Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 19

STATUS OF TEMPORARY CIRCULAR ISSUED BY WAPDA/LESCO

Sr.
NATURE DATE NUMBER MEMO OFFICE SUBJECT
No
EXTENSION IN PERIOD OF TEMPORARY INDUSTRIAL
1 TEMPORARY 26-08-90 5453-60 COM/846/90 GM (CS) CONNECTION
CONVERSION OF TEMPORARY CONNECTION TO REGULAR
2 TEMPORARY 01-09-94 6773-7000 MDCS/DG/R&CP.59021 GM (CS) CONNECTION
MDD/GMCS/DGC/DCA/G-945- TEMPORARY CONNECTIONS UNDER TARIFF E-1 & E-2 (PERIOD
3 TEMPORARY 22-04-98 906-50 97 MD (DISTT) OF TEMPORARY CONNECTION EXPIRY OF 3-YEARS)
GMCS/TARIFFS/T-136/VOL-
4 TEMPORARY 17-08-00 1671-1708 VIII GM (CS) TEMPORARY CONNECTIONS FOR CONSTRUCTION OF HOUSE

5 TEMPORARY 19-04-01 332-48 GMCS/TARIFFS/T-136/VOL-IX GM (CS) SANCTION OF TEMPORARY CONNECTIONS

6 TEMPORARY 23-04-03 529-38 MDCS/DG/R&CP/59021 GM (CS) POLICY FOR TEMPORARY CONNECTIONS


SOP FOR PROVISION OF TEMPORARY CONNECTION FOR
7 TEMPORARY 03-06-03 11313-20 DRW/471/CAEB/P&D CEO LESCO TEMPORARY CONNECTIONS
CEREMONIAL FUNCTIONS WITHIN 6-HOURS FROM EXISTING
POWER
SOP FORSUPPLY SYSTUM
PROVISION WHERE T/F AND
OF TEMPORARY STRUCTURE
CONNECTION NOT
FOR
8 TEMPORARY 03-03-04 293-312 GMCS/TARIFF/T-10 GM (CS) INVOLVED
CEREMONIAL FUNCTIONS WITHIN 6-HOURS FROM EXISTING
POWER SUPPLY SYSTUM WHERE T/F AND STRUCTURE NOT
9 TEMPORARY 14-02-04 2161-678 GMO/CEHQ/DHQ/DD-1/AM GM (O) INVOLVED

10 TEMPORARY 22-05-04 15264-514 DRW/P&D CEO LESCO TEMPORARY CONNECTIONS

11 TEMPORARY 24-01-06 1136-1230 DRW P&D-LESCO/MI CEO LESCO TEMPORARY CONNECTIONS

12 TEMPORARY 07-02-06 860-74 DGC/TARIFF/T-10 DG COMMERCIAL MINUTES OF AUTHORITY MEETING HELD ON 21 JANUARY 2006

13 TEMPORARY 02-12-08 313-14 GM(TECH)/LESCO/PA CEO LESCO EXTENSION IN VALIDITY PERIOD OF TEMPORARY CONNECTIONS
STATUS OF HOUSING SCHEME CIRCULAR ISSUED BY WAPDA/LESCO

NATURE DATE NUMBER YEAR MEMO OFFICE SUBJECT

STANDARDISATION OF DESIGN INSTRUCTION NO.21 MINIMUN


1 ELECTRIFICATION 30-10-63 1963 GM POWER CLEARANCE OF OVERHEAD LINE
22885-92 1981 GMD./CEDD/DDD/16 GM DISTT
ELECTRIFICATION ELECTRIFICATION OF NEW HOUSING SCHEME
2 14-09-81
5385-94 1986 GMD/DW/327-L GM DISTT
ELECTRIFICATION ELECTRIFICATION OF NEW HOUSING SCHEME
3 02-04-86
15147-57 1986 GM DISTT
ELECTRIFICATION ELECTRIFICATION OF NEW HOUSING SCHEME
4 02-10-86
84061-63 1987 DESIGN CAEB LHR ELECTRIFICATION/ST LIGHT PROVISION IN WAPDA CO-OP
ELECTRIFICATION
5 20-04-87 HOUSING SCHEME
84992-85015 1988 DESIGN CAEB LHR INSTALLATION OF INDIVIDUAL CONNECTION IN BIG COMERCIAL
ELECTRIFICATION
6 02-04-88 CENTRES/PLAZAS OWNED BY NE OR DIFFERENT PERSONS
100-111 1989 MDD/GMOP/DHQ/327-L MD DISTT
ELECTRIFICATION OFFICE ORDER
7 05-01-89
6755-69 1989 CEDE/DDE CE DISTT ENGS DISTRIBUTION PLAN OF EXTERNAL ELECTRIFICATION OF
ELECTRIFICATION
13-11-89 HOUSING SCHEMES
6661-71 1990 CEDE/DDE CE DISTT ENGS PROCEDURE FOR PREPERATION OF DESIGN FOR EXTERNAL
ELECTRIFICATION ELECTRIFICATION OF HOUSING SCHEME ON FULL COST DEPOSIT
8 15-10-90 BASIS BY THEFOR
PRODEDURE DEPARTMENT
PREPRATION OF DESIGN FOR
1990 ELECTRIFICATION OF HOUSING SCHEME ON FULL COST DEPOSIT
9 ELECTRIFICATION 08-12-90 1496-1511 PS/MDD/29 MD DISTT BASIS BY THE DEPARTMENT
1990 ELECTRIFICATION OF HOUSING SCHEME BY SPONSOR THROUGH
10 ELECTRIFICATION 17-12-90 7821-30 GMO/CEHQ/DHQ/327/L GM O OWN CONTRACTOR

11 ELECTRIFICATION 02-06-91 3046-57 1991 GMO/DHQ/327(L) GM O OFFICE ORDER

ELECTRIFICATION 03-06-91 3394-3407 1991 PS/MDD/GM(PES)/E-91 MD DISTT OFFICE ORDER

12 ELECTRIFICATION 16-06-91 564-99 1991 GMO/CEHQ/PA-22 MD DISTT OFFICE ORDER

13 ELECTRIFICATION 03-06-91 3394-3407 1991 PS/MDD/GM(PES)/E-91 GM O OFFICE ORDER


GM (PE&S) STANDARD AND CRITERIA FOR THE ELECTRIFICATION OF NEW
14 ELECTRIFICATION 18-09-91 4850-58 1991 GMPE&S/CEDE/DDE/E-42 WAPDA HOUSING SCHEMES
OFFICE ORDER BY ELECTRIFICATION OF HOUSING SCHEME BY
15 ELECTRIFICATION 13-10-91 5371-83 1991 MDD/GMOP/DHQ/ 327.I MD DISTT SPONSOR THROUGH OWN CONTRACTOR
ELECTRIFICATION OF HOUSING SCHEMES WHOSE
ELECTRIFICATION SPONSOR/DEVELOPERS HAVE EITHER ABANDONED THEM OR
NOT COMING UP TO WAPDA FORTHEIR PROPER
16 14-01-92 135 1992 GMO/CEHQ/DHQ/327/L GM O ELECTRIFICATION
PLAZAS 30-03-92 145411 1992 DESIGN/DRW/1963RD CAEB LHR SOP TO GULBERG HEIGHTS GULBERG-III LAHORE
GM (PE&S)/CEDE/DDE/E- GM (PE&S) STANDARD AND CRITERIA FOR THE ELECTRIFICATION OF NEW
17 ELECTRIFICATION 02-05-92 1980-99 1992 42 WAPDA HOUSING SCHEMES
SUPPLY OF POWER TO SHOPPING PLAZAS/COMMERCIAL
18 PLAZAS 10-07-92 14023-26 1992 DESIGN/DRW/21 CAEB CAEB LHR BUILDINGS AND OTHER MULTISTORY BUILDINGS
SUPPLY OF POWER TO SHOPPING PLAZAS/COMMERCIAL
19 PLAZAS 13-12-92 57133-17 1992 DESIGN/DRW/21 CAEB CAEB LHR BUILDINGS AND OTHER MULTISTORY BUILDINGS
STANDARD AND CRITERIA FOR THE ELECTRIFICATION OF NEW
02-05-93 110373-75 1993 DESIGN/DRW/H.SCHEME CAEB LHR HOUSING SCHEMES
SUPPLY OF POWER TO SHOPPING PLAZAS/COMMERCIAL
20 PLAZAS 21-07-93 6882-84 1993 DESIGN/DRW/21 CAEB CAEB LHR BUILDINGS AND OTHER MULTISTORY BUILDINGS

21 PLAZAS 18-09-93 5/30/1980 1993 DESIGN/DRW/21 CAEB CAEB LHR INSTALLATION OF 25 KVA TRANSFORMER
GM (PE&S) STANDARD AND CRITERIA FOR THE ELECTRIFICATION OF NEW
22 ELECTRIFICATION 26-10-93 2163-81 1993 GMPE&S/CEDE/DDE/E-42 WAPDA HOUSING SCHEMES
SUPPLY OF POWER TO SHOPPING PLAZAS/COMMERCIAL
23 PLAZAS 19-04-94 99931-36 1994 DESIGN/DRW/21 CAEB CAEB LHR BUILDINGS AND OTHER MULTISTORY BUILDINGS
SUPPLY OF POWER TO SHOPPING PLAZAS/COMMERCIAL
24 PLAZAS 07-07-94 2191-94 1994 DESIGN/DRW/21 CAEB CAEB LHR BUILDINGS AND OTHER MULTISTORY BUILDINGS
INSTALLATION OF SEPARATE ROOM SPACE FOR INSTALLATION
25 PLAZAS 31-08-95 2406-2465 1995 MDD/DG(R&CP) 59034 MD DISTT OF ELECTRIC METERS IN PLAZAS AND MULT ISTORY BUILDINGS

26 PLAZAS 31-08-95 2378-2405 1995 MDD/DG(R&CP) 59034 MD DISTT SALE OF POWER TO PLAZAS, SHOPPING CENTRES

27 ELECTRIFICATION 24-02-96 70314-20 1996 247/CAEB CAEB LHR GRANT OF INDIVDUAL CONNECITONS IN UN-ELECTRIFIED AREAS

28 PLAZAS 18-01-97 66116-242 1997 CAEB/DRW/21 CAEB LHR THEFT OF ELECTRICITY IN COMMERCIAL PLAZAS/CENTRES
SOP TO SHOPING PLAZAS, COMMERCIAL BUILDINGS AND MULTI
29 PLAZAS 28-04-98 82283-88 1998 DRW/21/LESCO P&D CEO LESCO STORY BUILDINGS

