
N/O
to 3-EAMCC-03 N/O
to 3-AMCC-01
FCM NY4 N/O
FCU-03-03 (Dry storage rm.) Architects
N/O
FCU-03-07 (Control rm.1/1) NY4 N/O
to 3-EAMCC-01 FCM NY4 N/O
EAF-03-03 (Toilet main hall)
N/O
FCU-03-08 (Control rm.1/2)
N/O
EAF-03-03 (Toilet main hall) FCM NY4 N/C
PAU-03-01 (zone 1/1, 1/2, 2)
N/O
FCU-03-09 (EE rm.4/1) FCM NY4 N/O
N/O
EAF-03-09 (Future toilet) FCM NY4 N/O
FCU-03-02 (EE rm. - 2) NY4 N/O
to 3-EAMCC-02
NY4 N/O
FCU-03-10 (EE rm.4/2) EAF-03-09 (Future toilet)
N/O
FCU-03-11/1 to 11/2 (Co worker canteen) FCM NY4 N/O
FCU-03-04 (EE rm. - 1) ISO
N/O
FCU-03-12 (Conference) FCM NY4 N/O
FCU-03-01 (EE rm.-3)
N/O
FCU-03-13 (Office) FCM NY4 N/O
N/O
FCU-03-05 (Office)
NY4 N/O
U-03-14 (LAC/MED rm.) FCU-03-06 (Cash Counting )
N/O
FCU-03-15 (Locker rm.) ISO FCM NY4 N/O
EAF-03-01 (Toilet main hall)
N/O
FCU-03-16 (REC/SEC rm.)
N/O
FCU-03-17 (Office&Storage rm.) ISO NY4 N/O
EAF-03-02 (Toilet main hall) Structural engineer
FCM NY4 N/O
SEF-03-01 zone6/1
WEERAKIJ LERTBUNDITKUL
FCM NY4 N/C
KEX-03-02 (Kitchen)
ISO NY4 N/O
KEX-03-03 (Kitchen) KANOKWAN ARTUDORN
Electrical engineer
3M FL. NALATTHAWAN SUTTIPAN
TIRADA CHEGSAKUL
L5-001 L5-131 L1-040 L1-058 L2-042 L3-081 L3-083
FATB-3 S S S S S S S
KANPICHA PICHAYAGAN
FMM 101 receive common supervisory switch valve FCM (3-4/1) FCM (3-3/1) FCM (3-3/2) FCM (3-2/1) FCM (3-1/1)
signal from Emsphere M HS HS HS Ω
(3-4/1)
HS HS HS Ω
(3-3/1)
HS HS HS Ω
(3-3/2)
HS HS HS Ω
(3-2/1)
HS HS HS Ω
(3-1/1)
FMM 101 Flow switch zone alarm signal from LL FCM Ω
FCM Ω
FCM Ω
FCM Ω
FCM Ω Sanitary engineer
FATB-3A1
M M M M
FATB-3A2
ISO FMM 101 FCM FMM 101 FCM FCM FCM
FATB-3T
Flow switch zone alarm signal from LL (3-4/2) Alarm signal from Novec system (3-3/3) (3-2/2) (3-1/2)
LOOP 1 ISO M HS HS HS Ω
HS HS HS Ω
HS HS HS Ω
HS HS HS Ω TASSANEE PHATIWET
(3-4/2) (3-3/3) (3-2/2) (3-1/2)
FATB-3C
FATB-3B
ISO FRM G fl. Alarm signal to Smart signage system FCM Ω
FMM 101 Trouble signal from Novec system FCM Ω
FCM Ω
FCM Ω
LOOP 2 ISO M M M M
FRM G fl. Alarm signal to Smart signage system FRM to Access/Door (3-4) ISO FRM to Access/Door (3-3) FRM to Access/Door (3-2) FRM To Access/Door
RONNAKON VUTTHANUNT
LOOP 3 ISO M
FIRE ALARM ISO FRM G fl. Alarm signal to Smart signage system ISO ISO FRM To Shutter Door FRM To Shutter Door
LOOP 4 ISO M L1-001 L1-039 M M M
PONGRAPEE NILWATCHARAPORN
PANEL ISO FRM G fl. Alarm signal to Smart signage system S S FRM To Shutter Door FRM To Shutter Door
NFS2-3030E LOOP 5 ISO L2-001 L2-041
Mechanical engineer
ISO FRM common alarm signal to CCTV S S ISO ISO
LOOP 6 ISO
ISO FRM 3rd fl. Alarm signal to roller shutter CHUTIWAT TEEMUANGSONG
LOOP 7 ISO
ISO FRM Single knock alarm signal to PA L4-001 L4-065
S H S KRITCHALAT ONRATN
FRM Double knock alarm signal to PA
ISO POWER SUPPLY M&E. Contractor :
CCTV ROOM POWER SUPPLY
PSE-10E
No.2
PSE-10E TAIKISHA (THAILAND) CO.,LTD.
