BAY LINE PULAU BAAI 1, LINE PULAU BAAI 2, LINE MUKO-MUKO 1, LINE MUKO-MUKO 2, TRAFO, KOPEL
SEPTEMBER WEEK 3 SEPTEMBER WEEK 4 OKTOBER WEEK 1 OKTOBER WEEK 2 OKTOBER WEEK3
N0 TASK NAME TIME
20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 CHECK SUPLAY AC and DC (LB Pulau -Baai 1)
Panel Control dan Proteksi
MK and Apparatus
2 ACTIVATION PANEL CONTROL dan PROTEKSI (LB Pulau Baai 1)
Check Internal and External panel Control & Proteksi
3 ACTIVATION APPARATUS BESERTA INTERLOCK LOCAL (LB Pulau Baai 1)
Disconecting Switch 1 (DS1)
Visual check and check Electrical
Check manual operation
Local Control
Disconecting Switch 2 (DS2)
Visual check and check Electrical
Check manual operation
Local Control
Disconecting Switch LINE (DSL)
Visual check and check Electrical
Check manual operation
Local Control
Circuit Breaker
Visual check
Check Electrical
Local Control
4 CHECK SUPLAY AC and DC (LB Pulau -Baai 2)
Panel Control dan Proteksi
MK and Apparatus
5 ACTIVATION PANEL CONTROL dan PROTEKSI (LB Pulau Baai 2)
Check Internal and External panel Control & Proteksi
6 ACTIVATION APPARATUS BESERTA INTERLOCK LOCAL (LB Pulau Baai 2)
Disconecting Switch 1 (DS1)
Visual check and check Electrical
Check manual operation
Local Control
Disconecting Switch 2 (DS2)
Visual check and check Electrical
Check manual operation
Local Control
Disconecting Switch LINE (DSL)
Visual check and check Electrical
Check manual operation
Local Control
Circuit Breaker
Visual check
Check Electrical
MONITORING PRA COMMISSIONING GI 150 kV ARGAMAKMUR
BAY LINE PULAU BAAI 1, LINE PULAU BAAI 2, LINE MUKO-MUKO 1, LINE MUKO-MUKO 2, TRAFO, KOPEL
SEPTEMBER WEEK 3 SEPTEMBER WEEK 4 OKTOBER WEEK 1 OKTOBER WEEK 2 OKTOBER WEEK3
N0 TASK NAME TIME
20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Local Control
7 CHECK SUPLAY AC and DC (LB Muko Muko 1)
Panel Control dan Proteksi
MK and Apparatus
8 ACTIVATION PANEL CONTROL dan PROTEKSI (LB Muko Muko 1)
Check Internal and External panel Control & Proteksi
9 ACTIVATION APPARATUS BESERTA INTERLOCK LOCAL (LB Muko Muko 1)
Disconecting Switch 1 (DS1)
Visual check and check Electrical
Check manual operation
Local Control
Disconecting Switch 2 (DS2)
Visual check and check Electrical
Check manual operation
Local Control
Disconecting Switch LINE (DSL)
Visual check and check Electrical
Check manual operation
Local Control
Circuit Breaker
Visual check
Check Electrical
MONITORING PRA COMMISSIONING GI 150 kV ARGAMAKMUR
BAY LINE PULAU BAAI 1, LINE PULAU BAAI 2, LINE MUKO-MUKO 1, LINE MUKO-MUKO 2, TRAFO, KOPEL
SEPTEMBER WEEK 3 SEPTEMBER WEEK 4 OKTOBER WEEK 1 OKTOBER WEEK 2 OKTOBER WEEK3
N0 TASK NAME TIME
20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Local Control
10 CHECK SUPLAY AC and DC (LB Muko Muko 2)
Panel Control dan Proteksi
MK and Apparatus
11 ACTIVATION PANEL CONTROL dan PROTEKSI (LB Muko Muko 2)
Check Internal and External panel Control & Proteksi
12 ACTIVATION APPARATUS BESERTA INTERLOCK LOCAL (LB Muko Muko 2)
Disconecting Switch 1 (DS1)
Visual check and check Electrical
Check manual operation
Local Control
Disconecting Switch 2 (DS2)
Visual check and check Electrical
Check manual operation
Local Control
Disconecting Switch LINE (DSL)
Visual check and check Electrical
Check manual operation
Local Control
Circuit Breaker
Visual check
Check Electrical
Local Control