Professional Documents
Culture Documents
Circular Index
Circular Index
Sr.
NATURE DATE NUMBER MEMO OFFICE SUBJECT
No
EXTENSION IN PERIOD OF TEMPORARY INDUSTRIAL
1 TEMPORARY 26-08-90 5453-60 COM/846/90 GM (CS) CONNECTION
CONVERSION OF TEMPORARY CONNECTION TO REGULAR
2 TEMPORARY 01-09-94 6773-7000 MDCS/DG/R&CP.59021 GM (CS) CONNECTION
MDD/GMCS/DGC/DCA/G-945- TEMPORARY CONNECTIONS UNDER TARIFF E-1 & E-2 (PERIOD
3 TEMPORARY 22-04-98 906-50 97 MD (DISTT) OF TEMPORARY CONNECTION EXPIRY OF 3-YEARS)
GMCS/TARIFFS/T-136/VOL-
4 TEMPORARY 17-08-00 1671-1708 VIII GM (CS) TEMPORARY CONNECTIONS FOR CONSTRUCTION OF HOUSE
12 TEMPORARY 07-02-06 860-74 DGC/TARIFF/T-10 DG COMMERCIAL MINUTES OF AUTHORITY MEETING HELD ON 21 JANUARY 2006
13 TEMPORARY 02-12-08 313-14 GM(TECH)/LESCO/PA CEO LESCO EXTENSION IN VALIDITY PERIOD OF TEMPORARY CONNECTIONS
STATUS OF HOUSING SCHEME CIRCULAR ISSUED BY WAPDA/LESCO
21 PLAZAS 18-09-93 5/30/1980 1993 DESIGN/DRW/21 CAEB CAEB LHR INSTALLATION OF 25 KVA TRANSFORMER
GM (PE&S) STANDARD AND CRITERIA FOR THE ELECTRIFICATION OF NEW
22 ELECTRIFICATION 26-10-93 2163-81 1993 GMPE&S/CEDE/DDE/E-42 WAPDA HOUSING SCHEMES
SUPPLY OF POWER TO SHOPPING PLAZAS/COMMERCIAL
23 PLAZAS 19-04-94 99931-36 1994 DESIGN/DRW/21 CAEB CAEB LHR BUILDINGS AND OTHER MULTISTORY BUILDINGS
SUPPLY OF POWER TO SHOPPING PLAZAS/COMMERCIAL
24 PLAZAS 07-07-94 2191-94 1994 DESIGN/DRW/21 CAEB CAEB LHR BUILDINGS AND OTHER MULTISTORY BUILDINGS
INSTALLATION OF SEPARATE ROOM SPACE FOR INSTALLATION
25 PLAZAS 31-08-95 2406-2465 1995 MDD/DG(R&CP) 59034 MD DISTT OF ELECTRIC METERS IN PLAZAS AND MULT ISTORY BUILDINGS
26 PLAZAS 31-08-95 2378-2405 1995 MDD/DG(R&CP) 59034 MD DISTT SALE OF POWER TO PLAZAS, SHOPPING CENTRES
27 ELECTRIFICATION 24-02-96 70314-20 1996 247/CAEB CAEB LHR GRANT OF INDIVDUAL CONNECITONS IN UN-ELECTRIFIED AREAS
28 PLAZAS 18-01-97 66116-242 1997 CAEB/DRW/21 CAEB LHR THEFT OF ELECTRICITY IN COMMERCIAL PLAZAS/CENTRES
SOP TO SHOPING PLAZAS, COMMERCIAL BUILDINGS AND MULTI
29 PLAZAS 28-04-98 82283-88 1998 DRW/21/LESCO P&D CEO LESCO STORY BUILDINGS
47 ELECTRIFICATION 13-01-00 9519-20 2000 GMO/DHQ GM O EXEMPTION OF BANK GUARENTTE IN JUBLEE TOWN
RECOVERYOF 50 % ESTIMATED COST FOR CONSTRUCTION OF
48 GRID SHARING 19-01-00 73-83 2000 GMO/DDV/F GMO 132 KV GRID STATION AND TRANSMISSION LINE FOR HOUSING
SCHEME
RECOVERYOF 50 % ESTIMATED COST FOR CONSTRUCTION OF
49 GRID SHARING 26-01-00 39212-15 2000 CAEB/DRW/397 CEO LESCO 132 KV GRID STATION AND TRANSMISSION LINE FOR HOUSING
SCHEME
PROVISION OF SEPARATE DADICATED TRANSFORMERS FOR
PLAZAS 17-02-00 42803 2000 DRW/21/LESCO P&D CEO LESCO COMMERCIAL PLAZAS
RECOVERY OF 50% ESTIMATED COST FOR CONSTRUCTION OF
50 GRID SHARING 08-09-00 785 2000 GMO/PA GM O 132 KV GRID STATION AND TRANSMISSION LINE FOR HOUSING
SCHEME
OPENING OF NEW HEAD A/C FOR SHARING COST OF GRID
51 GRID SHARING 27-09-00 17065 2000 DRW/397/LESCO CEO LESCO
