Unit IG2: Risk assessment

Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).

Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.

Part 1: Background

You should aim to complete this section in 150 - 200 words.


Topic Comments
Name of organisation* RK GROUP
Site location* HYDERABAD
Number of workers 150
RK GROUP is the one of the best company in Hyderabad ,RK GROUP a trusted builder with
more than 7 years of expertise in real estate spectrum.
The selected project is a construction of warehouse and office building for the client in city
center mall the risk assessment covers the activity going on warehouse construction premises.
The major activities including backfilling, confined space work, roof sheeting work, mobilization
General description of the organisation excavation, concreting, plastering, scaffolding work etc. The equipment used inside the site is
excavator ,hoist, power tools, tipper ,back hoe loader, wheel loader, compactor, cement mixer,
boom lift, trolley etc.
The general work shift of the main workers from 8:30 am to 5:30 pm. The workers is need to
work on 8 hrs a day for 6 days in a week. Sunday is off for all the workers as per the rules and
regulation.
Description of the area to be included in the
The risk assessment covers the whole area of ware house and surroundings
risk assessment
health and safety officer and project manager has the responsibility of health and safety of the
Any other relevant information
whole company
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.

Learner number:00735254 Learner name:Akhilraj A Page 1 of 17


You should aim to complete this section in 100 - 200 words.
Note: this section can be completed after you have competed your risk assessment.
Outline how the risk assessment was carried Before conducting the risk assessment I gathered information about health and safety practice in
out this should include: the construction from ILO codes along with Hyderabad municipality code. I reffered some
 sources of information consulted; guidelines mentioned below
 who you spoke to; and 1. ILO Convention 167 (C167)- Safety and health in construction
 how you identified: (https://www.ilo.org/wcmsp5/groups/public/---ed_protect/---protrav/---
- the hazards;
- what is already being done; and 2. ILO Convention C155 -Occupational safety and health convention,1981
- any additional controls/actions that (https://www.ilo.org/dyn/normlex/en/f?p=NORMLEXPUB:12100:0::NO::P12100
may be required. _ILO_CODE:C155)

3. ILO Recommendation 164 – Occupational safety and health recommendation


(https://www.ilo.org/dyn/normlex/en/f?p=NORMLEXPUB:12100:0::NO::P12100
_ILO_CODE:R164)

4. ILO Recommendation 175 Safety and Health in construction


(https://www.ilo.org/dyn/normlex/en/f?p=NORMLEXPUB:12100:0::NO::P12100
_ILO_CODE:R1750)

Hyderabad municipality code


I visited sites and conducted a visual inspection then talked with workers, supervisor, engineer,
and other few professionals in health and safety management field. Their knowledge about the
proper risk assessment has shared with me. At the construction site I interviewed several
workers, engineer, project manager who had several years of experience behind them. they
provided the best valuable safety practices they have acquired through the life time.

I have reviewed records such as HSE plan, HSE policy, audit report, incident log book, accident
records, training records, first aid reports, near miss reports etc. and found that 8 months ago the
last accident occurred and found that there was no last time injury.

Part 2: Risk Assessment


Organisation name: RK GROUP
Date of assessment:24/01/2023
Scope of risk assessment: The risk assessment covers the whole area of warehouse and surroundings

Learner number:00735254 Learner name:Akhilraj A Page 2 of 17


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for Responsible
category and and how? required? further actions person’s job
hazard to be title
completed
(within …)
1.work at Scaffold erectors, bottom  Only competent  Implement to conduct daily 2 weeks Site engineer
height workers in scaffold, persons are allowed scaffold inspection to find
visitors to erect scaffold any detect in the scaffold
Workers
 Implement scaffold tag
working on a Workers might be fall 2 weeks Site engineer
scaffold were from height during  Ladder is provided for system to ensure safe
scaffold tie is scaffold erection leads to safe acess scaffold
not provided sever cut injury or facture  Implement to use rope and 2 weeks Site engineer
some case death also  Scaffold is free from bucket to raise or lower
any damges materials to/from the
Workers or nearby platform
workers might be harmed  Guard rail is provided  Conduct third party
like cut injury or fracture for the scaffold inspection body approved by 3 weeks Project
some case death also manager
Hyderabad municipality
due to collapse of  Raker support is
scaffolding because of
those scaffold above 10 m
provided to increase height
absence of scaffold tie
during scaffold erection. the strength of  Provide scaffold tie like (box 2 weeks Site engineer
scaffold tie, por through tie)for
Workers might be harmed support scaffold
like head injury by falling  Bracing is provided
of materials from height. for the scaffold to
increase the strength
of scaffold