No.2
6th Thaniya Building
62 Silom Road,Suriyawong
Bangrak,Bangkok 10500
Tel: +66 2236 8055-9
SHOP DRAWING
FIRE ALARM SYSTEM SCHEMATIC Revision
3rd FL. NTS No. Date Description
FATB-G
BATTERY BACKUP GRAPHIC GRAPHIC To FATB-3C (0.98A), FATB-3CM (1.4A)
30 hrs. Stanby
M M FRM To Access/Door
1 hrs. Alarm
ANNUNCIATOR ANNUNCIATOR
To FATB-3B (0.56A), FATB-3BM (1.4A) ADDRESSABLE MANUAL PULL STATION
S FCM NY4 N/O
To EAF-G-01 Goods Receiving
POWER ON ACKNOWLEDGE LAMP TEST BUZZER POWER ON ACKNOWLEDGE LAMP TEST BUZZER
LL CONTROL ROOM 1. COLD ROOM/FREEZER ROOM DETECTOR SHALL BE INDICATED IN DD STAGE HS HORN / STROBE
To FATB-3T (1.309A)
30 hrs. Stanby ONYXWORK LITE 4. MFCP SHALL BE EQUIPPED WITH BUILT-IN PRINTER.
L3-069 L3-070 Checked : -
1 hrs. Alarm
5. FREIGHT LIFT CONTROL AND STATUS LINK TO FCP S ,TO BE CONFIRMED WITH LL
S S
6. MINIMUM BATTERY POWER BACKUP CAPACITY IS 30 HOURS IN OPERATION MODE AND THEREAFTER M FCM Plot Date : 20-06-2023
60 MINUTES IN ALARM MODE. HS HS HS Ω
FATB-B
8. FIRE ALARM SYSTEM CABLE SHALL BE AS THE FOLLOWING :
BATTERY BACKUP M FRM To Access/Door
30 hrs. Stanby - 2C-2.5 SQ.MM. FRC IN 15MM (DIA.) IMC FOR MONITORING CIRCUIT FROM MONITOR MODULE. Scale : NTS [A1]
1 hrs. Alarm - 2C-2.5 SQ.MM. FRC IN 15MM (DIA.) IMC FOR FIRE SPEAKER FCM NY4 N/O
N/O
To FCU-B1-01
FIRE ALARM CONTROL - 2x(2C-2.5 SQ.MM.) FRC IN 20MM (DIA.) IMC FOR FIRE SPEAKER WITH STROBE LIGHTS. To ACDU-B-01
PANEL - 2C-1.5 SQ.MM. TWISTED PAIR W/ SHIELD FRC IN 15MM (DIA.) IMC FOR ADDRESSABLE DATA LOOP. M ISO N/O
N/O
To FCU-B1-02 Sheet title
To ACDU-B-02
NFS2-3030E - 2C-1.5 SQ.MM. FRC IN 15MM (DIA.) IMC FOR FIRE TELEPHONE AND CONTROL CIRCUIT FROM CONTROL MODULES. NY4 N/O
To ACDU-B-02
POWER SUPPLY POWER SUPPLY - 2Cx2.5 SQ.MM. TWISTED PAIR W/ SHIELD FRC IN 20MM (DIA.) IMC FOR AUDIO RISER CABLE.
L3-001 L3-068
FIRE ALARM SYSTEM SCHEMATIC
Basement FL.
PSE-10E No.1 PSE-10E No.2 - 2x(2Cx2.5) SQ.MM. FRC IN 20MM (DIA.) IMC FOR CONTROL MODULES AND MONITOR MODULES POWER SUPPLY.