PROCEDURE FOR ELECTRIFICATION OF HOUSING SCHEME BY


ELECTRIFICATION SPONSOR THROUGH OWN CONTRACTOR (for Private
GM (PE&S)
30 21-05-98 4481-95 1998 GMPE&S/CEDE/DP WAPDA Execution)
ELECTRIFICATION OF HOUSING SCHEME BY SPONSOR THROUGH
31 ELECTRIFICATION 13-06-98 94405-11 1998 DESIGN/DRW/21 CAEB CAEB LHR THEIR OWN CONTRACTOR/CONSULTANT

ELECTRIFICATION EXEMPTION OF BANK GUARENTTE IN ARMY WELFARE


32 25-06-98 491-98 1998 PS/MDD/13 MD DISTT TRUST HOUSING (FINAL)
PROCEDURE FOR ELECTRIFICATION OF HOUSING SCHEME BY
33 ELECTRIFICATION 08-07-98 6490-91 1998 DESIGN/DRW/21 CAEB CAEB LHR SPONSOR THROUGH OWN CONTRACTOR
GM (PE&S) PROCEDURE FOR ELECTRIFICATION OF HOUSING SCHEME BY
34 ELECTRIFICATION 22-07-98 1311-25 1998 GM PE&S/CE/D(P) WAPDA SPONSOR THROUGH OWN CONTRACTOR
PROCEDURE FOR ELECTRIFICATION OF HOUSING SCHEME BY
35 ELECTRIFICATION 08-08-98 4991 1998 GMO/DHQ/327(L) GM O SPONSOR THROUGH OWN CONTRACTOR
PROCEDURE FOR ELECTRIFICATION OF HOUSING SCHEME BY
36 ELECTRIFICATION 13-08-98 16036-37 1998 DESIGN/DRW/21 CAEB CAEB LHR SPONSOR THROUGH OWN CONTRACTOR
SOP TO SHOPING PLAZAS, COMMERCIAL BUILDINGS AND MULTI
PLAZAS
37 27-08-98 19291-96 1998 DRW/21/LESCO P&D CAEB LHR STORY BUILDINGS (MORE THAN 5000 Sq FT) FINAL
DESIGNING AND ASSESMENT OF LOAD OF COMMERCIAL
38 PLAZAS 29-08-98 99060-61 1998 DRW/590.4TH CAEB LHR BUILDINGS MULTI STORY CENTRES AND PLAZAS ETC
PROCEDURE FOR ELECTRIFICATION OF HOUSING SCHEME BY
39 ELECTRIFICATION 19-09-98 6941-53 1998 DRW/21/LESCO P&D CAEB LHR SPONSOR THROUGH OWN CONTRACTOR
GM(P&ES) PROCEDURE FOR ELECTRIFICATION OF HOUSING SCHEME BY
40 ELECTRIFICATION 22-09-98 6750-64 1998 GM PE&S/CE/D(P) WAPDA SPONSOR THROUGH OWN CONTRACTOR
OFFICE ORDER POLICY REGARDING ELECTRIFICATION OF
HOUSING SCHEME/COMMERCIAL BUILDINGS ( existing nearest
11KV Feeder even it the voltage drop execeeds the limit of 5% but this
GM (PE&S) shall not go beyound 11% in case it exceeds 11% then working shall be
41 PLAZAS 06-10-98 6891-97 1998 GM(PE&S).CE./DP
WAPDA made in accordance with Para B(b) given in the succeding part.) & 2500-
KW ULTIMATE LOAD FRO MIX LOAD FEEDER & INDIVIDUAL
METERING & Stopgap given to Housing Scheme & Plaza (FINAL)
PROCEDURE FOR ELECTRIFICATION OF HOUSING SCHEME BY
42 ELECTRIFICATION 11-12-98 47252-53 1998 247/CAEB CAEB LHR SPONSOR THROUGH OWN CONTRACTOR
ADDRESS TO ALL SDO,S AND SES OF IST, 2ND, 3RD AND 5TH
43 PLAZAS 18-02-99 65750-910 1999 DRW/21/LESCO P&D CAEB LHR CIRCLES
SOP TO SHOPING PLAZAS, COMMERCIAL BUILDINGS AND MULTI
44 PLAZAS 20-04-99 80300-05 1999 DRW/21/LESCO P&D CAEB LHR STORY BUILDINGS
SOP TO SHOPING PLAZAS, COMMERCIAL BUILDINGS AND MULTI
PLAZAS
45 28-04-99 82283-89 1999 DRW/21/LESCO P&D CAEB LHR STORY BUILDINGS (METERING FOR PLAZA)
MONITERING
46 GRID SHARING 23-09-99 6065 1999 SAD/MON/02675-1
CELL
IMPLEMENTATION STATUS OF CHAIRMAN DECISION.DIRECTIVE

47 ELECTRIFICATION 13-01-00 9519-20 2000 GMO/DHQ GM O EXEMPTION OF BANK GUARENTTE IN JUBLEE TOWN
RECOVERYOF 50 % ESTIMATED COST FOR CONSTRUCTION OF
48 GRID SHARING 19-01-00 73-83 2000 GMO/DDV/F GMO 132 KV GRID STATION AND TRANSMISSION LINE FOR HOUSING
SCHEME
RECOVERYOF 50 % ESTIMATED COST FOR CONSTRUCTION OF
49 GRID SHARING 26-01-00 39212-15 2000 CAEB/DRW/397 CEO LESCO 132 KV GRID STATION AND TRANSMISSION LINE FOR HOUSING
SCHEME
PROVISION OF SEPARATE DADICATED TRANSFORMERS FOR
PLAZAS 17-02-00 42803 2000 DRW/21/LESCO P&D CEO LESCO COMMERCIAL PLAZAS
RECOVERY OF 50% ESTIMATED COST FOR CONSTRUCTION OF
50 GRID SHARING 08-09-00 785 2000 GMO/PA GM O 132 KV GRID STATION AND TRANSMISSION LINE FOR HOUSING
SCHEME
OPENING OF NEW HEAD A/C FOR SHARING COST OF GRID
51 GRID SHARING 27-09-00 17065 2000 DRW/397/LESCO CEO LESCO
STATION

52 ELECTRIFICATION 16-01-01 160-73 2001 GMO/DHQ GM O PROVISION OF ELECTRICITY TO HOUSING SCHEMES


GM ARMY CORD
53 GRID SHARING 31-03-01 1370-1430 2001
CELL
MINUTES OF CHAIRMAN CONFERENCE 29-30 MARCH 2001
RECOVERY OF SHARING COST OF GRID STATION FROM THE
54 GRID SHARING 21-04-01 567-80 2001 GMO/PA GM O
SPONSOR OF HOUSING SCHEMES

RECOVERY OF SHARING COST OF GRID STATION FROM THE


GRID SHARING 2001 DRW/346-A.LESCO CEO LESCO
SPONSOR OF HOUSING SCHEMES (FINAL)
55 22-05-01 57868-86

56 PLAZAS 02-02-02 48-55 2002 GMO/DOV/F GM O COMMERCIAL PLAZAS


PHASED WISE RECOVERY OF GRID SHARING COST BY AIR
57 GRID SHARING 12-02-02 1354 2002 GMO/CEHQ/DDV-110 GM O
FORCE HOUSING SCHEME

58 PLAZAS 10-07-02 2173-82 2002 GMO/CEHQ/6-B/DISCOS GM O CLARIFICATION REGARDING COMMERCIAL BUILDINGS


GM (C&M) INSTALLATION OF POLES IN MOHALLAS OR VILLAGES ALREADY
59 ELECTRIFICATION 11-12-02 4102--14 2002 GM (C&M) P/E-131 POWER ELECTRIFIED
INSTALLATION OF POLES IN MOHALLAS OR VILLAGES ALREADY
60 ELECTRIFICATION 11-12-02 14857-68 2002 GMO/CEHQ/6-B/DISCOS GM O ELECTRIFIED

61 GRID SHARING 31-12-02 4104-54 2002 ACC/2002-17 PSO CHAIRMAN MINUTES OF CHAIRMAN CONFERENCE 23-24 DEC 2002
GM (C&M) RECOVERY OF SHARING COST OF GRID STATION FROM THE
62 GRID SHARING 03-04-03 179-91 2003 GM(C&M)/P/E-172
POWER SPONSOR OF HOUSING SCHEMES

RECOVERY OF SHARING COST OF GRID STATION FROM THE


SPONSOR OF HOUSING SCHEMES(25% SPONSOR & 25% OF THE
COST SHALL BE RECOVERED FROM THE PLOT OWNER AT THE
TIME OF GIVEN NEW CONNECTION & GOVT SPONSORED
HOUSING SOCIETY SHALL PROVIDE 4 TO 6 ACRES OF LAND FREE
GM (C&M) OF CHARGES FOR CONSTRUCTION OF GRID STATION TO WAPDA
63 GRID SHARING 02-01-03 19-31 2003 GM (C&M) P E-5
POWER AS SUCH THE COST OF LAND WILL NOT BE CHARGED TO THESE
SOCIETE. (TRANSMISSION LINE OF GRID STATION) FIRST LETTER
( Grid share cost to be recovered from consumer Rs.1233/-
being land of Grid Station is to be provided by
sponsor)FINAL

RECOVERY OF SHARING COST OF GRID STATION FROM THE


64 GRID SHARING 06-03-03 7780-81 2003 DRW/383/LESCO CEO LESCO
SPONSOR OF HOUSING SCHEMES
GM (C&M) RECOVERY OF SHARING COST OF GRID STATION FROM THE
65 GRID SHARING 03-04-03 179-91 2003 GM(C&M)/P/E-172
POWER SPONSOR OF HOUSING SCHEMES
RECOVERY OF SHARING COST OF GRID STATION FROM THE
GM (C&M)
GRID SHARING 2003 GM(C&M) P/E-131 SPONSOR OF HOUSING SCHEMES (Clearification of Grid
POWER
66 29-04-03 1776-89 Share cost for Old Housing Scheme)
REVISED POLICY FOR ELECTRIFICATION OF SHOPPING
PLAZAS PLAZAS/COMMERCIAL & MULTISTORY BUILDINGS (& R&R Charges
67 22-10-03 6390-6405 2003 DRW/CIRCULAR CEO LESCO for Plaza)
REVISED POLICY FOR ELECTRIFICATION OF SHOPPING
PLAZAS PLAZAS/COMMERCIAL & MULTISTORY BUILDINGS (& R&R Charges
68 01-11-03 93335-76 2003 DRW/CIRCULAR CEO LESCO for Plaza Order held in abeyance)
MEMBER TRUNCK FACILITIES OF ELECTRICITY GAS ETC TO HOUSIGN
69 ELECTRIFICATION 30-12-03 14086 2003 MP/PA POWER COLONIES/SCHEME
REPAIR/RECTIFICATION OF TRANSFORMER INSTALLED AT STATE
70 ELECTRIFICATION 21-05-04 Jul-41 2004 SM (P&D) CEO LESCO ENTERPRISES CO-OP HOUSING SOCIETY