 Damaged scaffold
materials are
removed from the site

Learner number:00735254 Learner name:Akhilraj A Page 3 of 17


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for Responsible
category and and how? required? further actions person’s job
hazard to be title
completed
(within …)
 Scaffolds were
erected, moved.
Dismantled or altered
only under the
supervision of
competent persons

 Scaffold construction
area were isolated
and cleared for all
persons

 Used personal
protective
equipment(PPE)such
as appropriate gloves,
full body harness,
head protection and
safety shoes

 Scaffolds have base


plates, even when
setting on a concrete
floor
2.work Carpenters, workers  Carpentry shop is  Provide lightning in the work 3 weeks Site engineer
equipment and near the equipment provided for the area
machinery. workers  Blades with broken teeth
Cut injury or amputation
 Only authorised should be replaced
Use of circular to carpenters, workers 3 weeks Project

Learner number:00735254 Learner name:Akhilraj A Page 4 of 17


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for Responsible
category and and how? required? further actions person’s job
hazard to be title
completed
(within …)
saw for cutting due to accidental hand persons is allowed to immediately manager
woods without touch to the wheel while operate the machine  Display name of the
guard rotating every injury due  Always keep the operators authorised to use 2 weeks Site engineer
to flying particles from machine switched off the machine
plywood during cutting
when not in use
due to absence of guard
 Ensured appropriate  Provide emergency switch 2 weeks Site engineer
cleaning and house for cutting saw
keeping practices are
maintained to  Purchase and fix the crown 3 weeks
minimize the risk of guard on the circular saw Project
slips, trips and falls machine manager
 Personal protective
equipment is issued  Instruct the operators
2 weeks Site
for operators including regards to remove all
supervisor
hand gloves, googles jewellery, tuck in loose
etc. clothing and tie back long
hair
3.electricity Electricians workers  Workers are  Purchase reduce the voltage 1 month Purchase
those using power tools competent to do the equipment110v instead of manager
different power work 220v
tools are used workers working with
 RCD is used in the  Purchase battery powered
in the site were electrical powered tool will 1 month Purchase
some of the be affect shock due site to prevent electric equipment manger
cable is accidentally contact with shock  Purchase new standard
damaged damaged cable or  Electric cords are cables and fix it and remove 3 weeks Purchase
damaged double insulated all damaged cables manager
 All certified
equipments and good
quality cables in use

Learner number:00735254 Learner name:Akhilraj A Page 5 of 17


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for Responsible
category and and how? required? further actions person’s job
hazard to be title
completed
(within …)

4.vibration Workers related to  Workers are  Conduct awareness classes 2 weeks HSE officer
concrete compactor competent to do the for the workers on the
workers are work consequences of continuous
exposed high Vibration is transmitted
 Rest are provided for exposure to vibration
vibration during into your hanfds and arms
concrete when using hand held / the workers to avoid  Implement job rotation 2 weeks Site engineer
compactor operated tools and continues exposure of system in concrete
machinery. vibration compaction work to avoid
Excessive exposure can  Quality inspections for continuous vibrstion
affect the nerves, blood equipments are exposure
vessels , muscles and conducted in every
joints of the hand, wrist month for early  Conduct health surveillance
and arm causing hand detection of any among the workers for early 3 weeks HR manager
arm vibration defect detection of any disesases
syndrome(HAVS)
 The worker is  Purchase anti vibration 1 month
provided with gloves gloves and forehold the Project
to reduce the impact compacter manager
 Tool box talk is
provided for the
workers regards
health affects of
continous vibration
5.mental ill Civil workers,  Monthly leaves are  Recruit additional man 3 weeks Project
health supervisor given to the workers power to complete the manager
in annually project in timely
Workers facing All the workers in the
 Allowance are  Implement tour programme
over high working site occurred 2 weeks HR manager
pressure or when their is high provided for the for workers in monthly to
stress to pressure from the top workers reduce their mental stress