STATION
61 GRID SHARING 31-12-02 4104-54 2002 ACC/2002-17 PSO CHAIRMAN MINUTES OF CHAIRMAN CONFERENCE 23-24 DEC 2002
GM (C&M) RECOVERY OF SHARING COST OF GRID STATION FROM THE
62 GRID SHARING 03-04-03 179-91 2003 GM(C&M)/P/E-172
POWER SPONSOR OF HOUSING SCHEMES
71 ELECTRIFICATION 26-05-04 15621-26 2004 SM (P&D) CEO LESCO BAN ON NEW CONNECTIONS IN DISPUTED HOUSING SCHEMES
MEMBER
72 ELECTRIFICATION 13-07-04 481-83 2004 MP/GMO/DDV/110 POWER ELECTRIFICATION OF PRIVATE HOUSING SCHEMES
70 ELECTRIFICATION 02-08-05 1611-17 2005 P & D /DRW -543 CEO LESCO SOP TO ABANDONED DOCTORS HOUSING SCHEME
RECOVERY OF 50% ESTIMATED COST FOR CONSTRUCTION OF
GRID SHARING 2006 DRW CEO LESCO 132 KV GRID STATION AND TRANSMISSION LINE FOR HOUSING
71 08-03-06 4460-61 SCHEME
PROVISION OF ELECTRICITY TO ABADIES /COLONIES WITHIN THE
72 ELECTRIFICATION 02-09-08 3039-56 2008 CE/RE CE (RE) LIMITS OF TMA/UNION COUNCILS
Sr.
NATURE DATE DATE NUMBER YER MEMO OFFICE SUBJECT
No
SECRETARY
INDUSTRIAL 22-12-76 17617-17876 1976 OFFICE ORDER
WAPDA
2 INDUSTRIAL ` 27-04-1980 1454-61 1980 COM/D-1683 GM DISTT ELECTRIC CONNECTION IN THE SAME PREMISES
.04-02- MORE THAN ONE INDUSTRIAL CONNECTIONS OF THE SAME
3 INDUSTRIAL 04-02-81 683-1100 1981 GMD/DDP&P/MOM=29 GM DISTT
1981 NATURE IN ONE PREMISES
NO BOJECTION CERTIFICATE FROM THE MUNICIPAL
.11-04-
4 INDUSTRIAL 11-04-81 8099-8106 1981 GMD/DD(R&M)56018 GM DISTT COMMITTEES /MUNICIPAL CORPORATIONS FOR THE INDUSTRIAL
1981
CONNECTIONS WITH IN THE MUNICIPAL AREA
PROVSION OF 11 KV OCBS FOR THE SUPPLY OF 11 KV (PLAN OF
5 PANEL 02-04-84 02-04-1984 1817 1984 CE DESIGN DISTT CE DESIGN
ROOM)
1- PERCENTAGE OF INSTALLATION CHARGES TO BE ADDED IN
NGSC
.22-01- 2- REFUND OF CAPITAL COST
6 ESTIMATE 22-01-85 1235-1976 1985 GMD/MFD/IMPLE-3 GM DISTT 3- DEFINATION OF DEPOSIT WORKS AND LEVY OF 24%
1985
DEPARTMENTAL CHARGES (FINAL FOR REFUND UPTO
10% MAY NEITHER)
PERCENTAGE OF INSTALLATION CHARGES TO BE ADDED IN
ESTIMATE 30-05-85 8487-9332 1985 GMD/MFD/IMPLE-3 GM DISTT NGSC REFUND OF CAPITAL COST DEFINATION OF DEPOSIT
WORKS AND LEVY OF 24% DEPARTMENTAL CHARGES
PERCENTAGE OF INSTALLATION CHARGES TO BE ADDED IN
ESTIMATE 10-06-85 91132-54 1985 DESIGN CAEB LESCO NGSC REFUND OF CAPITAL COST DEFINATION OF DEPOSIT
WORKS AND LEVY OF 24% DEPARTMENTAL CHARGES
PRIORITY TO WAPDA EMPLOYEES IN NEW ELECTRICITY
7 GENERAL 07-10-85 10/7/1985 2156-2257 1985 GMD/TARIFF/G-67 GM DISTT
CONNECTION
PERCENTAGE OF INSTALLATION CHARGES TO BE ADDED IN
8 ESTIMATE 21-08-85 8/21/1985 15454-16300 1985 GMD/MFD/IMPLE-3 GM DISTT
NGSC
RECOVERY OF SERVICE RENTAL INSTEAD OF LUMPSUM COST
9 GENERAL 27-04-86 4/27/1986 896 1986 GMD/TARIFF/G-157 GM DISTT OF SERVICE ESTIMATE FOR GIVING SERVICE CONNECTION TO
MOSQUE,
10 ESTIMATE 11-12-86 12/29/1986 15424-26193 1986 GMD/D(R&CP) WM218 GM DISTT SEVICE ESTIMATE AND DEMAND NOTICE
RECOVERY OF ESCLATION CHARGES OF MATERIAL INCLUDED IN