71 ELECTRIFICATION 26-05-04 15621-26 2004 SM (P&D) CEO LESCO BAN ON NEW CONNECTIONS IN DISPUTED HOUSING SCHEMES
MEMBER
72 ELECTRIFICATION 13-07-04 481-83 2004 MP/GMO/DDV/110 POWER ELECTRIFICATION OF PRIVATE HOUSING SCHEMES

73 ELECTRIFICATION 19-07-04 7372-80 2004 GMO/CEHQ/DDV-110 GM O ELECTRIFICATION OF PRIVATE HOUSING SCHEMES


GM (C&M) RECOVERY OF SHARING COST OF GRID STATION FROM THE
74 GRID SHARING 07-10-04 4931 2004 GM (C&M) P/E-152
POWER SPONSOR OF HOUSING SCHEMES
RECOVERY OF SHARING COST OF GRID STATION FROM THE
SPONSOR OF HOUSING SCHEMES (Cost of G/St Transmission Line
involved is less than 5-KM will be the same as of upto 5-KM i.e Rs. 4.93
million per MW and where the transmission line i.e 5.80 Million per MW
GM (C&M)
GRID SHARING 2004 GM (C&M) P/E-152 will be recovered. Howerer 0.54 million per KW as a cost of land be
POWER
recovered is the sponsor) ( Grid share cost to be recovered from
consumer Rs.1233/- being land of Grid Station is to be provided by
sponsor) 4.93(cost of transmission line)+0.534 ( cost of land)=cost of
75 28-10-04 5232-42 Grid Share (100%)

PROCEDURE FOR CERTIFICATION OF DEPOSIT WORK


COMPLETED BY CONSTRUCTION DIVISIONS (FINAL)
ELECTRIFICATION COMMITTEE Shifting Line, Construction of lines for new
conn:, B-3 New / EOL housing scheme (Private
76 16-12-04 6858-66 2004 CAEB/DRW/P-III CEO LESCO Execution / LESCO EXECUTION)
GOVT OF NOTIFICATION REGARDING ELECTRIFICATION OF HOUSING
77 ELECTRIFICATION 25-01-05 382 2005 SOR(LG)382/2004 PUNJAB SCHEME
COST SHARING OF GRID STATION RECOVERABLE FROM THE
GRID SHARING 2005 DRW/346/LESCO CEO LESCO INDIVIDUALS PLOTS OWNERS AT THE TIME OF INSTALLING THE
78 10-02-05 1808-15 CONNECTION

70 ELECTRIFICATION 02-08-05 1611-17 2005 P & D /DRW -543 CEO LESCO SOP TO ABANDONED DOCTORS HOUSING SCHEME
RECOVERY OF 50% ESTIMATED COST FOR CONSTRUCTION OF
GRID SHARING 2006 DRW CEO LESCO 132 KV GRID STATION AND TRANSMISSION LINE FOR HOUSING
71 08-03-06 4460-61 SCHEME
PROVISION OF ELECTRICITY TO ABADIES /COLONIES WITHIN THE
72 ELECTRIFICATION 02-09-08 3039-56 2008 CE/RE CE (RE) LIMITS OF TMA/UNION COUNCILS

STANDARDS AND CRITERIA FOR THE ELECTRIFICATION OF


ELECTRIFICATION
GM(O)/CEO/DHQ/16-B HOUSING SCHEMES. REFUSE THE CLASUE-1 (MAP
73 03-01-09 13-25 2009 DISCOS GM O APPROED FROM LOCAL BODY)
STATUS OF INDUSTRIAL CIRCULAR ISSUED BY WAPDA/LESCO

Sr.
NATURE DATE DATE NUMBER YER MEMO OFFICE SUBJECT
No

SECRETARY
INDUSTRIAL 22-12-76 17617-17876 1976 OFFICE ORDER
WAPDA

1 INDUSTRIAL 03-02-80 27-04-1980 1936-2429 1980 COM/D-90 GM DISTT REDUCTION OF LOAD

2 INDUSTRIAL ` 27-04-1980 1454-61 1980 COM/D-1683 GM DISTT ELECTRIC CONNECTION IN THE SAME PREMISES
.04-02- MORE THAN ONE INDUSTRIAL CONNECTIONS OF THE SAME
3 INDUSTRIAL 04-02-81 683-1100 1981 GMD/DDP&P/MOM=29 GM DISTT
1981 NATURE IN ONE PREMISES
NO BOJECTION CERTIFICATE FROM THE MUNICIPAL
.11-04-
4 INDUSTRIAL 11-04-81 8099-8106 1981 GMD/DD(R&M)56018 GM DISTT COMMITTEES /MUNICIPAL CORPORATIONS FOR THE INDUSTRIAL
1981
CONNECTIONS WITH IN THE MUNICIPAL AREA
PROVSION OF 11 KV OCBS FOR THE SUPPLY OF 11 KV (PLAN OF
5 PANEL 02-04-84 02-04-1984 1817 1984 CE DESIGN DISTT CE DESIGN
ROOM)
1- PERCENTAGE OF INSTALLATION CHARGES TO BE ADDED IN
NGSC
.22-01- 2- REFUND OF CAPITAL COST
6 ESTIMATE 22-01-85 1235-1976 1985 GMD/MFD/IMPLE-3 GM DISTT 3- DEFINATION OF DEPOSIT WORKS AND LEVY OF 24%
1985
DEPARTMENTAL CHARGES (FINAL FOR REFUND UPTO
10% MAY NEITHER)
PERCENTAGE OF INSTALLATION CHARGES TO BE ADDED IN
ESTIMATE 30-05-85 8487-9332 1985 GMD/MFD/IMPLE-3 GM DISTT NGSC REFUND OF CAPITAL COST DEFINATION OF DEPOSIT
WORKS AND LEVY OF 24% DEPARTMENTAL CHARGES
PERCENTAGE OF INSTALLATION CHARGES TO BE ADDED IN
ESTIMATE 10-06-85 91132-54 1985 DESIGN CAEB LESCO NGSC REFUND OF CAPITAL COST DEFINATION OF DEPOSIT
WORKS AND LEVY OF 24% DEPARTMENTAL CHARGES
PRIORITY TO WAPDA EMPLOYEES IN NEW ELECTRICITY
7 GENERAL 07-10-85 10/7/1985 2156-2257 1985 GMD/TARIFF/G-67 GM DISTT
CONNECTION
PERCENTAGE OF INSTALLATION CHARGES TO BE ADDED IN
8 ESTIMATE 21-08-85 8/21/1985 15454-16300 1985 GMD/MFD/IMPLE-3 GM DISTT
NGSC
RECOVERY OF SERVICE RENTAL INSTEAD OF LUMPSUM COST
9 GENERAL 27-04-86 4/27/1986 896 1986 GMD/TARIFF/G-157 GM DISTT OF SERVICE ESTIMATE FOR GIVING SERVICE CONNECTION TO
MOSQUE,
10 ESTIMATE 11-12-86 12/29/1986 15424-26193 1986 GMD/D(R&CP) WM218 GM DISTT SEVICE ESTIMATE AND DEMAND NOTICE
RECOVERY OF ESCLATION CHARGES OF MATERIAL INCLUDED IN
11 ESTIMATE 29-12-86 12/29/1986 58296-59192 1986 GMD/D(R&CP) WM-181 GM DISTT THE SERVICE ESTIMATE AFTER REGISTERATION OF ELECTRIC
CONNECTION
26% DEPARTMENTAL CHARGES ON SERVICE CONNECTION
ESTIMATE 0-03-87 17216-23 1987 GMD/CEHQ/DW GM DISTT
INVOLVING TRANSFORMERS
12 METERING 15-08-87 44872-81 1987 GMO GM O SEPARATE LIGHT METER ON INDUSTRIAL PREMISES
OPENING OF ALREADY SECURED PANEL AND REPLACEMENT OF
13 PANEL 18-10-87 5159-67 1987 GMCS /DDP &P GM CS
METERING EQUIPMENT ETC
PERCENTAGE OF INSTALLATION CHARGES TO BE ADDED IN
14 ESTIMATE 21-06-89 6/21/1989 1905-22 1989 GMO/B3/B-VOL 4TH GM O
NGSC
SOP TO AGRO (ARC) STEEL INDUSTRIES PVT LTD FOR ARC
15 INDUSTRIAL 02-08-89 8/2/1989 4261-62 1989 CEDE/D(RED&S)186 CE DISTT ENG
FURNACES
COST OF BURNT METERS, MDI, OR OTHER MEASURING
METERING 23-08-89 1482-89 1989 GM(CS)/DG(EM)/DD(P&P) GM CS
INSTRUMENTS
SUPPLY OF POWER OT STEEL FURNACES (METERING ROOM
SHOULE BE BOUNDARY OF THE CONSUMER PREMISES AND ITS
16 INDUSTRIAL 27-11-89 11/27/1989 2073-91 1989 MDD/DG(EM/D(ES)154 MD DISTT ONLY DOOR MUST HAVE OPENING ON THE PUNLIC ROAD SIDE
AND ONE KEY OF THE ROOM TO XEN / DM(O) & OTHER KET WITH
S.E / M(O) (FINAL FOR ARC FURNACE)
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
17 INDUSTRIAL 01-09-90 9/1/1990 5657-6605 1990 GMCS/G-137/90 GM CS
CONNECTION SHARING COST OF TRANSFORMER
COPY OF ESTIMATE PREPARED FOR SERVICE CONNECTION TO
18 GENERAL 03-02-90 2/3/1990 555-71 1990 GMO/D(R&CP) WM-181 GM O
BE SENT ALONGWITH S.RS
CLARIFICATION REGRADING LEVY OF INSTALLATION CHARGES
19 ESTIMATE 03-09-90 9/3/1990 2991-3006 1990 GMCS/L(R&CP)56286 GM CS
AT 26%
CREDIT OF DEPRECIATED VALUE OF MATERIAL TO BE REMOVED
20 ESTIMATE 23-09-90 9/23/1990 7173-74 1990 COM/D-2202/90 GM CS
IN THE EXT/ROL CASES
PENDING INDUSTRIAL CONNECTIONS (CONNECTION NOT
21 GENERAL 17-01-91 1/17/1991 361-68 1991 COM/G-788/90 GM CS
REJECTED DUE TO NON AVALIBLE OF LOAD) &
SHOULD BE GIVEN CONNECTION IN CASE OF OVER
LOADED GRID STATION
PROCEDURE FOR INDUSTRIAL CONNECTION (FINAL
22 INDUSTRIAL 16-03-91 3/16/1991 1768-78 1991 COM/G-003-91 GM CS
POLICY B-4)
RECOVERY OF FIXED AMOUNT AS A COST OF SERVCE
23 ESTIMATE 28-07-91 842-65 1991 GMCS/D(R&CP) /55904 CONNECTION FROM THE PROSPECTIVE CONSUMER OF
DOMESTIC CATEGORY
24 ESTIMATE 01-10-91 10/1/1991 428-56 1991 GMO/BS/E-77 GM O DISCOUNTINUATION OF DEPARTMENTAL CHARGES
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
25 INDUSTRIAL 03-10-91 10/3/1991 1533-53 1991 GMCS/D(R&CP)58006 GM CS
CONNECTION SHARING COST OF TRANSFORMER
26 GENERAL 07-11-91 11/7/1991 4025-32 1991 GMCS/COM/G-65 GM CS LEVY OF SURCHARGE ON INSTALLMENT OF CURRENT BILLS
POLICY FOR SHIFTING OF INDUSTRIAL AND TUBE WELL
27 SHIFTING 27-01-92 1/27/1992 3017-28 1992 GMCS/D(R&CP) /55717 GM O
CONNECTIONS
PRIORITY TO WAPDA EMPLOYEES IN NEW ELECTRICITY
28 GENERAL 08-03-92 3/8/1992 3175-95 1992 GMCS/DG/R&CP/55904 GM CS
CONNECTION
29 ESTIMATE 13-04-92 1088-89 1992 G-985 GM CS SOP TO GULBERG HEIGHTS
CREDIT OF DEPRECIATED VALUE OF MATERIAL TO BE REMOVED
30 ESTIMATE 28-06-92 6/28/1992 2059-66 1992 COM/D-2202/90 GM CS
IN THE EXT/ROL CASES
RECOVERY OF ESCLATION CHARGES OF MATERIAL INCLUDED IN
31 ESTIMATE 28-07-92 7/28/1992 4453-62 1992 GMCS/D(R&CP) WM-121 GM CS THE SERVICE ESTIMATE AFTER REGISTERATION OF ELECTRIC
CONNECTION
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
32 INDUSTRIAL 18-08-92 8/18/1992 4557-75 1992 GMCS/D(R&CP)58006 GM O
CONNECTION SHARING COST OF TRANSFORMER
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
33 INDUSTRIAL 30-09-92 9/30/1992 4461-83 1992 GMCS/D(R&CP)58006 GM CS
CONNECTION SHARING COST OF TRANSFORMER
34 SECURITY 07-10-92 10/7/1992 4571-79 1992 GMCS/D(R&CP)56195 GM CS ENHANCEMENT OF SECURITY DEPOSIT RATES
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
35 INDUSTRIAL 27-02-93 2/27/1993 614-37 1993 GMCS/D(R&CP)58006 GM CS
CONNECTION SHARING COST OF TRANSFORMER
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
36 INDUSTRIAL 19-03-93 3/19/1993 1213-22 1993 GMCS/D(R&CP)58006 GM CS
CONNECTION SHARING COST OF TRANSFORMER
37 GENERAL 07-08-93 8/7/1993 2668-78 1993 GMCS/DCA/G-1060 MD DISTT ILLEGAL ISSUANCE OF ADDITIONAL DEMAND NOTICE