Learner number:00735254 Learner name:Akhilraj A Page 6 of 17


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for Responsible
category and and how? required? further actions person’s job
hazard to be title
completed
(within …)
complete the management or by the  Holidays are given to  Conduct monthly mental 1 month Project
work huge work load, leads to the workers in health check up and manager
depression, bipolar weekend counsiling
disorder attention deficit
 Rest break is  Implement to maintain good
and anxiety etc. 2 weeks Site engineer
provided to avoid house keeping in the site
continuous work
 Overtime and extra
wages also provided
by company
 Bonus is given by the
company
 Neat and tidy shelter
room is provided
6.movement of All workers on site  All drivers are  Provide separate walkways 3 weeks Project
people and competent to drive for pedestrian and vehicle manager
vehicles  Ensured mobile plant movement
Vehicles might be collide
and vehicle fitted  Post a flagman to control the
vehicles are with workers during the 4 weeks Site engineer
coming to the movement of vehicle in audible reverse alarm vehicle and pedestrian
site for loading the sight and it lead to  Only authorised movement
and unloading sever cut injury or fracture vehicles to be  Provide a gate in entrance
activity where in some case death also permitted at sight area and appoint a security 3 weeks Project
separate  Warning signs are to avid an unauthorised manager
pathway for the provided regards sight entry
workers is not speed , crossing  Purchase convex lens and
provided points etc. fix it in adequate location 2 weeks Purchase
manager
 Humbs are provided  Purchase safety cones for
2 weeks
the area pedestrian temporary use Purchase
needs to cross manager

Learner number:00735254 Learner name:Akhilraj A Page 7 of 17


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for Responsible
category and and how? required? further actions person’s job
hazard to be title
completed
(within …)
 Sight speed allowed
only 10 km per hour
 PPE like reflective
jacket is provided to
the workers
7.manual Loading and unloading  The workers are given  Purchase manual handling 1 month Project
handling workers training on good aid like trollys or shifting the manager
handling techniques materials for another place
Workers are The workers might be
 Workers are  Recruit more man power for
carrying heavy injured like back injury or 1 month HR manger
equipment by muscular skeletal disorder competent to do the manual handling work
hand due to continuous lifting work  Introduce job rotation of
 Job break is provided workers when the equipment 3 weeks Project
Workers might be injured for the workers to cut is frequently lifted from one manager
like cut injury or fracture shot continuous place to another
or bruises or abbreation exposure of manual  Provide training for the
due to contact with sharp handling workers regards safe 2 weeks HSE officer
edge  The workers are manual handling
provided with
gloves ,cover and all
safety boots
8.hazardous All workers  House keeping is  Implement job rotation 2 weeks Site engineer
substance maintained among the workers to avoid
Exposure to dust can  Traffic is reduced to continuous exposure of dust
presence of cause irritation to the
control the dust in site  Implement misting water
dust in site eyes, skin and respiratory 2 weeks Project
where workers tract, and prolonged  Dust suppression sprays sufficient to reduce manager
exposed these exposure can lead to a using truck mounted airbourne dusting from
dust range of serious lung water spray system is demolition work
diseases done periodically  Purchase high efficiency 1 month Project