11 ESTIMATE 29-12-86 12/29/1986 58296-59192 1986 GMD/D(R&CP) WM-181 GM DISTT THE SERVICE ESTIMATE AFTER REGISTERATION OF ELECTRIC
CONNECTION
26% DEPARTMENTAL CHARGES ON SERVICE CONNECTION
ESTIMATE 0-03-87 17216-23 1987 GMD/CEHQ/DW GM DISTT
INVOLVING TRANSFORMERS
12 METERING 15-08-87 44872-81 1987 GMO GM O SEPARATE LIGHT METER ON INDUSTRIAL PREMISES
OPENING OF ALREADY SECURED PANEL AND REPLACEMENT OF
13 PANEL 18-10-87 5159-67 1987 GMCS /DDP &P GM CS
METERING EQUIPMENT ETC
PERCENTAGE OF INSTALLATION CHARGES TO BE ADDED IN
14 ESTIMATE 21-06-89 6/21/1989 1905-22 1989 GMO/B3/B-VOL 4TH GM O
NGSC
SOP TO AGRO (ARC) STEEL INDUSTRIES PVT LTD FOR ARC
15 INDUSTRIAL 02-08-89 8/2/1989 4261-62 1989 CEDE/D(RED&S)186 CE DISTT ENG
FURNACES
COST OF BURNT METERS, MDI, OR OTHER MEASURING
METERING 23-08-89 1482-89 1989 GM(CS)/DG(EM)/DD(P&P) GM CS
INSTRUMENTS
SUPPLY OF POWER OT STEEL FURNACES (METERING ROOM
SHOULE BE BOUNDARY OF THE CONSUMER PREMISES AND ITS
16 INDUSTRIAL 27-11-89 11/27/1989 2073-91 1989 MDD/DG(EM/D(ES)154 MD DISTT ONLY DOOR MUST HAVE OPENING ON THE PUNLIC ROAD SIDE
AND ONE KEY OF THE ROOM TO XEN / DM(O) & OTHER KET WITH
S.E / M(O) (FINAL FOR ARC FURNACE)
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
17 INDUSTRIAL 01-09-90 9/1/1990 5657-6605 1990 GMCS/G-137/90 GM CS
CONNECTION SHARING COST OF TRANSFORMER
COPY OF ESTIMATE PREPARED FOR SERVICE CONNECTION TO
18 GENERAL 03-02-90 2/3/1990 555-71 1990 GMO/D(R&CP) WM-181 GM O
BE SENT ALONGWITH S.RS
CLARIFICATION REGRADING LEVY OF INSTALLATION CHARGES
19 ESTIMATE 03-09-90 9/3/1990 2991-3006 1990 GMCS/L(R&CP)56286 GM CS
AT 26%
CREDIT OF DEPRECIATED VALUE OF MATERIAL TO BE REMOVED
20 ESTIMATE 23-09-90 9/23/1990 7173-74 1990 COM/D-2202/90 GM CS
IN THE EXT/ROL CASES
PENDING INDUSTRIAL CONNECTIONS (CONNECTION NOT
21 GENERAL 17-01-91 1/17/1991 361-68 1991 COM/G-788/90 GM CS
REJECTED DUE TO NON AVALIBLE OF LOAD) &
SHOULD BE GIVEN CONNECTION IN CASE OF OVER
LOADED GRID STATION
PROCEDURE FOR INDUSTRIAL CONNECTION (FINAL
22 INDUSTRIAL 16-03-91 3/16/1991 1768-78 1991 COM/G-003-91 GM CS
POLICY B-4)
RECOVERY OF FIXED AMOUNT AS A COST OF SERVCE
23 ESTIMATE 28-07-91 842-65 1991 GMCS/D(R&CP) /55904 CONNECTION FROM THE PROSPECTIVE CONSUMER OF
DOMESTIC CATEGORY
24 ESTIMATE 01-10-91 10/1/1991 428-56 1991 GMO/BS/E-77 GM O DISCOUNTINUATION OF DEPARTMENTAL CHARGES
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
25 INDUSTRIAL 03-10-91 10/3/1991 1533-53 1991 GMCS/D(R&CP)58006 GM CS
CONNECTION SHARING COST OF TRANSFORMER
26 GENERAL 07-11-91 11/7/1991 4025-32 1991 GMCS/COM/G-65 GM CS LEVY OF SURCHARGE ON INSTALLMENT OF CURRENT BILLS
POLICY FOR SHIFTING OF INDUSTRIAL AND TUBE WELL
27 SHIFTING 27-01-92 1/27/1992 3017-28 1992 GMCS/D(R&CP) /55717 GM O
CONNECTIONS
PRIORITY TO WAPDA EMPLOYEES IN NEW ELECTRICITY
28 GENERAL 08-03-92 3/8/1992 3175-95 1992 GMCS/DG/R&CP/55904 GM CS
CONNECTION
