PEMINDAHAN PIPERACK DAN NEW PIPERACK

Nomor Bahan Volume Unit


1 BESI H BEAM 200 1794 KG
2 PIPA CS SCH 10 47.16 KG
3 SEWA CRANE 2 HARI
4 PEMINDAHAN PIPERACK 1 LS
5 Penggalian tanah 11.48 m³
6 Pengurukan tanah 11.48 m³
7 Pembesian 190 kg
8 Pengecoran k300 4 m³
9 Angkur bolt 20x60 18 buah
10 Bagesting 3.5 m²
Mobilisasi dan Demobilisasi 1 ls
House skeeping 1 ls
TOTAL
DAN NEW PIPERACK
Material Upah Jumlah
Rp 35,000.00 Rp 10,000.00 Rp 80,730,000.00
Rp 16,000.00 Rp 8,000.00 Rp 1,131,840.00
Rp - Rp 12,000,000.00 Rp 24,000,000.00
Rp 12,000,000.00 Rp 12,000,000.00
Rp - Rp 170,000.00 Rp 1,951,600.00
Rp 100,000.00 Rp 1,148,000.00
Rp 20,000.00 Rp 10,000.00 Rp 5,700,000.00
Rp 1,450,000.00 Rp 200,000.00 Rp 6,600,000.00
Rp 130,000.00 Rp 60,000.00 Rp 3,420,000.00
Rp 250,000.00 Rp 100,000.00 Rp 1,225,000.00
Rp - Rp 2,000,000.00 Rp 2,000,000.00
Rp - Rp 1,000,000.00 Rp 1,000,000.00
Rp 140,906,440.00