Learner number:00735254 Learner name:Akhilraj A Page 8 of 17


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for Responsible
category and and how? required? further actions person’s job
hazard to be title
completed
(within …)
 Dust mask is provided particulate air, HEPA mask manager
for the workers for the workers
 Speed of vehicle is  Provide training for the
workers regards risk of dust 2 weeks Safety officer
reduced to reduce the
dust contamination exposure and precautionary
measure
9.confined Confined space entrant  Mechanical ventilation  Purchase radio 1 month Project
space is provided by using communication like walkie- manager
Worker might be feeling proper air blowers talkie for use between the
Under ground giddiness or faint or
 Prior to entry in safety watch, confined
tank grinding unconsciousness
confined space entry space entrant and
work were sometimes leads to loss
proper of life due to oxygen or work begins, supervisor 2 weeks Project
communication deficiency in the under potential hazard  Necessary periodic training manager
device is not ground tank evaluation was should be provided to those
provided conducted and a work employs on safe working
The absence of proper permit was issued procedures while in confined
communication device and signed by a spaces
makes delay in competent person  Practise evacuation drills 2 weeks HSE officer
emergency rescue if the  Safety watcher is atleast monthly one time
workers suffer in a 1 month HSE officer
medical emergencies or
provided  Implement job rotation to
unconsciousness, it may  Prior to entry in avoid continuous working
leads to loss of life confined space that confined space
atmosphere will be  Provide training for the 2 weeks HSE officer
tested by authorised workers regards the risk in
person and confirm confined space and safe
oxygen concentration working procedure
is not less than 19.5%
and not more than

Learner number:00735254 Learner name:Akhilraj A Page 9 of 17


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for Responsible
category and and how? required? further actions person’s job
hazard to be title
completed
(within …)
23.5%
 Workers are
competent to due
confined space work
10.slipsand Carpentry workers,  Ensured routes to be  Separate pedestrian and 2 weeks Project
trips loading and unloading travel should be free vehicle routes are provided manager
workers and other from obstruction or  When cables are to close
trailing visitors to the site any hazard 3 weeks Project
the pedestrian walk way
electrical cable manager
are available in Workers might be injured  Sight safety rules arrange the hoses above the
different like cuts, bruissers clearly displayed near head level or place a ramp
location muscle strain/sprain to the entrance of over cables to prevent trips
fractured due to tripping entrance  Implement proper material 2 weeks Project
presence of over cables or scattered  All visitors were stacking at site manager
scattered of wooden planks inducted  Appoint more housekeeping
wooden plank  Skip box is provided staff to maintain good house 2 weeks
using for in the site keeping in the site Project
concreting manager
 Maintained proper  Conduct tool box talk for
cable management workers regards the slip and 2 weeks
 Adequate directional trip hazards Safety officer
signage provided
 All visitor to be wear
PPE hard hat, safety
shoe and high
visibility jacket
11.fire All workers  Metal type portable  Purchase and install falme 3 weeks Project
drum is used for the proof electrical fitting in the manager
Tube light are The sparks from tube light storage of diesel storage area
used in diesel make an ignition source
 Container is closed  Implement to reduce the
storage room for fire or explosion in 2 weeks Project

Learner number:00735254 Learner name:Akhilraj A Page 10 of 17


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for Responsible
category and and how? required? further actions person’s job
hazard to be title
completed
(within …)
diesel store room it may after the use and quantity of storage for manager
leads to severe burn special tool is reduce the severity rate in
injury or death and reccured for open case of any fire
property loss  Well ventilated  Make or arrange the storage 2 weeks Project
manager
storage room is area away from the sight
provided for storage  Provide warning signs LIKE 2 weeks Site engineer
of diesel NO smoking are need to
 Smoking is prohibited postered
near storage area  Train the employs how to 3 weeks HSE officer
 Appointed a use fire extinguisher
watchman for fueling
and refuelling
 Drip tray is provided
 DCP fire extinguisher
is placed near storage
area
 PPE like safety
helmet, safety shoe,
hand gloves and
cover all is provided