RCO 19-10-93 3416-17 1993 GMCS/DCA/G-980 GM CS RECONNECTION POLICY


CREDIT OF DEPRECIATED VALUE OF MATERIAL TO BE REMOVED
38 ESTIMATE 28-11-93 11/28/1993 2307-2332 1993 GMCS/R&CP/58077 GM CS
IN THE EXT/ROL CASES
39 SECURITY 07-02-94 2/27/1994 660-68 1994 GMCS/DCA/D-2483 GM CS SECURITY DEPOSIT DEFERRED NEW CONNECTIONS CASES
REDUCTION /ENHANCEMENT OF LOAD DATE OF
40 REDUCTION 08-03-94 3/8/1994 2962-85 1994 GMCS/D(R&CP)/58072 GM CS
COMMENCEMENT
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
41 INDUSTRIAL 04-04-94 4/4/1994 3109-32 1994 GMCS/D(R&CP)58006 GM CS
CONNECTION SHARING COST OF TRANSFORMER
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
42 INDUSTRIAL 07-04-94 4/7/1994 3152-75 1994 GMCS/D(R&CP)58006 GM CS
CONNECTION SHARING COST OF TRANSFORMER
CREDIT OF DEPRECIATED VALUE OF MATERIAL TO BE REMOVED
43 ESTIMATE 11-05-94 5/11/1994 3518-35 1994 GMCS/D(R&CP)/58077 GM CS
IN THE EXT/ROL CASES (FINAL DISMENTLED T/F)

SUPPLY OF POWER TO CONSUMERS THROUGH


44 INDUSTRIAL 31-08-94 8/11/1994 6511-6742 1994 GMCS/D(R&CP)55716 GM CS
INDEPENDENT FEEDERS
RCO 10-10-94 7826-47 1994 GMCS/DCA/G-980 GM CS RECONNECTION POLICY

PAYMENT OF DEMAND NOTICE AND SUBMISSION OF TEST


REPORT BY CONSUMERS OF TARIFF B-3 AND B-4 (SECURITY DN
45 SECURITY 17-07-95 7/17/1995 2094-2118 1995 MDD/DG(R&CP) WM-34 MD DISTT ISSUED AFTER COMPLETION OF WORK & OWN REQUEST OF
CAPITAL COST) FINAL
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
46 INDUSTRIAL 18-07-95 7/18/1995 2147-67 1995 GMO/D(R&CP)/58077 GM DISTT
CONNECTION SHARING COST OF TRANSFORMER
CE DESIGN T&
47 PANEL 13-02-96 2/13/1996 4458-67 1996 11 KV CONSUMERS PANEL AGAINST DEPOSIT WORKS
G
CE DESIGN T& TECHNICAL INSTRUCTIONS OF INDEPENDENT GRID STATION
48 INDUSTRIAL 01-03-96 3/1/1996 1996 CED/T&G/DSR
G SPECIFICATION 24:96
49 INDUSTRIAL 17-03-96 1114-22 1996 472/ALL CAEB MD DISTT TIMELY ELECTRIC CONNECTION TO GOVT INSTALLATIONS
PRIORITY TO WAPDA EMPLOYEES IN NEW ELECTRICITY
50 GENERAL 03-04-96 4/3/1996 1571-2240 1996 GMCS/DG/R&CP/55904 MD DISTT
CONNECTION
51 GENERAL 07-04-96 4/7/1996 772-82 1996 PS/MDD/13 MD DISTT PERMISSION TO HAVE DOUBLE SOURCE OF ELECTRICITY
GMCS/DGC/DCAC/DDR/A- LEVY OF LATE PAYMENT SURCHARGE TO GOVT AGENCIES IN
52 GENERAL 03-06-96 6/3/1996 3322-36 1996 GM CS
233 THE LIGHT OF ECC DECISION DATED 29-11-93
TRANSFORM MDD/DG(r&CP) SOP AT 400/230 VOLTS TO THE INDUSTRIAL AND TUBEWELL
53 26-09-96 4390-99 1996 MD DISTT
ER /58006/T/TARIFF CONNECTIONS (SHARING COST OF T/F)
TRANSFORM PRIVATE PURCHASE OF 100/200 KVA T/F BY THE PROSPECTIVE
54 03-10-96 10/3/1996 33046-174 1996 CAEB/P&E CEO LESCO
ER CONSUMER
GMCS/D(R&CP)56286/
55 ESTIMATE 12-04-97 4/12/1997 605-21 1997 GM O % AGE OF DISMENTALED CHARGES
VOL-II
GMCS/TARIFFS/G-243 SECRETARY
56 07-05-97 2467-96 1997 NOTIFICATION
VOL-II WAPDA
CE DESIGN T& COST OF INTALLATION OF 11 KV CONSUMER PANELS AGAINST
57 PANEL 30-05-97 5/30/1997 9871-87 1997 CED/DDE/MA/ 941
G DEPOSIT WORKS FOR THE PERIOD 97-98
TRANSFORM GMCS/DG(R&CP)58006/ SOP AT 400/230 VOLTS GENRAL INDUSTRAIL AND TUBEWELL
58 23-08-97 2749-58 1997 MD DISTT
ER VOL III CONNECTIONS SHARING COST OF TRANSFORMERS
CE DESIGN T& COST OF INTALLATION OF 11 KV CONSUMER PANELS AGAINST
59 PANEL 03-07-97 7/30/1997 14337-57 1997
G DEPOSIT WORKS FOR THE PERIOD 97-98
GMCS/D(R&CP)58006/ SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
60 INDUSTRIAL 30-08-97 8/30/1997 2749-58 1997 MD DISTT
VOL-III CONNECTION SHARING COST OF TRANSFORMER
PRIORITY TO WAPDA EMPLOYEES IN NEW ELECTRICITY
61 GENERAL 13-09-97 9/13/1997 2881-3257 1997 GMCS/DG/R&CP/55904 MD DISTT
CONNECTION
REDUCTION IN LOAD TO MEET A PART OF LOAD FROM PRIVATE
62 REDUCTION 10-10-97 10/10/1997 3442-56 1997 GMCS/DG/R&CP/59070 (A) MD DISTT
POWER GENERATION
RECOVERY OF SERVICE RENTAL INSTEAD OF LUMPSUM COST
GMCS/DGC/D(R&CP)WM-
63 GENERAL 11-10-97 10/11/1997 3461-514 1997 MD DISTT OF SERVICE ESTIMATE FOR GIVING SERVICE CONNECTION TO
321
MOSQUE, CHURCHES, TEMPLES AND GURDWARAS

