MT Snow
Note for Cable Laying:
RF Cables:
C C
1. Cable mentioned in Black Color is RF cable LMR Cable
2. We have supplied 1 X 100 MTS. Please use this cable for two
length run. Both for RX and TX.
Proposed length between antenna location and VSAT Rack.
3. Please lay from proposed antenna location (Proposed in the port
side wing)to VSAT Rack positon (Server Room)
4. Please don't run in the cable tray designated for Power cables.
LAN Cables:
1. Cables mentioned in Blue Color.
2. We have supplied 1 box of CAT 5 cables
3. Please don't run more that 100mts in one length
4. For Master Deck D , there are three wireless AP to be fixed.
B 4a. One near to the Master's cabin B

4b. One near to the Engineer's cabin


4c. One in between Owner's cabin and officers cabin (Rear of the
Deck D)
4d. kindly confirm the location with Master or superintendent
before laying the cable
5. All the LAN cable's other end go to the VSAT rack in the Radio
Room (in the server room)
6. Please don't run along with the power cables.
Power cables:
1. Cables mentioned in Red color.
2. We have supplied 100mts 3 core cable.
Please provide grounding point near to the VSAT server rack
A A
BY: DATE: TITLE:
DRAWN: AS 16/10/2017 NITC
CHECKED: BT MT SNOW VESSEL - VSAT PROJECT
CONCENTRICITY 0.2 APPROVED: BT SINGLE LINE DRAWING
1 NEW DRAWING FIRST ISSUE AS BT BT SURFACE FINISH 3RD ANGLE PROJECTION PROJECT No: - SHEET ID: -
ALL DIMENSIONS N8 UNLESS REV:
REV DESCRIPTION DATE BY CHK'D APP'D SCALE: SHEET: DRG No:
REVISION HISTORY
IN mm OTHERWISE
STATED NTS 1 OF 2
SLD-2.dwg A3 1