Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.
Part 1: Background
I have reviewed records such as HSE plan, HSE policy, audit report, incident log book, accident
records, training records, first aid reports, near miss reports etc. and found that 8 months ago the
last accident occurred and found that there was no last time injury.
Damaged scaffold
materials are
removed from the site
Scaffold construction
area were isolated
and cleared for all
persons
Used personal
protective
equipment(PPE)such
as appropriate gloves,
full body harness,
head protection and
safety shoes
4.vibration Workers related to Workers are Conduct awareness classes 2 weeks HSE officer
concrete compactor competent to do the for the workers on the
workers are work consequences of continuous
exposed high Vibration is transmitted
Rest are provided for exposure to vibration
vibration during into your hanfds and arms
concrete when using hand held / the workers to avoid Implement job rotation 2 weeks Site engineer
compactor operated tools and continues exposure of system in concrete
machinery. vibration compaction work to avoid
Excessive exposure can Quality inspections for continuous vibrstion
affect the nerves, blood equipments are exposure
vessels , muscles and conducted in every
joints of the hand, wrist month for early Conduct health surveillance
and arm causing hand detection of any among the workers for early 3 weeks HR manager
arm vibration defect detection of any disesases
syndrome(HAVS)
The worker is Purchase anti vibration 1 month
provided with gloves gloves and forehold the Project
to reduce the impact compacter manager
Tool box talk is
provided for the
workers regards
health affects of
continous vibration
5.mental ill Civil workers, Monthly leaves are Recruit additional man 3 weeks Project
health supervisor given to the workers power to complete the manager
in annually project in timely
Workers facing All the workers in the
Allowance are Implement tour programme
over high working site occurred 2 weeks HR manager
pressure or when their is high provided for the for workers in monthly to
stress to pressure from the top workers reduce their mental stress
Specific legal arguments R175-Safety and health in construction recommendation scaffold “every scaffold should be properly
designed, erected and maintained so as to prevent collapse or accidental displacement when
properly used”. So as the employer has to ensure above legislation for safe use of scaffold but if the
tie is not provided to the scaffold it will leads to scaffold collapse and it will also leads to
enforcement action following accident due to failure of follow of these legislation.
Consideration of likelihood AND severity The likelihood of injuries occurring from work at height especially on scaffolding is to be considered
as very high because more than 4scaffold are used in the particular site and almost 20 workers are
types of injury or ill health working on the top and bottom of scaffold for masonry work and plastering work, so the scaffold
number of workers at risk may shake due to movement of people and materials and weight of the materials in the top of the
how often the activity is carried scaffold increase the risk of scaffold collapse. abscence of scaffold tie decreases the stability of
out scaffold so it increase the chance of scaffold collapse.
how widespread the risk is
When considering the severity I set 4 categories:
In case of scaffold collapse it leads to fall of people from the top of scaffold and the people
or material falls to workers in the bottom workers. when person fall from top of scaffold
leads to severe cut injury or fracture some case death also. The bottom workers may also
injured like head injury and fracture. So the severity level is considered as catastrophic.
How effective the action is likely to be in
By providing scaffold tie it will enhance lateral stability and ensure a content and correct spacing
controlling the risk. This should include:
between the work surface and scaffold. Ties used to link the scaffold to any existing building or
the intended impact of the action; structure. It provides resistance to inward and outward movements to the scaffold. Ties should be in
justification for the timescale that such a way that it provides additional restraint to the scaffold. The provision of scaffold tie reduces
you indicated in your risk the likelihood of accident so the risk will reduce considerably.
assessment; and I had recommended two weeks for complete this action because the project manager needs to
whether you think the action will arrange sufficient coupler and scaffolder for complete this work
fully control the risk
This action alone won’t control the risk fully, In addition with implement scaffold tag system to
ensure safe scaffold, Conduct third party inspection body approved by Hyderabad municipality
those scaffold above 10m will control the risk as low as reasonably practicable level.
Specific legal arguments According to ILO C-199 guarding of machinery convention,1963 (No.119),Article 11 states that “no
worker shall use any machinery with out the guards provided being in position, nor shall any worker
be required to use any machinery without the guards provided being in position”. So the employer
has to ensure above legislation for safe use of circular saw but if the guard is not provided to the
circular saw it will leads to accident and it will also leads to enforcement action following accident
due to failure of follow of these legislation.
Specific legal arguments The confined spaces Regulations 1997 work in confined spaces states that “no person at work shall
enter a confined space to carry out work for any purpose unless”. It is not reasonably practicable to
achieve that purpose without such entry.
C167 – Safety and Health in Construction Convention Article 13 SAFETY OF WORKPLACES
states that ”all appropriate precautions shall be taken to ensure that all workplaces are safe and
without risk of injury to the safety and health of workers. ”so the employer has to ensure above
legislation for proper communication between confined space entrant and safety watch. If the
walkie-talkie is not provided and it will also leads to accident in case of worker feel any sudden