64 GENERAL 11-10-97 10/11/1997 3147-3167 1997 GMCS/TARIFF/G-226 GM CS TARIFF NOTIFICATION

65 SECURITY 20-01-98 1/20/1998 380-882 1998 GMCS/DG/R&CP/56195 MD DISTT EXEMPTION FROM PAYMENT OF SECURTY DEPOSIT
INSTALLATION OF SINGLE PHASE 10/40 A METERS UPTO 8 KW
66 METERING 04-03-98 1121-30 1998 GMO/DHQ GM O
SINGLE PHASE LOAD
67 SECURITY 16-05-98 5/16/1998 1172-73 1998 GMCS/DCA/LHR GM CS REFUND OF SECURITY

68 GENERAL 02-07-98 434-544 1998 LESCO CEO LESCO FORMATION OF LAHORE ELECTRIC SUPPLY COMPANY
CIRCULAR REGARDING SELF PURCHASED MATERIAL TO
69 GENERAL 31-08-98 8/31/1998 2668-2816 1998 S&S/RD/C CEO LESCO
CONSUMERS OF NEW CONNECTIONS
70 TUBE WELL 30-10-98 10/31/1998 2627 1998 GMCS/DG/R&CP/ GM CS GRANT OF NEW TUBEWELL CONNECTIONS

71 METERING 17-12-98 16056-73 1998 GMCS/DGCDCAC/B-8 GM CS SEPARATE LIGHT METER ON INDUSTRIAL PREMISES

72 INDUSTRIAL 25-01-99 1/25/1999 78-122 1999 GMCS/DDP/55716 GM CS SUPPLY OF POWER TO ARC FURNACES

73 SECURITY 28-10-99 10/28/1999 882-92 1999 GMCS/TARIFF/G-226 GM CS CHARGING OF SECURITY DEPOSIT N EOL CASES

74 SECURITY 25-01-99 1/25/1999 69-77 1999 GMCS/D(R&CP)56195 GM CS SECURITY DEPOSIT DEFERRED NEW CONNECTIONS CASES

75 GENERAL 15-03-99 3/15/1999 19587-99 1999 RD/C/LESCO CEO LESCO PRIVATE PURCHASE OF MATERIAL AGAINST NEW CONNECTIONS
EXTENSION FROM EXISTING ELECTRICITY CONNECTIONS OF
76 GENERAL 15-03-99 3/15/1999 720-27 1999 GMO/PA GM O
DOMESTIC AND COMMERCIAL CATEGORIES
77 INDUSTRIAL 13-04-99 4/13/1999 411-14 1999 GMO/DHQ GM O DISCONNECTION DUE TO EXTENSION OF LOAD

78 INDUSTRIAL 15-04-99 4/15/1999 51-85 1999 GMCS/D(R&CP)57000 GM CS INCENTIVE POLICY FOR REVIVAL OF STEEL MELTING INDUSTRY
MEMBER APPLICATION OF T.O.D TARIFF TO B-3, B-4 INDUSTRIAL
79 METERING 08-07-99 7/8/1999 23-32 1999 GMCS/DG®.F-D3
POWER CONSUMERS WHERE T.O.D METERS ARE ALREADY EXISTING
CLARIFICATION REGRADING SHARING COST OF TRANSFORMER
80 INDUSTRIAL 21-08-99 8/21/1999 1153-54 1999 GMCS/D(R&CP)58006 GM CS
SUB STATION TO TUBEWELL AND INDUSTRIAL CONNECTIONS
DOMESTIC CONNECTIONS FOR DERAS FROM TUBEWELL
81 TUBE WELL 21-08-99 8/21/1999 1141 1999 GMCS/D(R&CP)55717 GM CS
TRANSFORMERS
82 METERING 02-09-99 9/2/1999 10699 1999 CEO LESCO INSTALLATION OF TOD METERS ON STEEL MELTING FURNACES
APPLICATION FO T.O.D TARIFF TO B-3, B-4 INDUSTRIAL
83 METERING 13-09-99 9/13/1999 780-87 1999 GMCS/TARIFF/T-101 GM CS
CONSUMERS
84 INDUSTRIAL 24-09-99 9/24/1999 13335-47 1999 GMCS/D(R&CP)57000 GM CS INCENTIVE POLICY FOR REVIVAL OF STEEL MELTING INDUSTRY

85 REDUCTION 29-09-99 9/29/1999 1352 1999 GMCS/D(R&CP)58072 GM CS REDUCTION OF LOAD


M(P)/GMCS/ MEMBER
86 RCO 11-10-99 10/11/1999 1357-74 1999
D(R&CP)59026 POWER RECONNECTION POLICY (FINAL)
87 TUBE WELL 16-10-99 1403-20 1999 GMCS/DGC/55717 GM CS SOP TO TUBEWELL CONNECTIONS

88 GENERAL 22-10-99 10/22/1999 1422-30 1999 GMCS/D(R&CP)57000 GM CS MINUTES OF CHARIRMANS CONFERENCE ON 22-23 SEP 1999
M(P)/GMCS/
89 INDUSTRIAL 17-11-99 11/17/1999 1517-40 1999 GM CS INCENTIVE PAKAGE FOR INDUSTRIES
D(R&CP)57000
M(P)/GMCS/ MEMBER
90 INDUSTRIAL 02-12-99 12/2/1999 1628-70 1999 INCENTIVE PAKAGE FOR INDUSTRIES
D(R&CP)57000 POWER
RELIEF PAKAGE TO PRIVATE AGRICULTURAL TUBEWELL
91 TUBE WELL 21-12-99 12/21/1999 1732-65 1999 GMCS/D(R&CP)55717 GM CS
CONSUMERS
PREPARETION OF CORRECT ESTIMATE FOR PROVIDING SUPPLY
92 ESTIMATE 24-12-99 12/24/1999 1915 1999 DY.C/GMCS/DCS GM CS
TO THE PROSPECTIVE CONSMERS
93 ESTIMATE 28-12-99 9339-45 1999 GMO/DHQ/44 GM O OFFICE ORDER REGARDING INSTALLATION CHARGES

94 TUBE WELL 30-12-99 1139-55 1999 GMO/BS/B-I VOL-II GM O SOP TO TUBEWELL CONNECTIONS 50% BY INSTALLMENT

95 GENERAL 17-01-00 1/17/2000 78-89 2000 GMCS/DGC/DCSO/769 GM CS CHANGE OF CONSUMERS NAME ON ELECTRICITY BILL
M(P)/GMCS/D(R&CP)/AM-
96 INDUSTRIAL 01-03-00 3/1/2000 206-42 2000 GM CS INCENTIVE PACKAGE FOR INDUSTRIES
357000
GMCS/DD(R&CP).AM- RELIEF PACKAGE TO PRIVATE AGRICULTURAL TUBE WELL
97 TUBE WELL 01-03-00 3/1/2000 280-316 2000 GM CS
2/55717 CONSUMERS
OFFICE ORDER REGARDING INSTALLATION CHARGES FINAL
98 ESTIMATE 07-03-00 3/7/2000 1057-78 2000 GMO/DHQ/44-A GM O (DISMENTALMEN CHARGES 5% & RE-USE
CHARGES 15%)
99 GENERAL 13-03-00 3/13/2000 1113-21 2000 WE/GMCS/DGC/DCA/D-24 GM CS SURVEY/REGULARIZATION OF UN AUTHORISED EXTENDED LOAD

100 METERING 06-04-00 4/6/2000 906-25 2000 GMCS/DG/EM/R)F-03 GM CS FUNCTIONING OF T.O.U/T.O.D METERS

101 GENERAL 18-04-00 4/18/2000 8337-45 2000 CE/DRS/1573 CEO LESCO STANDING COMMITTEES
102 METERING 04-05-00 5/4/2000 8352-60 2000 CRG/435 CEO LESCO FUNCTIONING OF T.O.U/T.O.D METERS
PUTTING OF DDITIONAL LOAD ON UNDER LOADED EXCLUSIVE
103 INDUSTRIAL 30-05-00 5/30/2000 2802-2804 2000 GMO/DHQ/F GM O
FEEDERS
PUTTING OF DDITIONAL LOAD ON UNDER LOADED EXCLUSIVE
104 INDUSTRIAL 06-06-00 6/6/2000 64585 2000 CEO LESCO
FEEDERS
SECRETARY MINUTES OF MEETING HELD ON 20-06-2000 (CAPITAL COST
107 GENERAL 20-06-00 7/6/2000 2447-2487 2000 S/AD(CORD)03003/MTG
WAPDA INSTALLEMENT WITH MARKUP)
COMETENCY FOR SANCTIONING OF INDUSTRIAL CONNECITONS
105 INDUSTRIAL 29-06-00 68244-60 2000 DRW/24/ CEO LESCO
UNDER TARIFF B-2
RELIEF PACKAGE TO PRIVATE AGRICULTURAL TUBE WELL
106 TUBE WELL 04-07-00 7/4/2000 15309-14 2000 CRG/402 CEO LESCO
CONSUMERS
SECRETARY RELIEF PACKAGE TO PRIVATE AGRICULTURAL TUBE WELL
108 TUBE WELL 07-07-00 7/7/2000 3168-90 2000 GMO/R&CP
WAPDA CONSUMERS
109 TUBE WELL 11-07-00 118-27 2000 GMCS/DD(R&CP)55717 GM CS SANCTION OF NEW TUBEWELL CONNECTIONS

110 RCO 20-07-00 7/20/2000 735-41 2000 GMCS/DD(R&CP).59026 GM CS PROPOSAL FOR REDUCTION IN RECONNECTION FEES
RELIEF PACKAGE TO PRIVATE AGRICULTURAL TUBE WELL
111 TUBE WELL 27-07-00 7/27/2000 4440-51 2000 DRW CEO LESCO CONSUMERS-REFUND OF CAPITAL COST AND SECURITY
AMOUNT
REGIONAL MANAGER APPROVAL OF TESTING CHARGES OF EQUIPMENT PURCHASED
112 METERING 27-07-00 7/27/2000 3062 2000 CEO LESCO
M&T BY CONSUMER
113 RCO 16-08-00 8/16/2000 4236-44 2000 GMO/CEHQ/DHQ GM O RECONNECTION ORDER AND FEE

114 GENERAL 25-08-00 8/25/2000 841-52 2000 GMCS/D(R&CP)57000 GM CS PROMOTION OF SALE OF SURPLUS POWER

115 INDUSTRIAL 25-08-00 8/25/2000 863-80 2000 DD(R&CP)55716 GM CS SUPPLY OF POWER THROUGH 11 & 33 KV FEEDERS
GMCS/DD(R&CP).AM-
116 INDUSTRIAL 25-08-00 8/25/2000 881-902 2000 GM CS INCENTIVE PACKAGE FOR INDUSTRIES
4/57000
GMCS/DD(R&CP).AM-
117 GENERAL 05-09-00 9/5/2000 917-38 2000 GM CS ELECTRIC WIRING TEST REPORT
1/55732
118 GENERAL 08-09-00 9/8/2000 768-82 2000 GMO/PA GM O SALE OF POWER BY SPP,S
SUPPLY OF POWER THROUGH 11 & 33 KV FEEDERS (for inspection
119 INDUSTRIAL 09-09-00 9/9/2000 11932 2000 DRW CEO LESCO
of 3rd metering panel link GM No,1227-48 dt. 19-3-01))
120 REDUCTION 14-09-00 9/14/2000 939-48 2000 GMCS/DD(R&CP)59080 GM CS REDUCTION OF LOAD

