Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Checklist for equipment Inspection

Project Name : Project Code :

Checklist No. : Date :

Serial No. : Model :

Hired Contractor

Equipment Name & Number: GAS CUTTING SET


Note: Please write Yes or No in the given box and if some comments write in remarks column.
No. Description Yes / No Remarks
1 Cylinder keep in trolley secure with lock chain.
2 Keep in upright position.
3 Valve protection secured.
4 Regulator free from any defect.
5 Pressure gauge in proper condition.
6 Provide industrial clip and flashback arrestor.
7 Hose in good condition with color coded.
8 Joint to be firm and free from defect or leakage
9 Torch in good condition.
Use proper PPE for the job, e.g., Leather hand glove &
10
safety goggles, etc.
Fire extinguisher / fire blanked to standby at work
11
area.
12 Work carried out by competent person.

5 6
1

8
7
4

FIT PARTLIALLY FIT UNFIT


Inspection By Review By
Name Name
Signature with date

You might also like