Project Name: INSTALLATION OF STATIC VAR COMPENSATOR (SVC) AT QASSIM-2 380KV BSP #
9025
Contract No: 44000151921
Contractor Name: Guarantee Business Contracting Co.
RFI No: Room Name:
Drawings
System No:
Ref No:
Status
Description Remarks
YES NO
A. First Stage: Activation of one detector in a hazard area (Zone 1 Activation)
1. Fire Alarm Signal to Fire Releasing Control Panel (Zone-A “FIRE”) in
Control Room.
2. Alarm Signal Transmitted to Main Fire Alarm Control Panel located
in Control Room.
3. Alarm Signal on MIMIC Panel illuminate RED LED.
4. Alarm Bells with strobe inside each protected room and all rooms in
SVC Building will activate.
5. HVAC is shutdown through FECP
4. After 30 seconds delay time the FECP Releasing circuit enabled and
FM200 Gas Releasing in the affected room.
4. Alarm bells with strobe inside each protected room and bells in
all areas in SVC Building will activate.
5. Pre-Discharge Horn & Strobe inside and outside the affected room
with tone is activated.
6. Delay time of 30 seconds in FECP has started before the release of
gas.
7. After 30 seconds FECP releasing circuit enabled and Solenoid valve
triggered, FM200 gas releasing in the affected room
8. Gas Discharged Signal displayed on FECP through Pressure operator
switch in FM200 raiser
1. In case there is no any actual fire, then we can press and hold the
abort-switch to avoid the Electrical Actuator operation.
2. In case of actual fire, pressing and holding the abort switch will hold
the Electrical Actuator Operation, so that no lefts at protected room
prior to discharge of agent. Releasing Abort Switch will start actual
delay of 30secs. To release the solenoid.
G. Activation of Addressable devices and Outdoor WP-HD detectors:
1. Alarm signal to Main Fire Alarm Control Panel (MFACP) located in
Control Room
2. Outdoor Weatherproof Horn/Strobe are activated in tone (NAC#3-
General Alarm)
H. Supervisory Pressure Switches
1. Supervisory Low-Pressure switch when removed shall show
supervisory trouble on FECP panel.
2. Cylinder charged pressure dropped Low-Pressure status display on
FECP
3. Main FACP Printer printed the Log Events
I. Maintenance Switch
1. Maintenance switch used to cut the power off from the releasing
module, to avoid any faulty discharge during maintenance, and
should give trouble on the panel. (using the maintenance switch
during the alarm will not affect the alarm signal, alarm signal will
keep active)
J. Main/Reserve Switch:
1. Main/Reserve switch used to transfer between the main & reserve
cylinders in each system is operational?
K. Printer