29 ESTIMATE 13-04-92 1088-89 1992 G-985 GM CS SOP TO GULBERG HEIGHTS
CREDIT OF DEPRECIATED VALUE OF MATERIAL TO BE REMOVED
30 ESTIMATE 28-06-92 6/28/1992 2059-66 1992 COM/D-2202/90 GM CS
IN THE EXT/ROL CASES
RECOVERY OF ESCLATION CHARGES OF MATERIAL INCLUDED IN
31 ESTIMATE 28-07-92 7/28/1992 4453-62 1992 GMCS/D(R&CP) WM-121 GM CS THE SERVICE ESTIMATE AFTER REGISTERATION OF ELECTRIC
CONNECTION
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
32 INDUSTRIAL 18-08-92 8/18/1992 4557-75 1992 GMCS/D(R&CP)58006 GM O
CONNECTION SHARING COST OF TRANSFORMER
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
33 INDUSTRIAL 30-09-92 9/30/1992 4461-83 1992 GMCS/D(R&CP)58006 GM CS
CONNECTION SHARING COST OF TRANSFORMER
34 SECURITY 07-10-92 10/7/1992 4571-79 1992 GMCS/D(R&CP)56195 GM CS ENHANCEMENT OF SECURITY DEPOSIT RATES
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
35 INDUSTRIAL 27-02-93 2/27/1993 614-37 1993 GMCS/D(R&CP)58006 GM CS
CONNECTION SHARING COST OF TRANSFORMER
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
36 INDUSTRIAL 19-03-93 3/19/1993 1213-22 1993 GMCS/D(R&CP)58006 GM CS
CONNECTION SHARING COST OF TRANSFORMER
37 GENERAL 07-08-93 8/7/1993 2668-78 1993 GMCS/DCA/G-1060 MD DISTT ILLEGAL ISSUANCE OF ADDITIONAL DEMAND NOTICE
65 SECURITY 20-01-98 1/20/1998 380-882 1998 GMCS/DG/R&CP/56195 MD DISTT EXEMPTION FROM PAYMENT OF SECURTY DEPOSIT
INSTALLATION OF SINGLE PHASE 10/40 A METERS UPTO 8 KW
66 METERING 04-03-98 1121-30 1998 GMO/DHQ GM O
SINGLE PHASE LOAD
67 SECURITY 16-05-98 5/16/1998 1172-73 1998 GMCS/DCA/LHR GM CS REFUND OF SECURITY
68 GENERAL 02-07-98 434-544 1998 LESCO CEO LESCO FORMATION OF LAHORE ELECTRIC SUPPLY COMPANY
CIRCULAR REGARDING SELF PURCHASED MATERIAL TO
69 GENERAL 31-08-98 8/31/1998 2668-2816 1998 S&S/RD/C CEO LESCO
CONSUMERS OF NEW CONNECTIONS
70 TUBE WELL 30-10-98 10/31/1998 2627 1998 GMCS/DG/R&CP/ GM CS GRANT OF NEW TUBEWELL CONNECTIONS
71 METERING 17-12-98 16056-73 1998 GMCS/DGCDCAC/B-8 GM CS SEPARATE LIGHT METER ON INDUSTRIAL PREMISES
72 INDUSTRIAL 25-01-99 1/25/1999 78-122 1999 GMCS/DDP/55716 GM CS SUPPLY OF POWER TO ARC FURNACES
73 SECURITY 28-10-99 10/28/1999 882-92 1999 GMCS/TARIFF/G-226 GM CS CHARGING OF SECURITY DEPOSIT N EOL CASES
74 SECURITY 25-01-99 1/25/1999 69-77 1999 GMCS/D(R&CP)56195 GM CS SECURITY DEPOSIT DEFERRED NEW CONNECTIONS CASES
75 GENERAL 15-03-99 3/15/1999 19587-99 1999 RD/C/LESCO CEO LESCO PRIVATE PURCHASE OF MATERIAL AGAINST NEW CONNECTIONS
EXTENSION FROM EXISTING ELECTRICITY CONNECTIONS OF
76 GENERAL 15-03-99 3/15/1999 720-27 1999 GMO/PA GM O
DOMESTIC AND COMMERCIAL CATEGORIES
77 INDUSTRIAL 13-04-99 4/13/1999 411-14 1999 GMO/DHQ GM O DISCONNECTION DUE TO EXTENSION OF LOAD
78 INDUSTRIAL 15-04-99 4/15/1999 51-85 1999 GMCS/D(R&CP)57000 GM CS INCENTIVE POLICY FOR REVIVAL OF STEEL MELTING INDUSTRY
MEMBER APPLICATION OF T.O.D TARIFF TO B-3, B-4 INDUSTRIAL