9. NOVEC OPERATION SHALL BE REFERED TO FIRE PROTECTION DWG. S S
PRINTER LQ-310
10. QUANTITY AND LOCATION OF FLOW SWITCH AND SUPERVISORY SWITCH SHALL BE REFERED TO FIRE PROTECTION DWG.
BATTERY BACKUP BATTERY BACKUP 11. IN CASE OF FIRE, AUTOMATIC DOOR SHALL BE OPEN AND RETAINED.
30 hrs. Stanby 30 hrs. Stanby 12. ISOLATOR MODULE SHALL BE PROVIDED EVERY 15 OF EQUIPMENT AND EACH FLOOR.
1 hrs. Alarm 1 hrs. Alarm 13. CABLE FROM FCP TO RANN SHALL BE AS PER MANUFACTURER RECOMMENDATION.
BACNET AUTO DIALER
BMS
GATEWAY LK-120S 14. SYSTEM TO BE OPERATED < 1 MIN AFTER FIRE DETECTION.
15. IN CASE OF FIRE, AUTOMATIC DOOR SHALL BE OPEN EXCEPT FIRE DOORS. Sheet No.
AC POWER 16. CONTRACTOR SHALL ALLOW COST FOR ADDITIONAL FIRE ALARM 20% OF TOTAL QUANTITY SHOWN ON MEP DRAWINGS FOR FUTURE EXPANSION.
CCTV ROOM 220 VAC 17. CABLING SYSTEM FOR VIDEO, DATA AND COMMUNICATION SYSTEM COMPLYING WITH IT REQUIREMENTS AND 75m. MAX LENGTH.
18. FIRE ALARM SYSTEM IS SET UP WITH SINGLE AND DOUBLE KNOCK SYSTEM.
FIRE ALARM SYSTEM SCHEMATIC IKEA-E-0103
Project
IKEA BKK3
AT EMSPHERE SUKHUMVIT
Owner
POWER
RUN
OFF 10 OFF 10
1 2 3 4/SBY ZONE ACK RESET LAMP TEST
PEAK GENERAL MONITOR PANEL MP-210-AS
1 2 3 4
SIGNAL A FUSE UNIT
OPERATE POWER NETWORK OUTPUT SELECTOR MONITOR VOLUME
5 5
POWER B CPU EMG MIC 4 6 4 6 POWER
VOICE EVACUATION FRAME VX-3004F
-24dB -18dB -12dB -6dB -3dB 0dB 3 7 3 7
RUN
4
5
6 4
5
6 LAN B
-24dB -18dB -12dB -6dB -3dB 0dB 3 7 3 7 RS LINK A
2 8 2 8 RS LINK B
AMPLIFIER FAULT STATUS
1 9 1 9
2 8 2 8
1 9 1 9
OFF 10 OFF 10
3 3 3
4 4 4
5 5 5
6 6 6
7 7 7
9 9 9
10 10 10
RM-300X
REMOTE MICROPHONE FS-7010RM FS-7010RM FS-7010RM
4
1
4
1
4
Landscape area.
5 5 5
6 6 6
7 7 7
8 8 8
RM-300X
REMOTE MICROPHONE FS-7010RM FS-7010RM FS-7010RM SPEAKER SELECTOR
SS-1010
Company Limited
87/2, Soi Phaholothin 5 T : 66 [0] 2 619 5656
Phaholyothin Rd., E : fos.architect@gmail.com
Phayathai, Bangkok www.fos.co.th
Thailand 10400
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 10
SPEAKER SELECTOR
SS-1010
POWER
RUN
EMERGENCY
CPU OFF
LAN A
LAN B
RS LINK A
RS LINK B
AMPLIFIER FAULT STATUS
Architects
POWER
RUN
EMERGENCY
CPU OFF
Structural engineer
LAN A
LAN B
RS LINK A
RS LINK B
AMPLIFIER FAULT STATUS
WEERAKIJ LERTBUNDITKUL
KANOKWAN ARTUDORN
Electrical engineer
NALATTHAWAN SUTTIPAN
TIRADA CHEGSAKUL
KANPICHA PICHAYAGAN
Sanitary engineer
TASSANEE PHATIWET
VOLUME CONTROL
POWER
RUN
EMERGENCY
CPU OFF
LAN A
LAN B
RS LINK A
RONNAKON VUTTHANUNT
RS LINK B
AMPLIFIER FAULT STATUS
1 2 3 4/SBY ZONE ACK RESET LAMP TEST
ZONE SELECTOR
PEAK GENERAL
1 2 3 4
SIGNAL A FUSE UNIT
OPERATE POWER NETWORK
POWER B CPU EMG MIC
VOICE EVACUATION FRAME VX-3004F
PONGRAPEE NILWATCHARAPORN
NORMAL SOUND
Mechanical engineer
- WHEN PA INSTALL IN ROOM THAT WALL CONSTRUCTED FULL HEIGHT TO CEILING SPEAKER REQUIRED TO
IMPROVE LOUNDNESS.