121 INDUSTRIAL 03-10-00 10/3/2000 19353-56 2000 DRW/491/CAEB CEO LESCO SUPPLY OF POWER THROUGH 11 & 33 KV FEEDERS

COMETENCY FOR SANCTIONING OF INDUSTRIAL CONNECITONS


122 INDUSTRIAL 23-11-00 139 2000 GMCS/DCA/D-177 GM CS UNDER TARIFF B-2 ( 71 to 500 KW WITH LATTER
NO.68244-60/DRW/124)

123 GENERAL 22-11-00 11/22/2000 1083 2000 GMCS/DD(R&CP)58004 GM CS CHANGE OF NAME

124 INDUSTRIAL 12-12-00 12/12/2000 1102-18 2000 GMCS/DD(R&CP)59026 GM CS INCENTIVE PACKAGE FOR CONSUMERS DRAWING FROM SPP
CLARIFICATION REGARDING NON CHARGING OF SHARING COST
125 INDUSTRIAL 19-12-00 12/19/2000 32128-34 2000 DRW505 CEO LESCO
OF SYSTEM FROM INDUSTRIAL CONSUMERS UP 10 KW
126 INDUSTRIAL 13-01-01 1/13/2001 91 2001 GMO/DDV/51 GM O SUPPLY OF POWER THROUGH 11 & 33 KV FEEDERS

127 SECURITY 13-03-01 3/13/2001 128-149 2001 GMCS/DD(R&CP)58004 GM CS UPDATION OF SECURITY FOR EOL (FINAL) DEPOSIT N
EOL CASES
CALRIFICATION REGARDING NON CHARGING OF SHARING COST
INDUSTRIAL 27-03-01 48462-68 2001 DRW/505/LESCO CEO LESCO
SYSTUM FROM INDUSTRIAL CONSUMERS UPTO 10 KW LOAD
SUPPLY OF POWER THROUGH 11 & 33 KV FEEDERS ( in response
GM(O)/DHQ/R&CP-
128 INDUSTRIAL 19-03-01 3/19/2001 1227-48 2001 GM O of CE LESCO No. 11932 dt. 9-9-2000 for 3rd Metering panel which on
55716/VOL-III
consumer end for inspection)
POLICY FOR SHIFTING OF INDUSTRIAL AND TUBE WELL
129 SHIFTING 30-03-01 3/30/2001 190-210 2001 GM(O)/DHQ/R&CP-55717 GM O
CONNECTIONS (FINAL GENERAL & IND )
REFUND OF CAPITAL COST AND MINUTS OF MEETING HELD IN
130 GENERAL 20-04-01 4/20/2001 51995-52013 2001 SECY/LESCO CEO LESCO
CEO LESCO OFFICE ON 9-10-2000
TRANSFORM
131 05-05-01 5/3/2001 20271-76 2001 MGR MM CEO LESCO COST OF RECLAIMED TRANSFORMER 70% COST OF NEW T/F
ER
132 INDUSTRIAL 10-05-01 5/10/2001 903-10 2001 GMO/DDP GM O REGULARIZATION OF UNAUTHORISED EOL
TRANSFORM
133 14-06-01 6/14/2001 2864-75 2001 GMO/DHQ/DDV/35-3 GM O INSTALLATION OF RECLAIMED/OLD TRANSFORMER
ER
CE DESIGN SUPPLY OF POWER TO ARC FURNACES IN THE NAME OF ISHTIAQ
134 INDUSTRIAL 28-06-01 6/28/2001 15820 2001 CEDES/NTDE/DGS
NTDC STEEL INDUSTRY

SUPPLY OF POWER SOP THROUGH 11/33 KV FEEDERS (ABOVE


135 INDUSTRIAL 11-07-01 7/11/2001 495-515 2001
M(P) MEMBER 1000-KW INDEPENDENT FEEDER & GROUPED FEEDER
GMCS/DD/R&CP/55710 POWER & REFUND FROM INDEPENDENT GROUPED FEEDER)
SEE No.11398-412 dt.9-8-03
MDP/GMCS/ NOC FROM OWNER OF THE PREMISES FOR EXTENSION IN LOAD
136 INDUSTRIAL 06-08-01 393-424 2001 MD POWER
DD(R&CP)59153 APPLIED BY OCCUPIER
GMCS/DD(R&CP).AM-
137 TUBE WELL 04-09-01 624-43 2001 GM CS SOP TO TUBEWELL CONNECTIONS FIXATION OF PRIORITY
5/55717
GMCS/DD(R&CP).AM- APPLICATION OF X-Y FORMULA ON INDUSTRIAL CONNECTIONS
138 INDUSTRIAL 12-09-01 672 2001 GM CS
5/55716 HAVING LOAD LESS THAN 500 KW UNDER TARIFF B-2
GMCS/DD(R&CP).AM-
139 INDUSTRIAL 19-09-01 9/19/2001 677-97 2001 GM CS INCENTIVE PAKAGE FOR INDUSTRIES
5/57000
GMCS/
140 SECURITY 10-11-01 11/10/2001 978 2001 GM CS NON REFUND OF SECURITY DEPOSIT
DD(R&CP).WRT321-LHR
141 GENERAL 29-12-01 12/29/2001 912-932 2001 GMCS /TARIFF/T-150 GM CS REVISED ELECTRICITY TARIFFS
GMCS/DGC/
142 INDUSTRIAL 15-02-02 2/15/2002 162-83 2002 GM CS INCENTIVE PACKAGE FOR INDSUTRIES 2002
D(R&CP)AM.6/57000
SECRETARY
143 TUBE WELL 09-04-02 4/9/2002 1759-80 2002 GMCS/TARIFF/T-143-II RELIEF PAKAGE FOR AGRICULTURAL TUBEWELL
WAPDA
REVISED INSTALLATION CHARGES FINAL (8%
144 ESTIMATE 01-07-02 7/1/2002 6555-71 2002 GMO/CEHQ/6-B/DISCOS GM O
INSTALLATION CHARGES)
145 GENERAL 01-08-02 8/1/2002 2877-81 2002 NEPRA/LIC-207/LESCO NEPRA GRANT OF DISTRIBUTION LICENCE TO LESCO
TRANSFORM GMCS/DGC/D(R&CP) CONNECTION FROM MANDATORY INDEPENDENT
146 26-09-02 1942-62 2002 GM CS
ER 58006 TRANSFORMERS
LUMPSUM CHARGES FRO NEW GENERAL CONNECTIONS UNDER
147 GENERAL 12-11-02 11/12/2002 13195-14008 2002 GMO/CEHQ/6-B/DISCOS GM O
TARIFF A-1 AND A-2
SECRETARY
148 GENERAL 11-01-03 1/11/2003 2206-12 2003 MINUTES OF AUTHORTIY MEETING HELD ON 1,2,3 JAN 2003
WAPDA
149 THEFT 20-01-03 1/20/2003 608-19 2003 GMO/CEHQ/6-B/DISCOS GM O POWER LINE 11 KV THEFT
DIRECTOR
150 THEFT 27-01-03 1/27/2003 6835-38 2003 LA-248/2001 RECOVERY OF STOLEN MATERIAL THROUGH ELECTRICITY BILL
LAW
GMCS/DGC/
151 INDUSTRIAL 01-02-03 2/1/2003 161-82 2003 GM CS INCENTIVE PACKAGE FOR INDSUTRIES 2003
D(R&CP)AM.7/57000
PAYMENT OF DEMAND NOTICE FOR NEW CONNECTIONS FOR
SECURITY 14-02-03 17882-88 2003 CE/PA CEO LESCO
PROSPECTIVE CONSUMERS
152 GENERAL 20-03-03 3/20/2003 25225 2003 GMO/CEHQ GM O LUMPSUM CHARGES FOR NGSC UNDER TARIFF A-1, A-2
STANDARD DRAWINGS OF SERVICE CONNECTION OF SINGLE
153 METERING 29-03-03 3/29/2003 702-10 2003 CEDE/DDE CE DISTT ENG
PHASE AND THREE PHASE METERS
SECY/LESCO/GMCS/D/ SECRETARY
154 INDUSTRIAL 09-06-03 6/9/2003 892-912 2003 EXEMPTION OF ELECTRIC WIRING TEST REPORT
(R&CP) WAPDA
PSO TO
155 GENERAL 23-07-03 7/23/2003 2105-54 2003 ACC/2003/17 MINUTES OF CHAIRMAN CONFERENCE OF CEO 2003
CHAIRMAN
GMCS/DGC/
156 GENERAL 22-07-03 7/22/2003 1209-31 2003 GM CS INCENTIVE PACKAGE FOR SPP CONSUMERS
D(R&CP)57000
FEEDER REHABLITAION COST RECOVERABLE FROM INDUSTRIAL
157 INDUSTRIAL 09-08-03 8/9/2003 11398-412 2003 GMO/CEHQ/STAT-106 GM O CONSUMER (ABOVE 1000-KW INDEPENDENT FEEDER WITH
ATTECHED No.495-515 dt. 11-7-01
DETERMINATION OF APPROPRIATE T/F CAPACITY FOR
TRANSFORM
158 12-08-03 8/12/2003 73535-44 2003 MARKETING CEO LESCO APPLIED /EXTENDED LOAD ( INDUSTRIAL CONNECTION GIVEN ON
ER
100% LOADING OF TRANSFORMER) )
OFFICE ORDER REGARDING SHIFTING OF
159 SHIFTING 15-08-03 8/15/2003 11787-95 2003 GMO/CEHQ/DHO/44-A GM O
TANSFORMER WISE CHARGES (FINAL)
160 GENERAL 23-08-03 8/23/2003 2616-25 2003 CAEB/P&E CEO LESCO UTILIZATION OF DISMENTALED STRUCTURE
GMCS/DGC/ SOP AT 400/230 VOLTS TO THE INDUSTRIAL AND TUBEWELL
161 INDUSTRIAL 09-09-03 9/9/2003 1476-98 2003 GM CS
D(R&CP)58006 CONNECTIONS (SHARING COST OF T/F)
COMPALAINT REGARDING NON INSTALLATION OF 2ND NEW
162 GENERAL 12-09-03 9/12/2003 82842-47 2003 CEO LESCO
CONNECTION AT ONE PREMISES
TRANSFORM
163 07-10-03 10/7/2003 14561-71 2003 GMO/CEHQ/6-B/DISCOS GM O PROVISION OF OWN TRANSFORMER
ER
164 RCO 09-10-03 10/18/2003 90922-33 2003 CEO LESCO RECONNECTION OF DISCONNECTED CONNECTIONS
IMPLEMENTATION OF PUNCTIONAL SCHEMATIC UNDER PEPCO
165 GENERAL 13-11-03 11/13/2003 95553-603 2003 CEO LESCO
ORGANOGRAM
CLARIFICATION REGARDING APPLICABILLITY OF GST TO
166 GENERAL 08-12-03 12/8/2003 4076-85 2003 GMCS/DGC/DCAC A-319 GM CS
RECLAMATION AND DRAINAGE SCHEME TUBEWELLS
GMCS/DGC/
167 SHIFTING 18-12-03 12/18/2003 2327 2003 GM CS SHIFTING OF INDUSTRIAL CONNECTION
D(R&CP)55717
GMCS/DGC/ SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBEWELL
168 INDUSTRIAL 22-01-04 1/22/2004 105-270 2004 GM CS
D(R&CP)58006 CONNECTION SHARING COST OF TRANSFORMER
GMCS/DGC/ REDUCTION OF LOAD OF INDUSTRIES SWITCHING OVER TO SELF
169 Fdouble 26-01-04 1/26/2004 163-70 2004 GM CS
D(R&CP)59070 GENERATION
UPDATION OF SECURITY ON ACCOUNT OF CHANGE OF
NAME/TARIFF OF DRINKING WATER SUPPLY SCHEME(Conversion
170 SECURITY 07-02-04 2/7/2004 201-210 2004 GMCS/TARIFF/G-226 GM CS
to A2(b) in respect of existing connection should be treated as a regular
change of tariff and all