79 METERING 08-07-99 7/8/1999 23-32 1999 GMCS/DG®.F-D3
POWER CONSUMERS WHERE T.O.D METERS ARE ALREADY EXISTING
CLARIFICATION REGRADING SHARING COST OF TRANSFORMER
80 INDUSTRIAL 21-08-99 8/21/1999 1153-54 1999 GMCS/D(R&CP)58006 GM CS
SUB STATION TO TUBEWELL AND INDUSTRIAL CONNECTIONS
DOMESTIC CONNECTIONS FOR DERAS FROM TUBEWELL
81 TUBE WELL 21-08-99 8/21/1999 1141 1999 GMCS/D(R&CP)55717 GM CS
TRANSFORMERS
82 METERING 02-09-99 9/2/1999 10699 1999 CEO LESCO INSTALLATION OF TOD METERS ON STEEL MELTING FURNACES
APPLICATION FO T.O.D TARIFF TO B-3, B-4 INDUSTRIAL
83 METERING 13-09-99 9/13/1999 780-87 1999 GMCS/TARIFF/T-101 GM CS
CONSUMERS
84 INDUSTRIAL 24-09-99 9/24/1999 13335-47 1999 GMCS/D(R&CP)57000 GM CS INCENTIVE POLICY FOR REVIVAL OF STEEL MELTING INDUSTRY
88 GENERAL 22-10-99 10/22/1999 1422-30 1999 GMCS/D(R&CP)57000 GM CS MINUTES OF CHARIRMANS CONFERENCE ON 22-23 SEP 1999
M(P)/GMCS/
89 INDUSTRIAL 17-11-99 11/17/1999 1517-40 1999 GM CS INCENTIVE PAKAGE FOR INDUSTRIES
D(R&CP)57000
M(P)/GMCS/ MEMBER
90 INDUSTRIAL 02-12-99 12/2/1999 1628-70 1999 INCENTIVE PAKAGE FOR INDUSTRIES
D(R&CP)57000 POWER
RELIEF PAKAGE TO PRIVATE AGRICULTURAL TUBEWELL
91 TUBE WELL 21-12-99 12/21/1999 1732-65 1999 GMCS/D(R&CP)55717 GM CS
CONSUMERS
PREPARETION OF CORRECT ESTIMATE FOR PROVIDING SUPPLY
92 ESTIMATE 24-12-99 12/24/1999 1915 1999 DY.C/GMCS/DCS GM CS
TO THE PROSPECTIVE CONSMERS
93 ESTIMATE 28-12-99 9339-45 1999 GMO/DHQ/44 GM O OFFICE ORDER REGARDING INSTALLATION CHARGES
94 TUBE WELL 30-12-99 1139-55 1999 GMO/BS/B-I VOL-II GM O SOP TO TUBEWELL CONNECTIONS 50% BY INSTALLMENT
95 GENERAL 17-01-00 1/17/2000 78-89 2000 GMCS/DGC/DCSO/769 GM CS CHANGE OF CONSUMERS NAME ON ELECTRICITY BILL
M(P)/GMCS/D(R&CP)/AM-
96 INDUSTRIAL 01-03-00 3/1/2000 206-42 2000 GM CS INCENTIVE PACKAGE FOR INDUSTRIES
357000
GMCS/DD(R&CP).AM- RELIEF PACKAGE TO PRIVATE AGRICULTURAL TUBE WELL
97 TUBE WELL 01-03-00 3/1/2000 280-316 2000 GM CS
2/55717 CONSUMERS
OFFICE ORDER REGARDING INSTALLATION CHARGES FINAL
98 ESTIMATE 07-03-00 3/7/2000 1057-78 2000 GMO/DHQ/44-A GM O (DISMENTALMEN CHARGES 5% & RE-USE
CHARGES 15%)
99 GENERAL 13-03-00 3/13/2000 1113-21 2000 WE/GMCS/DGC/DCA/D-24 GM CS SURVEY/REGULARIZATION OF UN AUTHORISED EXTENDED LOAD
100 METERING 06-04-00 4/6/2000 906-25 2000 GMCS/DG/EM/R)F-03 GM CS FUNCTIONING OF T.O.U/T.O.D METERS
101 GENERAL 18-04-00 4/18/2000 8337-45 2000 CE/DRS/1573 CEO LESCO STANDING COMMITTEES
102 METERING 04-05-00 5/4/2000 8352-60 2000 CRG/435 CEO LESCO FUNCTIONING OF T.O.U/T.O.D METERS
PUTTING OF DDITIONAL LOAD ON UNDER LOADED EXCLUSIVE
103 INDUSTRIAL 30-05-00 5/30/2000 2802-2804 2000 GMO/DHQ/F GM O
FEEDERS
PUTTING OF DDITIONAL LOAD ON UNDER LOADED EXCLUSIVE
104 INDUSTRIAL 06-06-00 6/6/2000 64585 2000 CEO LESCO
FEEDERS
SECRETARY MINUTES OF MEETING HELD ON 20-06-2000 (CAPITAL COST
107 GENERAL 20-06-00 7/6/2000 2447-2487 2000 S/AD(CORD)03003/MTG