- WHEN FIRE ALARM INTERFACE WITH PA, TO CONNECT AT MAIN FCP / BACKBONE
2. THE SPEAKER CIRCUIT CABLE LAYOUT IS TO BE DESIGNED SO THAT THE TWO CIRCUITS COMPLEMENT EACH
OTHER IN ALL PARTS OF THE COVERED AREA AND NOT ONLY DIVIDES THE ENTIRE AREA IN TWO HALVES
WHERE ALL COVERAGE IS LOST IN ONE HALF IF ONE CIRCUIT MALFUNCTIONS. POWER AMP SHALL BE AT LEAST
50% FOR EACH GROUP OF SPEAKERS.
3. THE SOUND LEVELS SHALL BE WELL BALANCED AND UNIFORM IN ALL
AREAS WITH AN STI EQUAL OR GREATER THAN 0.5%
4. UPS WITH BATTERY BACK UP 60 MIN. ALARM AND .STAND BY MODE 6 HR SHALL BE PROVIDED.
5. SPEAKERS SHALL BE GREY IF THEY ARE PLACED ABOVE THE GRID OR AREAS WITHOUT CEILING AND WHITE IF Project No. : 522670
PLACED IN THE CEILING.
6. ALL TEST AND COMMISSIONING SHALL BE INCLUDED IN BID PROPOSED. Drawn by : I.SURADET
7. THE SOUND LEVEL OF THE PA SYSTEM SHALL BE 15 dB (A) ABOVE BACKGROUND NOISE WITH 65 dB (A) AS A
MINIMUM VALUE AND 120 dB (A) AS A MAXIMUM VALUE. Checked : -
8. PA RACKS ARE NOT EQUIPPED WITH WHEELS.
9. CABLING IS FIRE RESISTANT AT LEAST 30 MINS MINIMUM. Plot Date : 20-06-2023
* EACH AREA / ZONE SHALL BE SERVED BY TWO AMPLIFIER.
** DIFFERENT ZONING & MUSIC OPTION. Cad File : IKEA-E-0104
10. PUBLIC ADDRESS SOUND LEVEL ;
- BACKGROUND MUSIC : LOW LEVEL Scale : NTS [A1]
- MANUAL : MEDIUM LEVEL
- EVACUATION : MAX LEVEL Sheet title
11. THE PUBLIC ADDRESS SOUND LEVEL AGAINST THE SMOKE EXHAUST FAN SHALL BE LOUDER THAN 15dB OVER BACKGROUND NOISE WHEN IN OPERATION.
12. THE SYSTEM SOFTWARE SHALL BE SCALABLE BY 25% FOR FUTURE EXTENSION. PUBLIC ADDRESS SYSTEM
13. CONTRACTOR SHALL ALLOW COST FOR ADDITIONAL PUBLIC ADDRESS 20% OF TOTAL QUANTITY SHOWN ON MEP DRAWINGS FOR FUTURE EXPANSION.
14. CABLING SYSTEM FOR VIDEO, DATA AND COMMUNICATION SYSTEM COMPLYING WITH IT REQUIREMENTS AND 75m. MAX LENGTH. SCHEMATIC
Sheet No.