171 GENERAL 07-02-04 2/7/2004 192-200 2004 GMCS/TARIFF/T-6 GM CS CLARIFICATION REGARDING TARIFF A2(b)
MONITORING OF ALL NGSC UNDER TARIFF B-III B-IV C-2 C-1 EOL
172 GENERAL 25-02-04 2/25/2004 11724-29 2004 CEO LESCO ROL CON ELECTRIFICATION OF HOUSIGN SCHEME AND MULTI
STORY BUILDINGS
GRACE PERIOD FOR PAYMENT OF DEMAND NOTICE OF CAPITAL
173 GENERAL 04-03-04 3/4/2004 12204-09 2004 DRW CEO LESCO
COST AND SECURITY
RECOVERY OF COST OF TRANSFORMER DAMAGED FOR
TRANSFORM
174 30-03-04 747-57 2004 GMO/STAT-147 GM O CONSUMER WHO PAY COST OF TRANSFORMER WHEN THEIR
ER
CONNECTION IS SANCTION/INSTALLED
SOP AT 400/230 VOLTS TO GENERAL INDUSTRIAL AND TUBE
GMCS/DGC/
175 INDUSTRIAL 14-04-04 4/14/2004 690-712 2004 GM CS WELL CONNECTION SHARING COST OF TRANSFORMER (Aug: of
D(R&CP)58006
T/F not allowed to avoid L.T Line in Field to avoid theft of energy)

176 METERING 12-05-04 5/12/2004 14804 2004 215-IST CEO LESCO COST OF BACKUP METERS INSTALLED ALONGWITH TOU METERS
FEEDER REHABLITAION COST RECOVERABLE FROM INDUSTRIAL
177 INDUSTRIAL 18-05-04 5/18/2004 957-67 2004 GMO/STAT-153 GM O
CONSUMER
TRANSFORM
178 21-05-04 5/21/2004 15167 2004 SM (P&D) CEO LESCO REPAIR OF T/F IN STATE ENTERPRISES HOUSING SCHEME
ER
RELIEF PACKAGE FOR NEW CONNECTIONS TO B-I CONSUMERS
179 INDUSTRIAL 10-06-04 6/10/2004 3998-401 2004 GMCS/DGC/DCAD/C-92 GM CS (INSTALLEMENT 6- NOS
UPTO 40 KW
CAPITAL COST)FINAL
GMCS/DGC/D(R&CP)/
180 METERING 23-06-04 6/23/2004 200-08 2004 GM CS COST OF BACKUP METERS INSTALLED ALONGWITH TOU METERS
58004
181 INDUSTRIAL 30-06-04 6/30/2004 37629-41 2004 PA/M&T CEO LESCO CEO VISIT TO M&T OFFICES
DISMENTALEMENT OF CPPER CONDUCTOR AGAINST H.T
182 GENERAL 06-07-04 7/6/2004 211-34 2004 SM (P&D) CEO LESCO
PROPOSALS
INSTALLATION OF PLANE 3-PHASE METER INSTEAD OF TOU
183 METERING 07-07-04 7/7/2004 301 2004 CAEB/DRW/1575 CEO LESCO
METERS AS TIME GAP ARRANGMENT
GMCS/DD(R&CP).AM-
184 INDUSTRIAL 09-07-04 7/9/2004 251-73 2004 GM CS INCENTIVE PAKAGE FOR INDUSTRIES
9/57000
TESTING INSPECTION OF 11 KV METERING PANELS (PRIVATE
185 INDUSTRIAL 21-07-04 7/21/2004 3103-06 2004 MANAGER M&T WEST CEO LESCO
PURCHASE OF CONSUMER METERING PANEL)
RECOVERY OF ARREARS FROM PERMANENTLY DISCONNECTED
186 RCO 05-08-04 8/5/2004 385-415 2004 GMCS/DGC/(R&CP).55721 GM CS
CONSUMERS
FEEDER REHABLITAION COST RECOVERABLE FROM INDUSTRIAL
187 INDUSTRIAL 07-08-04 8/7/2004 1334-41 2004 GMO/STAT-153 GM O
CONSUMER UPTO 1000 KW
188 INDUSTRIAL 13-08-04 5624-27 2004 GMCS/DGC/(R&CP).55721 GM CS OFFICE ORDER REGARDING COMPETENCY OF B-II CONNECTION
TRANSFORM
189 18-10-04 10/18/2004 9413-19 2004 GMO/CEHQ/MC GM O ISSUAE OF RECLAIMED TRANSFORMER ON HIGHER RATES
ER
TRANSFORM DG CONNECTION FROM MANDATORY INDEPENDENT
190 05-11-04 668 2004 DGC/DD(R&CP) 58006
ER COMMERCIAL TRANSFORMERS

PROCEDURE FOR CERTIFICATION OF DEPOSIT WORK


COMPLETED BY CONSTRUCTION DIVISIONS (FINAL)
76 COMMITTEE 16-12-04 12/16/2004 6858-66 2004 CAEB/DRW/P-III CEO LESCO COMMITTEE Shifting Line, Construction of lines for new
conn:, B-3 New / EOL housing scheme (Private
Execution / LESCO EXECUTION)
REDUCTION OF LOAD OF INDUSTRIES SWITCHING OVER TO SELF
191 REDUCTION 02-02-05 2/3/2005 114-39 2005 DGC/R&CP/59070 GM CS GENERATION (Submitted before June 30,2005 in orer to take from july
01, 2005)(FINAL) NOT FEED FOR EOL
BAN ON ISSUANCE OF DEMAND NOTICE TO PRIVATE
192 TUBE WELL 19-03-05 3/19/2005 257-69 2005 GMO/STAT-147 GM O
AGRICULTURAL TUBE WELL
LUMPSUM CHARGES FOR NEW GENERAL CONNECTIONS UNDER
193 GENERAL 02-03-05 3/2/2005 2931 2005 DRW/CAEB CEO LESCO
TARIFF A-1 & A-2 IN PLAZAS
PSO TO
194 GENERAL 01-04-05 4/1/2005 5961-6010 2005 PSO/C/2005/17 MINUTES OF CHAIRMAN CONFERENCE OF CEO 2005
CHAIRMAN
195 REDUCTION 02-04-05 4/2/2005 4505-08 2005 DRW/278/SKP CEO LESCO REDUCTION OF LOAD OF M/S TAHA SPINNING
PRICE BULLETIN OF STORE MATERIAL AVAILABLE IN REGIONAL
196 GENERAL 05-04-05 4/5/2005 412-416 2005 RM STORE SHALAMAR CEO LESCO
STORE SHALAMAR LHR
DG POLICY FOR SHIFTING OF INDUSTRIAL AND TUBE WELL
197 SHIFTING 10-05-05 5/10/2005 271-92 2005 DGC/DD (R&CP) /55717
COMMERCIAL CONNECTIONS (FINAL)
GM (C&M)
198 TUBE WELL 16-05-05 5/16/2005 813-21 2005 GM (C&M) CEO-STAT-147 AGRICULTURAL TUBEWELL CONNECTIONS
POWER
DG
199 SECURITY 24-05-05 5/24/2005 288-307 2005 DGC/TARIFF/G-226 CLARIFICATION REGARDING SECURITY DEPOSITS
COMMERCIAL
MINISTRY OF
200 GENERAL 03-06-05 6/3/2005 2005 SELF POWER GENERATION TO INDUSTRIES
W&P
DG
201 INDUSTRIAL 30-06-05 6/20/2005 3690 2005 DGC/DD(R&CP).59070 ROL OF INDUSTRIES SWITCHING OVER TO SELF GENERATION
COMMERCIAL
DG POLICY FOR SHIFTING OF INDUSTRIAL AND TUBE WELL
202 SHIFTING 06-07-05 7/6/2005 408-16 2005 DGC/DD (R&CP) /55717
COMMERCIAL CONNECTIONS
DG
203 INDUSTRIAL 07-07-05 7/7/2005 417-45 2005 DGC/DD(R&CP).57000 INCENTIVE PAKAGE FOR INDUSTRIES
COMMERCIAL
DG RECOVERY OF ARREARS FROM PERMANENTLY DISCONNECTED
204 RCO 14-07-05 7/14/2005 483-512 2005 DGC/DD(R&CP).55721
COMMERCIAL CONSUMERS
INCORPORATION OF TESTING CHARGES OF M& T IN THE
205 INDUSTRIAL 26-07-05 7/26/2005 1293-94 2005 DRW/51/LESCO CEO LESCO
ESTIMATE OF NEW CONNECTION/EOL UNDER TARIFF B-III
DG REDUCTION OF LOAD OF INDUSTRIES SWITCHING OVER TO SELF
206 REDUCTION 30-07-05 7/30/2005 529 2005 DGC/DD(R&CP).59070
COMMERCIAL GENERATION
TRANSFORM DG SOP AT 400/230 VOLTS TO THE INDUSTRIAL AND TUBEWELL
207 30-07-05 531-52 2005 DGC/DD(R&CP).58006
ER COMMERCIAL CONNECTIONS (SHARING COST OF T/F)
GMCS/DGC/
208 INDUSTRIAL 29-09-05 652-80 2005 GM CS INCENTIVE PAKAGE FOR SPP CONSUMERS
DD(R&CP).57000SPP
DG RECOVERY OF ARREARS FROM PERMANENTLY DISCONNECTED
209 RCO 21-12-05 886-98 2005 DGC/DD(R&CP).55721
COMMERCIAL CONSUMERS
DG RECOVERY OF ARREARS FROM PERMANENTLY DISCONNECTED
210 RCO 27-12-05 12/27/2005 908-37 2005 DGC/DD(R&CP).55721
COMMERCIAL CONSUMERS
DG
211 INDUSTRIAL 31-12-05 12/31/2005 948-75 2005 DGC/DD(R&CP).57000 INCENTIVE PAKAGE FOR INDUSTRIES
COMMERCIAL