WAPDA INSTALLEMENT WITH MARKUP)
COMETENCY FOR SANCTIONING OF INDUSTRIAL CONNECITONS
105 INDUSTRIAL 29-06-00 68244-60 2000 DRW/24/ CEO LESCO
UNDER TARIFF B-2
RELIEF PACKAGE TO PRIVATE AGRICULTURAL TUBE WELL
106 TUBE WELL 04-07-00 7/4/2000 15309-14 2000 CRG/402 CEO LESCO
CONSUMERS
SECRETARY RELIEF PACKAGE TO PRIVATE AGRICULTURAL TUBE WELL
108 TUBE WELL 07-07-00 7/7/2000 3168-90 2000 GMO/R&CP
WAPDA CONSUMERS
109 TUBE WELL 11-07-00 118-27 2000 GMCS/DD(R&CP)55717 GM CS SANCTION OF NEW TUBEWELL CONNECTIONS
110 RCO 20-07-00 7/20/2000 735-41 2000 GMCS/DD(R&CP).59026 GM CS PROPOSAL FOR REDUCTION IN RECONNECTION FEES
RELIEF PACKAGE TO PRIVATE AGRICULTURAL TUBE WELL
111 TUBE WELL 27-07-00 7/27/2000 4440-51 2000 DRW CEO LESCO CONSUMERS-REFUND OF CAPITAL COST AND SECURITY
AMOUNT
REGIONAL MANAGER APPROVAL OF TESTING CHARGES OF EQUIPMENT PURCHASED
112 METERING 27-07-00 7/27/2000 3062 2000 CEO LESCO
M&T BY CONSUMER
113 RCO 16-08-00 8/16/2000 4236-44 2000 GMO/CEHQ/DHQ GM O RECONNECTION ORDER AND FEE
114 GENERAL 25-08-00 8/25/2000 841-52 2000 GMCS/D(R&CP)57000 GM CS PROMOTION OF SALE OF SURPLUS POWER
115 INDUSTRIAL 25-08-00 8/25/2000 863-80 2000 DD(R&CP)55716 GM CS SUPPLY OF POWER THROUGH 11 & 33 KV FEEDERS
GMCS/DD(R&CP).AM-
116 INDUSTRIAL 25-08-00 8/25/2000 881-902 2000 GM CS INCENTIVE PACKAGE FOR INDUSTRIES
4/57000
GMCS/DD(R&CP).AM-
117 GENERAL 05-09-00 9/5/2000 917-38 2000 GM CS ELECTRIC WIRING TEST REPORT
1/55732
118 GENERAL 08-09-00 9/8/2000 768-82 2000 GMO/PA GM O SALE OF POWER BY SPP,S
SUPPLY OF POWER THROUGH 11 & 33 KV FEEDERS (for inspection
119 INDUSTRIAL 09-09-00 9/9/2000 11932 2000 DRW CEO LESCO
of 3rd metering panel link GM No,1227-48 dt. 19-3-01))
120 REDUCTION 14-09-00 9/14/2000 939-48 2000 GMCS/DD(R&CP)59080 GM CS REDUCTION OF LOAD
121 INDUSTRIAL 03-10-00 10/3/2000 19353-56 2000 DRW/491/CAEB CEO LESCO SUPPLY OF POWER THROUGH 11 & 33 KV FEEDERS
124 INDUSTRIAL 12-12-00 12/12/2000 1102-18 2000 GMCS/DD(R&CP)59026 GM CS INCENTIVE PACKAGE FOR CONSUMERS DRAWING FROM SPP
CLARIFICATION REGARDING NON CHARGING OF SHARING COST
125 INDUSTRIAL 19-12-00 12/19/2000 32128-34 2000 DRW505 CEO LESCO
OF SYSTEM FROM INDUSTRIAL CONSUMERS UP 10 KW
126 INDUSTRIAL 13-01-01 1/13/2001 91 2001 GMO/DDV/51 GM O SUPPLY OF POWER THROUGH 11 & 33 KV FEEDERS
127 SECURITY 13-03-01 3/13/2001 128-149 2001 GMCS/DD(R&CP)58004 GM CS UPDATION OF SECURITY FOR EOL (FINAL) DEPOSIT N
EOL CASES
CALRIFICATION REGARDING NON CHARGING OF SHARING COST
INDUSTRIAL 27-03-01 48462-68 2001 DRW/505/LESCO CEO LESCO
SYSTUM FROM INDUSTRIAL CONSUMERS UPTO 10 KW LOAD
SUPPLY OF POWER THROUGH 11 & 33 KV FEEDERS ( in response
GM(O)/DHQ/R&CP-
128 INDUSTRIAL 19-03-01 3/19/2001 1227-48 2001 GM O of CE LESCO No. 11932 dt. 9-9-2000 for 3rd Metering panel which on
55716/VOL-III
consumer end for inspection)
POLICY FOR SHIFTING OF INDUSTRIAL AND TUBE WELL