IKEA-E-0104
Project
IKEA BKK3
D D ?? AT EMSPHERE SUKHUMVIT
BG BG BG BS BS-4-01
Owner
BS BS-4-04
220 V.
?? RB-4-01
R
RB-4-02
RPU4-18 CR R IKANO (THAILAND) LIMITED
DT-4-01
BG D 38 Moo 6, BANGKAEW SUB-DISTRICT,
(CLICK AND BANGPLEE DISTRICT, SAMUTPRAKARN 10540
SC-4-01
ZONE B (EE ROOM-2) ZONE A (EE ROOM-1) COLLECT) TEL. +662 708 7999, FAX +662 108 1009
4th FLOOR TOWER ZONE
- This drawing is the design intent only. The Contractor
shall take responsible for shop drawings, calculation
S 2x10G INDOOR MULTI-MODE LSZH, S S S submission, thickness indicative and material sizes.
- This drawing to be read in conjunction with structural
24 CORE OM4 FIBER OPTIC CABLE drawings and ME drawings.
CR FOR FIBRE CABLING IN WIREWAY CR CR CR ZONE C (EE ROOM-3) - Apart form back of house, all finishing and details
to be confirmed by Interior Designer.
ZONE D
ZONE E
ZONE B
ZONE C
ZONE PR
ZONE A
D
SL-3-13 D D S S
RPU4-13 CR M M-3-09
SL-3-18 220 V.
O/Px1 I/Px17 S ZONE C CR CR CR CR Structural engineer
CR M MS-3-16
(FIREMAN LIFT) M-3-10 M CR CR BG
3T-ITS-1 RPU1-10 CR BG WEERAKIJ LERTBUNDITKUL
220 V.
M-3-12 M KEYPAD M MS-3-18
BG M 220 V. KANOKWAN ARTUDORN
(WORK SPACE) M 220 V. 220 V.
D D S MS-3-19 M ?? ?? S 220 V. MASTER STATION#2 SE UPS-2 DT-3-03
220 V. 12 VDC from
D Electrical engineer
PRU4-3 (OFFICE) R ?? S 3C-ITS-1
SE SE DT-3-05
CR CR CR MS-3-21 M CR CR CR S K CR D
R RPU4-4 CR ETH-SW-1 RPU4-6 CR O/Px1I/Px24 NALATTHAWAN SUTTIPAN
SC-3-01
BG CR BG DT-3-06 BG BG BG RPU1-9 CR K CR CR CR
CR BG TIRADA CHEGSAKUL
D 12 VDC from (TROLLY)
CR CR BG (MAINTENANCE)
BG PRU4-3
DT-3-11 (SWEDISH FOOD 12 VDC from KANPICHA PICHAYAGAN
D 220 V.
MARKET) PRU4-3 BG BG
D RB-3-32 S 220 V. S Sanitary engineer
R S ??
RPU4-12 CR RB-3-36 RPU4-11 CR RPU4-3 CR TASSANEE PHATIWET
R RPU1-8 CR RPU1-5 CR
BG BG BG RONNAKON VUTTHANUNT
(BESIDE S6) (XXXXX) (CASH ROOM) BG
BG (GOOD UNLOADING)
220 V. 220 V. (BISTRO) 220 V. PONGRAPEE NILWATCHARAPORN
3rd FLOOR
Mechanical engineer
(GOOD UNLOADING)
CONNECT WITH CCTV S SC-G-01 CHUTIWAT TEEMUANGSONG
UPS-2
SHOP DRAWING
D M M-B-01 Revision
RPU1-1 CR No. Date Description
BG
(WAREHOUSE)
BASEMENT (B1)
NOTE
Company Limited
87/2, Soi Phaholothin 5 T : 66 [0] 2 619 5656
WIRING DIAGRAM SL-X-XX Strobe Light with Buzzer Phaholyothin Rd., E : fos.architect@gmail.com
Phayathai, Bangkok www.fos.co.th
FOR ACCESS DOOR (DOUBLE DOOR TYPE) M M-X-XX Magnetic Contactor
Thailand 10400
TIRADA CHEGSAKUL
EXIT PUSH BUTTON (INSIDE)
KANPICHA PICHAYAGAN
ENTRY CARD READER (OUTSIDE) 4C-1 mm.² (18 AWG.) CONTROL CABLE
EMERGENCY MANUAL BREAK GLASS (INSIDE) KEYPAD Sanitary engineer
4C-1 mm.² (18 AWG.) CONTROL CABLE TASSANEE PHATIWET
KEYPAD
RONNAKON VUTTHANUNT
4C-1 mm.² (18 AWG.) CONTROL CABLE
WIRING DIAGRAM PONGRAPEE NILWATCHARAPORN
KEYPAD
FOR ACCESS DOOR (SINGLE DOOR TYPE)
4C-1 mm.² (18 AWG.) CONTROL CABLE Mechanical engineer
NOTE: APPLIED FOR ACCESS CONTROL ONLY NOT FOR FIRE DOORS KEYPAD CHUTIWAT TEEMUANGSONG
2C-1 mm.² (18 AWG.) CONTROL CABLE
KRITCHALAT ONRATN
TO 3B-ITS-1 (POWER ROOM 3M ZONE B)
220 VAC. UPS -1 O/P-1 I/P-1 I/P-X PSU INTRUSION M&E. Contractor :
UPS 2000 VA FOR ACS, TO 3A-ITS-2 (CASH ROOM) TAIKISHA (THAILAND) CO.,LTD.