PAYMENT OF SECURITY DEPOSIT THROUGH INSTALLMENT IN


NEW CONNECTIONS REGARDING INDSTURIAL TARIFF B-2 & B-3
212 SECURITY 15-02-06 2/15/2006 859-85 2006 GMCS/DGC/DCAD/C-153 GM CS
( 1st 50% CONNECTION WILL BE INSTALLED BEFORE
PAYMENT than 6-equal )
SOP AT 400/230 VOLTS TO THE INDUSTRIAL AND TUBEWELL
DG CONNECTIONS (SHARING COST OF T/F) Tubewell connection should
213 TUBE WELL 11-03-06 3/11/2006 132-45 2006 DGC/DD(R&CP) 58006
COMMERCIAL not be granted from the transformer meant for electrification of
village/dera. FINAL

214 GENERAL 18-03-06 3/18/2006 4891-4949 2006 PEPCO/TECH. DIR/74 TECH DIR POWER FOR WRITE OFF OF LOSSES
PAYMENT OF SECURITY DEPOSIT THROUGH INSTALLMENT IN
215 SECURITY 31-05-06 5/31/2006 2756-58 2006 GMCS/DGC/DCAD/C-153 GM CS
NEW CONNECTIONS REGARDING INDSTURIAL TARIFF B-2 & B-3
REGULARIZATION OF 233 NOS DOMESTIC AND 02 NOS
216 GENERAL 28-06-06 6/28/2006 2398--400 2006 DRW/741-LESCO CEO LESCO
COMMERCIAL CONNECTION IN DHA-V

217 GENERAL 25-07-06 7/25/2006 8226 2006 AD© DCO PROVISION OF ELECTIRICITY

RECOVERY OF CAPITAL COST FROM NEW INDUSTRIAL B-I AND


218 INDUSTRIAL 10-10-06 3056 2006 MC/DCM CEO MEPCO
DOMESTIC CONSUMERS THROUGH INSTALLMENT

TRANSFORM SOP STANDARD OPERATING PROCEDURE FOR REPLACEMENT


08-11-96 65527-34 2006 OD-28 CEO LESCO
ER OF DEFECTIVE/DAMAGED TRANSFORMERS
SOP AT 400/230 VOLTS TO THE INDUSTRIAL AND TUBEWELL
TRANSFORM DG CONNECTIONS (Industrial Connection given 10-HP
219 21-11-06 11/21/2006 698-706 2006 DGC/DD (R&CP) /58006
ER COMMERCIAL
on installed T/F )
DG RECOVERY OF OUTSTANDING AMOUNT FROM PERMANENT
220 RCO 18-12-06 7389-7403 2006 DGC/DCAC/C-203
COMMERCIAL DISCONNECTED CONSUMERS
DG RECOVERY OF CAPITAL COST FROM NEW INDUSTRIAL B-I AND
221 INDUSTRIAL 26-12-06 7530-36 2006 DGC/DCAC/C-153
COMMERCIAL DOMESTIC CONSUMERS THROUGH INSTALLMENT
DG RECOVERY OF ARREARS FROM PERMANENTLY DISCONNECTED
222 RCO 30-12-06 839-66 2006 DGC/DD (R&CP) /55721
COMMERCIAL CONSUMERS
DG
223 INDUSTRIAL 30-12-06 783-810 2006 DGC/DD (R&CP) /57000 INCENTIVE PAKAGE FOR INDUSTRIES
COMMERCIAL
DGC/DD (R&CP) DG
224 INDUSTRIAL 30-12-06 811-38 2006 INCENTIVE PAKAGE FOR SPPS CONSUMER
/57000/SPP COMMERCIAL
RECOVERY OF CAPITAL COST FROM NEW INDUSTRIAL B-I AND
225 INDUSTRIAL 20-01-07 4166 2007 CRG-72/MAIN CEO LESCO
DOMESTIC CONSUMERS THROUGH INSTALLMENT
226 INDUSTRIAL 19-05-07 5593-5600 2007 GM(M&S) GM M&S PROVISION OF MORE THAN CONNECTION IN SAME PREMISES
CHARGING OF CONSULTANCY CHARGES OF M/S BARQAAB IN
227 INDUSTRIAL 29-05-07 5/29/2007 30250-60 2007 DRW/505/LESCO CEO LESCO
THE ESTIMATE OF DEPOSIT WORKS
GMCS/DGC/ DG
228 INDUSTRIAL 30-06-07 6/30/2007 264-93 2007 INCENTIVE PAKAGE FOR INDUSTRIES
DD(R&CP).57000 COMMERCIAL
APPROVAL OF SAFE CARRIAGE /ERECTION MAKING OF
229 GENERAL 13-07-07 7/13/2007 1264-69 2007 PDC CEO LESCO
FOUNDATIONS CONCRETING OF STEEL STRUCTURE
TRANSFORM
230 14-07-07 7/14/2007 1227-42 2007 MGR MM CEO LESCO ISSUANCE OF 400/630 KVA T/F
ER
ENHANCEMENT OF FEEDER REHABLITAION COST RECOVERABLE
231 INDUSTRIAL 20-09-07 9/20/2007 2247-55 2007 CE(O) DHQ CE OP
FROM INDUSTRIAL CONSUMER
DG
232 SHIFTING 19-11-07 11/19/2007 334-38 2007 DGC/DD (R&CP) /55715 SHIFTING OF INDUSTRIAL TRANSFORMER
COMMERCIAL
DG CONSUMPTION OF AGRICULTURAL TUBE WELLS DURING PEAK
233 TUBE WELL 11-12-07 12/11/2007 2372-79 2007 DGC/TARIFF/T-8
COMMERCIAL HOURS
MINUTES OF 76TH MEETING OF BOD INCLUDING POINT
SECRETARY CHARGING OF COST FROM B-4 CONSUMERS (COST OF
234 GENERAL 15-12-07 12/15/2007 1647-55 2007 CS LESCO/IMPL
LESCO
POWER TRANSFORMER RS.5000000/-)
235 SECURITY 22-01-08 1/22/2008 4760-6010 2008 CRG/8-D CEO LESCO NOTIFICATION

236 SECURITY 26-01-08 1/26/2008 6327-6570 2008 CRG/8-D MAIN-II CEO LESCO NOTIFICATION-CORRIGENDUM
DG RECOVERY OF ARREARS FROM PERMANENTLY DISCONNECTED
237 RCO 28-01-08 31-40 2008 DD(R&CP)55731
COMMERCIAL CONSUMERS
DG
238 INDUSTRIAL 28-01-08 50-78 2008 DD(R&CP)55731 INCENTIVE PAKAGE FOR INDUSTRIES
COMMERCIAL
DG E &MC PROVISION OF MORE THAN CONNECTION IN SAME PREMISES
239 GENERAL 25-03-08 3/25/2008 505-17 2008 DG(EMC)/DIR(L,M) F-125
PEPCO (2nd Connection in the same primises)
DG E &MC PERMISSION FOR THE ELECTRICITY CONNECTIONS FOR VIDIO
240 GENERAL 27-05-08 5/27/2008 792-95 2008 DG(EMC)/
PEPCO SCREEN OF PUNJAB ENTERTAINMENT CO( GAURENTEE LTD
241 GENERAL 30-05-08 5/30/2008 20087 2008 DRW/129/LESCO CEO LESCO LUMPSUM CHARGES FOR NGSC UNDER TARIFF A-1, A-2
TRANSFORM ELECTRICITY CONNECTIONS FROM MANDATORY INDEPENDENT
242 13-06-08 1065-74 2008 CE(O)/STAT-187 CE OP
ER TRANSFORMER
DG
243 INDUSTRIAL 30-06-08 6/30/2008 250-279 2008 DGC/DD(R&CP).57000 INCENTIVE PAKAGE FOR INDUSTRIES
COMMERCIAL
244 GENERAL 08-08-08 8/8/2008 50859-62 2008 GM O LESCO CEO LESCO POLICY REGARDING ELECTRIC CROSSING ON RAILWAY TRACKS
TRANSFORM
245 27-08-08 8/27/2008 8238-63 2008 MGR MM CEO LESCO COST OF RECLAIMED TRANSFORMER
ER
TRANSFORM
235 30-08 9/30/2008 2976-83 2008 M&S /DDC05008/1465/08 DIR M&S REPAIR OF TRANSFORMERS
ER
236 SECURITY 12-12-08 12/12/2008 81059-65 2008 MGR CS CEO LESCO TARIFF NOTIFICATION
DG
237 INDUSTRIAL 22-12-08 12/22/2008 589-617 2008 DGC/DD(R&CP).57000 INCENTIVE PAKAGE FOR INDUSTRIES
COMMERCIAL
238 SECURITY 16-02-09 431-40 2009 CE(O)/DHQ/6-B DISCO CE OP REVISION OF SECURITY AMOUNT
INDUSTRIAL CONNECTION REGRATED BY THE APPROVAL OF
239 CHIEF EXECUTICE LESCO IN UN-ELECTRIFIED ALIA TOWN
HOUSING SCHEME SHALAMAR LAHORE
240 17-7-09 21271-72 P&D/DRW/797/3rd

You might also like