129 SHIFTING 30-03-01 3/30/2001 190-210 2001 GM(O)/DHQ/R&CP-55717 GM O
CONNECTIONS (FINAL GENERAL & IND )
REFUND OF CAPITAL COST AND MINUTS OF MEETING HELD IN
130 GENERAL 20-04-01 4/20/2001 51995-52013 2001 SECY/LESCO CEO LESCO
CEO LESCO OFFICE ON 9-10-2000
TRANSFORM
131 05-05-01 5/3/2001 20271-76 2001 MGR MM CEO LESCO COST OF RECLAIMED TRANSFORMER 70% COST OF NEW T/F
ER
132 INDUSTRIAL 10-05-01 5/10/2001 903-10 2001 GMO/DDP GM O REGULARIZATION OF UNAUTHORISED EOL
TRANSFORM
133 14-06-01 6/14/2001 2864-75 2001 GMO/DHQ/DDV/35-3 GM O INSTALLATION OF RECLAIMED/OLD TRANSFORMER
ER
CE DESIGN SUPPLY OF POWER TO ARC FURNACES IN THE NAME OF ISHTIAQ
134 INDUSTRIAL 28-06-01 6/28/2001 15820 2001 CEDES/NTDE/DGS
NTDC STEEL INDUSTRY
171 GENERAL 07-02-04 2/7/2004 192-200 2004 GMCS/TARIFF/T-6 GM CS CLARIFICATION REGARDING TARIFF A2(b)
MONITORING OF ALL NGSC UNDER TARIFF B-III B-IV C-2 C-1 EOL
172 GENERAL 25-02-04 2/25/2004 11724-29 2004 CEO LESCO ROL CON ELECTRIFICATION OF HOUSIGN SCHEME AND MULTI
STORY BUILDINGS
GRACE PERIOD FOR PAYMENT OF DEMAND NOTICE OF CAPITAL
173 GENERAL 04-03-04 3/4/2004 12204-09 2004 DRW CEO LESCO
COST AND SECURITY
RECOVERY OF COST OF TRANSFORMER DAMAGED FOR
TRANSFORM
174 30-03-04 747-57 2004 GMO/STAT-147 GM O CONSUMER WHO PAY COST OF TRANSFORMER WHEN THEIR
ER
CONNECTION IS SANCTION/INSTALLED
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBE
GMCS/DGC/
175 INDUSTRIAL 14-04-04 4/14/2004 690-712 2004 GM CS WELL CONNECTION SHARING COST OF TRANSFORMER (Aug: of
D(R&CP)58006
T/F not allowed to avoid L.T Line in Field to avoid theft of energy)
176 METERING 12-05-04 5/12/2004 14804 2004 215-IST CEO LESCO COST OF BACKUP METERS INSTALLED ALONGWITH TOU METERS
FEEDER REHABLITAION COST RECOVERABLE FROM INDUSTRIAL
177 INDUSTRIAL 18-05-04 5/18/2004 957-67 2004 GMO/STAT-153 GM O
CONSUMER
TRANSFORM
178 21-05-04 5/21/2004 15167 2004 SM (P&D) CEO LESCO REPAIR OF T/F IN STATE ENTERPRISES HOUSING SCHEME
ER
RELIEF PACKAGE FOR NEW CONNECTIONS TO B-I CONSUMERS
179 INDUSTRIAL 10-06-04 6/10/2004 3998-401 2004 GMCS/DGC/DCAD/C-92 GM CS (INSTALLEMENT 6- NOS
UPTO 40 KW
CAPITAL COST)FINAL
GMCS/DGC/D(R&CP)/
180 METERING 23-06-04 6/23/2004 200-08 2004 GM CS COST OF BACKUP METERS INSTALLED ALONGWITH TOU METERS
58004
181 INDUSTRIAL 30-06-04 6/30/2004 37629-41 2004 PA/M&T CEO LESCO CEO VISIT TO M&T OFFICES
DISMENTALEMENT OF CPPER CONDUCTOR AGAINST H.T
182 GENERAL 06-07-04 7/6/2004 211-34 2004 SM (P&D) CEO LESCO
PROPOSALS
INSTALLATION OF PLANE 3-PHASE METER INSTEAD OF TOU
183 METERING 07-07-04 7/7/2004 301 2004 CAEB/DRW/1575 CEO LESCO
METERS AS TIME GAP ARRANGMENT
GMCS/DD(R&CP).AM-
184 INDUSTRIAL 09-07-04 7/9/2004 251-73 2004 GM CS INCENTIVE PAKAGE FOR INDUSTRIES
9/57000
TESTING INSPECTION OF 11 KV METERING PANELS (PRIVATE
185 INDUSTRIAL 21-07-04 7/21/2004 3103-06 2004 MANAGER M&T WEST CEO LESCO
PURCHASE OF CONSUMER METERING PANEL)