Learner number:00735254 Learner name:Akhilraj A Page 11 of 17


Part 3: Prioritise 3 actions with justification for the selection
Suggested word counts
Moral, general legal and financial arguments for all actions: 300 to 350 words
For EACH action:
Specific legal arguments: 100 to 150 words
Likelihood AND severity: 75 to 150 words
How effective the action is likely to be in controlling the risk: 100 to 150 words

Moral, general legal and financial arguments for ALL actions


Moral, general legal and financial MORAL
arguments The company has a moral duty to protect all workers who work either in the workshop or all the work site. RK
GROUP is a fast growing company with growing number of projects and employees from different places.
maintain safe work place and protect workers from hazards are companies one of major concern every
employee would like to return home from work place safely. any accident will cause the reputation of
company and moral values of workers and co- workers. An accident will affect the life quality of worker and
his family. Decrease in moral value in workers will affect the production also. Company consider the workers
are main pillars for business growth ;so they are giving a priority to providing a safe work place and
enhancing moral value of workplace. In addition to that morality of the workers obviously linked to the
condition of the work place, morality of the workers will be reduced significantly. As a result of reduction in the
workers morale, quality and productivity of the business will be affected adversely.so the company has to
provide reasonably practical control measures in order to protect the workers.
FINANCIAL ARGUMENTS
When an accident occured or any worker becomes sick due to the workplace exposure, the company has to
face huge financial loss in terms of direct cost and indirect cost.
 THE DIRECT COST : direct or insured costs for accidents are usually considered those costs
covered by workers compensation insurance and other minor medical costs for the accident .The
company pays insurance to cover these costs which will include all the medical expenses,
compensation to the workers and public the cost for the fine and enforcement, the cost the material
damage and property of damage and the cost to buy new equipment
 THE INDIRECT COST : Indirect costs are all the “uninsured” additional costs associated with an
accident. What is important to realize is that indirect costs are usually much greater than direct costs
which include the damage to reputation to the company
workers attention rate, loss of present and future projects, training and recruitment of new employee

Learner number:00735254 Learner name:Akhilraj A Page 12 of 17


cost, the down time cost of many related activities, investigation cost so on. The cost when compared
to implement the said safety precaution is way lesser than the direct and indirect cost combined and
in the long run the many human lives will be saved.
Here, most of the losses are uninsured costs. In other hands, by implementing recommended control
measures, company can avoid the accidents and ill- health and these costs would have become the profit of
organisation.
LEGAL ARGUMENTS
Employer has a legal duty to provide safe work ,safe equipment and material as per the ILO code ILO
convention 155(c155),ILO recommendation (r164). Employer should comply with legal and laws regulations.
implementation of legal practices is necessary for all organisation. there are some rules are set by
international bodies, if organisation fails to achieve those standards then enforcement agencies take further
action. At first they aware the organisation through general notice after that they take further steps. They can
stop the work which have potential to harm the employees. Enforcement authorities can also demand to start
the working after making certain improvements or taking respective control measure in order to make the risk
factor low.in case of any severe accident.
Overseeing chief can be imprisoned and firm license can be cancelled.

Justification for action 1


Action (Taken from column 4 of risk Provide scaffold tie like (box, tie, or through tie)for support scaffold(hazard category:work at height)
assessment)

Specific legal arguments R175-Safety and health in construction recommendation scaffold “every scaffold should be properly
designed, erected and maintained so as to prevent collapse or accidental displacement when
properly used”. So as the employer has to ensure above legislation for safe use of scaffold but if the
tie is not provided to the scaffold it will leads to scaffold collapse and it will also leads to
enforcement action following accident due to failure of follow of these legislation.
Consideration of likelihood AND severity The likelihood of injuries occurring from work at height especially on scaffolding is to be considered
as very high because more than 4scaffold are used in the particular site and almost 20 workers are
 types of injury or ill health working on the top and bottom of scaffold for masonry work and plastering work, so the scaffold
 number of workers at risk may shake due to movement of people and materials and weight of the materials in the top of the
 how often the activity is carried scaffold increase the risk of scaffold collapse. abscence of scaffold tie decreases the stability of
out scaffold so it increase the chance of scaffold collapse.
 how widespread the risk is
When considering the severity I set 4 categories:

