Professional Documents
Culture Documents
1-Mr. Ross Quaite William
1-Mr. Ross Quaite William
1-Mr. Ross Quaite William
manufacturer of CPT
equipment
Welcome
Presentation introduction
www.geomil.com
Geomil Equipment BV
Contents of presentation
Procedures
www.geomil.com
History of CPT
Initial Developmenrt
www.geomil.com
History of CPT
Further development
www.geomil.com
Introduction to Geomil
Current status and position
www.geomil.com
Introduction to Geomil
Associations in the market
www.geomil.com
Introduction to Geomil
Business focus
Core business
• Design, production and service of CPT equipment
• Creation and support of Data Acquisition System
- Geotechnical Sensor Network
• Development of data recording and machine
control software
• Focus on CPT equipment for
onshore, nearshore and offshore
Training & client support
• Geomil College
• Onsite training / instruction
• Remote support service
www.geomil.com
Why CPT data
More that just data collection
www.geomil.com
Why CPT data
Operational and financial efficiency
OPTION ONE (BH only)
# type hrs / loc t hrs € / hr €
26 BH 36 936 1.575,00 1.474.200,00
26 LAB test 5.000,00 130.000,00
936 1.604.200,00
39 days
www.geomil.com
Applications of CPT Data
Parameters Obtained
www.geomil.com
Applications of CPT Data
Parameters Obtained
www.geomil.com
CPT equipment
Geomil data acquisition system
Principle analogue / digital
A/D-conversion
A/D-conversion
Digital signal [1011010101]
www.geomil.com
CPT Equipment
Fox
www.geomil.com
CPT Equipment
Lynx
www.geomil.com
CPT Equipment
Husky
www.geomil.com
CPT Equipment
Panther
www.geomil.com
CPT Equipment
Gizzly
www.geomil.com
CPT Equipment
Kodiak
www.geomil.com
Shark-200 nearshore system
Coastal area’s
www.geomil.com
Shark-200 system
Coastal area’s
www.geomil.com
Orca-90 down hole system
Offshore Down Hole (DH) CPT system
www.geomil.com
Orca-90 down hole system
Key advantages
Easy to integrate with existing drilling setup
Should be supported with a seabed clamp Marlin-120
seabed template
Water column up to 2000 m Orca ballast weight
up to 1500 m with umbilical that provides real-time data
capability
As ‘wire line’ tool can be used for rig moves
helicopter mobilizations possible
Easy to move between marine plant, quick setup
www.geomil.com
Orca-90 down hole system
In practical use
www.geomil.com
Marlin seabed clamp
Supporting tool for DH CPT’s (Orca)
www.geomil.com
Marlin seabed clamp
Supporting tool for Orca
Marlin-120 characteristics
Based on Manta deep water techniques
Depth rating 1500 m
Compatible with Manta umbilical, CT winch and skirt.
Dry weight 12 ton (modular compatible ballast with Manta)
Free passage 380 mm true clamp
Hydraulically activated camp
Holding force > 50 ton
Submersible electric – hydraulic PP
PTO installed (client applications as shear-rams etc.)
Option to have clamp opening by failing communication
normally open function
Marlin-120 Manta-200
www.geomil.com
Manta seabed CPT system
Main characteristics
www.geomil.com
Manta seabed CPT system
history & track record
www.geomil.com
Manta seabed CPT system
Supporting plant to deploy system
www.geomil.com
Manta seabed CPT system
Principle handling method
www.geomil.com
Manta seabed CPT system
Components
www.geomil.com
Manta seabed CPT system
Components
Geomil CDS
Conventional
No slip
Rod slip
High continuous traction
Loosing traction on high loads
Low wear
High wheel / rod wear
Can drive casing
No casing driving
www.geomil.com
Manta seabed CPT system
Deck controls
www.geomil.com
Manta seabed CPT system
Manta in use
www.geomil.com
Manta seabed CPT system
Level frame (add-on option)
www.geomil.com
Manta seabed CPT system
Plate load-test PLT ad-on unit (patented by DEME Group)
www.geomil.com
Manta seabed CPT system
Seafloor plate load test (PLT) add-on
www.geomil.com
Geomil Equipment
What is the offer we make to our clients
www.geomil.com
Geomil Equipment B.V.
www.geomil.com