ITS, INT BACKUP 12 HRS MAIN CONTROL 6th Thaniya Building
62 Silom Road,Suriyawong
Bangrak,Bangkok 10500
UTP CAT6 Tel: +66 2236 8055-9
NOTE : WIRING DIAGRAM
BATTERY
TO SWITCH RPU
BACKUP
ACU SHOULD BE LOCATED ON FOR MAIN CONTROL INTRUSION SYSTEM SHOP DRAWING
220 VAC. THE SECURE SIDE
UTP CAT6 UTP CAT6 UTP CAT6 UTP CAT6 UTP CAT6
UTP CAT6 TO ETH-SW-2 12 VDC FROM RPU 12 VDC FROM RPU 12 VDC FROM RPU
12 VDC FROM RPU 12 VDC FROM RPU
TO SWITCH TO SWITCH TO SWITCH TO SWITCH TO SWITCH
2C-1 mm.² (18 AWG.) CONTROL CABLE
2-1.5 mm.² LSOH CABLE
R R R
CR M
M K CR K CR M
M Project No. : 522670
ACCESS CONTROL, INTRUSION AND INTERCOM SYSTEM SCHEMATIC SHEET 2 Sheet No.
NTS
IKEA-E-0105/1
Project
F
4-C5
IKEA BKK3
AT EMSPHERE SUKHUMVIT
TOWER ZONE ZONE B (EE ROOM-2) ZONE A (EE ROOM-1) ZONE C (EE ROOM-3) IKANO (THAILAND) LIMITED
38 Moo 6, BANGKAEW SUB-DISTRICT,
BANGPLEE DISTRICT, SAMUTPRAKARN 10540
12 CORE MULTI-MODE OPTICAL OM3 IN 20MM (DIA.) IMC CONDUIT TEL. +662 708 7999, FAX +662 108 1009
3B-CCTV-1 3MB-C1 3A-CCTV-1 3MA-C1 3MC-C1 3MC-C2 - Apart from specification herein, the Contractor shall
read in conjunction with the Landscape drawings for
3MT-C1 Landscape area.
F 3B-C32 3A-C25 F
Contractor to verify all dimensions on site before commencing work. Figured
dimensions given are to be taken in preference to scaling. Copyright of designs
3T-CCTV-1 3T-C1 3C-CCTV-1 3C-C1 shown herein is retained by this office. Authority is required for any reproduction.
C Copyright Foundry of Space Co., Ltd.
STP OR FUTP POE IN 15mm.Dia. EMT. STP OR FUTP POE IN 15mm.Dia. EMT.
F F
RACK 1 RACK 2
3B-C1 3A-C1
STP OR FUTP POE IN 15mm.Dia. EMT. STP OR FUTP POE IN 15mm.Dia. EMT.
CONTROL ROOM 2/2 EE ROOM 3
3rd FLOOR
12 CORE MULTI-MODE OPTICAL OM3 IN 20MM (DIA.) IMC CONDUIT
F
Architects
G-C5
F
G-CCTV-1
12 CORE MULTI-MODE OPTICAL OM3 IN 20MM (DIA.) IMC CONDUIT G-C1
STP OR FUTP POE IN 15mm.Dia. EMT. Structural engineer
RACK 4
GROUND (G) WEERAKIJ LERTBUNDITKUL
(GOOD UNLOADING) KANOKWAN ARTUDORN
Electrical engineer
F
TIRADA CHEGSAKUL
F
KANPICHA PICHAYAGAN
B1-C1
Sanitary engineer
STP OR FUTP POE IN 15mm.Dia. EMT.