Learner number:00735254 Learner name:Akhilraj A Page 13 of 17


 Minimal- no injury and/or damage occurred
 Minor- injury requiring first aid and/or slight damage for plant or equipment
 Major- injury requiring hospital treatment and/or major damage to buildings
 Catastrophic- death and/or irreplaceable damage to plant/equipment

In case of scaffold collapse it leads to fall of people from the top of scaffold and the people
or material falls to workers in the bottom workers. when person fall from top of scaffold
leads to severe cut injury or fracture some case death also. The bottom workers may also
injured like head injury and fracture. So the severity level is considered as catastrophic.
How effective the action is likely to be in
By providing scaffold tie it will enhance lateral stability and ensure a content and correct spacing
controlling the risk. This should include:
between the work surface and scaffold. Ties used to link the scaffold to any existing building or
 the intended impact of the action; structure. It provides resistance to inward and outward movements to the scaffold. Ties should be in
 justification for the timescale that such a way that it provides additional restraint to the scaffold. The provision of scaffold tie reduces
you indicated in your risk the likelihood of accident so the risk will reduce considerably.
assessment; and I had recommended two weeks for complete this action because the project manager needs to
 whether you think the action will arrange sufficient coupler and scaffolder for complete this work
fully control the risk
This action alone won’t control the risk fully, In addition with implement scaffold tag system to
ensure safe scaffold, Conduct third party inspection body approved by Hyderabad municipality
those scaffold above 10m will control the risk as low as reasonably practicable level.

Justification for action 2


Action (Taken from column 4 of risk Purchase and fix the crown guard on the circular saw machine( hazard category: work equipment)
assessment)

Specific legal arguments According to ILO C-199 guarding of machinery convention,1963 (No.119),Article 11 states that “no
worker shall use any machinery with out the guards provided being in position, nor shall any worker
be required to use any machinery without the guards provided being in position”. So the employer
has to ensure above legislation for safe use of circular saw but if the guard is not provided to the
circular saw it will leads to accident and it will also leads to enforcement action following accident
due to failure of follow of these legislation.

Learner number:00735254 Learner name:Akhilraj A Page 14 of 17


Consideration of likelihood AND severity The likelihood of injuries occurring during usage of circular saw is considered as veryhigh
especially without guard system because the circular saw is continuously use in this particular site
 types of injury or ill health almost 5workers working 7 hours in a day. A table saw cuts wood with a circular blade whose teeth
 number of workers at risk are moving, in the direction of the operator, at over one hundred miles per hour these create
 how often the activity is carried several hazards: they can cut fingers and hands due to accidental contact with saw, they can lift up
out and throw a work piece back at the operator at high speeds(“kickbacks”), due to absence of crown
 how widespread the risk is guard.
Please see `justification’ 1 for severity categories. The severity of the risk occurring could be fairly
serious are likely to range from minor injuries such as bruising, cut injury, slightly more serious like
amputation or eye injury or loss of vision due to kickback.so the severity is major
How effective the action is likely to be in
A guard should prevent employees from contacting the dangerous parts of the machines, and it
controlling the risk. This should include:
should be secure. implementation of safeguard reduce accidental contact with rotating blade. A
 the intended impact of the action; plastic barrier guard is suspended over the blade to prevent inadvertent blade contact from above,
 justification for the timescale that the sides and the rear. It also prevents the blade’s rising teeth from throwing back the work piece
you indicated in your risk towards the operator. The provision of guard reduce the likelihood of accident, so the risk reduce
assessment; and considerably.
 whether you think the action will I had given 3 weeks to complete this action because the employer needs to purchase the guard
fully control the risk system from the supplier and fix it in table saw. This action alone won’t control the risk fully, In
addition with provision of lighting in the working area and changing of blades with broken teeth it
should fully control the risk.

