Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

C1 = 20,9 L/min C1 = 12,5 L/min C1 = 6,7 L/min C1 = 10,2 L/min C1 = 28 L/min C1 =

C2 = 9,5 L/min C2 = 5,8 L/min C2 = 4 L/min C2 = 10,2 L/min C2 = 28 L/min C2 = 28 L/min

C1 C2 C1 C2 C1 C2 C1 C2 C1 C2 C1 C2
G1/2 G1/2 G1/2 G1/2 G1/2 G1/2

140 bar

15
bar

300
bar P

T
LS

Note:
Pressures are set to the HYDRAULIC SCHEMATIC
accuracy of the gauge as
received from the Apitech control block
manufacturer. KVM 23X

You might also like