BASEMENT (B1) TASSANEE PHATIWET
RONNAKON VUTTHANUNT
19", 42U
PONGRAPEE NILWATCHARAPORN
Owner
Company Limited
87/2, Soi Phaholothin 5 T : 66 [0] 2 619 5656
Phaholyothin Rd., E : fos.architect@gmail.com
Phayathai, Bangkok www.fos.co.th
Thailand 10400
Architects
Structural engineer
WEERAKIJ LERTBUNDITKUL
KANOKWAN ARTUDORN
Electrical engineer
NALATTHAWAN SUTTIPAN
TIRADA CHEGSAKUL
KANPICHA PICHAYAGAN
Sanitary engineer
TASSANEE PHATIWET
RONNAKON VUTTHANUNT
PONGRAPEE NILWATCHARAPORN
Mechanical engineer
CHUTIWAT TEEMUANGSONG
KRITCHALAT ONRATN
M&E. Contractor :
TAIKISHA (THAILAND) CO.,LTD.
6th Thaniya Building
62 Silom Road,Suriyawong
Bangrak,Bangkok 10500
Tel: +66 2236 8055-9
SHOP DRAWING
Revision
No. Date Description
Drawn by : I.SURADET
Checked : -
Plot Date : 20-06-2023
Cad File : IKEA-E-0107
Sheet title
FIRE ALARM SEQUENCE
OF OPERATION
Sheet No.
Owner
C
IWPC-22
Company Limited
4th FLOOR 87/2, Soi Phaholothin 5 T : 66 [0] 2 619 5656
Phaholyothin Rd., E : fos.architect@gmail.com
Phayathai, Bangkok www.fos.co.th
Thailand 10400
TOWER ZONE ZONE B (EE ROOM-2) ZONE A (SERVER ROOM) ZONE C (EE ROOM-3) C Copyright Foundry of Space Co., Ltd.
RACK 2 Architects
WEERAKIJ LERTBUNDITKUL
C C
IWPC-07 IWPC-08 KANOKWAN ARTUDORN
C FIBER PATCH CORD OM4
IWPC-21 C IWPC-13 C IWPC-14 Electrical engineer
3M-CP-2(42 U) NALATTHAWAN SUTTIPAN
C IWPC-11 C C C
C IWPC-19 C IWPC-20 IWPC-12 IWPC-05 IWPC-06 TIRADA CHEGSAKUL
SERVER RACK 3
KANPICHA PICHAYAGAN
3-CP-1(42 U) 3-CP-2(42 U)
C IWPC-09 C UTP CAT6 LSZH (TYP.) Sanitary engineer
C IWPC-17 C IWPC-18 IWPC-10 SERVER ROOM SERVER ROOM C C
IWPC-03 IWPC-04 TASSANEE PHATIWET
RACK 1 RACK 4
RONNAKON VUTTHANUNT
C PONGRAPEE NILWATCHARAPORN
CONTROL ROOM 2/2 IWPC-16 EE ROOM 3
FIBER OPTIC CABLE Mechanical engineer
OF TELECOMMUNICATION CABLING SYSTEM C
IWPC-15 CHUTIWAT TEEMUANGSONG
KRITCHALAT ONRATN
C C
IWPC-01 IWPC-02 M&E. Contractor :
FIBER OPTIC CABLE TAIKISHA (THAILAND) CO.,LTD.
OF TELECOMMUNICATION CABLING SYSTEM 6th Thaniya Building
3rd FLOOR 62 Silom Road,Suriyawong
Bangrak,Bangkok 10500
Tel: +66 2236 8055-9
SHOP DRAWING
Revision
No. Date Description
GROUND (G)
Drawn by : I.SURADET
Checked : -
Plot Date : 17-06-2023
Cad File : IKEA-E-0111
Sheet title
PEOPLE COUNTING
SYSTEM SCHEMATIC
Sheet No.