Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MAGNETIC PARTICLE EXAMINATION REPORT

S.O.# : 851
Report No.: MT-RNQ-23-00838 Date: 03-Apr-2023 Next Insp.: 02-Apr-2024
Client Name: Project Name: Ref. Report No.:
NATIONAL ENERGY SERVICES REUNITED COIL TUBING 0533
(NESR) DEPARTMENT
Location: Surface Condition: Material:
NESR YARD QATIF As Welded/Cleaned/Ground Carbon Steel/ S.Steel
Magnetic Particle Particle Type Vehicle Current Type
Equipment: Portable Visible Oil AC
LIGHT INT:More than Wet Examination Method DC
1076 LUX ; Ambient. Fluorescent Continuous
Materials/Chemicals Manufacturer Expiry Date: Acceptance Criteria
FLUXO 4 / FLUXO 3 SREM Technologies Apr 2027 / Nov 2026 BS EN ISO 23278
Inspection Procedure: Type of inspection: Relevant Industry Standard:
ECI-NDT-TP-001 Rev. 01 PERIODIC LEEA-048
Direction of Magnetization and Amperage:
Yoke: MODEL B300S CONTOUR PROBE, Serial Number - 28928 Coil Wrap Yoke

10lb TEST : Longitudinal :


# of Coil Turns:
Equipment Description
Name CEMENT BLOCK W/ 4 LIFTING PAD EYES
Serial number CB-043

OBSERVATIONS: MPI Test has been carried out on:.


Accessible weld areas inspected. General visual & MPI has been carried out. No any bending deformation and
relevant indication found during time of Inspection.
TEST RESULT:ACCEPTED

Inspected By: NDT Level II MT Verified By : NDT QA/QC Client


Name: RAJA NAQASH Name: JING SALVAMANTE Name:
Signature:
Signature: Signature:

Powered by TCPDF (www.tcpdf.org)

You might also like