Justification for action 3


Action (Taken from column 4 of risk Purchase radio communication like walkie-talkie for use between the safety watch, confined space
assessment) entrant and the supervisor (hazard category: Confined space)

Specific legal arguments The confined spaces Regulations 1997 work in confined spaces states that “no person at work shall
enter a confined space to carry out work for any purpose unless”. It is not reasonably practicable to
achieve that purpose without such entry.
C167 – Safety and Health in Construction Convention Article 13 SAFETY OF WORKPLACES
states that ”all appropriate precautions shall be taken to ensure that all workplaces are safe and
without risk of injury to the safety and health of workers. ”so the employer has to ensure above
legislation for proper communication between confined space entrant and safety watch. If the
walkie-talkie is not provided and it will also leads to accident in case of worker feel any sudden

Learner number:00735254 Learner name:Akhilraj A Page 15 of 17


illness and also leads to enforcement action due to failure of follow of these legislation.
Consideration of likelihood AND severity The likelihood of illness or injuries occurring from confined space is very high because in the site
many confined space activity is going on daily basis. almost 5 workers working in the confined
 types of injury or ill health space also increase the chance of hazard. The confined space have deficiency of oxygen
 number of workers at risk atmosphere so the absence of radio communication like walkie-talkie in confined spacy delay the
 how often the activity is carried evacuation process in case of emergency increase the chance of risk
out
Please see ‘justification’1 for severity categories. The severity is also catastrophic
 how widespread the risk is
Because the communication gap between the fire watch and workers inside the confined space
makes delay in rescue activities it will leads to death of workers.
How effective the action is likely to be in
As workers may not be able to see each other if one is inside in a confined space and the other is
controlling the risk. This should include:
outside, a direction line of communication using walkie-talkies or another device will help maintain
 the intended impact of the action; contact even if supervisors cannot keep them in their line of sight. Using walkie-talkies can alert the
 justification for the timescale that staff member outside of the enclosed space if someone is in need of rescue or emergency medical
you indicated in your risk services in case things go wrong.so they can save the life of the person. Other communications
assessment; and equipment can include cellphones, however, the conditions of an enclosed space may make it
 whether you think the action will difficult for phones to receive a signal
fully control the risk I had given one month for complete this action is enough for the employer to purchase the walkie-
talkie from the supplier and needs to provide training for the workers about how to use.
This action alone won’t control the risk fully in addition with provision of periodic training to the
confined space employees and practice of evacuation drills will control the risk fully

Part 4: Review, communicate and check


Suggested word counts for each section:
 Planned review date or period and reasoning for this: 50 - 100 words
 How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words
 Follow up on the risk assessment: 100 - 150 words.
Planned review date/period with As per company policy the review of the risk assessment has to be done at every 12 months. Therefore I
reasoning given the review date for 12 months timescales 23/01/2024.But, in case any major accidents change in
management or policy happens inside the organisation, the risk assessment should be reviewed according
to the change.
How the risk assessment findings will be I will arrange a conference meeting with the management to discuss the risk assessment and how

Learner number:00735254 Learner name:Akhilraj A Page 16 of 17


communicated AND who you need to tell the additional control measures can be effectively implemented in future . I will also point out the
management team about the statutory requirement like ILO guidelines, hyderabad muncipality
guide lines followed in construction site. I will take all the actions to include the findings of risk
assessment in the next available tool box talk which have to be discussed with the workers. I will
also publish the summary of risk assessment in company website and notice board in site so any
one can easily access.
How you will follow up on the risk After doing the risk assessment I will set up a reminder for 5 days whether they have taken any
assessment to check that the actions action for completing the work as per assessment report. Then I will put up E-Mail to the
have been carried out management for each of the actions whether all actions are taken in progress of his organisation &
even I will contact with the project manager & safety officer whether actions are implemented or not
in the organisation. If same problem arises then I will find out the source and give ideas to the
management why the safety measure is important for the organization and help out with some
consultant for progress for their organization.

Learner number:00735254 Learner name:Akhilraj A Page 17 of 17