RECOVERY OF ARREARS FROM PERMANENTLY DISCONNECTED
186 RCO 05-08-04 8/5/2004 385-415 2004 GMCS/DGC/(R&CP).55721 GM CS
CONSUMERS
FEEDER REHABLITAION COST RECOVERABLE FROM INDUSTRIAL
187 INDUSTRIAL 07-08-04 8/7/2004 1334-41 2004 GMO/STAT-153 GM O
CONSUMER UPTO 1000 KW
188 INDUSTRIAL 13-08-04 5624-27 2004 GMCS/DGC/(R&CP).55721 GM CS OFFICE ORDER REGARDING COMPETENCY OF B-II CONNECTION
TRANSFORM
189 18-10-04 10/18/2004 9413-19 2004 GMO/CEHQ/MC GM O ISSUAE OF RECLAIMED TRANSFORMER ON HIGHER RATES
ER
TRANSFORM DG CONNECTION FROM MANDATORY INDEPENDENT
190 05-11-04 668 2004 DGC/DD(R&CP) 58006
ER COMMERCIAL TRANSFORMERS
214 GENERAL 18-03-06 3/18/2006 4891-4949 2006 PEPCO/TECH. DIR/74 TECH DIR POWER FOR WRITE OFF OF LOSSES
PAYMENT OF SECURITY DEPOSIT THROUGH INSTALLMENT IN
215 SECURITY 31-05-06 5/31/2006 2756-58 2006 GMCS/DGC/DCAD/C-153 GM CS
NEW CONNECTIONS REGARDING INDSTURIAL TARIFF B-2 & B-3
REGULARIZATION OF 233 NOS DOMESTIC AND 02 NOS
216 GENERAL 28-06-06 6/28/2006 2398--400 2006 DRW/741-LESCO CEO LESCO
COMMERCIAL CONNECTION IN DHA-V
217 GENERAL 25-07-06 7/25/2006 8226 2006 AD© DCO PROVISION OF ELECTIRICITY
236 SECURITY 26-01-08 1/26/2008 6327-6570 2008 CRG/8-D MAIN-II CEO LESCO NOTIFICATION-CORRIGENDUM
DG RECOVERY OF ARREARS FROM PERMANENTLY DISCONNECTED
237 RCO 28-01-08 31-40 2008 DD(R&CP)55731
COMMERCIAL CONSUMERS
DG
238 INDUSTRIAL 28-01-08 50-78 2008 DD(R&CP)55731 INCENTIVE PAKAGE FOR INDUSTRIES
COMMERCIAL
DG E &MC PROVISION OF MORE THAN CONNECTION IN SAME PREMISES
239 GENERAL 25-03-08 3/25/2008 505-17 2008 DG(EMC)/DIR(L,M) F-125
PEPCO (2nd Connection in the same primises)
DG E &MC PERMISSION FOR THE ELECTRICITY CONNECTIONS FOR VIDIO
240 GENERAL 27-05-08 5/27/2008 792-95 2008 DG(EMC)/
PEPCO SCREEN OF PUNJAB ENTERTAINMENT CO( GAURENTEE LTD
241 GENERAL 30-05-08 5/30/2008 20087 2008 DRW/129/LESCO CEO LESCO LUMPSUM CHARGES FOR NGSC UNDER TARIFF A-1, A-2
TRANSFORM ELECTRICITY CONNECTIONS FROM MANDATORY INDEPENDENT
242 13-06-08 1065-74 2008 CE(O)/STAT-187 CE OP
ER TRANSFORMER
DG
243 INDUSTRIAL 30-06-08 6/30/2008 250-279 2008 DGC/DD(R&CP).57000 INCENTIVE PAKAGE FOR INDUSTRIES
COMMERCIAL
244 GENERAL 08-08-08 8/8/2008 50859-62 2008 GM O LESCO CEO LESCO POLICY REGARDING ELECTRIC CROSSING ON RAILWAY TRACKS
TRANSFORM
245 27-08-08 8/27/2008 8238-63 2008 MGR MM CEO LESCO COST OF RECLAIMED TRANSFORMER
ER
TRANSFORM
235 30-08 9/30/2008 2976-83 2008 M&S /DDC05008/1465/08 DIR M&S REPAIR OF TRANSFORMERS
ER
236 SECURITY 12-12-08 12/12/2008 81059-65 2008 MGR CS CEO LESCO TARIFF NOTIFICATION
DG
237 INDUSTRIAL 22-12-08 12/22/2008 589-617 2008 DGC/DD(R&CP).57000 INCENTIVE PAKAGE FOR INDUSTRIES
COMMERCIAL
238 SECURITY 16-02-09 431-40 2009 CE(O)/DHQ/6-B DISCO CE OP REVISION OF SECURITY AMOUNT
INDUSTRIAL CONNECTION REGRATED BY THE APPROVAL OF
239 CHIEF EXECUTICE LESCO IN UN-ELECTRIFIED ALIA TOWN
HOUSING SCHEME SHALAMAR LAHORE
240 17-7-09 21271-72 P&D/DRW/797/3rd